Вы находитесь на странице: 1из 56

PROMOSIKAN ALAT BERAT ANDA Dl :

Journal Of Building Contruction, Interior & Material Prices

Cf
.
..

HAR@A ~AYUAIN !BAHAN !SAN@UNAN


K@N~YRUK~IDANINY~RH@R

Contact:
Jl. Kembang Raya No. 11 A Kwitang Senen Jakarta Pusat
Tel: (021) 31925229; 31925234 Fax: (021) 3901710
Pin: 26 BDC 162 HP: 0856-9496-1397
Email : jurnal_hargasatuan@yahoo.co.id

<>

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

PROPINSI JAWA BARAT


DAFTAR HARGA BAHAN DAN UPAH PEKERJA
KOTABEKASI
DAFTAR HARGA BAHAN BANGUNAN

A.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
Eo/Sf

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


Pasir Urug
Sirtu
PasirTeras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok (Apung)
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol (Untuk Bronjong)
Batu Koral Beton Kali
BatuTempel Hitam
Batu Pinggir Beton 1Ox20x35
Batu Pinggir Beton 15x35x50 (K-225)
BatuTelor
Batako Kecil 8x1 Ox20
Batako Besar 8x20x30
Con Blok 8x20x40
Bata Merah Bakar Kelas I
Bata Merah Bakar Kelas II
Bata Merah Oven (Kiingker)
Roster Beton 20x20
Roster Beton 30x30
Grass Blok 20x20
Grass Blok 30x45
Paving Blok Natural 8cm
Paving Blok Warna 8cm
Paving Blok Natural 6cm
Paving Blok Warna Scm
Kanstin Paving Blok
Semen PC Tiga Roda I 50Kg
Semen Putih
Kanstin Jalan ukuran Besar (Bina Marga) 1bh = 60cm
Readymix Beton K 300, tanpa pampa (Selang)
Readymix Beton K 225, tanpa pampa (Selang)
Readymix Beton K 175, tanpa pampa (Selang)
Kapur Pasang/ Kapur Tembok
KapurSirih
SemenWarna
Tanah Liat
Air

AHUNXXI

m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m2
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak
zak
bh
m3
m3
m3
m3
kg
kg
m3

130.000
125.000
125,000
170.000
176.000
161.000
18.000
190.000
185.000
185.000
180.000
160.000
140.000
135.000
110.000
17.000
43.000
150.000
1.100
1.600
3.500
600
500
2.500
6.000
8.000
11.000
15.000
46.000
56.000
36.000
42.000
22.000
63.500
74.000
36.000
780.000
710.000
650.000
86.000
6.400
7.000
52.000
2.000

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

149.000
138.000
138.000
203.000
190.000
172.000
20.000
230.000
220.000
210.000
210.000
175.000
150.000
150.000
135.000
20.000
45.000
165.000
1.500
1.800
3.800
700
550
3.100
6.500
9.000
15.000
17.000
48.000
59.000
38.000
44.000
26.000
65.000
80.000
40.000
825.000
760.000
680.000
94.000
6.800
8.100
55.000

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"tt
:::0

"tt

en

Ill

)::!.

""'

B.

BAHAN FINISHING: LABURAN, PENGISI DAN ALATNYA

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
35.
36.
37.
38.
39.
40.
41.
42.

PlamirTembok
Cat Tembok ICI Eksterior (Beton)
Cat Tembok ICIInterior (Piafond dan dinding)
Cat Tembok Vinilex
Cat Dasar ICI untuk Interior (2 pelapis)
CatTembok Sanlex
Cat Tahan Asam
PelapisAikali ICI (Cat Dasar Beton Eksterior)
Cat Marka I Spotlight
Water Profing Emulsion
Water Profing Membrance
Pool Cat tembok
KapeTembok
Kape Kayu
Soligneum 1 Blok
Plincote
Pengawetan Kayu
Pengopenan Kayu
Kuas 3"
Oker
Oyan
Olen (Pewarna Plitur)
Spiritus
Bahan Plitur Kripik (Sirlak India)
Dempul Lain
Dempul Plitur
Dempul Halus /lmfra (Wood Filter)
Terpentin
liner A
TinerB
Kumpon
Melamik
Dempul Plastik
Dempul Duco
Am pel as
Dempul Kayu Cap Kucing
Meni Kayu/ Besi
Sincromat
Cat Kayu Sieve
Cat Besi Sieve
Cat Besi Duco Danaglos/ICI
CatBron

c.

BAHAN KAYU BERIKUT BAHAN JADINYA

1.
2.
3.
4.

Bambu dia. 5 s/d 7


Bambu dia. 7 s.d 10
Bambu Gombong
Kayu Papan Tarentang

34.

494

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

kg
kg
kg
kg
ltr
kg
kg
ltr
kg
kg
m2
bh
bh
bh
51tr
kg
m3
m3
bh
kg
bks
bks
ltr
kg
kg
kg
kg
ltr
ltr
ltr
kg
kg
kg
kg
lbr
kg
kg
kg
kg
kg
kg
kg

12.000
92.000
58.000
16.000
40.000
14.000
43.000
48.000
47.000
38.000
82.000
18.000
6.000
7.000
41.000
28.000
320.000
351.000
9.000
25.000
4.000
2.000
12.000
150.000
22.000
27.000
29.000
6.000
16.000
20.000
26.000
40.000
33.000
40.000
3.000
23.000
20.000
32.000
44.000
44.000
84.000
35.000

13.000
98.000
62.000
18.000
45.000
15.000
45.000
50.000
50.000
41.000
85.000
22.000
7.000
8.000
43.000
32.000
330.000
360.000
12.000
28.000
5.000
3.000
15.000
160.000
25.000
34.000
40.000
8.000
20.000
22.000
28.000
42.000
37.000
45.000
4.000
25.000
22.000
35.00
45.000
45.000
86.000
37.000

bt
bt
bt
m3

13.000
18.000
40.000
1.800.000

14.000
20.000
45.000
2.000.000

& INTERIOR

Eotst34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

,
0

m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1

7.655.000
4.000.000
4.200.000
6.000.000
6.500.000
5.900.000
7.000.000
9.600.000
9.800.000
2.800.000
17.000.000
13.800.000
9.500.000
9.000.000
3.200.000
700.000
15.000
22.000
5.100
6.500
11.000
14.000
24.000
85.000
54.000
2.800
4.000
7.700

7.900.000
4.500.000
5.000.000
6.300.000
7.000.000
6.800.000
7.500.000
10.000.000
10.400.000
3.400.000
18.000.000
14.000.000
10.250.000
9.400.000
3.600.000
775.000
16.000
25.000
7.000
7.000
13.000
17.000
26.000
90.000
65.000
3.100
4.200
8.000

BAHAN PENUTUP RANGKA PLAFOND


Bahan Plafond Eternit 4mm (Bola Dunia)
Bahan Plafon Harflex 5mm 120x240
Bahan PlafondAsbes Semen 5mm
Gypsum 120x240 t=9mm Ex. DN Qayabord)
Gypsum 120x240 t=9mm Ex. Luar
AkustikAmstrong 60x120
List Profil gypsum L= 10 CM
Tepung Gypsum

m2
lbr
m2
lbr
lbr
lbr
m'
kg

12.000
52.000
15.000
56.000
68.000
92.000
13.000
6.000

13.000
56.000
17.000
60.000
70.000
95.000
15.000
7.000

BAHAN KAYU LAPIS


Tripleks 3mm 120x240
Tripleks4mm 120x240
Tripleks 4mm uk. pintu
Tripleks 6mm 120x240
Tripleks 9mm 120x240
JabarWood4mm
Bilik Bambu (tanpa kulit)
Bilik Bambu (dengan kulit)
Bilik Bambu Hitam Variasi (Motif)

lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2

43.000
53.000
38.000
73.000
105.000
82.000
18.000
20.000
32.000

45.000
55.000
40.000
78.000
110.000
90.000
20.000
23.000
35.000

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.

Kayu Kamper Singkil I Kapur ( K. Samarinda Kelas II)


Kayu Balok Borneo Super
Kayu Papan Borneo Super
Kayu Balok Kamper Medan (Kruing)
Kayu Papan Kamper Medan (Kruing)
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Balok Rasamala
Kayu Jati Jatim I Jateng tua dia. 70em
Kayu Jati Jatim I Jateng tua dia. 40em
Kayu Jati Jabar tua dia. 40em
Kayu Jati Jabar tua dia. 40em kebawah
Kayu Hutan Kelas I (Segeng, Mahoni, Laban)
Kayu Albasia
Dol ken 5 s.d 7
Dol ken 7 s.d 10
List profil kamper 1x 1em
List profil kamper 2x1em
List profil kamper 4x1 em
List profil kamper 5x1 em
List profil kamper 10x1.5em
Pegangan Tangga Profil Jati
Pegangan Tangga Profil Kamper
Kayu reng 213 Borneo Super
Kayu reng 213 kamper Banjar
Kayu reng 314 Kamper Banjar

D.
1.
2.
3.
4.
5.
6.
7.
8.

E.
1.
2.
3.
4.
5.
6.
7
8.
9.

Eotst 34

TAHUN

XXI 2015

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

495

-~
(I)

~
~
"'i

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"t1
::0
0
~

::c:

en
~

~
~
~

""''

10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

F.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

496

Wall Paper (Kelas Menengah)


Multipleks 9mm 120x240
Multipleks 12mm 120x240
Multipleks 18mm 120x240
Playwood 18mm 120x240
Teakwood 3mm 120x240
Teakwood4mm 120x240
Teakwood 3mm uk. Pintu
Teakwood 4mm uk. Pintu
Gypsum Board 9mm elephant
Tacon (tahan bakar)
Supercon
Melamin 4mm 120x240
Melamin TOK 4mm
Formika 120x240
Formika ukuran Pintu

m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr

35.000
118.000
145.000
210.000
230.000
93.000
98.000
60.000
70.000
58.000
85.000
51.000
75.000
88.000
160.000
93.000

45.000
121.000
149.000
215.000
250.000
95.000
105.000
65.000
74.000
60.000
90.000
55.000
82.000
92.000
165.000
95.000

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m1
m2
bh
m2
m2
m2
m2

2.400
1.800
2.800
2.750
2.500
2.200
3.100
2.500
1.500
2.100
2.000
35.000
42.000
39.000
42.000
44.000
37.000
43.000
32.000
42.000
85.000
500.000
250.000
13.000
16.000
25.000
7.500
1.500.000
1.200.000
1.000.000
850.000

2.700
2.500
3.000
3.000
2.800
2.400
3.500
2.800
1.600
2.200
2.200
37.000
45.000
42.000
46.000
48.000
42.000
46.000
36.000
46.000
90.000
600.000
260.000
15.000
18.000
26.000
9.000
1.800.000
1.300.000
1.100.000
900.000

BAHAN LANTAI DAN PELAPIS DINDING


Tegel PC 20x20
Plin Tegel PC 1Ox20
Tegel PC 30x30
Plin Tegel PC 15x30
Tegel Warna 20x20
Plin Tegel Warna 10x20
Tegel Warna 30x30
Plin Tegel Warna 15x30
Tegel Wafel PC 20x20
Tegel Wafel Warna 20x20
Tegel Badak PC 30x30
Poslin 11x11 Warna Standard DN
Poslin 11x11 Warna Khusus DN
Keramik 10x20 dan 20x20 KW I DN Putih I Poles
Keramik 1Ox20 KW I DN Corak I Warna I Anti Slip
Keramik 20x20 (KM) KW I DN Corakl Warnal Anti Slip
Keramik 20x20 (KM) KW I DN Putih Poles
Keramik 20x25 Dinding KM KW I DN Corak
Keramik 30x30 KW I DN Putih Poles
Keramik 30x30 KW I DN Warnal Corak (Anti Slip)
Vynillantai Standard
Karpel Kelas Baik LN
Karpel Kelas Sedang LN
Stairnosing Keramik 10120
Stairnosing Fiber
Taraso Kerang 30x30
Plin taraso 1Ox30
Gran it Alam LN Uk. Besar
Gran it Alam LN Uk. Kecil
GranitAiam DN Uk. Besar
Gran it Alam DN Uk. Kecil
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& iNTERIOR

Eotst 34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"tt

::0
0
32.
33.
34.
35.
36.
37.
3B.
39.
40.
41.
42.

Granito Tile Essensa uk. 40x40 polis


Granito Tile Essensa uk. 40x40 unpolis
Marmer Alam Lampung uk. Besar (60x90em)
Marmer Alam Lampung uk. Kecil (60x60em)
Marmer Alam Citatah uk. Besar (60x90cm)
Marmer Alam Citatah uk. Kecil (60x60em)
Marmer Sintetis
Granito Tile Essensa 60x60 Polis
Granito Tile Essensa 60x60 unpolis
Bata Karawang
Campuran untuk kedap air (AM)

G.
1.
2.
3.
4.
5.
6.
7
B.
9.
10.
11.
12.
13.
14.
15.
H.
1.
2.
3.
4.
5.
6.
7
B.
9.
10.
11.
12.
13.
14.
15.
16.
17.
1B.
19.
20.

BAHAN SALURAN AIR KOTORI BERSIH


Grafe! U 20 em'
Grafe! U 30 em'
Grafe! U 40 em'
Buis Beton dia. 20cm (1m')
Buis Beton dia. 30cm (1m')
Buis Beton dia. 40cm (1m')
Buis Beton dia. 50cm (1m')
Buis Beton dia. 60em (1m')
Buis Beton dia. 100cm (0.50m)
Buis Beton dia. BOem (0.50m)
BuisTanah dia.10cm (0.50m)
Buis Tanah dia. 15em (0.50m)
Buis Tanah dia. 20em (0.50m)
Buis Tanah dia. 25em (0.50m)
lnjuk
BAHAN LOGAM DAN BAHAN JADINYA
Besi Beton U-24 Rata-rata
Besi Beton U-39/ U-32 Rata-rata
Pagar BRC Lengkap Tiang (Tanpa Pondasi)
Bondek
IWF Ex. ON Sll
IWF Ex. Jepang
Besi Profil ON Sll
Besi Profil Ex. LN
Besi CLip Channel
Ongkos Galvanis Besi
Kawat Beton
KawatOuri
Kawat Pengikat
Kawat Bronjong 4mm
KawatTembaga
Ram Nyamuk Hijau
Ram Kawat 1x1em
Ram A yam
Kawat Kasa 1x1em (Putih)
Kawat Harmonika4em

Eo!S/34 TAHUN XXI 2015

m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
ltr

233.000
195.000
400.000
340.000
320.000
245.000
110.000
19B.OOO
225.000
2.900
1B.OOO

272.000
225.000
450.000
355.000
340.000
275.000
120.000
215.000
240.000
3.500
20.000

m1
m1
m1
m1
m1
m1
stk
stk
stk
stk
stk
stk
stk
stk
kg

23.000
30.000
42.000
40.000
53.000
70.000
84.000
101.000
140.000
125.000
9.000
12.000
14.000
16.000
9.000

26.000
35.000
45.000
45.000
56.000
74.000
90.000
110.000
150.000
132.000
10.000
14.000
16.000
1B.OOO
10.000

kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
m1
m1
kg
kg
m2
m2
m2
m2
m2

9.500
9.700
130.000
120.000
12.000
13.000
12.000
11.000
11.000
3.400
1B.OOO
4.000
2.500
22.000
20.000
12.000
13.000
12.000
25.000
26.000

9.BOO
11.000
150.000
135.000
13.000
14.000
13.000
12.000
12.000
3.BOO
20.000
5.200
2.750
25.000
23.000
14.000
15.000
13.000
30.000
2B.OOO

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

497

"tt

C/)

....

i;

~
~

""'

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"tt

::0
0

"'t::

-i;;
(I)

~
~

""'

21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.

