CALENDARIO VALORIZADO DE A

Entidad
Obra
Formula

:MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO


:INSTALACION DEL HUARO EN EL CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MA
:N01 INSTALACION DE HUARO

Ubicacin

:CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MARAON,DEP. HUANUCO

Contratista

: CONSORCIO ARGOS (GRUPO CONSTRUCTOR ARGOS MINERA INMOVILIARIA SAC. -CONSTRUCTORA INGENIEROS VILLA EVELYN SAC.

Item

Descripcin

01
01.01.00
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.01.08

OBRAS CIVILES
TRABAJOS PROVISIONALES

01.02.00
01.02.01
01.02.02

TRABAJOS PRELIMINARES

01.03.00
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06

SEGURIDAD Y SALUD

01.04.00
01.04.01

FLETE TERRESTRE

01.05.00
01.05.01
01.05.02
01.05.03
01.05.04

MOVIMIENTO DE TIERRAS

01.06.00
01.06.01

OBRAS DE CONCRETO SIMPLE

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS


ACONDICIONAMIENTO DE ACCESO
ALMACEN DE OBRA (A=30 m2)
CASETA DE OBRA (A=12m2)
CASETA DE GUARDIAN (A=2m2)
CERCO PROVISIONAL DE OBRA
SUMINISTRO E INSTALACION DE LETRINA
CARTEL DE OBRA 3.60x7.20(INC.INSTALACION)

TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL

PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO


EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACIONN TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
CONTINGENCIA ANTE EMERGENCIA EN OBRA

FLETE TERRESTRE

CORTE EN MATERIALSUELTO MANUAL


EXCVACION MANUAL EN TERRENO NATURAL
RELLENO EN TERRAPLEN
BASE DE AFIRMADO PARA LOSA H=0.15m

SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

01.07.00
01.07.01
01.07.01.01
01.07.01.02

OBRAS DE CONCRETO ARMADO

01.07.02
01.07.02.01
01.07.02.02
01.07.02.03

CAMARAS DE ANCLAJE

Unidad

Metrado

GLB
M
M2
M2
M2
M
UND
UND

1.00
26.90
30.00
12.00
2.00
152.80
1.00
1.00

M2
M2

88.11
88.11

GLB
MES
GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00
1.00
1.00

GLB

1.00

M3
M3
M3
M2

12.30
37.04
301.77
37.68

M2

5.52

M3
KG

2.76
133.76

M3
KG
M

27.54
89.16
17.52

ZAPATAS
ZAPATAS-CONCRETO f'c=210 kg/cm2
ZAPATAS.- ACERO Fy=4200 kg/cm2

CONCRETO F`C=210 KG/CM2


MACIZO BARRA DE ACERO D=2"
BARRA DE CONEXIN MACIZO-CABLE

01.07.03
01.07.03.01
01.07.03.02
01.07.03.03

COLUMNAS

01.07.04
01.07.04.01
01.07.04.02
01.07.04.03

VIGAS

01.07.05
01.07.05.01
01.07.05.02
01.07.05.03

LOSA MACIZA DE PISO (E=0.15m)

01.07.06
01.07.06.01
01.07.06.02
01.07.06.03

SARDINELES

01.07.07
01.07.07.01
01.07.07.02
01.07.07.03

GRADAS

01.08.00
01.08.01
01.08.02
01.08.02
01.08.03

COLUMNAS CONCRETO F`C=210 KG/CM2


COLUMNAS ENCOFRADO Y DESENCOFRADO
COLUMNAS ACERO FY=4200 KG/CM2

CONCRETO F`C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO
ACERO FY=4200 KG/CM2

CONCRETO F`C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO
ACERO FY=4200 KG/CM2

