A. Labour Salary
Unit Price (Rp)
NO
DESCRIPTION
Unit
OH
50,000
2
3
OH
70,000
7
8
10
11
12
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
13
OH
Remark
Other
OH = Orang / Hari
70,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
100,000
125,000
150,000
B. Material Prices
1 $ : Rp
13,300
URAIAN
A.
I.
1.1
1.2
1.3
II.
III.
IV.
V
VI.
VII.
7.1
7.2
7.3
7.4
7.5
7.6
7.7
VIII.
1
2
3
BASICLY MATERIAL
Sand
Sand fill (Pasir Urug / Timbunan)
Sand Pair (Pasir Pasang)
Sand for Concrete (Pasir Beton)
Red Soil
Gravel (Kerikil)
Sand Stone (Sirtu)
Portland Cement (50 kg)
White Cement (40kg)
River Stone (Batu Kali)
Cobblestone (Batu bulat utuh)
Crushed Stone 7-10 cm
Crushed Stone 5-7 cm
Crushed Stone 3-5 cm
Crushed Stone 2-3 cm
Crushed Stone 1-2 cm
Rock
ROCK
Rock 10-300 kg
Rock 300-900 kg
Rock 900-1200 kg
B.
I.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
II.
2.1
2.2
2.3
IRON MATERIAL
Plain Reinforcement (Besi Beton Polos)
d = 4 mm
d = 6 mm
d = 8 mm
d = 10 mm
d = 12 mm
d = 14 mm
d = 16 mm
d = 19 mm
d = 22 mm
C.
I.
1.1
1.2
1.3
WOOD MATERIAL
WOOD CLASS I
Unit
m3
m3
m3
m3
m3
m3
zak
zak
89,000
100,000
148,000
m3
m3
m3
m3
m3
m3
m3
152,000
237,000
256,000
262,000
267,000
272,000
160,000
Remark
50,000
PT. BKS
160,000
192,000
220,000
Assumptions
Assumptions
PT. BKS
277,000
177,000
43,000
53,000
m3
m3
m3
btng
btng
btng
btng
btng
btng
btng
btng
btng
24,000
35,500
50,000
75,000
106,000
131,000
165,000
200,000
325,000
btng
btng
btng
110,000
165,000
227,000
m3
m3
m3
10,300,000
10,550,000
8,750,000
Other
m3
8,800,000
m3
m3
4,800,000
4,850,000
m3
m3
2,900,000
3,475,000
lmbr
lmbr
lmbr
lmbr
53,500
71,000
99,000
131,000
lmbr
97,500
D.
I.
II.
III.
IV.
ROAD MATERIAL
Geotextile
Geotextile
Geomattress
Aspal
m2
m2
m2
kg
E.
I.
II.
III
FUEL
Solar
Premium
Minyak Pelumas
ltr
ltr
ltr
F.
I.
II.
III.
IV.
OTHER
Nail
Formwork Oil
PVD GI-Drain 70
Drain Shoe
kg
ltr
m'
bh
37,300
43,500
40,000
10,700
8,600
3,100
2,500
16,000
29,500
17,500
12,000
C. Rental Cost
Unit Price (Rp)
NO
1
2
3
4
5
6
7
8
9
10
11
DESCRIPTION
Tug Boat
Barge
Excavator
Wheel loader
Buldozer
Square Pontoon
Dump truck
Crawler crane
Theodolit
Vibro Roller
Sampan
Unit
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Hour
Remark
Other
810,000
1,667,415
360,000
315,000
450,000
193,500
180,000
720,000
50,000
315,000
65,000
65000
Note :
1 Responsibilities of tenants includes mobilization and demobilization equpments, fuel, meals allowance, eat operator,
shelter / accommodation operator / mechanic, security, insurance and any taxes / levies
2 The minimum rental period 210 hours (1 month)
3 Production Year of Heavy Equipment 2008 - 2010