I.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
J.
1.
2.
498

Kawai Harmonika 2cm


Kawai Las Listrik
WiremeshM8
WiremeshM6
Timah
TimahHitam
Ram NyamukAiuminium
Plat Strip dia. 2x30mm (6 m1)
Plat Strip dia. 3x30mm (6 m1)
Plat Aluminium 0.2mm
Plat Aluminium 0.3mm
Plat Aluminium 0.4mm
Plat Aluminium 0.5mm
Plat Aluminium 0.6mm
PlatAiuminium 1.0mm
Kusen Aluminium Natural1.3mm t 1,3mm (4")
Kusen Aluminium Warna 1.3mm t 1,3mm (4")
Daun JendelaAiuminium Natural (Tanpa kaca dan Accessories)
Daun JendelaAiuminium Warna (Tanpa kaca dan Accessories)
Daun Pintu Aluminium Natural (Tanpa kaca dan Accessories)
Daun Pintu Aluminium Warna (Tanpa kaca dan Accessories)
Handle Aluminium (Tarikan PintuAiurniniurn)
KaitAnginAiuminium
Karel Aksesories Kusen/ Pintu Aluminium
Seng Plat BJLS 30 dia. 6Dcm
Seng Plat BJLS 30 dia. 90cm
Plat Besi Tipis 1.2mm
Plat Besi Tipis 0.8mm
Plat Besi 2mm s/d 5mm
Plat Besi 6mm s/d 10mm
Plat Besi 1Dmm keatas
Lem kuning (aibon)
Lem fox

=
=

m2
kg
m2
m2
kg
kg
m2
bt
bt
m2
m2
m2
m2
m2
m2
m1
m1
m2
m2
m2
m2
bh
ps
m1
m1
m1
kg
kg
kg
kg
kg
kg
kg

22.000
23.000
65.000
46.000
95.000
150.000
30.000
27.000
42.000
19.000
25.000
35.000
47.000
58.000
100.000
68.000
85.000
65.000
72.000
68.000
72.000
35.000
65.000
5.000
30.000
42.000
15.000
22.000
13.000
13.000
13.000
34.000
35.000

24.000
25.000
68.000
48.000
98.000
160.000
32.000
32.000
45.000
21.000
27.000
37.000
49.000
63.000
13.000
72.000
87.000
68.000
76.000
70.000
75.000
40.000
70.000
6.000
32.000
44.000
16.000
24.000
14.000
14.000
14.000
36.000
36.000

m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh

40.000
50.000
85.000
125.000
150.000
205.000
680.000
3.000.000
845.000
20.000
35.000

42.000
56.000
90.000
135.000
160.000
215.000
700.000
3.200.000
850.000
24.000
38.000

kg
kg

20.000
15.000

22.000
17.000

BAHANKACA
Kaca Polos 2mm (ASAHI)
Kaca Polos 3mm (ASAHI)
Kaca Polos 5mm (ASAHI)
Kaca Rayben 5mm (ASAHI)
Kaca Rayben 8mm (ASAHI)
Kaca Rayben 12mm (ASAHI)
Kaca Patri Lokal Terpasang (ASAHI)
Kaca Patri ex. Luar Negeri Terpasang
Kaca 8mm Graver
Glass Block ON 20x20 (Kedawung)
Glass Block ON 20x20 Ex. LN

BAHAN PAKU DAN MUR BAUT


Paku 1cm s/d 3cm
Paku 4cm s/d ?em
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eo1s/

34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1:1
::0

1:1
4.
5.
6.
7
8.
9.
10.
11.
12.
13.

Paku Scm s/d 12cm


Paku Beton 2cm s/d5cm
Paku Skrup
Paku Kait Lengkap
Paku Cacing
Besi Beugel Kuda-kuda
DukAngker
Angker Mur Baut dia. 19 panjang 60cm
Mur Baut HTB dia. 19 s/d 16 (5cm)
MurBaut Biasadia.19 s/d 16 (15cm)
Piser dia. 12 s/d 20cm

K.

BAHAN PERPIPAAN

1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.

Besi Pip a untuk Hydrant BSP dia. 1"


Besi Pipa untuk Hydrant BSP dia. 1.25"
Besi Pipa untuk Hydrant BSP dia. 1.5"
Besi Pipa untuk Hydrant BSP dia. 2"
Besi Pipa untuk Hydrant BSP dia. 2.5"
Besi Pipa untuk Hydrant BSP dia. 3"
Besi Pipa untuk Hydrant BSP dia. 4"
Besi Pipa untuk Hydrant BSP dia. 6"
Besi Pipa Hitam dia. 1" t=2mm
Besi Pipa Hitam dia. 2" t=2mm
Besi Pipa Hitam dia. 3" t=2mm
Besi Pipa Hitam dia. 4" t=2mm
Besi Pipa Hitam dia. 6" t=2mm
Pipa GIP MediumAdia. 1/2" (6 m1)
Pipa GIP Medium Adia. 3/4" (6 m1)
Pipa GIP Medium A dia. 1" (6 m1)
Pipa GJP MediumAdia. 11/4" (6 m1)
Pipa GJP Medium A dia. 1 1/2" (6 m1)
Pipa GIP Medium Adia. 1 3/4" (6 m1)
Pipa GIP MediumAdia. 2" (6 m1)
Pipa GJP Medium A dia. 2 1/2" (6 m1)
Pipa GJP MediumAdia. 3" (6 m1)
Pipa GJP MediumAdia. 4" (6 m1)
Macam-macam Sambungan GIP dia. 1/2"
Macam-macam Sambungan GJP dia. 3/4"
Macam-macam Sambungan GJP dia. 1"
Macam-macam Sambungan GJP dia. 11/4"
Macam-macam Sambungan GIP dia. 11/2"
Macam-macam Sambungan GIP dia. 1 3/4"
Macam-macam Sambungan GIP dia. 2"
Macam-macam Sambungan GJP dia. 21/2"
Macam-macam Sambungan GJP dia. 3"
Macam-macam Sambungan GIP dia. 4"
Pipa PVC RUCIKA type AW dia. 1/2"
Pipa PVC RUCIKA type AW dia. 3/4"
Pipa PVC RUCIKAtypeAW dia. 1"

3.

EDISI

34

TAHUN XXI

2015

kg
bh
kg
bh
kg
kg
bh
bh
bh
bh
bh

15.000
400
20.000
800
28.000
15.000
3.200
28.000
8.600
4.000
2.000

17.000
500
22.000
1.000
30.000
18.000
3.600
30.000
10.000
4.500
2.500

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt

265.000
285.000
375.000
485.000
550.000
750.000
1.100.000
1.600.000
150.000
285.000
380.000
557.000
760.000
135.000
185.000
275.000
350.000
415.000
485.000
600.000
785.000
835.000
1.250.000
4.000
5.000
6.000
7.000
10.000
13.000
16.000
26.000
40.000
55.000
30.000
34.000
46.000

278.000
299.000
393.000
509.000
577.000
787.000
1.155.000
1.680.000
157.000
299.000
399.000
584.000
798.000
141.000
194.000
288.000
367.000
435.000
509.000
630.000
824.000
876.000
1.312.000
4.200
6.000
6.500
8.000
12.000
14.000
18.000
28.000
42.000
60.000
35.000
67.000
48.000

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

499

(I)
....
~

~
~

""'

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

<Q>

"tJ

::tJ
0

J;!

(I)

$:
~

Ill

)::.

~
"""'

65.
66.
67.

Pipa PVC RUCIKA type AW dia. 11/4"


Pipa PVC RUCI KA type AW dia. 1 1/2"
Pipa PVC RUCIKAtypeAW dia. 2"
Pipa PVC RUCIKA type AW dia. 2 1/2"
Pipa PVC RUCI KA type AW dia. 3"
Pipa PVC RUCIKAtypeAW dia. 4"
Pipa PVC RUCI KA type AW dia. 6"
Pipa PVC RUCIKAtypeAW dia. 8"
Pipa PVC MASPIONABU dia. 1/2" (AW)
Pipa PVC MASPION ABU dia. 3/4" (AW)
Pipa PVC MAS PION ABU dia. 1" (AW)
Pipa PVC MASPION ABU dia. 1 1/4" (AW)
Pipa PVC MAS PION ABU dia. 11/2" (AW)
Pipa PVC MAS PION ABU dia. 2" (AW)
Pipa PVC MAS PION ABU dia. 2 1/2" (AW)
Pipa PVC MASPION ABU dia. 3" (AW)
Pipa PVC MAS PION ABU dia. 4" (AW)
Macam-macam Sambungan Paralon dia. 1/2"
Macam-macam Sambungan Paralon dia. 3/4"
Macam-macam Sambungan Paralon dia. 1"
Macam-macam Sambungan Paralon dia. 11/4"
Macam-macam Sambungan Paralon dia. 1 1/2"
Macam-macam Sambungan Paralon dia. 1 3/4"
Macam-macam Sambungan Paralon dia. 2"
Macam-macam Sambungan Paralon dia. 21/2"
Macam-macam Sambungan Paralon dia. 3"
Macam-macam Sambungan Paralon dia. 4"
Sambungan Pipa PVC JenisAW 4" TY
Lem Paralon
Solatif Leideng
Pipa PVC 4" berlobang jenis AW

L.

BAHAN SANITER

1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.

Stop Kran 3/4" KIT


Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate Waive 1/2"
Saringan Air Lt. KM Stainless Steel
Apoer Bath Tube
Kran Stainless Lokal Kait
Shower dengan liang
Shower tanpa liang
Kran tembok sun eui dia. 1/2"

37,
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.

64.

500

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
gl
m1

56.000
80.000
130.000
180.000
245.000
410.000
725.000
1.100.000
23.000
28.000
32.000
46.000
60.000
92.000
115.000
175.000
260.000
3.000
3.500
4.000
5.000
5.500
6.000
8.000
11.000
16.000
22.000
44.000
7.000
2.000
68.000

61.000
85.000
135.000
185.000
260.000
430.000
740.000
1.200.000
24.000
32.000
35.000
48.000
65.000
95.000
120.000
185.000
265.000
4.000
4.500
5.000
6.000
6.500
6.500
9.000
13.000
18.000
24.000
48.000
7.500
2.500
75.000

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

75.000
100.000
170.000
250.000
450.000
680.000
50.000
7.000
10.000
60.000
30.000
120.000
55.000
200.000
150.000
50.000

85.000
115.000
185.000
265.000
465.000
705.000
60.000
8.000
12.500
63.000
35.000
125.000
60.000
240.000
185.000
60.000

& INTERIOR

Eotst 34

TAHUN

XXI 2015

<Q>

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

.,
.,
:::0

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.

Kran tembok ITAP dia. 1/2"


Kran Bebek Sun eui 1/2"
Kran bebek ITAP 1/2"
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafellengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin warn a TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Wastafel Bulat Warna Standard Lengkap Toto
Closet duduk warn a standard lengkap INA
Urinoir Lengkap TOTO warna standard lengkap
Penyekat poslin urinoir TOTO
Kitchen Zink Stainless Standard Lokal (1 lubang)
Kitchen Zink Stainless Stainless Non Standard Franke (1 Lubang)
Kitchen Zink Stainless Stainless Non Standard Franke (2 Lubang)

M.

BAHANPENUTUPLUBANG

1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

Atap Plastik Gelombang 80x180


Atap Fiber Glass Tipis 80x180 (Gelombang)
Atap Fiber Glass Tebal80x180 (Gelombang)
AtapAiuminium Natural USR 26 (JAINDO)
A tap Aluminium Warn a USR 26 (JAINDO)
AtapAsbes Gelombang Kecil4mrn 80x180
AtapAsbes Gelombang Besar 5mm 105x180
Atap Tegola Kubota, Lengkap
Atap Tegola Kwalitas Sedang
Aluminium Foile
Atap Genteng Plentong pres Bakar Kw. I
Atap Genteng Plentong pres Molen Oven Kw. 1
Atap Genteng Flam pres Molen Oven Jatiwangi
Bubung Genteng pres Bulat ex. Jatiwangi
Genteng Bubungan ex. Jatiwangi Segi Tiga
Genteng Bubungan Beton
Genteng Metal (Rainbow Roof)
Genteng Metal hana
Nok Alas Metal (Rainbow Roof)
Nok Alas Metal hana
Nok Pinggir Metal (Rainbow Roof)
Nok Pinggir Hana
Wall Flasing (Rainbow Roof)
Wall Flashing Hana
Atap Genteng Beton Warna 14,5/m2
Genteng Beton Natural
Sirap kelas I (801m2)
Genteng Keramik Naturallntan 14,5/m2

EDISI

34

TAHUN

XXI 2015

bh
bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
unit
unit
bh
unit
bh
bh
bh
bh

40.000
95.000
75.000
170.000
485.000
30.000
1.900.000
950.000
180.000
160.000
550.000
2.000.000
950.000
950.000
1.650.000
420.000
150.000
250.000
420.000

45.000
105.000
85.000
185.000
510.000
35.000
1.950.000
1.100.000
200.000
165.000
585.000
2.200.000
1.000.000
1.100.000
1.850.000
450.000
185.000
260.000
450.000

lbr
lbr
lbr
m2
m2
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
m1
m1
m1
m1
m1
m1
m2
m2
bh
m2

23.000
38.000
65.000
135.000
150.000
35.000
46.000
285.000
170.000
8.500
950
1.100
1.200
4.500
4.000
6.000
135.000
100.000
90.000
52.000
65.000
56.000
65.000
55.000
60.000
48.000
1.300
70.000

26.000
40.000
72.000
145.000
165.000
38.000
49.000
290.000
175.000
12.000
1.100
1.250
1.300
5.000
4.500
6.500
140.000
105.000
94.000
54.000
68.000
58.000
68.000
58.000
62.000
53.000
1.500
80.000

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

501

(I)

....
~

OJ

):!.

""'

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"tt

::0
0
"tt

29.
30.
31.
32.
33.

34.

(I)

~
~

""'

35.
36.

N.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
13.

0.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

502

Genteng Keramik G\asur Standard 14,5/m2


Genteng Keramik G\asur Specia\14,5/m2
Genteng Keramik G\asur Premium 14,5/m2
Genteng Murando Natura\1 m2 = 20bh
Genteng Murando Glasur 1m2= 20bh
Bubung Murando Natural
Bubung Murando G\asur
Bubungan Genteng Keramik
BAHAN MEKAN\KAL
Jockey Pump kap. 80gln/menit 100m1 (18.6kW)
Electrical Pump kap. 750gln/ menit 120 m1 (90kW)
Diesel Pump kap. 750gln/ menit 120m1 (105kW)
Presure Tank kap. 500\iter lengkap
Hydran Box dalam gedung (lengkap)
Fire House 1.5x30m + nose
Exhouse Fan H 600 W 60x60cm
Exhouse Fan H 350 W CFM 50x50cm
Exhouse Fan H 145 W 45x45cm
AC Split 3PK setara TOSHIBA
AC Split 2PK setara TOSHIBA Plasma
AC Split 1PK setara TOSHIBA Plasma
Mesin AC Split TOSHIBA (Indoor/ Outdoor Unit)
BAHAN ELEKTRICAL
Kabel NYA 1x1.5 Prima (1 roll = 50m')
Kabel NYA 1x2.5 Prima (1 roll = 50m')
Kabel NYM 2x1.5 Prima (1 roll = 50m')
Kabel NYM 3x1.5 Prima (1 ro\1 = 50m')
Kabel NYM 2x2.5 Prima (1 ro\1 = 50m')
Kabel NYM 3x2.5 Prima (1 ro\1 = 50m')
Kabel NYM 4x2.5 Prima (1 ro\1 = 50m')
Kabel NYM 2x4 Prima (1 roll= 50m')
Kabel NYM 3x4 Prima (1 roll= 50m')
Kabel NYM 4x4 Prima (1 roll= 50m')
Kabel NYM 2x6 Supreme (1 roll = 50m')
Kabel NYM 3x6 Supreme (1 roll = 50m')
Kabel NYM 4x6 Supreme (1 ro\1 = 50m')
Kabel NYM 2x1 0 Supreme (1 ro\1 = 50m')
Kabel NYM 3x1 0 Supreme (1 roll= 50m')
Kabel NYM 4x1 0 Supreme (1 ro\1 = 50m')
Kabel NYM 4x16 Supreme (1 roll = 50m')
Kabel NYY 2x4 Supreme (1 ro\1 = 50m')
Kabel NYY 3x4 Supreme (1 roll = 50m')
Kabel NYY 4x4 Supreme (1 roll= 50m')
Kabel NYY 2x6 Supreme (1 roll= 50m')
Kabel NYY 3x6 Supreme (1 ro\1 = 50m')
Kabel NYY 4x6 Supreme (1 ro\1 = 50m')
Kabel NYY 2x1 0 Supreme (1 ro\1 = 50m')
Kabel NYY 3x1 0 Supreme (1 ro\1 = 50m')
JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

m2
m2
m2
bh
bh
bh
bh
bh

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU
ro\1
ro\1
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

& INTERIOR

80.000
110.000
140.000
2.300
2.500
4.800
6.000
12.000

90.000
120.000
150.000
2.500
2.700
5.000
7.000
13.000

35.000.000
120.000.000
300.000.000
17.500.000
3.250.000
2.500.000
900.000
600.000
450.000
8.526.000
6.648.000
3.750.000
1.600

37.000.000
122.000.000
305.000.000
18.000.000
3.350.000
2.750.000
950.000
635.000
485.000
8.672.000
6.850.000
3.850.000
1.700

225.000
275.000
5.000
5.800
6.500
8.500
12.000
11.000
14.000
16.000
18.000
20.000
24.000
19.000
30.000
32.000
42.000
20.000
24.000
32.000
26.000
36.000
44.000
38.000
54.000

240.000
285.000
5.500
6.000
7.000
8.700
13.000
12.000
16.000
18.000
19.000
22.000
26.000
21.000
32.000
35.000
45.000
22.000
26.000
35.000
29.000
38.000
46.000
40.000
60.000

EDIS/34

TAHUN

XX/2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"tt
:::0
0

64.