CONCRETO F`C=210 KG/CM2


ENCOFRADO Y DESENCOFRADO
ACERO FY=4200 KG/CM2

GRADAS CONCRETO F`C=210 KG/CM2


GRADAS ENCOFRADO Y DESENCOFRADO
GRADAS ACERO FY=4200 KG/CM2

M3
M2
KG

2.23
23.81
311.69

M3
M2
KG

0.14
2.84
29.76

M3
M2
KG

5.66
9.60
165.60

M3
M2
KG

1.16
15.34
20.04

M3
M2
KG

1.80
10.58
30.21

M2
M2
M2
M2

31.92
8.24
3.52
2.08

REVOQUES
ACABADO DE LOSA CEMENTO SEMIPULIDO e=2.5cm
REBEST.C/CEMENTO PULIDO PASO Y CONTRAPASO e=2.5cm
TARRAJEO DE VIGAS Y/O COLUMNAS
TARRAJEO DE SARDINELES MORTERO CA 1:4

CALENDARIO VALORIZADO DE A
Entidad
Obra
Formula

:MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO


:INSTALACION DEL HUARO EN EL CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MA
:N01 INSTALACION DE HUARO

Ubicacin

:CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MARAON,DEP. HUANUCO

Contratista

: CONSORCIO ARGOS (GRUPO CONSTRUCTOR ARGOS MINERA INMOVILIARIA SAC. -CONSTRUCTORA INGENIER

Item

Descripcin

Unidad

01.09.00
01.09.01
01.09.02

SISTEMA DE PROTECCION

01.10.00
01.10.01
01.10.02

CARPINTERIA METALICA

01.11.00
01.11.01
01.11.02
01.11.03

PRUEBAS DE CALIDAD

01.12.00
01.12.01
01.12.02

IMPACTO AMBIENTAL

01.13.00
01.13.01

PLAN DE MONITOREO ARQUEOLOGICO

IMPERMEABILIZACIN CON PINTURA ASFLTICA


JUNTA DE DITALACIN ASFLTICA CON TECNOPOR E=3/4"

BARANDA DE TUBO DE FG D=2"


PERNO DE ANCLAJE E=3/4" x 0.60m

ENSAYO A LA COMPRESION DEL CONCRETO ICL.TRASLADO.


DISEO DE MEZCLA F`C=210 KG/CM2
ENSAYO DE COMPACTACION DE SUELOS

ACONDICIONAMIENTO DE BOTADERO S/EQUIPO


SEMBRADO DE PLANTAS TIPICAS

PLAN DE MONITOREO ARQUEOLOGICO

Metrado

M2
M

20.29
5.50

M
JGO

26.69
4.00

UND
UND
UND

8.00
1.00
18.00

M2
M2

100.00
100.00

GLB

1.00

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

23.996%
10.00%

SUB-TOTAL
I.G.V.

18.00%

TOTAL PRESUPUESTO

PORCENTAJE DE AVANCE DE OBRA MENSUAL


PORCENTAJE DE AVANCE DE OBRA MENSUAL ACUMULADO

ALORIZADO DE AVANCE DE OBRA

E HUACRACHUCO, PROVINCIA DE MARAON, DEPARTAMENTO DE HUANUCO

E MARAON,DEP. HUANUCO

PLAZO 30 DIAS CALENDARIO


1ra. QUINCENA

RUCTORA INGENIEROS VILLA EVELYN SAC.

