Вы находитесь на странице: 1из 2

J. E. MANALO & CO., INC.

GENERAL CONTRACTOR
Bernal St. corner C. Raymundo Avenue, Rosario, Pasig City
Tel. Nos.: 641-27-96 to 98, 642-1042, 642-1036, 641-8572 Fax: 641-4850

MEMBER

PAGASA STEEL ROTATING MILL RECIRCULATING WATER RESERVOIR


Pinagbuhatan, Pasig City

SUMMARY OF CONCRETING WORKS


SEPTEMBER 2015
Class of Concrete :
Date of

Test

Average

Tested

Required

Result (psi)

(psi)

At

Strength

5,160

4,990

Matest

71% at 12 days - 3320 psi

Passed

4000psi 3/4 PCD @ 28 days

4,820

slump 5"-7"

3
Matest

95% at 28 days - 4000 psi

not yet tested

Matest

100% at 28 days - 4000 psi

not yet tested

Structure

Covered/ Location cu.m.

Pouring
04-Sep-15

Length/Station Volume Concrete Cylinder Testing

"A"

COLUMN/BEAM

Samples Taken

Date

11-Sep-15

18-Sep-15

Remarks

3
2-Oct-15

Class of Concrete :
Date of

Covered/ Location cu.m.

Pouring
19-Sep-15

Length/Station Volume Concrete Cylinder Testing

Structure

SLAB/FOOTING

Samples Taken

81

Date
26-Sep-15

"A"

Test

Average

Tested

Required

Result (psi)

(psi)

At

Strength

Matest

71% at 12 days - 3320 psi

not yet tested

Matest

95% at 28 days - 4000 psi

not yet tested

Matest

100% at 28 days - 4000 psi

not yet tested

4000psi 3/4 PCD @ 28 days

slump 5"-7"

Remarks

4
3-Oct-15

4
17-Oct-15

Prepared by:

Checked by:

Noted by:

Engr. Sharibel A. Derije


Materials Engineer
J.E. Manalo & Co., Inc.

Engr. George C. Cantor


Project-In-Charge
J.E. Manalo & Co., Inc.

____________________________
Consultant/Client's Representative