Kabel NYM 4x10 Supreme (1 roll= 50m')


Kabel NYM 4x16 Supreme (1 roll= 50m')
NSFB FUJI EA-100A
NSFB FUJI EA-150A
Rumah Panel 30x40x20cm (Kosong)
Skring Kas 2 Group Biasa
Skring Kas 3 Group Biasa
Skring Kas 5 Group Biasa
MCB 1 PHASE
MCB 3 PHASE
Tahanan 50A Merk Fuji
Saklar Broko Tunggal Standard (1 Phase)
Saklar Broko Seri Standard (1 Phase)
Stop Kontak Broko Standard (1 Phase)
Stop Kontak Broco 3 Phase (Out Bow)
Stop Kontak Broco 3 Phase (In Bow)
Stop Kontak Handle 3 Phase
lnstalasi Titik Lampu I Stop kontak (upah dan alai)
Lampu Pijar 25 Watt s/d 100 Watt
Lampu Neon TL Phillip 20W
Lampu Neon TL Phillip 40W
Trafo TL 20 W (Phillip)
TrafoTL40W (Phillip)
Trafo TL 20 W (Sinar)
Trafo TL 40 W (Sinar)
Stater Neon Phillip
Stater Neon Biasa
Rumah TL In Bow/ Out Bow 2x20 W (Kosongan)
Down Light+ SL 25 W Phillips
Lampu SL Phillips 20W
Lampu Sirkel TL 20W Lengkap
Lampu Mercuri 80W
Lampu Taman+ Tiang + Lampu 1 Buah
Lampu Baret 30cm + Neon
Lampu Neon Acrilic 2x40W Lengkap
Jarum Penangkal Petir 16
Kawai BC (Tembaga)
Pentanahan Penangkal Petir
Pentanahan Panel

m'
m'
bh
bh
unit
unit
unit
unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk

68.000
84.000
530.000
1.550.000
160.000
120.000
150.000
310.000
45.000
65.000
340.000
16.000
20.000
16.000
28.000
28.000
37.000
115.000
10.000
15.000
30.000
28.000
28.000
24.000
24.000
4.000
2.500
72.000
65.000
30.000
50.000
135.000
165.000
150.000
300.000
30.000
40.000
250.000
130.000

73.000
90.000
550.000
1.600.000
175.000
130.000
160.000
320.000
50.000
70.000
350.000
18.000
22.000
18.000
30.000
30.000
42.000
120.000
12.000
17.000
34.000
30.000
30.000
26.000
26.000
5.000
3.000
95.000
75.000
35.000
54.000
150.000
200.000
160.000
325.000
35.000
50.000
265.000
140.000

P.
1.
2.
3.
4.
5.
6.
7
8.

BAHAN ALAT PENGGANTUNG DAN KUNCI


Kunci Silinder ALFA untuk Pintu Aluminium
Tarikan Pintu Aluminium
Kunci 2 Slagg ROYAL
Rei Handerson Lengkap
Ret Maraton I Pi ntu
Kunci 2 Slagg Silinder SEIS asli type 210 s/d 226
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO

bh
bh
bh
bh
unit
bh
bh
bh

65.000
25.000
80.000
225.000
165.000
250.000
175.000
140.000

70.000
30.000
85.000
270.000
200.000
275.000
200.000
150.000

26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.

44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.

Eo1s1

34

TAHUN XXI

2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

503

(I)

~
~

"""

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

'tl
::0

'tl

(I)

OJ
:b

""''

9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
Q.
1.
2.
3.
4.
R.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.

Kunci KM Bulat Kualitas Biasa


Kunci KM BulatALFA
Kunci 2 Slag Silinder Utama Standard
Kunci Gembok Besar
Kunci 2 Slag Kuda Terbang
Espangolet
Grendel15cm
Grendel5cm
Hak Angin Kait Jendela Biasa
HakANgin Jendela Antik
Hak Angin Sendok Stainless I Kuningan
Nako Lengkap Tralis 1 Daun
S\oot pintu berikut Rantai
Sloot Jendela Tunggal
Engsel Pintu Uni\on Standard Besar 5"
Engse\ Jendela Unilon
Engsel patrun
Engsel Harmonika
Door Closer Kelas Standard (Kelas Sedang)
Door Closer Kelas Standard (Kelas Baik)
Door Closer Kelas Rendah
Tarikan A\mari Rata-rata
Seng BJLS 30 Iebar 60cm (1 roll 50m')
Seng BJLS 30 Iebar 90cm (1 roll 50m')

s.

BAHAN PENAMPUNG AIR

1.
2.
3.
4.
5.
6.

Tangki Air Fiber Glass 0.5m3 (Penguin)


Tangki Air Fiber Glass 1m3 (Penguin)
Tangki Air Fiber Glass 2m3 (Penguin)
Bak KM Fiber 60x60
Bak teraso WC 40x40
Bak KM Teraso 60x60

504

bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
dn
bh
bh
ps
ps
ps
m1
unit
unit
unit
bh
m1
m1

55.000
65.000
190.000
35.000
45.000
25.000
12.000
6.000
12.000
15.000
25.000
20.000
25.000
9.500
25.000
20.000
10.000
15.000
145.000
225.000
80.000
8.500
28.000
40.000

60.000
75.000
200.000
40.000
50.000
27.000
13.000
7.000
15.000
20.000
27.000
25.000
27.000
12.000
30.000
25.000
12.000
20.000
150.000
265.000
90.000
10.000
30.000
45.000

ton
kg
kg
kg

950.000
8.300
7.400
7.800

1.100.000
8.600
7.800
8.000

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

175.000
250.000
320.000
575.000
780.000
3.400.000
5.100.000
20.000.000
11.000.000
155.000.000
3.800.000

185.000
265.000
330.000
625.000
825.000
3.600.000
5.250.000
22.500.000
12.000.000
155.500.000
4.000.000

750.000
1.200.000
2.350.000
185.000
175.000
220.000

800.000
1.300.000
2.600.000
200.000
190.000
250.000

BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


Hotmixjadi Berikut alai dan bahan bakar (T = 5cm, 9m2)
Aspal (ESO) 1 Drum 150Kg
Aspal Curah
Aspal RC 70 (Cilacap)

BAHAN PENGHISAP AIR SUMUR DALAM


PompaKodok
Pompa Dragon legal
Pompa Dragon Asli
Mesin Pompa Air 1OOW- San yo
Mesin Pompa Air 150W- Sanyo
Mesin Pompa Air 250W - Sanyo
Mesin Pompa Air 450W- Sanyo
Pompa Submersible Kap. 150\iter/ menit 3kW
Gear Pump kap. 60\iter/ menit
Deep Well dengan kelengkapannya kap. 150\iter/ me nit
HandOi\Pump

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

bh
bh
bh
bh
bh
bh

& INTERIOR

EoJSJ 34

TAHUN

XXI 2015

JOURNAL OF BUILOING CONSTRUCTION, INTERIOR & MATERIAL PRICE

0
T.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.

u.
1.
2.
3.
4.
5.
6.
7
8.
9.
10.

v.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

BIAYAQUALITYCONTROL, IZIN-IZIN, PENGUKIRAN


BIASA DAN BIAYA PENYAMBUNGAN
Penyambungan Listrik PLN
Sondir Rata-rata
Pengukuran Site+ Patak
Biaya Tes Jalan (Quality Control)
Biaya Tes 1 Macam Beton
Biaya pengujian Bahan Agregat
Biaya Pengujian Listrik+gambar+trafo &Adm
lzin sumur artesis lengkap
Penyambungan PDAM untuk rumah
Geolistrik
ALATTUKANG
Palu 0,5kg
Cangkul
Singkup
Sekrop
Pengki
Lingg is
Roo! Meter 50 Meter (Bahan Plastik)
Roo! Meter 5 Meter (Bahan Besi)
Selang Plastik untuk Water Pas dia. 0,5cm
Water Pas Aluminium 60 CM
STANDARD RATA-RATASEWAALAT BESAR, ALAT
MEKANIK TRUK, KENDARAAN RODA4 DAN LAIN NYA
Sewa Me sin Gil as 8 Ton s/d 1Oton
Tirud Roller 3Jam/hari
Tam dam Roller 6-8 Ton 5Jam/ Hari
Tamdam Roller8-10Ton 5Jam/ Hari
RollerViberator- Ped 1 ton 4 Jam/ hari
Roller Viberator- Self 7 ton 5 Jam/ hari
Roller 3 Whelled- 8 Ton 5 Jam/ hari
Roller Pneumatic 8-15 Ton 5 Jam/ hari
Loader Wheeled 5 Jam/ hari
Sewa Kran 30 Ton
Sewa Exavator Backhoe 5 Jam/ hari
Sewa Draklint
Whell Loader
Buldozer 4 jam/hari
Ecavator Hydr 1m3
Backu
Motor Grader 5 Jam/ hr
Pheumatic Drill hammer 3 Jam/ hr
Vibro Roller

EDISJ34 TAHUN

XXI 2015

(I)

1watt
1 ttk
m2
ttk
1 spl
1 spl
1 watt
unit
unit
1 ttk

bh
bh
bh
bh
bh
bh
bh
bh
m'
bh

hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
jam
jam
jam
jam
jam
jam
jam
hari
hari

1.200
265.000
1.400
85.000
180.000
65.000
400
5.500.000
1.250.000
315.000

1.200
265.000
1.400
85.000
180.000
65.000
400
5.500.000
1.250.000
315.000

45.000
40.000
35.000
35.000
10.000
45.000
70.000

50.000
45.000
40.000
40.000
12.000
48.000
80.000

300.000
240.000
360.000
320.000
294.000
330.000
198.000
342.000
450.000
5.400.000
150.000
174.000
150.000
138.000
150.000
150.000
180.000
234.000
210.000

312.000
249.000
374.000
332.000
306.000
342.000
205.000
354.000
468.000
5.616.000
156.000
180.000
156.000
144.000
156.000
156.000
187.000
245.000
220.000

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

505

....
~

~
~""i

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"0

::tl
0

20.

Stone Crusher

hari

210.000

220.000

(I)

21.

AMP

hari

245.000

330.000

22.

Teractor Equament 2Jam/hari

hari

108.000

115.000

23.

ScreningPient 5 Jam/ hari

hari

360.000

375.000

24.

Asphalt Finisher

hari

330.000

345.000

~
~

""'

25.

Asphalt Melting Kalte

hari

174.000

180.000

26.

Asphalt Spayer

hari

120.000

125.000

27.

Asphal Mixing Plant

hari

300.000

312.000

28.

Sprayer Self Prop 10001 4jam/hr

hari

300.000

312.000

29.

Tamper, Viberator Plate 3Jam/hari

hari

240.000

250.000

30.

Crusher/ SCR

hari

900.000

936.000

31.

Concrete Mixer0.125m3

hari

120.000

125.000

32.

Concrete Mixer 0.5m3

hari

150.000

156.000

33.

Concrete Viberator

hari

120.000

125.000

34.

Pick Up

hari

210.000

220.000

35.

Dump Truck 3.5 Ton

hari

420.000

436.000

36.

Dump Truck 5 Ton 4 Jam/ hari

hari

480.000

500.000

37.

Flatbed Truck 3.5 Ton

hari

330.000

345.000

38.

Truck 3/4 (Colt Disel)

hari

300.000

312.000

39.

Truck Foso

hari

780.000

820.000

40.

Mesin Las Listrik 18 pk 8 jam

hari

180.000

190.000

41.

Mesin PompaAir3"

hari

120.000

125.000

42.

Stamper 8jam

hari

150.000

156.000

43.

Compresor Air

hari

120.000

125.000

44.

Pump Water (5cm) 30m3/ hari

hari

120.000

125.000

45.

TraillerTowed 1 Ton 3 Jam/hari

hari

102.000

110.000

46.

Water Tank Truck 2 Jam/ hari

hari

180.000

190.000

w.

BAHAN BAKAR DAN PELUMAS

1.

MinyakTanah

ltr

9.500

12.000

2.

Kayu Bakar dari Kayu Karel

m3

185.000

200.000

3.

Bahan Bakar Residu

ltr

1.300

1.400

4.

Minyak Solar

ltr

5.500

5.500

5.

Bensin Premium

ltr

6.500

6.500

6.

Plus Oil

ltr

1.600

1.700

7.

Oli Mesran 40 SAE

ltr

30.000

36.000

12kg

78.000

80.000

15.1 kg

82.000

86.000

8.

Elpiji/ Botol

9.

Asitilin I Botol

10.

Angin (02) I Botol

btl

90.000

93.000

11.

Kawai Las Listrik

kg

23.000

25.000

12.

Karbit

19.000

21.000

506

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eo1s1

34

TAHUN

XXI 2015

->

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

'tl

DAFTAR HARGA UPAH


KOTABEKASI

::0
0

-~

(I)

1.

Pekerja

hari/8jam

62.000

2.

Tukang Batu

hari/8jam

76.000

3.

Kepala Tukang Batu

hari/8jam

90.000

4.

Tukang Kayu

hari/8jam

78.000

5.

Kepala Tukang Kayu

hari/8jam

92.000

6.

Tukang Cat/ pelitur

hari/8jam

76.000

7.

Kepala Tukang Cat/ pelitur

hari/8jam

90.000

8.

Tukang Besi Beton

hari/8jam

78.000

9.

Kepala T ukang Besi Beton

hari/8jam

92.000

10.

Tukang Besi Profil

hari/8jam

78.000

11.

Kepala T ukang Besi Profil

hari/8jam

92.000

12.

Mandor

hari/8jam

105.000

13.

Operator Alat Besar

hari/8jam

109.000

14.

Pembantu Operator/ mekanik

hari/8jam

62.000

15.

SupirTruck

hari/8jam

93.000

16.

KenekTruk

hari/8jam

62.000

17.

Penjaga Malam

hari/8jam

78.000

ED/SI

34

TAHUN XXI

2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

~
~
""''

507

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

"'0
::0

HARGA SATUAI\i PEKERJAAI\i


KOTABEKASI

:!2

:;:

(I)

~
~""'!

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M2
M1
M2
M2
M2
M2
M3
M3
M3
M3
M3
M3
M2
M3
M3
M3
M3
M3
M2
M3
M2
M3
M3
M3

Pekerjaan Pengukurab Kembali (Site)


Pekerjaan Pasangan Bouwplank
Los Kerja/ Gudang
Pekerjaan Kantor Oireksi
Papan Nama Proyek
Pagar Pengamanan Proyek
Pekerjaan Galian Tanah Biasa Max. Kedalaman 1M'
Pekerjaan Galian Tanah Biasa Max. Kedalaman 2M'
Pekerjaan GaHan Tanah Biasa Max. Kedalaman 3M'
Pekerjaan Galian Tanah berbatu/ Tanah Keras Max. Kedalaman 1 M'
Pekerjaan Galian Tanah Cadas Max. Kedalaman 1 M'
Pekerjaan Galian Tanah Lumpur Max. Kedalaman 1 M'
Pekerjaan Striping Tebing Setinggi 1M' tebal = 20cm
Pekerjaan Pembuangan Oalam Radius 15 M
Urugan Tanah kembali
Pekerjaan Pemadatan Tanah Setiap 20cm
Pekerjaan Lapisan Pudel 1 KP : 3PP : 7 TL Untuk stabilitas tanah
Pekerjaan Lapisan Pudel 1KP : 5 TL untuk stabilitas tanah
Peke~aan Pemasangan Lapisan lnjuk T = 10cm
Pekerjaan Perkerasan Sirtu Oipadatkan Setiap 20cm
Pekerjaan Pembuatan Jalan Sementara Tebal 20cm
Pekerjaan Galian Tanah Sumuran Max. Kedalaman 1OM'
Urugan Pakai ala! besar tanah dari luar dipadatkan (5000m3)
Urugan Pasir Urug

A001
A002
A003
A004
A005
A006
A007
A008
A009
A010
A011
A012
A013
A014
A015
A016
A017
A018
A019
A020
A021
A022
A023
A024
A025
A026

1 M3 Lantai Kerja Beton Mutu fc = 7,4 Mpa (K 100), slump (3-6)cm, w/c = 0,87
1 M3 Pasangan Pondasi Cycloof, 60% beton campuran 1PC: 2PB: 3KR dan 4QOfc,