Precio

Sub-Total

15

2da. QUINCENA
16

TOTAL

30

720.00
19.52
101.14
154.03
311.68
17.46
1,510.67
1,268.46

720.00
525.09
3,034.20
1,848.36
623.36
2,667.89
1,510.67
1,268.46

360.00
525.09
3,034.20
1,848.36
623.36
2,667.89
1,510.67
1,268.46

360.00

720.00
525.09
3,034.20
1,848.36
623.36
2,667.89
1,510.67
1,268.46

1.22
1.75

107.49
154.19

64.49
154.19

43.00

107.49
154.19

1,250.00
1,905.00
700.00
450.00
1,500.00
660.00

1,250.00
1,905.00
700.00
450.00
1,500.00
660.00

625.00
952.50
350.00
225.00
750.00
330.00

625.00
952.50
350.00
225.00
750.00
330.00

1,250.00
1,905.00
700.00
450.00
1,500.00
660.00

2,089.97

2,089.97

2,089.97

2,089.97

26.75
38.23
93.84
18.81

329.03
1,416.04
28,318.10
708.76

329.03
1,416.04
19,822.67
708.76

329.03
1,416.04
28,318.10
708.76

20.45

112.88

112.88

112.88

533.27
4.75

1,471.83
635.36

1,471.83
635.36

1,471.83
635.36

534.50
7.07
140.31

14,720.13
630.36
2,458.23

14,720.13
630.36
2,458.23

14,720.13
630.36
2,458.23

8,495.43

627.52
41.78
4.75

1,399.37
994.78
1,480.53

1,399.37
994.78
1,480.53

1,399.37
994.78
1,480.53

587.64
54.26
4.75

82.27
154.10
141.36

82.27
154.10
141.36

82.27
154.10
141.36

464.81
27.98
4.75

2,630.82
268.61
786.60

2,630.82
268.61
786.60

2,630.82
268.61
786.60

471.61
33.73
4.75

547.07
517.42
95.19

547.07
517.42
95.19

547.07
517.42
95.19

432.86
40.11
4.75

779.15
424.36
143.50

779.15
424.36
143.50

779.15
424.36
143.50

23.16
34.44
31.19
24.05

739.27
283.79
109.79
50.02

739.27
283.79
109.79
50.02

739.27
283.79
109.79
50.02

ALORIZADO DE AVANCE DE OBRA

E HUACRACHUCO, PROVINCIA DE MARAON, DEPARTAMENTO DE HUANUCO

E MARAON,DEP. HUANUCO

PLAZO 30 DIAS CALENDARIO

ARIA SAC. -CONSTRUCTORA INGENIEROS VILLA EVELYN SAC.

E OBRA MENSUAL
A MENSUAL ACUMULADO

Precio

Sub-Total

1ra. QUINCENA
1

15

2da. QUINCENA
16

TOTAL

30

4.18
6.71

84.81
36.91

84.81
36.91

84.81
36.91

119.17
209.99

3,180.65
839.96

3,180.65
839.96

3,180.65
839.96

40.00
350.00
20.79

320.00
350.00
374.24

320.00

320.00
350.00
374.24

3.97
3.05

397.00
305.00

397.00
305.00

397.00
305.00

500.00

500.00

500.00

S/.

89,831.97
21,556.08
8,983.20

65,161.12
15,636.06
6,516.11

24,670.85
5,920.02
2,467.08

89,831.97
21,556.08
8,983.19

S/.

120,371.25
21,666.83

87,313.29
15,716.39

33,057.95
5,950.43

120,371.24
21,666.82

S/.

142,038.06

103,029.68

39,008.38

142,038.06

72.54%
72.54%

27.46%
100.00%

100.00%

350.00
374.24

500.00

Anlisis de Gastos General


Obra:

:INSTALACION DEL HUARO EN EL CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACH

LUGAR.:
A.

:CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MARAON,DEP. HUA

CARACTERISTICAS
Costo directo:
Gastos Generales y Utilidad :
Utilidad
Sub total
I.G.V. (18%)
Monto estimado de obra:

( 23.996% )
( 10.000% )

Plazo de ejecucin: (meses)


GASTOS GENERALES VARIABLES

**** 1.00.- GASTOS ADMINISTRATIVOS DE O


1.01 Personal Necesario en Obra
a) Obra
Gerente de Obra
Residente de Obra
Topografo
Almacenero
Guardian
Elementos de Proteccion Ambiental
Equipo de Utiles de Oficina
Seguro de Salud
Movilidad
Poliza de Seguros

