UNIT PRICES FOR MAKASSAR REGION

A. Labour Salary
Unit Price (Rp)
NO

DESCRIPTION

Unit

Jurnal HSBB Edisi


34 Tahun 2015

Unskilled workers (Pekerja Tidak Terampil)

OH

50,000

2
3

Skilled workers (Pekerja Terampil)

OH

70,000

Machinist Helper (Pembantu Masinis)

Warehouse Keeper (Penjaga Gudang)

Watchman (Penjaga Malam)

Carpenter (Tukang Kayu)

7
8

Mason (Tukang Batu)


Painter (Tukang Cat)

Electrician (Tukang Listrik)

10

Plumber (Tukang Pipa)

11

Vulcan (Tukang besi)

12

Foreman (Kepala Tukang)

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

13

Head Foreman (Mandor)

OH

Remark

Other

OH = Orang / Hari

70,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
125,000
150,000

B. Material Prices

1 $ : Rp

13,300

Unit Price (Rp)


NO

URAIAN

A.
I.
1.1
1.2
1.3
II.
III.
IV.
V
VI.
VII.
7.1
7.2
7.3
7.4
7.5
7.6
7.7
VIII.
1
2
3

BASICLY MATERIAL
Sand
Sand fill (Pasir Urug / Timbunan)
Sand Pair (Pasir Pasang)
Sand for Concrete (Pasir Beton)
Red Soil
Gravel (Kerikil)
Sand Stone (Sirtu)
Portland Cement (50 kg)
White Cement (40kg)
River Stone (Batu Kali)
Cobblestone (Batu bulat utuh)
Crushed Stone 7-10 cm
Crushed Stone 5-7 cm
Crushed Stone 3-5 cm
Crushed Stone 2-3 cm
Crushed Stone 1-2 cm
Rock
ROCK
Rock 10-300 kg
Rock 300-900 kg
Rock 900-1200 kg

B.
I.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
II.
2.1
2.2
2.3

IRON MATERIAL
Plain Reinforcement (Besi Beton Polos)
d = 4 mm
d = 6 mm
d = 8 mm
d = 10 mm
d = 12 mm
d = 14 mm
d = 16 mm
d = 19 mm
d = 22 mm

C.
I.
1.1
1.2
1.3

WOOD MATERIAL
WOOD CLASS I

Unit

Jurnal HSBB Edisi


34 Tahun 2015

m3
m3
m3
m3
m3
m3
zak
zak

89,000
100,000
148,000

m3
m3
m3
m3
m3
m3
m3

152,000
237,000
256,000
262,000
267,000
272,000
160,000

Sawmil saws Beam


Sawmil saws Boards
Sansaw saws Beam

Remark

50,000

PT. BKS

160,000
192,000
220,000

Assumptions
Assumptions
PT. BKS

277,000
177,000
43,000
53,000

m3
m3
m3

btng
btng
btng
btng
btng
btng
btng
btng
btng

24,000
35,500
50,000
75,000
106,000
131,000
165,000
200,000
325,000

btng
btng
btng

110,000
165,000
227,000

m3
m3
m3

10,300,000
10,550,000
8,750,000

Screw Reinforcement (Besi Beton Ulir)


d = 13 mm
d = 16 mm
d = 29 mm

Other

1.4 Sansaw saws Boards


II. WOOD CLASS II
2.1 Beam
2.2 Board
III. WOOD CLASS II
3.1 Beam
3.2 Board
IV. TRIPLEKS UK. 122X244 CM
4.1 Tripleks 2 mm
4.2 Tripleks 3 mm
4.3 Tripleks 6 mm
4.4 Tripleks 9 mm
4.5 Teakwood 3 mm

m3

8,800,000

m3
m3

4,800,000
4,850,000

m3
m3

2,900,000
3,475,000

lmbr
lmbr
lmbr
lmbr

53,500
71,000
99,000
131,000

lmbr

97,500

D.
I.
II.
III.
IV.

ROAD MATERIAL
Geotextile
Geotextile
Geomattress
Aspal

m2
m2
m2
kg

E.
I.
II.
III

FUEL
Solar
Premium
Minyak Pelumas

ltr
ltr
ltr

F.
I.
II.
III.
IV.

OTHER
Nail
Formwork Oil
PVD GI-Drain 70
Drain Shoe

kg
ltr
m'
bh

37,300
43,500
40,000

Ord > 1 Container (Geosinindo)


Ord < 1 Container (Geosinindo)

10,700
8,600

Pertamina 15 Juni 2015


Pertamina 15 Juni 2015

3,100
2,500

PT. Geoforce Indonesia


Assumptions

16,000

29,500

17,500
12,000

C. Rental Cost
Unit Price (Rp)
NO
1
2
3
4
5
6
7
8
9
10
11

DESCRIPTION
Tug Boat
Barge
Excavator
Wheel loader
Buldozer
Square Pontoon
Dump truck
Crawler crane
Theodolit
Vibro Roller
Sampan

Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour

Jurnal HSBB Edisi


34 Tahun 2015

Remark

Other
810,000
1,667,415
360,000
315,000
450,000
193,500
180,000
720,000
50,000
315,000
65,000
65000

P. Jawa Prices +30%

Note :
1 Responsibilities of tenants includes mobilization and demobilization equpments, fuel, meals allowance, eat operator,
shelter / accommodation operator / mechanic, security, insurance and any taxes / levies
2 The minimum rental period 210 hours (1 month)
3 Production Year of Heavy Equipment 2008 - 2010