A030
A031
A032
A033
A034
A035
A036
A037
A038
A039
A040
A041
A042
A043
A044

1M3 Pasang Pondasi sumuran dia. 100 em


1M3 Beton mutu fc=7,4 Mpa (K 100), SLUP (12+2) em, w/c=0,87
1M3 Beton mutu fc=7,4 Mpa (K 100), SLUP (12+2) em, w/c=0,78
1M3 Beton mutu fc=12,2 Mpa (K 150), SLUP (12+2) em, w/c=0,72
1M3 Beton mutu fc=14,5 Mpa (K 175), SLUP (12+2) em, w/c=0,66
1M3 Beton mutu fc=16,9 Mpa (K 200), SLUP (12+2) em, w/c=0,61
1M3 Beton mutu fc=19,3 Mpa (K 225), SLUP (12+2) em, w/c=0,58
1M3 Beton mutu fc=21,7 Mpa (K 250), SLUP (12+2) em, w/c=0,56
1M3 Beton mutu fc=24,0 Mpa (K 275), SLUP (12+2) em, w/c=0,53
1 M3 Beton Mutu fc = 26,4 Mpa (K300), slump (12+2)cm, w/c = 0.52
1M3 Beton mutu fc=28,8 Mpa (K 325), SLUP (12+2) em, w/c=0,49
1M3 Beton mutu fc=31,2 Mpa (K 350), SLUP (12+2) em, w/c=0,48
1 M3 Cor Beton K-175 Ready Mix Min 6M3 Berikut Siang
1 M3 Cor Beton K-225 Ready Mix Min 6 M3 Berikut Siang
1 M3 Cor Beton K-300 Ready Mix Min 6 M3 Berikut Siang
1OKg Besi Beton terpasang Palos/ Ulir
1Kg Pekerjaan Erection Konstruksi Kuda-kuda Besi
1 Kg Pekerjaan Baja IWF Ex. ON
1 Kg Pekerjaan Konstruksi Besi Siku/ Profil Ex. ON
10 Cm Pekerjaan Pengelasan dengan Las Listrik tebal = kawat 4mm
1 Titik Melubang Konstruksi Besi dengan Bar
1 M2 Pekerjaan Bondex
1 M2 Pekerjaan Wiremesh M8
1 M2 Bekisting dengan papan
1 M2 Bekisting Multipleks 9MM
1 M2 Bekisting Multipleks 12MM
1 M2 Pasangan Stoat Werk

508

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

3.300
51.540
586.520
696.630
806.490
335.180
54.030
66.570
79.340
71.890
109.230
87.030
3.980
23.660
18.000
39.870
242.990
195.580
71.360
184.930
109.660
97.580
101.070
193.210
707.510
2.194.460
842.120
764.170
800.970
829.840
863.980
896.590
920.980
937.110
964.780
973.390
1.005.930
1.057.370
958.740
1.027.710
1.108.170
124.640
1.670
25.370
25.370
22.330
6.930
155.450
89.150
131.940
130.080
137.810
198.420

Eotst34

3.300
57.990
654.830
781.270
899.830
361.660
54.030
66.570
79.340
71.890
109.230
87.030
3.980
23.660
18.000
39.870
261.830
201.860
201.860
201.860
342.800
97.580
107.670
218.290
765.000
2.277.150
879.270
811.100
848.780
878.240
913.170
946.380
971.500
987.760
1.051.690
1.024.360
1.057.210
1.108.750
993.220
1.085.180
1.159.900
128.440
1.670
26.630
26.630
23.710
6.930
172.710
92.700
141.460
136.490
144.510
217.890
TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

'1:1

::0
0

A068
A069
AO?O
A071
A072
A073
A074
A075
A076
A077
A078
A079
A080
A081
A082
A083
A084

M3
M3
M2
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M2
M2
M2
M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
M2
M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2

Eorsr 34

Pasangan Batu Kosong (Anstamping)


Pasangan Batu Bronjong
Pasangan Lempengan Rumput sampai Tumbuh
Pasangan Batu Belah, Camp. 1PC : 8PP
Pasangan Batu Belah, Camp. 1PC : 6PP
Pasangan Batu Belah, Camp. 1PC : 5PP
Pasangan Batu Belah, Camp. 1PC : 4PP
Pasangan Batu Belah, Camp. 1PC : 3PP
Pasangan Batu Belah 1 : 4 Pakai Muka Batu Segi Enam + Siaran
Pasangan Batu Tempel Hitam
Dinding Keramik Ukiran 10x20cm
Dinding Keramik Ukiran 20x20cm
Lantai Keramik Ukiran 1Ox20cm Corak/ Anti Slip
Lantai Keramik Ukiran 20x20cm Corak/ Anti Slip
Lantai Keramik 30x30cm ON Putih Palos
Lantai Keramik 30/30 ON Bercorakl Berwarna
Lantai Granit Ukiran Besar Ex. Luar Negeri
Dinding Granit Ukiran Besar Ex. Luar Negeri
Lantai Granit Ukiran Besar Ex. Dalam Negeri
Dinding Granit Ukiran Besar Ex. Dalam Negeri
Lantai Granit Ukiran Kecil Ex. Luar Negeri
Dinding Granit Ukiran Kecil Ex. Luar Negeri
Lantai Granit Ukiran Kecil Ex. Dalam Negeri
Dinding Granit Ukiran Kecil Ex. Dalam Negeri
Lantai Granito Tile Essensa Ukuran 60x60 Polished
Dinding Granito Tile Essensa Ukuran 60x60 Polished
Lantai Granito Tile Essensa Ukuran 40x40 Polished
Dinding Granito Tile Essensa Ukuran 40x40 Polished
Lantai Marmer Ex. Lampung Ukuran Besar
Dinding Marmer Ex. Lampung Ukuran Besar
Lantai Marmer Ex. Lampung Ukuran Kecil
Dinding Marmer Ex. Lampung Ukuran Kecil
Lantai Marmer Ex. Citatah Ukuran Besar
Dinding Marmer Ex. Citatah Ukuran Besar
Lantai Marmer Ex. Citatah Ukuran Kecil
Dinding Marmer Ex. Citatah Ukuran Kecil
Pasangan Dinding Bata Merah 1PC : 2PP, tebal 112 bata
Pasangan Dinding Bata Merah 1PC : 3PP, tebal 112 bata
Pasangan Dinding Bata Merah 1PC : 4PP, tebal 112 bata
Pasangan Dinding Bata Merah 1PC: 5PP, tebal112 bata
Pasangan Dinding Bata Merah 1PC : 2PP, tebal 1 bata
Pasangan Dinding Bata Merah 1PC : 3PP, tebal 1 bata
Pasangan Dinding Bata Merah 1PC : 4PP, tebal 1 bata
Pasangan Dinding Bata Merah 1PC : 5PP, tebal 1 bata
Pasangan Dinding Bata Merah 1PC : 6PP, tebal 1 bata
Pasangan Dinding Conblok 20, AD. 1PC : 3PP
Pasangan Dinding Conblok 20, AD. 1PC : 4PP
Plesteran 1PC: 1PP, tebal15cm
Plesteran 1PC: 2PP, tebal 15cm
Plesteran 1PC: 3PP, tebal 15cm
Plesteran 1PC: 4PP, tebal 15cm
Plesteran 1PC: 5PP, tebal 15cm
Plesteran 1PC : 6PP, tebal 15cm
Plesteran 1PC : 7PP, tebal 15cm
Plesteran 1PC : 8PP, tebal 15cm
Plesteran 1PC : 2PP, tebal 20cm
Plesteran 1PC : 3PP, tebal 20cm
Plesteran 1PC : 4PP, tebal 20cm

TAHUN XXI

2015

628.620
660.640
684.000
717.230
765.170
608.770
240.560
191.650
188.920
174.510
171.220
156.050
167.800
1.920.450
2.142.020
1.352.850
1.674.560
1.585.000
1.790.130
1.187.680
1.386.650
344.490
358.560
383.910
398.600
671.730
864.870
608.730
795.700
580.920
772.640
500.880
686.180
103.620
97.590
94.140
91.980
215.810
203.130
194.560
190.170
188.740
269.510
269.280
60.860
54.240
51.380
49.420
48.320
47.430
46.950
46.460
72.610
58.210
66.120

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

395.970
407.550
6.850
672.620
704.660
728.040
761.290
809.240
648.220
272.470
199.440
196.890
184.400
179.830
164.520
176.280
2.264.850
2.491.760
1.470.210
1.793.740
1.702.360
1.909.310
1.248.280
1.448.190
367.440
381.880
431.650
447.090
732.330
926.400
629.590
816.890
607.460
799.590
538.780
724.660
109.470
103.370
99.930
97.780
227.850
215.220
206.510
202.300
201.480
301.160
302.320
61.960
55.300
52.470
50.490
49.430
48.560
48.090
47.630
74.040
59.680
67.560

& INTERIOR

509

-en<:
'1:1

OJ

))

""'

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1 M2 Plesteran 1PC : 5PP, tebal 20cm


1 M2 Plesteran 1 PC : 6PP, tebal 20cm
i 1 M2 Plesteran skoning 1PC : 2PP,Ibr 10 mm
1 M2 Plesteran ciprat 1 PC : 2PP
1 M2 Finishing siar pasangan dinding bata merah (=20m')
1 M2 Finishing siar pasangan dinding conblok ekspose (=8m')
1 M2 Finishing siar pasangan batu kali adukan 1PC :2PP
1 M2Acian PC
1 Unit septitank 2.5x1.5x2m+rembesannya (kantor type besar)
1 Unit septitank 2x1.5x2m+rembesannya (kantor type kecil)
1 Unit septitank 1.5x1x1.5m+rembesannya (rumah kapasitas kecil)
M2 Pengecatan Beton ICI Eksterior
M2 Pengecatan Plafond dan dinding Interior ICI
M2 Pengecatan Dinding Vinilex (3x)
1 M2 Pengecatan Plafond Vinilex (3x)
1 M2 Pengecatan Dinding Sanlex (3x)
1 M2 Pengecatan Plafond Sanlex (3x)
1 M2 Pengecatan Kayu (3x) Berikut Meni
1 M2 Pengecatan Besi (3x)
1 M2 Plituran Bangunan (Biasa)
M2 Plituran Meubulair
1 M2 Pasangan Rangka Plafond (50x100cm) Kayu Kamper Banjar
1 M2 Pasangan Rangka Plafond (50x100cm) Kayu Borneo Super
1 M2 Pasangan Rangka Plafond (60x60cm) Kayu Borneo Super
1 M2 Pasangan Bahan Plafond Tripleks 4mm Penutup pada rangkanya
1 M2 Pasangan Bahan Plafond Gypsum 9mm Penutup pada rangkanya
1 M2 Pasangan Bahan Plafond asbes semen 5mm Penutup pada rangkanya
1 M2 Pasangan Bahan Plafon eternit 4mm (1 x1) pada rangkanya
1 M2 Pasangan Plafond akustik uk. (60x120)cm
1 M2 Pasangan Bahan Plafon akustik uk. (60x120) em
1 M2 Pasangan list profil gypsum
1 M2 Pasangan list profil kayu kamper banjar 4x1
1 M2 Pekerjaan lisplank kayu kamper banjar 3/30
1 M2 Pekerjaan lisplank kayu kamper banjar 3/20
1 M2 Pekljaan dinding pemisat.'partisi teakwood rangkap, rangkap KY K. Ba~ar
A112 1 M3 Kusen Kayu Kamper Banjarmasin
A113 1 M3 Kusen Kayu Borneo Super
A114 1 M3 Kusen Kayu Kamper Samarinda
A115 1 M3 Kusen Kayu Jati Jabar Kelas 2
A 116 1 M2 Daun Pintu Panil Kayu Samarinda
A117 1 M2 Daun Pintu Panil Kayu Jati Jabar Kelas 2
A118 1 M2 Daun Pintu Double Teakwood Rangka Kayu Banjar
A119 1 M2 Daun Pintu Panil Teakwood Rangka Kayu Banjar
1 M2 Daun Pintu Tripleks Ukuran Pintu Lapis Aluminium (KM/WC)
1 M2 Daun Pintu Tripleks Ukuran Pintu Lapis Formika (KMIWC) Kayu Kamper
1 M2 Daun Pintu Trip leks Lapis Seng Plat (KM/W C)
1 M2 Daun Jendela Kaca (Tanpa Kaca) Kayu Kamper Samarinda
1 M2 Daun Pintu Kaca (Tanpa Kaca) Kayu Kamper Samarinda
1 M2 Daun Pintu/ Jendela Jalusi Kayu Kamper Samarinda
M3 Kuda-kuda oversteik/ konsol kayu kamper banjar (expose)
M3 Kuda-kuda Kayu Kamper Banjar
M3 Konstruksi Gording Kamper Banjar
1 M2 Rangka Atap Genteng Beton/ Keramik K-Banjar (Hanya Rangkanya)
1 M2
Borneo

63.470
46.440
38.690
22.550
10.790
47.310
28.680
10.944.340
7.050.050
4.121.080
73.990
67.790
47.530
50.720
33.490
33.380
61.100
61.310
93.290
108.690
150.910
118.720
119.410
39.510
33.030
27.590
23.960
251.630
169.880
26.190
21.470
112.100
111.390
370.810
10.017.530
7.509.530
14.207.270
13.481.270
812.180
776.980
571.090
583.410
622.790
624.440
628.730
559.650
559.650
1.070.900
10.468.630
8.963.940
8.221.270
158.700
98.550

Eo!S/34

64.970
46.930
39.050
22.660
10.840
47.960
28.790
12.325.960
7.929.770
4.616.490
76.570
70.230
48.730
51.980
34.490
34.410
62.800
62.830
99.260
115.430
166.600
127.630
128.930
40.400
38.870
30.030
25.190
259.900
174.940
28.670
23.800
118.260
117.550
406.090
11.209.380
8.173.380
14.695.120
13.969.120
839.130
795.130
589.640
602.510
643.640
642.430
649.580
575.820
575.820
1.113.690
12.246.840
9.917.160
9.894.764
180.240
108.780
TAHUN

XX/2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1 M2 Penutup Atap Sirap (4 Lapis) + Rangka Atap


1 M1 Pekerjaan Bubungan Atap genteng ex. Jatiwangi
1 M1 Pekerjaan Bubungan Atap genteng Beton
1 M1 Pekerjaan Bubungan Atap genteng Keramik
1 M1 Pasang Talang Datar/Jurai Seng BJLS 30, Lbr 90 CM
1 M1 Pekerjaan Pagar Depan Tralis Standard
1 M1 Pekerjaan Pagar Belakang/ Samping
1 M2 Pasang Onderlag Batu Selah T =20cm
1 M2 Amparan Batu Pecah Mesin S/7 t = 1Ocm
1 M2 Amparan Batu Pecah Mesin 2/3 t = Scm
1 M2 Lapisan Pengisi/ Penutup
1 M2 Pengaspalan Manual
1 M2 Hotmix Tangan T = 3cm (Jadi) untuk Hal & Jalan Kelas 6 Ton Kebawah
1 M2 Hotmix Pakai Alat Besar T = Scm Kelas Jalan 8 Ton Lebih
1 M2 Konstruksi Penetrasi Lengkap
1 M1 Saluran Grefe! Beton 1/2 Q 20cm + pasangan
1 M1 Saluran Grefe! Beton 1/2 Q 30cm + pasangan
1
1
1
1
1

1
1
1
1
1
1

Eotst 34

M2 Pasangan Paving Block warna 6 em


M2 Pasangan Paving Block warna 8 em
M2 Pasangan Paving Block Natural 6 em
M2 Pasangan Paving Block Natural 8 em
M3 Membongkar dinding bata
M3 Membongkar dinding bata
M2 Membongkar plesteran dinding
M2 Membongkar genteng /sirap
M2 Membongkar genteng /sirap
M2 Membongkar rangka atap I reng kaso
M2 Membongkar rangka atap I reng kaso
M3 Membongkar Kuda-kuda Gording/ Balok
M3 Membongkar Kuda-kuda Gording/ Balok
M2 Membongkar plafon
M2 Membongkar plafon

TAHUN

XXI 2015

232.200
100.630
10S.880
129.190
188.260

262.120
111.320
116.270
141.S40
207.320

1.212.090
1.298.180
92.1SO
41.260
26.490
1S.310

1.269.010
1.3SS.240
102.870
46.490
29.960
16.640

S6.260
68.410
119.770
139.340
194.070
221.700
130.710
146.S40
124.0SO
13S.430
146.790

S8.SOO
70.8SO
138.080
1S1.600
20S.390
23S.920

78.S90
6.290
2.S10
38.830
9.790
19.S90
871.420
SS3.300
29.100
9.100

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

134.780
1S1.7SO
128.110
139.S20
146.790
78.S90
6.290
2.S10
38.830
9.790
19.S90
871.420
SS3.300
29.100
9.100

S11

[ JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

ANAUSA HARGA SATUAN PEKERJAAN


KOTABEKASI
URAIAN

NO.

A001

1 M2 PEK. PENGUKURAN KEMBALI (SITE)_


Tukang Batu
Pekerja

Peralatan
Jumlah
Keuntungan Max.

