Вы находитесь на странице: 1из 4

Activity 1

Jar positioning above the transition zone

Known Factors
WOB- Desired Weight on Bit (buoyed)

JTDW - Jar Tension Drilling Weight (buoyed)=


WDJ - Weight on Drilling Jar (buoyed)
=
DC - Drill collar in air - 6 x 2 (90.6 lb/ft) =
BF - Buoyancy factor (13 lb/gal) (Table 2)
=
DJ - Drilling Jar Weight (in air)
=

40,000 lb

15,000 lb
10,000 lb
2,718 lb (eac
1.25
1,600 lb

Activity 1

Jar positioning above the transition zone

Name:
ID:

Name:
ID:

Known Factors
WOB- Desired Weight on Bit (buoyed)
=
JTDW - Jar Tension Drilling Weight (buoyed) =
WDJ - Weight on Drilling Jar (buoyed)
=
DC - Drill collar in air - 6 x 2 (90.6 lb/ft)
BF - Buoyancy factor (13 lb/gal) (Table 2)
DJ - Drilling Jar Weight (in air)

Drilling Assembly Above Drilling Jar


EQUATION (IN AIR)
LB

FT

DC

EXAMPLE

WDJ x BF

WDJ x BF
WT of DC in LB/FT

WDJ x BF
WT per 30 FT of DC

=
.
=
.

Lower Drilling Assembly (LDA)


LB =
[JTDW + WOB] (BF)

](

FT

](

[JTDW + WOB] (BF) WT of DC in LB/FT

=
=
=

=
=

DC

[JTDW + WOB] (BF) WT per 30 FT of DC

](

)
=

BIT Weight Drill Collar (BWDC)


BWDC =
DESIRED WOB (BF)

Comments/Feed back

Вам также может понравиться