Unidad

Tiempo

mes
mes
mes
mes
mes
mes
glb
mes
mes
glb

1.50
1.25
0.50
1.00
1.00
4.00
1.25
10.00
1.25
1.00

Total 1.00. Administracin y G

GASTOS GENERALES FIJOS

**** 1.00.- GASTOS DE LICITACION Y CONTRA


DESCRIPCION
VISITA ALA ZONA DE PROYECTO
GASTOS DE LICITACION DE PROPUESTA
DOCUMENTOS DE PRESENTACION DE PROPUEST.
LEGALES Y NOTARIALES DE LA ORGANIZACICON

Unidad
glb
glb
glb
glb

10

Anlisis de Gastos General


Obra:

:INSTALACION DEL HUARO EN EL CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACH

LUGAR.:

:CENTRO POBLADO DE ASAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MARAON,DEP. HUA

**** 2.00.- GASTOS ADMINISTRATIVOS EN OF


2.01 Personal Necesario en oficina
GERENTE GENERAL
ADMINISTRADOR GENERAL
SECRETARIA
ALQUILER DE OFICINA
SERVICIOS(ELECTRICIDAD,AGUA,OTROS)

Tiempo
1.50
1.50
1.50
1.50
1.50

**** 3.00.- GASTOS FINANCIEROS *


Plazo
CARTA FIANZA DE FIEL CUMPLIMIENTO (10%)
CARTA FIANZA DE ADELANTO (20%)
CARTA DE FIANZA DE ADELANTO DE MATERIALES (20%)

0.10
0.20
0.40

Total 2.00. Administracin y G


Total Gastos Generales Variables
Total 1.00. Administracin y Generales de Obra
Total de Gastos Fijos
Total 3.00. Gastos Financieros

RESUMEN GENERAL
INCIDENCIA DE GASTOS GENERALES
VARIABLES:
FIJOS:
TOTAL:

11

de Gastos Generales

SAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MARAON, DEPARTAMENTO DE HUANUCO

NCIA DE MARAON,DEP. HUANUCO

S/.
S/.
S/.

89,831.97
21,556.08
8,983.20
120,371.25
21,666.83
142,038.08

S/.

142,038.06

1.00

S ADMINISTRATIVOS DE OBRA ****


Costo

Participacin

10,000.00
8,000.00
3,500.00
1,200.00
1,250.00
100.00
250.00
86.69
650.00
17,525.00

14.29%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.55%

Parcial
2,143.50
10,000.00
1,750.00
1,200.00
1,250.00
400.00
312.50
866.90
812.50
271.64

SUB-TOTAL (1.01)

Total
19,007.04

19,007.04

Total 1.00. Administracin y Generales de Obra

19,007.04

E LICITACION Y CONTRATACION ****


Costo
0.14
0.14
0.14
0.14

Participacin
2,300.00
1,200.00
350.00
200.00

Parcial
322.00
168.00
49.00
28.00

567.00

12

de Gastos Generales

SAY, DISTRITO DE HUACRACHUCO, PROVINCIA DE MARAON, DEPARTAMENTO DE HUANUCO

NCIA DE MARAON,DEP. HUANUCO

ADMINISTRATIVOS EN OFICINA ****


Costo
10,000.00
4,300.00
2,200.00
2,500.00
1,200.00

Participacin
1.43%
1.43%
1.43%
1.43%
1.43%

Parcial
214.50
92.24
47.19
53.63
25.74
433.30

GASTOS FINANCIEROS ****


Costo
142,038.08
142,038.08
142,038.08

Porcentaje
2.25%
1.30%
1.50%

Parcial
319.59
369.30
852.23

1,541.12
2,541.42

SUB-TOTAL (2.01)

Total 2.00. Administracin y Generales de Oficina S/.

S/.
S/.
S/.
S/.

Total

Monto
19,007.04
2,541.42
21,548.46
REDONDEANDO

2,541.42

19,007.04
2,541.42
21,548.46

Porcentaje

23.988

Presupuesto

21,556.08
23.988%