KOEF SAT.
3

0.0100
0.0200
0.5000

org
org

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
5
6
7=!3x5l 8=!3x6l

lot

76.000.00
62.000.00
2.000.00

760.00
1.240.00
1.000.00
3.000.00
300.00

4.500.000.00
17.000.00
45.646.00

40.000.00
570.00
6.288.35
46.858.35
4.685.84
51.544.19
51.540.00

45.000.00
646.00
7.075.13
52.721.13
5.272.11
57.993.24
57.990.00

4.500.000.00
17.000.00

400.000.00
3.750.00

450.000.00
4.250.00

30.000.00
45.000.00
65.000.00
516.250.00
529.156.25

30.800.00
21.500.00
6.350.00
11.560.00
59.245.00
533.205.00
53.320.50
586.525.50
586.520.00

33.000.00
22.500.00
6.500.00
12.906.25
66.144.53
595.300.78
59.530.08

Jumlah
Dibulatkan
A002 1 M1 PEK. PASANGAN BOUWPLANK
Kayu Borneo Super

Paku 5-7
Onokos Pasano
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A003 1 M2 LOS KERJA I G UDANG
Kayu Borneo Super
Paku5H7
Seng Glb BJLS 30
Triplex3 mm
PC(SOkg)
Peralatan
Onakos Pasana

0.0100
0.0380
0.1550

0.1000
0.2500
1.1000
0.5000
0.1000
0.0250
0.1250

rri'

4.000.000.00

kg
Is

15.000.00
40.570.00

rri'

4.000.000.00

kg
lbr
lbr
zak

15.000.00
28.000.00
43.000.00
63.500.00
462.400.00
473.960.00

lot
Is

Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan
A004 1 M2 PEK. KANTOR DIREKSI
Kayu Borneo Super

Paku5-7
Seng Glb BJLS 28 ( 80 x 180 em )
Triplex 3 mm

PC(50kg)
Pasir Pasang
Bata Merah
Perala tan
Ongkos Pasang

0.1000
0.2500
1.1000
0.5000
0.1000
0.2500
70.0000
0.0200
0.1500

rri'
kg
lbr
lbr
zak

rri'
bh
lot
Is

4.000.000.00
15.000.00
28.000.00
43.000.00
63.500.00
170.000.00
500.00
539.900.00
550.698.00

4.500.000.00
17.000.00
30.000.00
45.000.00
65.000.00
203.000.00
550.00
605.500.00
617.610.00

Jumlah
Keuntungan Max.
Jumlah

'"

ADOS 1 M2 PAPAN NAMA PROYEK


Kayu Borneo Super
Paku5-7
Cat Minyak
Penulisan
Ongkos Pasang

0.1300
0.2500
1.0000
0.1250
0.1250

rri'
kg
Is
Is
Is

4.000.000
15.000.00
55.549.00
579.299.00
651.711.38

4.500.000.00
17.000.00
57.099.00
646.349.00
727.142.63

.l"ml"h
Keuntunaan Max.
Jumlah
Dibulatkan

512

760.00

76.000.00
62.000.00
2.000.00

JuRNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

400.000.00
3.750.00
30.800.00
21.500.00
6.350.00
42.500.00
35.000.00
10.798.00
82.604.70
633.302.70

EoJSI

654.830.86
654.830.00

63.330.27
696.632.97
696.6,0.00

450.000.00
4.250.00
33.000.00
22.500.00
6.500.00
50.750.00
38.500.00
12.110.00
92.641.50
710.251.50
71.025.15
781.276.65
7R1.270.0.0_

520.000.00
3.750.00
55.549.00
72.412.38
81.463.92
733.175.,0

585.000.00
4.250.00
57.099.00
80.793.63
90.892.83
R1R0>'45

73.317.53

81.803.55
899.839.00

806.492.83
806.490.00

& INTERIOR

1.240.00
1.000.00
3.000.00
300.00
3.300.00
3.300.00

34

TAHUN

899.830.00

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1
A006

KOEF SAT.

URAIAN

NO.

1 M2 PAGAR PENGAMAN PROYEK


Seng Glb BJLS 28 ( 80 x 180 )
Kayu Borneo Super
Paku 5 - 7
Pengecatan Cat Mlnyak 2x Bagian Luar
Ongkos Pasang

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
6
5

1.4300
0.0360
0.2000
1.8000
0.2000

lbr
m3
kg
m2
is

28.000.00
4.000.000.00
15.000.00
37.160.00
253.928.00

28.000.00
4.500.000.00
17.000.00
38.082.67
273.988.80

40.040.000
144.000.00
3.000.00
66.888.00
50.785.60
304.713.60
30.471.36
335.184.36
335.180.00

40.040.00
162.000.00
3.400.00
68.548.80
54.797.76
328.786.56
32.878.66
361.665.22
361.660.00

0.7500
0.0250

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

46.500.00
2.625.00
49.125.00
4.912.50
54.037.50
54.030.00

45.500.00
2.625.00
49.125.00
4.912.50
54.037.50
54.030.00

0.9000
0.0450

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

55.800.00
4.725.00
60.525.00
6.052.50
66.577.50
66.570.00

55.800.00
4.7525.00
60.525.00
6.052.50
66.577.50
66.570.00

1.0500
0.0670

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

65.100.00
7.035.00
72.135.00
7.213.50
79.348.50
79.340.00

65.100.00
7.035.00
72.135.00
7.213.50
79.348.50
79.340.00

1.0000
0.0320

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

62.000.00
3.360.00
65.360.00
6.536.00
71.896.00
71.890.00

62.000.00
3.360.00
65.360.00
6.536.00
71.896.00
71.890.00

1.5000
0.0600

oh
oh

62.000.00
105.000.00

66.000.00
105.000.00

93.000.00
6.300.00
99.300.00
9.930.00
109.230.00
109.230.00

93.000.00
6.300.00
99.300.00
9.930.00
109.230.00
109.230.00

1.2000
0.0450

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

74.400.00
4.725.00
79.125.00
7.912.50
87.037.50
OI.UOU.UU

74.400.00
4.725.00
79.125.00
7.912.50
87.037.50
0/.UJU.UU

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A007

M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M'


Pekerja

Mandor

Jum!ah
Keuntungan Max.
Jumlah
Dibulatkan

A008

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 2M'


Pekerja
Mander

Jumlah
Keuntungan Max.
Jumlah

A009

Dibulatkan
1 M3 PEK. GALl AN TANAH BIASA MAX KEDALAMAN 3M'
Pekerja

Mander

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A010

1M3 PEK. GALIAN TANAH BERBATUITANAH KERAS MAX


KEDALAMAN 1M'
Pekerja

Mander
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A011

1M3 PEK. GALl AN TANAH CADAS MAXKEDALAMAN 1M'


Pekerja
Mandor

Jumlah
Keuntungan Max.

Jumlah
Dibulatkan
A012

1M3 PEK. GALIAN TANAH LUMPUR MAX KEDALAMAN 1M


Pekerja
Mandor

Jumlah
Keuntungan Max.
Jumlah

UIOUiatKan

EDIS/34 TAHUN

XXI 2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

513

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAl AN

1
A013

~
KOEF SAT.

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

0.0500
0.0050

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

3.100.00
525.00
3.625.00
362.50
3.987.50
3.980.00

3.100.00
525.00
3.625.00
362.50
3.987.50
3.980.00

0.3300
0.0100

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

20.460.00
1.050.00
21.510.00
2.151.00
23.661.00
23.660.00

20.460.00
1.050.00
21.510.00
2.151.00
23.661.00
23.660.00

0.2500
0.0083

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

15.500.00
87.150
16.371.50
1.637.15
18.008.85
18.000.00

15.500.00
871.50
16.371.50
1.637.15
18.008.65
18.000.00

0.5000
0.0500

oh
oh

62.000.00
105.000.00

62.000.00
105.000.00

31.000.00
5.250.00
36.250.00
3.625.00
39.875.00

31.000.00
5.250.00
36.250.00
3.625.00
39.875.00

0.4000
0.1350
0.9480
0.8000
0.4000
0.0400
0.0800

m3
m3
m3

170.000.00
86.000.00
52.000.00
62.000.00
76.000.00
90.000.00
105.000.00

203.000.00
94.000.00
55.000.00
62.000.00
76.000.00
90.000.00
105.000.00

68.000.00
11.610.00
49.296.00
49.600.00
30.400.00
3.600.00
8.400.00
22.906.00
22.090.60
242.996.60
242.990.00

81.200.00
12.690.00
52.140.00
49.600.00
30.400.00
3.600.00
8.400.00
238.030.00
23.803.00
261.833.00
261.830.00

86.000.00
52.000.00
62.000.00
76.000.00
90.000.00
105.000.00

94.000.00
55.000.00
62.000.00
76.000.00
90.000.00
105.000.00

21.328.00
64.480.00
49.600.00
30.400.00
3.600.00
8.400.00
177.808.00
17.780.80
195.588.80
195.580.00

23.212.00
68.200.00
49.600.00
30.400.00
3.600.00
8.400.00
183.512.00
18.351.20
201.863.20
201.860.00

TAHUN

XXI 2015

1M2 PEK. STRIPPINGTEBINGSETINGGI1 M', TEBAL=20 CM


Pekerja
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A014

1 M3 PEK. PEMBUANGAN DALAM RADIUS 15 METER


Pekerja
Mandor

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A015

1 M3 URUGAN TANAH KEMBALI


Pekerja
Mandor
Jumlah
KeuntunQan Max.
Jumlah
Dibulatkan

A016

1 M3 PEK PEMADATAN ATANAH SETIAP 20 CM


Pekerja

Mandor
Jumtah
Keuntungan Max.
Jumlah
Dlb olk

A017

1 M3PEK.LAPISAN PUDEL 1KP:3PP:7TL UTKSTABILITASTANAH


Pasir pasang
Kapur Padam
Tanah Liat
Pekerja
Tukang batu
Kepala Tukang
Mandor

oh
oh
oh
oh

Jumlah
KeuntunQan Max.
Jumlah
Dibulatkan

A018

1 M3 PEK. LAPISAN PUDEL 1 KP:5TL UTKSTABILITAS TANAH


Kapur Padam
0.2480
Tanah Liat
1.2400
Pekerja
0.8000
Tukang batu
0.4000
Kepala Tukang batu
0.0400
Mandor
0.0800

m3
m3

oh
oh
oh
oh

Jumlah
Keuntungan Max.
Jumlah

Dibulatkan

514

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eotst 34

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1
A019

KOEF SAT.

URAIAN

NO.

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

6.0000
0.1500
0.0150

kg
oh
oh

9.000.00
62.000.00
105.000.00

10.000.00
62.000.00
105.000.00

54.000.00
9.300.00
1.575.00
64.875.00
6.487.50
71.362.50
71.360.00

60.000.00
9.300.00
1.575.00
70.875.00
7.087.50
77.962.50
77.960.00

1.2000
0.2500
0.0250

m3
oh
oh

125.000.00
62.000.00
105.000.00

138.000.00
62.000.00
105.000.00

150.000.00
15.500.00
2.625.00
168.125.00
16.812.50
184.937.50
184.930.00

165.000.00
15.500.00
2.625.00
183.725.00
18.372.00
202.097.50
202.090.00

0.2500
0.0300
0.0500
0.5000
0.1000
0.0600

m3
m3
m3
oh
oh
oh

160.000.00
135.000.00
170.000.00
62.000.00
105.000.00
94.050.00

175.000.00
150.000.00
203.000.00
62.000.00
105.000.00
99.900.00

40.000.00
4.050.00
8.500.00
31.000.00
10.500.00
5.643.00
99.693.00
9.969.30
109.662,30
109.660.00

43.750.00
4.500.00
10.150.00
31.000.00
10.500.00
5.994.00
105.894.00
10.589.40
116.483.40
116.480.00

1.1500
0.0250
0.2000

oh
oh
lot

62.000.00
105.000.00
73.925.00

62.000.00
105.000.00
73.925.00

71.300.00
2.625.00
14.785.00
88.710.00
8.871.00
97.581.00
97.580.00

71.300.00
2.625.00
14.785.00
88.710.00
8.871.00
97.581.00
97.580.00

0.6000
0.6000
5.0000
1.2000

m3
m3
m3
m3

60.525.00
65.360.00
7.250.00
30.000.00

60.525.00
65.360.00
7.250.00
35.000.00

18.157.50
19.608.00
18.125.00
36.000.00
91.890.50
9.189.05
101.079.55
101.070.00

15.157.50
19.608.00
18.125.00
42.000.00
97.890.50
9. 789.05
107.679.55
107.670.00

1.2000
0.3000
0.0100

m2
oh
oh

130.000.00
62.000.00
105.000.00

149.000.00
62.000.00
105.000.00

156.000.00
18.600.00
1.050.00
175.650.00
17.565.00
193.215.00
193.210.00

178.800.00
18.600.00
1.050.00
198.450.00
19.845.00
218.295.00
218.290.00

1 M3 PEK. PEMASANGAN LAPISAN IJUK T = 10 CM


lnjuk
Pekerja
Mandor

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A020

1 M3 PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CM


Sirtu ( Membeli Sirtu }

Pekerja
Mandor

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A021

1M3 PEK. PEMBUATAN JALAN SEMENTARA TEBAL 20 CM


Batu Belah

Kerikil
Pasir Pasang

Pekerja
Mandor

Alat Bantu ( Pek. Pemadatan Tanah 1 m2 )


Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A022

1 M3 PEK. GALIAN TANAH SUMURAN MAX KEDALAMAN 10M'


Pekerja
Mandor
Alat Bantu

A023

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 M3 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPA
DATKAN (5000M31
Pek. Ga!ian (10 org) 50%
Pek. Galian Tanah Berbatu (10 org) 50%

Pek. Grading Plant (10 org) 50%


Beli Tanah + Angkut Max. 10 km
Jumlah
Keuntunqan Max.
Jumlah
Dibulatkan

A024

1 M3 URUGAN PASIR URUG


Pasir Urug
Pekerja
Mandor

JumJah
Keuntungan Max.
Jumlah
Dibulatkan

Eotst 34

TAHUN

XXI 2015

JURNAL HARGASATUAN BAHAN BANGUNAN, KONSTRUKSI

&

INTERIOR

515

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

URAIAN

1
A025

KOEF SAT.
3

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1 M3 LANTAI KERJA BETON MUTU fc=7,4 Mpa(K 100),slump


(3-6)cm,wlc=0,87
Semen PC
Pasir beton
Split Pecah Mesin 2/3

AIR
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntunaan Max.

230.0000
893.0000
1.027.0000
200.0000
1.2000
0.2000
0.0200
0.0600

kg
kg
kg
llr
oh
oh
oh
oh

1.270.00
125.71
137.04
2.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
135.71
162.96
51.00
62.000.00
76.000.00
90.000.00
105.000.00

292.100.00
112.262.86
140.737.04
400.00
74.400.00
15.200.00
1.800.00
6.300.00
643.199.89
64.319.99
707.519.98
707.510.00

299.000.00
121.192.86
167.362.96
10.200.00
74.400.00
15.200.00
1.800.00
6.300.00
695.455.82
69.545.58
765.001.40
765.000.00

160.000.00
1.270.00
176.000.00
185.000.00
9.500.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00

175.000.00
1.300.00
190.000.00
220.000.00
9.800.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00

76.800.00
246.380.00
54.912.00
86.580.00
1.197.000.00
32.400.00
210.800.00
64.600.00
7.650.00
17.850.00
1.994.972.00
199.497.20
2.194.469.20
2.194.460.00

84.000.00
252.200.00
59.280.00
102.960.00
1. 234. 800. 00
36.000.00
210.800.00
64.600.00
7.650.00
17.850.00
2.070.140.00
207.014
2.277.154.00
2.277.150.00

160.000.00
1.270.00
176.000.00
185.000.00
62.000.00
76.000.00
90.000.00
10' non nn

175.000.00
1.300.00
190.000.00
220.000
62.000.00
76.000.00
90.000.00
1n< non nn

76.800.00
246.380.00
54.912.00
86.580.00
210.800.00
64.600.00
7.650.00
17 A50 nn
765.572.00
76.557.20
842.129.20
842.120.00

84.000.00
252.200.00
59.280.00
102.960.00
210.800.00
64.600.00
7.650.00
17 A<n.nn
799.340.00
79.934.00
879.274.00
879.270.00

313.690.00
136.900.00
109.245.71
430.00
102.300.00
20.900.00
2.520.00
8.715.00
694.700.71
69.470.07
764.170.79
764.170.00

321.100.00
162.800.00
117.935.71
1.096.50
102.300.00
20.900.00
2.520.00
8.715.00
737.367.21
73.736.72
811.103.94
811.100.00

TAHUN

XXI 2015

Jumlah
Oibulatkan

A026

1 M3 PAS. PONDASI CYCLOOF,60% BETON CAMPUR 1


PC:2PB:3KR DAN 40% BATU SELAH
Batu belah 15/20 cm(40%) batu belah
Semen PC
Pasir beton

KR (SPLIT 2/3)
Besi beton

Kawai beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

0.4800
194.0000
0.3120
0.4680
126.000
1.8000
3.4000
0.8500
0.0850
0.1700

m3

kg
m3
m3

kg
kg
oh
oh
oh
oh

Jumlah
Keuntungan Max.
Jumlah
Oibulatkan

A026a 1 M3 PAS PONDASI SUMURAN,OIA.100CM


Batu Selah 15/20 cm(40%)
Semen PC
Pasir beton

KR (SPLIT 213)
Pekerja
Tukang batu
Kepala Tukang batu

Mandor
Jumlah

0.4800
194.0000
0.3120
0.4680
3.4000
0.8500
0.0850
0.1700

m3

kg
m3
m3
oh
oh
oh
oh

Keuntungan Max.
Jumlah
Dibulatkan

A026b 1M3 BETON MUTU fc=7,4, Mpa (K100),slump (1~2)cm, wlc=0,87


Semen PC
Split Pecah mesin 213
Pasir beton

AIR
Pekerja
Tukang Batu
Kepala Tukang Batu
Mander

247.0000
999.0000
869.0000
215.0000
1.6500
0.2750
0.0280
0.0830

kg
kg
kg
llr
oh
oh
oh
oh

1.270.00
137.04
125.71
2.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
162.96
135.71
5.10
62.000.00
76.000.00
90.000.00
105.000.00

Jumlah
Keuntunqan Max.
Jumlah
Dibulatkan

516

JURNAL HARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eo!s! 34

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

KOEF SAT.

URAl AN

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

A026c 1 M3 BETON MUTUfc=9 8 MPaiK125l.slumo 112+2\cm wlc=O 78


1.012.0000
828.0000

kg
kg
kg

1.270.00
137.04
125.71

1.300.00
162.96
135.71

138.681.48
104.091.43

215.0000

llr

2.00

1.6500
0.2750

oh
oh

62.000.00
76.000.00

5.10
62.000.00

430.00
102.300.00

102.300.00

76.000.00

20.900.00

20.900.00

0.0280
0.0830

oh

90.000.00

2.520.00

oh

105.000.00

90.000.00
105.000.00

8.715.00

2.520.00
8.715.00

Jumlah

728.157.91

771.621.45

Keuntungan Max.
Jumlah

72.815.79
800.973.70

77.162.14
848.783.59

Dibulatkan

800.970.00

848.780.00
388.700.00

276.0000

Semen PC
Split Pecah Mesin 2/3

Pasir beton

AIR
Pekerja

Tukang batu
Kepala Tukang batu
Mander

350.520.00

358.800.00
164.918.52
112.371.43
1.096.50

A026d 1 M3BETON MUTU f<:=1~2MPa(150),SLUMP(122)CM, WIC=0,72


Semen PC
Split pecah mesin 2/3

299.0000
1.0170

Pasir beton

799.0000

Air

215.0000
1.6500

Pekerja

kg
kg
kg

1.270.00

1.300.00

379.730.00

137.04

162.96
135.71

139 .. 366.67

165.733.33

100.445.71
430.00

108.435.71

llr

125.71
2.00

5.10

oh
oh

62.000.00
76.000.00

62.000.00
76.000.00

Kepala Tukang Batu

0.2750
0.0280

oh

90.000.00

90.000.00

Mander

0.0800

oh

105.000.00

105.000.00

Tukang Batu

20.900.00
2.520.00

20.900.00
2.520.00
8.715.00
798.400.55

Keuntungan Max.

8.715.00
754.407.38
75.440.74

Jumlah

829.848.12

79.840.05
878.240.60

Dibulatkan

829.840.00

878.240.00

414.020.00

423.800.00
167.688.89
103.142.86

Jumlah

A027

102.300.00

1.096.50
102.300.00

1M3 BETON MUTUf<:=14 5 MoaiK175l, slumo 112+2\cm,w/c=O 66


Semen PC
Split pecah mesin 2/3

326.0000
.1.029.0000
760.0000

Pasir beton
Air

215.0000
1.6500

Pekerja
Tukang batu

0.2750

Kepala Tukang batu

0.0280
0.0830

Mander

kg
kg
kg

1.270.00

ltr

137.04
125.71
2.00

oh

62.000.00

oh
oh
oh

1.300.00
162.96
135.71

141.011.11
95.542.86

5.10
62.000.00

430.00

1.096.50

102.300.00

102.300.00

20.900.00
2.520.00

20.900.00

76.000.00

76.000.00

90.000.00
105.000.00

90.000.00
105.000.00

Jumlah
Keuntungan Max.
Jumlah

8.715.00
785.438.97
78.543.90
863.982.87
863.890.00

Dibulatkan

2.520.00
8.715.00
830.162.25
83.016.32
913.179.57
913.170.00

A027a 1 M3 BETON MUTU fc=16,9, Mpa (K200),~ump (12+2)om, wlc=0,61

kg
kg
kg

1.270.00

1.300.00

447.040.00

1.031.0000
731.0000

137.04
125.71

162.96
135.71

141.285.19

457.600.00
168.014.81

215.0000

ltr

2.00

5.10

91.897.14
430.00

99.207.14
1.096.50

1.650.0000
0.27500

oh

62.000.00
76.000.00

62.000.00
76.000.00

102.300.00
20.900.00

102.300.00

90.000.00
10' nno.nr

90.000.00
10,,000.0(

2.520.00
8.715.00

20.900.00
2.520.00
8.715.00

Jum!ah

815.087.33

860.353.46

Keuntungan Max.

81.508.73
896.596.06
896.590.00

86.035.35
946.388.80

Semen PC

352.0000

Split Pecah mesin 2/3


Pasir beton

AIR
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

0.0280
0.8300

oh
oh
oh

Jum!ah
Dibu!atkan

EDJSJ34 TAHUN

XXI 2015

JURNAL HARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI

&

INTERIOR

946.380.00

517

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


URAIAN

NO.

1
A028

~
KOEF SAT.

JUMLAH
HARGASAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1 M3 BETON MUTUfc=19 3 MPa(K225I,slump 112+2)cm wlc=0,5S

87.748.57

94.728.57

162.96
135.71

ltr

2.00

oh
oh
oh
oh

62.000.00
76.000.00

5.10
62.000.00

430.00
102.300.00

76.000.00

20.900.00

90.000.00

2.520.00
8.715.00

2.520.00

Jumlah

837.261.35

Keuntungan Max.

83.726.13
920.987.48

883.182.29
88.318.23
917.500.52

920.980.00

971.500.00

Pasir beton

AIR

371,0000
1.047,0000
698,0000
215,0000

Tukang batu

1,6500
0,2750

Kepala Tukang batu

0,0280

Mander

0,0830

Pekerja

kg
kg
kg

90.000.00
105.000.00

105.000.00

Jumlah
Dibulatkan
A028a 1M3 BETON MUTU fc=21 ,7MPa(250),SLUMP(12;':2)CM, W/C=0,5S
Semen PC
Split pecah mesin 2/3

Pasir beton
Air

384,0000
1.039,0000
692,0000
215,0000

Pekerja

1,6500

Tukang Batu

0,2700

Kepala Tukang Batu

0,0280

Mander

0,0830

125.71

ltr

2.00
62.000.00

5.10
62.000.00

102.300.00

102.300.00

76.000.00

76.000.00

20.900.00

20.900.00

90.000.00

90.000.00

2.520.00

2.520.00

105.000.00

105.000.00

8.715.00

8. 715.00
897.964.30

oh
oh
oh
oh

487.680.00
142.381.48
86.994.29
430.00

Jumlah

Dibulatkan
A028b 1 M3 BETON MUTU fc=24,0 Mpa(K2751, slump (12+21cm,w/c=0,53
Split pecah mesin 2/3

1.026.000

Pasir beton

684.0000
215.0000

Air

Pekerja

1.6500

Tukang batu

0.2750

Kepala Tukang batu

0.0280
0.0830

499.200.00

162.96
135.71

1.300.00

851.920.77
85.192.08

406.0000

8.715.00

1.270.00
137.04

Jumlah

Semen PC

1.096.50
102.300.00
20.900.00

kg
kg
kg

Keuntungan Max.

169.318.52
93.914.29
1. 096.50

89.796.43

937.112.84
937.110.00

987.760.73
987.760.00
527.800.00
167.200.00

kg
kg
kg

1.270.00

1.300.00

515.620.00

137.04
125.71

162.96
135.71

140.600.00
85.988.57

ltr

2.00
62.000.00

5.10
62.000.00

430.00
102.300.00

1.096.50
102.300.00

76.000.00
90.000.00

76.000.00
90.000.00

20.900.00
2.520.00

20.900.00
2.520.00

105.000.00

105.000.00

oh
oh
oh
oh

92.828.57

8715.00

8.715.00

877.073.57
87.707.36

923.360.07
92.336.01

Jumlah

964.780.93

1.015.696.08

Dibulatkan

964.780.00

1.015.690.00

Mander

Jumlah
Keuntungan Max.

1 M3 BETON MUTU fc=26,4 Mpa (K 300)~1ump (12+2)cm, w/c=0,52


Semen PC

413.0000

Split Pecah mesin 2/3

kg
kg
kg

1.270.00
137.04

Pasir beton

1.021.000
681.0000

AIR

215.0000

llr

Pekerja

1.6500

Tukang Batu
Kepala Tukang Batu

0.2750
0.0280

Mander

0.0830

oh
oh
oh
oh

1.300.00

524.510.00

536.900.00

125.71

162.96
135.71

139.914.81
85.611.43

166.385.19
92.421.43

2.00

5.10

430.00

1.096.50

62.000.00
76.000.00

62.000.00

102.300.00

102.300.00

76.000.00

20.900.00

20.900.00

90.000.00
105.000.00

2.520.00
8.715.00

2.520.00
8.715.00

884.901.24
88.490.12

931.238.11

90.000.00
1"' noo.oo

Jumlah
Keuntungan Max.
Jumlah

973.391.37
973.390.00

Dibulatkan

518

482.300.00
170.622.22

1.300.00

137.04
125.71

Split Pecah Mesin 2/3

A029

471.170.00
143.477.78

1.270.00

Semen PC

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

ED!SI

34

TAHUN

93.123.11
1.024.361.93
1.024.360.00

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

KOEF SAT.

URAIAN

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
5
6
7=(3x5) 8=(3x6)

A029a 1 M3 BETON MUTUfc=28,8 MPa(K3251,slump (12!2Jcm, w/c=0,49


Semen PC
Split Pecah Mesin 2/3
Pasir beton

AIR
Pekerja
Tukang batu
Kepa!a Tukang batu

Mander
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A029b 1 M3 BETON MUTU fc=31.2MPai3501.SLUMP 12+21( M W/C=O 48
Semen PC
Split pecah mesin 2/3
Pasir beton
Air
Pekerja
Tukang Batu
Kepala Tukang Batu
Mander
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A030 1 M3 COR BETON 175 READY MIX MIN 6M3 BERIKUT SLANG
Adukan K175 Ready mix
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alai Bantu (slang+tes Jab)
Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan

A031

EDIS/

448.0000
1.000.0000
667.0000
215.0000
2.1000
0.3500
0.0350
0.1050

kg
kg
kg

ltr
oh
oh
oh
oh

kg
kg
kg

ltr
oh
oh
oh
oh

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3

oh
oh
oh
oh
tot

1.270.00
137.04
125.71
2.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
162.96
135.71
5.10
62.000.00
76.000.00
90.000.00
105.000.00

557.530.00
137.859.26
84.228.57
430.00
102.300.00
20.900.00
2.520.00
8.715.00
914.482.83
91.448.28
1.005.931.11
1.005.930.00

570.700.00
163.940.74
90.928.57
1.096.50
102.300.00
20.900.00
2.520.00
8.715.00
961.100.81
96.110.08
1.057.210.89
1.057.210.00

1.270.00
137.04
125.71
2.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
162.96
135.71
5.10
62.000.00
76.000.00
90.000.00
105.000.00

568.960.00
137.037.40
83.851.43
430.00
130.200.00
26.600.00
3.150.00
11.025.00
961.253.47
96.125.35
1.057.378.81
1.057.370.00

582.400.00
162.962.96
go.521.43
1.096.50
130.200.00
26.600.00
3.150.00
11.025.00
1.007.955.89
100.795.59
1.108.751.48
1.108. 750.00

650.000.00
62.000.00
76.000.00
90.000.00
105.000.00
834.050.00

680.000.00
62.000.00
76.000.00
90.000.00
105.000.00
864.050.00

650.000.00
155.000.00
19.000.00
9.000.00
1.050.00
37.532.25
871.582.25
87.158.23
958.740.48
958.740.00

680.000.00
155.000.00
19.000.00
9.000.00
1.050.00
38.882.25
902.932.25
90.293.23
993.225.48
993.220.00

710.000.00
62.000.00
76.000.00
90.000.00
105.000.00
894.050.00

760.000.00
62.000.00
76.000.00
90.000.00
105.000.00
944.050.00

710.000.00
155.000.00
19.000.00
9.000.00
1.050.00
40.232.25
934.282.25
93.428.23
1.027.710.48
1.027. 710.00

760.000.00
155.000.00
19.000.00
9.000.00
1.050.00
42.482.25
986.532.25
98.653.23
1.085.185.48
1.085.180.00

780.000.00
62.000.00
76.000.00
90.000.00
105.000.00
964.050.00

825.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.009.050.00

780.000.00
155.000.00
19.000.00
9.000.00
1.050.00
43.382.25
1.007.432.25
100.743.23
1.108.175.48
1.108.170.00

825.000.00
155.000.00
19.000.00
9.000.00
1.050.00
45.407.25
1.054.457.25
105.445.73
1.159.900.00
1.159.900.00

1 M3 COR BETON 225 READY MIX MIN 6M3 BERIKUT SLANG


Adukan K225 Ready mix

A032

439.0000
1.006.0000
670.0000
215.0000
1.6500
0.2750
0.0280
0.0830

Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alat Bantu tslano+tes lab)
Jumlah
KeuntunQan Max.
Jumlah
Dibulatkan
1 M3 COR BETON 300 READY MIX MIN 6 M3 BERIKUT SLANG
Adukan K300 Ready mix
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alat Bantu fslano+tes lab\
Jumlah
Keuntunoan Max.
Jumlah
Oibulatkan

34

TAHUN XXI

2015

oh
oh
oh
oh
lot

oh
oh
oh
oh
lot

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

519

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAIAN

1
A033

~
KOEF SAT.

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

10.5000
0.1500
0.0700
0.0700
0.0070
0.0040

kg
kg
oh
oh
oh
oh

9.500. 00
18.000.00
62.000.00
78.000.00
92.000.00
105.000.00

9.800.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

g9.750.00
2.700.00
4.340.00
5.460.00
644.00
420.00
113.314.00
11.331.40
124.645.40
124.640.00

102.900.00
3.000.00
4.340.00
5.460.00
644.00
420.00
116.764.00
11.676.40
128.440.40
128.440.00

0.0010
0.0010
0.0002
0.0001
0.0002
0.0200
0.0002
0.0100
0.0010
0.0002

oh
oh
oh
oh
oh
oh
Is
It
It
lot

62.000.00
78.000.00
92.000.00
105.000.00
109.000.00
62.000.00
19.000.00
5.500.00
30.000.00
1.519.50

62.000.00
78.000.00
92.000.00
105.000.00
109.000.00
62.000.00
21.000.00
5.500.00
36.000.00
1.525.90

62.00
78.00
18.40
10.50
21.80
1.240.00
3.80
55.00
30.00
0.30
1.519.80
151.98
1.671.78
1.670.00

62.00
78.00
18.40
10.50
21.80
1.240.00
4.20
55.00
36.00
0.31
1.526.21
152.62
1.678.83
1.670.00

1.1500
0.0600
0.0600
0.0060
0.0030

kg
oh
oh
oh
oh

12.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.800.00
3.720.00
4.680.00
552.00
315.00
23.067 00
2.306.70
25.373 70
25.370.00

14.950.00
3. 720.00
4.680.00
552.00
315.00
24.217.00
2.421. 70
26.638.70
26.630.00

1.1500
0.0600
0.0600
0.0060
0.0030

kg
oh
oh
oh
oh

12.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.800.00
3.720.00
4.680.00
552.00
315.00
23.067.00
2.306.70
25.373.70
25.370.00

14.950.00
3.720.00
4.680.00
552.00
315.00
24.217.00
2.421.71
26.638.70
26.630.00

0.4000
0.3000
0.0400
0.0400
0.0200
0.0020
0.0020
0.1700

kg
It
It
oh
oh
oh
oh

23.000.00
5.500.00
30.000.00
62.000.00
78.000.00
92.000.00
105.000.00
22.500.00

25.000.00
5.500.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00
23.750.00

9.200.00
1.650.00
1.200.00
2.480.00
1.560.00
184.00
210.00
3.825.00
20.309.00
2.030.90
22.339.90
22.330.00

10.000.00
1.650.00
1.440. 00
2.480.00
1.560.00
184.00
210.00
4.037.50
21.561.50
2.156.15
23.717.65
23.710.00

EoJSJ 34 TAHUN

XXI 2015

10 KG BESI BETON TERPASANG POLOS/ULIR


Besi beton po!os/ulir
Kawat Beton
Pekerja
Tukang besi
Kepala Tukang besi
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A034 1 KG PEK. ERECTION KONST KUDA-KUDA BESI


Pekerja
Tukang Besi profil
Kepala Tukang besi profil
Mandor
Operator alat besar
Pembantu operator
Sewa alat
Bahan bakar solar
Pelumas

Alat bantu
Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan
A035 1 KG PEKERJAAN BAJA IWF EX ON
Besi baja IWF ex DN Sll
Pekerja
Tukang besi profii/Tukang las
Kepala Tukang besi profil
Mandor
Jumlah
Keuntungan Max.
Ju lah
Dibulatkan
A036 1 KG PEK. KONTRUKSI BESI SIKU/PROFIL EX.DN
Besi profil I besi siku ex DN
Pekerja
Tukang besi profil/ tukang las
Kepala Tukang besi profil
Mandor
Jumlah
Keuntungan Max.
Jumlah
Uibulatkan
A037 10CM PEK PENGELASAN DENGAN LASUSTRIKTBL=KAWAT 4MM
Kawat las listrik
Bahan bakar solar
Pelumnas
Pekerja
Tukang besi profit
Kepala Tukang besi profil
Mandor
Sewa alat (mesin las listrik
Jum!ah
Keuntungan Max.
Jumlah
Dibulatkan

520

jam

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE 1

KOEF SAT.

URAIAN

NO.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

0.0500
0.0200
0.0030
0.0010
0.2500

oh
oh
oh
oh
lot

62.000.00
78.000.00
92.000.00
105.000.00
5.041.00

62.000.00
78.000.00
92.000.00
105.000.00
5.041.00

3.100.00
1.560.00
276.00
105.00
1.280.25
6.301.25
630.13
6.931.38
6.930.00

3.100.00
1.560.00
276.00
105.00
1.260.25
6.301.25
630.13
6.931.38
6.930.00

1.0100
0.1000
0.0500
0.0300
0.0100
1.0000

m2

120.000.00
23.000.00
62.000.00
78.000.00
105.000.00
11.331.40

135.000.00
25.000.00
62.000.00
78.000.00
105.000.00
11.676.00

121.200.00
2.300.00
3.100.00
2.340.00
1.050.00
11.331.40
141.132.14
14.132.54
155.453.54
155.450.00

136.350.00
2.500.00
3.100.00
2.340.00
1.050.00
11.676.40
157.016.40
15.701.64
172.718.04
172.710.00

1.0100
0.1000
0.1000
0.0750
0.0100

m2

oh
oh
org

65.000.00
23.000.00
62.000.00
78.000.00
105.000.00

68.000.00
25.000.00
62.000.00
78.000.00
105.000.00

65.650.00
2.300.00
6.200.00
5.850.00
1.050.00
81.050.00
8.105.00
89.155.00
89.150.00

68.680.00
2.500.00
6.200.00
5.850.00
1.050.00
84.280.00
8.428.00
92.708.00
92.700.00

Papan terentang (2 x pakai) 75%

0.0170
0.0240

m3
m3

paku

OAOOO

kg

pekerja

0.1200
0.2700
0.1500
0.0500

oh
oh
oh
oh

4.000.000.00
1.800.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

4.500.000.00
2.000.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

34.000.00
32.400.00
6.000.00
7.440.00
21.060.00
13.800.00
5.250.00
119.950.00
11.995.00
131.945.00
131.940.00

38.250.00
36.000.00
6.800.00
7.440.00
21.060.00
13.800.00
5.250.00
128.600.00
12.860.00
141.460.00
141.460.00

0.0170
0.3470
0.4000
0.1200
0.2700
0.1500
0.0500

m3

4.000.000.00
118.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

4.500.000.00
121.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

34.000.00
30.709.50
6.000.00
7.440.00
21.060.00
13.800.00
5.250.00
118.259.50
11.825.95
130.085.45
130.080.00

38.250.00
31.490.25
6.800.00
7. .440.00
21.060.00
13.800.00
5.250.00
124.090.25
12.409.28
136.499.28
136.490.00

A038

1 TITIK MELOMBANG KONTRUKSI BESI DENGAN BOR


Pekerja

Tukang besi Profil


Kepala Tukang besi
Mandor
Alai bantu (mesin bor listrik)
Jumlah
Keuntungan Max.
Jumlah

Dibulatkan
A039 1 M2 PEKERJAAN BONDEX
Bondex
Kawat las
Pekerjaan Terampil
Tukang besi profil
Mandor

Shear connector

kg

oh
oh
oh
Is

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A040

1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8
Kawat las
Pekerja

Tukang besi profil


Mandor

kg

Jumlah
Keuntunoan Max.
Jum!ah

Dibulatkan

A041

1M2 BEKISTING DENGAN PAPAN


Kaso 5/7 borneo sp(2 x pakai) 50%

tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntunqan Max.
Jumlah

A042

Dibulatkan
1M2 BEKISTING MULTIPLEK 9 MM
Kaso 5/7 borneo sp{2 x pakai) 50%
Papan terentang (2 x pakai) 75%
paku
pekerja
tukang kayu terampil
kepala tukang kayu
mandor

lbr
kg

oh
oh
oh
oh

Jumlah
Keuntungan Max.
Jum!ah
Dibu!atkan

ED/S/34 TAHUN XXI

2015

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

521

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

URAIAN

NO.
1
A043

KOEF SAT.
3

0.0170
0.3470
0.4000
0.1200
0.2700
0.1500
0.0500

m3

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
6
5

1M2 BEKISTING MULTIPLEK 12 MM


Kaso 5/7 borneo sp {2 x pakai)50%
Mulliplek 12mm (12 x pakai) 75%
Paku
Pekerja
Tukang kayu terampil

Kepala Tukang kayu


Mandor

4.000.000.00
145.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

lbr
kg

oh
oh
oh
oh

4.500.000.00
149.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

34.000.00

38.250.00

37.736.25
6.000.00
7.440.00
21.060.00

38.777.25
6.800.00
7.440.00
21.060.00

13.800.00
5.250.00
125.286.25
12.528.63
137.814.88
137.810.00

13.800.00
5.250.00
131.377.25
13.137.73
144.514.98
144.510.00

A044 1 M2PASANGANSTOOTWERK
Kayu stool (dinding 2 x pakai) 50%
papan terentang (2 xpakai)

paku
pekerja
Tukang kayu
Kepala tukang kayu
Mandor

9.0000
0.0160
0.5000
0.1500
0.2000
0.2000
0.0170

bt
m3
kg

oh
oh
oh
oh

22.000.00

25.000.00

99.000.00

112.500.00

1.800.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

2.000.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

28.800.00
7.500.00
9.300.00
15.600.00

32.000.00
8.500.00
9. 300.00
15.600.00

18.400.00
1.785.00
180.385.00
18.038.50
198.423.50
198.420.00

18.400.00
1. 785.00
198.085.00
19.808.50
217.893.50
217.890.00

160.000.00
130.000.00
62.000.00
76.000.00

175.000.00
149.000.00

192.000.00
56.160.00

62.000.00
76.000.00

48.360.00
29.640.00

210.000.00
64.368.00
48.360.00
29.640.00

90.000.00
105.000.00

90.000.00
105.000.00

3.510.00
4.095.00
333.765.00
33.376.50

3.510.00
4.095.00
359.973.00
35.997.30

367.141.50
367.140.00

395.970.30
395.970.00

150.000.00

168.000.00

180.000.00

25.000.00
59.000.00
62.000.00
105.000.00

77.000.00
88.500.00
12.400.00
2.100.00

87.500.00
88.500.00
12.400.00
2.100.00

348.000.00
34.800.00
382.800.00
382.800.00

370.500.00
37.050.00
407.550.00
407.550.00

2.400.00
2.480.00
1.050.00

2.700. 00
2.480.00
1.050.00

5.930.00
593.00
6.523.00
6.520.00

6.230.00
623.00
6.853.00
6.850.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A045

1 M3 PASANGAN BATU KOSONG (ANSTAMPING)


Batu be!ah 15cm/20 em
Pasir urug
Pekerja

Tukang batu
Kepala tukang batu
Mandor

1.2000
0.4320
0.7800
0.3900
0.0390
0.0390

m3
m3

oh
oh
oh
oh

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A046

1M2 PASANGANBATU BRONJONG


Batu kali (balu bulat) bronjol

1.2000

m3

kawat bronjong

3.5000
1.5000
0.2000
0.0200

kg

pekerja
pekerja terampil

mandor

oh
oh
oh

140.000.00
22.000.00
59.000.00
62.000.00
105.000.00

Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

A047

1M2 PASANGAN LEMPENGAN RUMPUTSAMPAITUMBUH


Lempengan Rumput Biasa (Teki)
pekerja
mandor

1.2000
0.0400
0.0100

m2

oh
oh

2.000.00
62.000.00
105.000.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

522

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

2.250.00
62.000.00
105.000.00

EDJSJ34 TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1
A048

KOEF SAT.

URAl AN

NO.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
6
5

1.2000
g1.0000
0.5840
1.5000
0. 7500
0.0750
0.0750

m3
kg
m3
oh
oh
oh
oh

160.000.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.ooo.nn

175.000.00
1.300.00
203.000.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

1g2.000.00
115.570.00
gg_280.00
g3.000.00
57.000.00
6.750.00
7.875.00
571.475.00
57.147.50
628.622.50
628.620.00

210.000.00
118.300.00
118.552.00
g3.000.00
57,000.00
6.750.00
7.875.00
611.477.00
61.147.70
672.624.70
672.620.00

1.2000
117.0000
0.5610
1.5000
0.7500
0.0750
0.0750

m3
kg
m3
oh
oh
oh
oh

160.000.00
1.270.00
170.000.00
62.000.00
76.000.00
go_ooo.oo
105.000.00

175.000.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1g2.000.00
148.590.00
g5.370.00
93.000.00
57.000.00
6.750.00
7.875.00
600.585.00
60.058.50
660.643.50
660.640.00

210.000.00
152.100.00
113.883.00
g3.000.00
57.000.00
6.750.00
7.875.00
640.608.00
64.060.80
704.668.80
704.660.00

1.2000
136.0000
0.5440
1.5000
0.7500
0.0750
0.0750

m3
kg
m3
oh
oh
oh
oh

160.000.00
1.270.00
170.000.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

175.000.00
1.300.00
203.000.00
62.000.00
90.000.00
105.000.00

192.000.00
172.720.00
g2.480.00
93.000.00
57.000.00
6.750.00
7.875.00
621.825.00
62.182.50
684.007.50
684.000.00

210.000.00
176.800.00
110.432.00
g3.000.00
57.000.00
6.750.00
7.875.00
661.857.00
66,185.70
728.042.70
728.040.00

1.2000
163.0000
0.5200
1.5000
0.7500
0.0750
0.0750

m3
kg
m3
oh
oh
oh
oh

160.000.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

175.000.00
1.300.00
203.000.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

1g2.000.00
207.010.00
88.400.00
93.000.00
57.000.00
6.750.00
7.875.00
652.035.00
65.203.50
717.238,50
717.230.00

210.000.00
211.900.00
105.560.00
g3.000.00
57.000.00
6.750.00
7.875.00
692.085.00
69.208.50
761.293.50
761.290.00

1.2000
202.0000
0.4850
1.5000
0.7500
0.0750
0.0750

m3
kg
m3
oh
oh
oh
oh

160.000.00
1.270.00
170.000.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

175.000.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

192.000.00
256.540.00
82.450.00
g3.000.00
57.000.00
6.750.00
7.875.00
695.615.00
69.561.50
765.176.50
765.170.00

210.000.00
262.600.00
98.455.00
93.000.00
57.000,00
6.750.00
7.875.00
735.680.00
73.568.00
809,248,00
8og.240.00

1 M3 PASANGAN BATU BELAH CAMP. 1PC : 8PP


Batu Selah 15 cm/20 em

Semen PC
Pasir Pasang
Pekerja

Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

A049

1 M3 PASANGAN BATU BELAH, CAMP.1PC: 6PP


Balu Belah 15 cm/20 em
Semen PC
Pasir Pasang

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

Jumlah
Keuntun an Max.
Jum!ah
Dibulatkan

A050

1 M3 PASANGAN BATU BELAH, CAMP.1PC: 5PP


Batu Selah 15 cm/20 em
Semen PC

Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mander
Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan

A051

1 M3 PASANGAN BATU BELAH CAMP.1PC: 5PP


Batu Belah 15 cm/20 em
Semen PC

Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mander

Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

A052

1 M3 PASANGAN BATU BELAH, CAMP.1PC: 4PP


Batu Selah 15 cm/20 em
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepa!a Tukang batu
Mandor
Jum!ah
Keuntungan Max.
Jum!ah
Dibulatkan

ED!S/34 TAHUN

XXI 2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

523

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAIAN

1
A053

~
KOEF SAT.

HARGASAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MNM..M) (MAXIMUM)
5
6
7=(3x5) 8=(3x6)

Batu Selah

1.5000

175.000.00

240.000.00

262.500.00

1.2500

m3
zak

160.000.00

Semen PC

63.500.00

79.375.00
59.160.00

81.250.00

1M3PA&BATUBEI.AH1:4PAKAIMUKABATUSEGIENAM+SIARAN

Pasir Pasang

0.3480

m3

170.000.00

65.000.00
203.000.00

Pekerja

1.2500

62.000.00

62.000.00

77.500.00

77.500.00

Tukang batu

1.1250

oh
oh
oh
oh

76.000.00

76.000.00

85.500.00

85.500.00

90.000.00

90.000.00

10.125.00

10.125.00

105.000.00

105.000.00

1.774.50

1. 774.50

553.434.50

589.293.50

Kepala Tukang batu

0.1125

Mandor

0.0169

Jumlah

55.343.45

58.929.35

Jumlah

608,777.95

648.222.85

Dibulatkan

608,770.00

648.220.00

135.000.00

121.000.00

148.500.00
15.275.00
7.105.00

Keuntungan Max.

A054

1 M2 PASANGAN BATU TEMPEL HITAM


Batu tempe! hitam

1.1000

m2

110.000.00

11.7500

kg

1.270.00

1.300. 00

14.922.50

Pasir Pasang

0.0350

m3

170.000.00

203.000.00

5.950.00

Pekerja

0.7000

62.000.00

43.400.00

43.400.00

0.3500

76.000.00

76.000.00

26.600.00

26.600.00

Kepala Tukang batu

0.0350

90.000.00

go.ooo.oo

3.150.00

3.150.0

Mandor

0.0350

oh
oh
oh
oh

62.000.00

Tukang batu

105.000.00

105.000.00

Semen PC

Jumlah

21.869.75

24.770.50
272.475.50

Dibulatkan

240.560.00

272.470.00
44.520.00
12.ogo.oo

1 M2 DINDING KERAMIK UK.10 X20 CM


53.0000

bh

780.00

840.00

41.340.00

9.3000

kg

1.270.00

1.300.00

11.811.00

Pasir Pasang

0.0180

m3

170.000.00

203.000.00

3.060.00

3.654.00

Semen Warna

2.7500
o.gooo

kg

7.000.00

8.100.00

1g.250.00

22.275.00

Keramik KW 1 DN

Pekerja

Tukang batu

0.4500

Kepala Tukang batu

0.0450

Mandor

0.0450

oh
oh
oh
oh

62.000.00

62.000.00

55.800.00

55.800.00

76.000.00

76.000.00

34.200.00

34.200.00

90.000.00

90.000.00

4.050.00

4.050.00

105.000.00

105.000.00

4.725.00

4.725.00

174.236.00

181.314.00

Jumlah
Keuntun!lan Max.
Jumlah
Dibulatkan

17.423.60

18.131.40

191.659.60
191.650.00

199.445.40
199.440.00

1 M2 DIN DING KERAMIK UK. 20 X20 CM


26.5000

bh

1.680.00

840.00

44.520.00

48.760.00

Semen PC

9.3000

kg

1.270.00

1.300.00

11.811.00

12.090.00

Pasir Pasang

0.0180

m3

170.000.00

203.000.00

3.060.00

3654.00
15 .. 714.00

Keramik KW 1 ON

524

3.675.00
247.705.00

240.567.25

Semen PC

A056

3.675.00
218.697.50

Jumlah

Keuntungan Max.

A055

70.644.00

Semen Warna

1.9400

kg

7.000.00

8.100.00

13.580.00

Pekerja

0.0900

62.000.00

62.000.00

55.800.00

55.800.00

Tukang batu

0.4500

oh
oh
oh
oh

76.000.00

76.000.00

34.200.00

34.200.00

Kepala Tukang batu

0.0450

Mandor

0.0450

90.000.00

90.000.00

4.050.00

4.050.00

105.000.00

105.000.00

4. 725.00

4.725.00
178.993.00

Jumlah

171.746.00

Keuntungan Max.

17.174.600

17.899.30

Jumlah

188.920.60

196.892.30

Dibulatkan

188.920.00

196.890.00

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eo/Si34 TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

53.0000
8.1900

bh
kg

0.0450

m3

Semen warna

2.7500

Pekerja

0.7000
0.3500

kg
oh
oh
oh
oh

1
A057

KOEF SAT.

URAIAN

NO.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MNrvt...M)
(MAXIMUM)
(MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1M2 LANTAI KERAMIK UK.10X20CM CORAKIANTI SLIP


Keramik 10/20 KW 1 ON Corak/anti slip
Semen PC

Pasir Pasang

Tukang batu

Kepala Tukang batu

0.0350
0.0350

Mander

840.00
1.270.00
170.000.00

920.00
1.300.00

44.520.00
10.401.30

203.000.00

7.650.00

7.000.00

8.100.00

19.250.00

62.000.00

62.000.00
76.000.00

43.400.00
26.600.00

76.000.00
90.000.00
105.000.00

90.000.00
105.000.00

Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

A058

Keramik 20/20 KW 1 DN Corak/anti slip

22.275.00
43.400.00
26.600.00

3.675.00
158.646.30

3.150.00
3.675.00
167.642.00

15.864.63
174.510.93

184.406.20

174.510.00

184.400.00

16.764.20

26.5000
10.4000

bh
kg

1.760.00
1.270.00

1.920.00
1.300.00

46.640.00
13.208.00

50.880.00
13.520.00

7.650.00
11.340.00

13.122.00

9.135.00

Pasir Pasang

0.0450

m3

170.000.00

203.000.00

1.6200

Pekerja

0.7000
0.3500

kg
oh
oh
oh
oh

7.000.00
62.000.00

8.100.00
62.000.00

43.400.00

43.400.00

76.000.00

76.000.00

26.600.00

90.000.00
105.000.00

90.000.00
105.000.00

26.600.00
3.150.00

Kepala Tukang batu

0.0350
0.0350

Keuntungan Max.

3.150.00
3.675.00
155.663.00
15.566.30

Jumlah

171.229.30

16.348.20
179.830.20

Dibulatkan

171.220.00

179.830.00

Mandor

Jumlah

3.675.00
163.482.00

1M2 LANTAI KERAMIK UK. 30X30 CM ON PUTIH POLOS


Keramik KW 1 DN Putih Poles

11.8700

m2

2.880.29

3.240.32

34.189.02

38.462.65

Semen PC

10.000

kg

13.000.00

m3

Semen Warna

0.0450
1.5000

1.300.00
203.000.00

12.700.00

Pasir Pasang

1.270.00
170.000.00

8.100.00

0.7000

7.650.00
10.500.00
43.400.00

9.135.00
12.160.00

Pekerja

7.000.00
62.000.00

Tukang batu

0.3500
0.0350
0.0350

Kepala Tukang batu


Mander

kg
oh
oh
oh
oh

76.000.00

62.000.00
76.000.00

90.000.00
105.000.00

90.000.00
105.000.00

Jumtah
Keuntunqan Max.

26.600.00
3.150.00
3.675.00
141.864.02
14.186.40
156.050.42
156.050.00

Jumlah
Dibulatkan

43.400.00
26.600.00
3.150.00
3.675.00
149.572.65
14.957.26
164.529.91
164.520.00

1 M2LANTAI KERAMIK UK. 30X30CM BERCORAKIBERWARNA


11.8700

m2

Semen PC

10.000

kg

Pasir Pasang

0.0450
1.5000

m3

Keramik KW 1 ON bercorak berwarna

Semen Warna
Pekerja

0.7000
0.3500

Tukang batu

kg
oh
oh
oh
oh

3.780.38
1.270.00
170.000.00

4.140.41
1.300.00
203.000.00

7.000.00
62.000.00

8.100.00
62.000.00

76.000.00
90.000.00
105.000.00

76.000.00
90.000.00
105.000.00

44.873.09
12.700.00
7.650.00
10.500.00
43.400.00

12.150.00
43.400.00
26.600.00
3.150.00
3.675.00
160.256.71

Jumlah

15.254.81
167.802.90

16.025.67
176.282.39

Dibulatkan

167.800.00

176.280.00

0.0350
0.0350

Mandor
Jumlah
Keuntunqan Max.

34

TAHUN XXI

2015

JURNAL HARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI

26.600.00

49.146.71
13.000.00
9.135.00

3.150.00
3.675.00
152.548.09

Kepala Tukang batu

EDISI

10.647.00
9.135.00

Semen Warna
Tukang batu

A060

3.150.00

48.760.00

1M2 LANTAI KERAMIK UK. 20X20CM CORAKIANTI SLIP


Semen PC

A059

& INTERIOR

525

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAIAN

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNM.lv1) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.0500
0.0250
0.0320

m2
zak
m3
lot
oh
oh
oh
oh
oh

1.500.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.691.735.00

1.800.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.995.115.00

1.500.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
4.500.00
2.625.00
54.135.52
1.745.870.52
174.587.05
1.920.457.57
1.920.450.00

1.800.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
4.500.00
2.625.00
63.843.68
2.058.958.88
205.895.87
2.264.854.55
2.264.850.00

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.1000
0.0480

m2
zak
m3
lot
oh
oh
oh
oh
oh

1.500.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.858. 110.00

1.800.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
2.161.490.00

1.500.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
10.500.00
89.189.28
1.947.299.28
194.729.93
2.142.029.21
2.142.020.00

1.800.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
10.500.00
103.751.52
2.265.241.52
226.524.15
2.491.765.67
2.491. 760.00

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.0500
0.0250

1.000.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.100.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.000.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
4.500.00
2.625.00

1.100.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
4.500.00
2.625.00

Alot Rnot"

o o??o

m2
zak
m3
lot
oh
oh
oh
oh
nh

1 101 70< nn

1 ?95 115 001

1
A061

KOEF SAT.

1M2 LANTAI GRANIT UK. BESAR EX LUAR NEGERI


Granit Ex italy (setelah dipotong)
Semen PC
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Manda
Alat Bantu
Jum!ah
Keuntungan Max.
Jumlah

Dibulatkan

A062

1M2 DINDtNG GRANlT UK. BESAR EX. LUAR NEGERl


Granit Ex LN (setelah dipotong)
Semen PC
Pasir Pasang
Campuran kedap air
Pekerja

Tukang batu
Kepala Tukang batu

Mandor
Alat bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A063

1 M2 LANTAl GRANlT UK. BESAR EX DALAM NEGERl


Granit Ex DN {setelah dipotong)
Semen PC
Pasir Pasang
Campuran kedap air

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A064

52

"

U?

1.336.558.68
133.655.87
1.470.214.87
1.470.210.00

1.000.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
105.000.00
69.725.28
1.522.335.28

1.100.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
105.000.00
74.687.52
1.630.677.52

1M2 DlNDING GRANlT UK. BESAR EX DALAM NEGERl


Granit Ex ON (setelah dipotong)
Semen PC
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alai Bantu
Jumlah

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
1.0000
0.0480

m2
zak
m3
lot
oh
oh
oh
oh
oh

1.0000.000.00
63.500.000
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.452.610.00

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSl

1.100.000.00
62.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.555.990.00

,., ""'

Mex

Jumlah
Dibulatkan

526

~R 1~5

1.229.870.52
122.987.05
1.352.857.57
1.352.850.00

1.674.568.81
1.674.560.00

& INTERIOR

Eo!SI34 TAHUN

...

.~

.,;

1.793.745.27
1.793.740.00

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

1
A065

KOEF SAT.

URAIAN

Campuran kedap air


Pekerja
Tukang batu

Kepala Tukang batu


Man do
Alai Bantu
Jumlah

A067

Keuntungan Max.
Jumlah
Dibulatkan
1M2 DINDING GRANIT UK. KECIL EX LUAR NEGERI
Granit Ex LN (setelah dipotong)
Semen PC
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alai bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1M2 LANTAI GRANIT UK. KECIL EX DALAM NEGERI
Granit Ex ON (sete!ah dipotong)
Semen PC

Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alai Bnatu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A068

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
1.0000
0.0250
0.0320

m2
zak
m3
lot
oh
oh
oh
oh
lot

1.200.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.396.235.00

1.300.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.499.615.00

1.200.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
9.000.00
2.625.00
44.679.52
1.440.914.52
144.091.45
1.585.005.97
1.585.000.00

1.300.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
9.000.00
2.625.00
47.987.68
1.547.602.68
154.760.27
1.702.362.95
1.702.360.00

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.5000
0.0480

m2
zak
m3
lot
oh
oh
oh
oh
lot

1.200.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.552.860.00

1.300.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.656.240.00

1.200.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
5.250.00
74.537.28
1.627.397.28
162.739.73
1.790.137.01
1.790.130.00

1.300.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
5.250. 00
79.499.52
1.735.739.52
173.573.95
1.909.313.47
1.909.310.00

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.1000
0.0250
0.0320

m2
zak
m3
lot
oh
oh
oh
oh
lot

850.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.046.235.00

900.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.099.615.00

850.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
9.000.00
2.625.00
33.479.52
1.079. 714.52
107.971.45
1.187.685.97
1.187.680.00

900.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
9.000.00
2.625.00
35.187.68
1.134.802.68
113.480.27
1.248.282.95
1.248.280.00

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
1.0000
0.0480

m2
zak
m3
lot
oh
oh
oh
oh
lot

850.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.202.000.00

900.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
1.256.240.00

850.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
5.250.00
57.737.28
1.260.597.28
<?n<an

900.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
5.250.00
60.299.52
1.316.539.52

1.386.657.01
1.386.650.00

1.448.193.47
1.448.190.00

1M2 DINDING GRAN IT UK. KECIL EXDALAM NEGERI


Granit Ex DN (setelah dipotong)
Semen PC
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alat Bantu
Jumlah
M"
Jumlah
Dibulatkan

EoiSI

1M2 LANTAI GRANIT UK. KECILEX. LUAR NEGERI


Granit Ex italy {setelah dipotong)
Semen PC
Pasir Pasang

A066

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) ( MNI'v'LM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

34

TAHUN XXI

2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

1>1 . ., . ,

527

[ JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

URAIAN

NO.

1
A069

KOEF SAT.
3

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNM.M) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1M2 LANTAI GRANITO TILE ESSENZA UK. 60X60 POLISHED


Granito Essenza 60x60 polished
Semen PC
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alai Bantu

1.0000
0.2600
0.0300
1.0000
0.2500
0.6000
0.0500
0.0250
0.0240

m2
zak

m3

lot
oh
oh
oh
oh
lot

198.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
305.835.00

215.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
326.215.00

198.000.00
16.510.00
5.100.00
18.000.00
15.500.00
45.600.00
4.500.00
2.625.00
7.340.04
313.175.04
31.317.50
344.492.54
344.490.00

215.000.00
16.900.00
6.090.00
20.000.00
15.500.00
45.600.00
4.500.00
2.625.00
7.829.16
334.044.16
33.404.42
367.448.58
367.440.00

198.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
313.435.00

215.000.00
65.000.00
203.000.0
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
333.815.00

198.000.00
16.510.00
5.100.00
18.000.00
15.500.00
53.200.00
4.500.00
2.625.00
12.537.40
325.972.40
32.597.24
358.569.64
358.560.00

215.000.00
16.900.00
6.090.00
20.000.00
15.500.00
53.200.00
4.500.00
2.625.00
13.352.60
347.167.50
34.716.76
381.884.36
381.880.00

233.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
340.835.00

272.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
383.215.00

233.000.00
16.510.00
5.100.00
18.000.00
15.500.00
45.600.00
41.500.00
2.625.00
8.180.04
349.015.04
34.901.50
383.916.54
383.910.00

272.000.00
16.900.00
6.090.00
20.000.00
15.500.00
45.600.00
4.500.00
2.625.00
9.197.16
392.412.16
39.241.22
431.653.38
431.650.00

233.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
348.435.00

272.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
390.815.00

233.000.00
16.510.00
5.100.00
18.000.00
15.500.00
53.200.00
4.500.00
2.625.00
13.937.40
362.372.40

272.000.00
16.900.00
6.090.00
20.000.00
15.500.00
53.200.00
4.500.00
2.625.00
15.632.60
406.447.60

398.609.64
398.600.00

447.092.36
447.090.00

Jumlah

Keuntungan Max.
Jumlah
Dibulatkan

A070

1 M2 DIN DING GRANITO TILE ESSENZA UK. 60X60 POLISHED


Granito Essenza 60x60 polished
Semen PC+Campuran khusus
Pasir Pasang
Campuran kedap air + perekat lain
Pekerja

Tukang batu
Kepala Tukang batu
Mandor
Alat Bantu

A071

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1M2 LANTAI GRANITO TILE ESSENZA UK. 40X40 POLISHED
Granito tile Essenza 40x40 polished
Semen PC + Campuran khusus

Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Atat Bnatu
Jumlah
Keuntungan Max.

1.0000
0.2600
0.0300
1.0000
0.2500
0.7000
0.0500
0.0250
0.0480

1.0000
0.2600
0.0300
1.0000
0.2500
0.6000
0.0500
0.0250
0.0240

m2
zak

m3

lot
oh
oh
oh
oh
lot

m2
zak

m3

lot
oh
oh
oh
oh
lot

Jumlah
Dibu!atkan

A072

1M2 DIN DING GRANITO TILE ESSENZA UK. 40X40 POLISHED


Granito tile Essenza 40x40 polished
Semen PC+Campuran khusus
Pasir Pasang
Campuran kedap air + perekat lain
Pekerja
Tukang batu
Kepa!a Tukang batu
Mandor

Alai Bantu

1.0000
0.2600
0.0300
1.0000
0.2500
0.7000
0.0500
0.0250
0.0400

m2
zak

m3

lot
oh
oh
oh
oh
lot

Jumlah

I """"'"""'"

,;;,;-;:,

MOY

Jumlah
Dibulatkan

528

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eotst 34

TAHUN

A;;-;.;-A 7;

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1
A073

KOEF SAT.

URAl AN

NO.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNMJ'v1) (MAXIMUM)
6
7=(3x5) 8=(3x6)
5

400.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
591.735.00

450.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
645.115.00

400.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
4.500.00
2.625.00
18.935.52
610.670.52
61.067.05
671.735.57
671.730.00

450.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
4.500.00
2.625.00
20.643.68
665.758.68
66.575.87
732.334.55
732.330.00

1M2 LANTAI MARMER EX LAMPUNG UK. BESAR

Campuran kedap air

1.0000
0.2600
0.0300
1.0000

Pekerja

o.sooo

Tukang batu

1.5000
0.0500
0.0250
0.0320

m2
zak
m3
lot
oh
oh
oh
oh
lot

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.0250
0.0480

m2
zak
m3
lot
oh
oh
oh
oh
lot

400.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
750.235.00

450.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
803.615.00

400.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
2.625.00
36.011.28
786.246.28
78.624.63
864.870.91
864.870.00

450.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
2.625.00
38.573.52
842.188.52
84.218.85
926.407.37
926.400.00

1.0000
0.2600
0.0300
1.0000
0.2500
0.6000
0.0500
0.0250
0.0240

m2
zak
m3
lot
oh
oh
oh
oh
lot

340.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
536.235.00

355.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
554.615.00

340.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
9.000.00
2.625.00
17.159.52
553.394.52
55.339.45
608.733.97
608.730.00

355.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
9.000.00
2.625.00
17.747.68
572.362.58
57.236.27
629.598.95
629.590.00

1.0000
0.2600
0.0300
1.0000
0.2500
0.7000
0.0500
0.0250
0.0400

m2
zak
m3
lot
oh
oh
oh
oh
lot

340.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
690.235.00

355.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
708.615.00

340.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
2.625.00
33.131.28
723.366.28

355.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
2.625.00
34.013.52
742.628.52

Marmer Ex Lampung

Semen PC + Campuran khusus


Pasir Pasang

Kepala Tukang batu

Mandor

Alai Bantu

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A074

1M2 DINDING MARMER EX LAMPUNG UK. BESAR


Marmer Ex Lampung
Semen PC + Campuran khusus
Pasir Pasang
Campuran kedap air

Pekerja
Tukang batu
Kepala Tukang batu
Mander
Alai Bantu

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A075

1M2 LANTAI MARMER EX LAMPUNG UK. KECIL


Marmer Ex Lampung UK. Keci!
Semen PC + Campuran khusus
Pasir Pasang
Campuran kedap air

Pekerja
Tukang batu

Kepala Tukang batu


Mandor

Alai Bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A076

1M2 DINDING MARMER EX LAMPUNG UK. KECIL


Marmer Ex Lampung UK. Kecil
Semen PC + Campuran khusus
Pasir Pasang
Campuran kedap air
Pekerja

Tukang batu
Kepala Tukang batu
Mandor
Ala! Bantu
Jumlah

I """"'"""'"

M"

7? ' " "

Jum!ah

795.702.91
795.700.00

Dibulatkan
EDISI

34

TAHUN

XXI 2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

" ,., "


816.891.37
816.890.00

529

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

URAIAN

1
A077

KOEF SAT.
3

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNMJ\11) (MAXIMUM)
7=(3x5) 8=(3x6)
6
5

1M2 LANTAI MARMER EXCITATAH UK. BESAR


Marmer Ex Citatah uk. besar
Semen PC + Campuran khusus
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor

Alai Bantu

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.0500
0.0250
0.0320

m2
zak

m3

lot
oh
oh
oh
oh
lot

320.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
511.735.00

340.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
535.115.00

320.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
4.500.00
2.625.00
16.375.52
528.110.52
52.811.05
580.921.57
580.920.00

340.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
4.500.00
2.625.00
17.123.68
552.238.68
55.223.87
607.462.55
607.460.00

320.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
670.235.00

340.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
693.615.00

320.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
2.625.00
32.171.28
702.406.28
70.240.63
772.646.91
772.640.00

340.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
2.625.00
33.293.53
726.908.52
72.690.85
799.599.37
799.590.00

245.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
441.235.00

275.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
474.615.00

245.000.00
16.510.00
5.100.00
18.000.00
31.000.00
114.000.00
9.000.00
2.625.00
14.119.52
455.354.52
45.535.45
500.889.97
500.880.00

275.000.00
16.900.00
6.090.00
20.000.00
31.000.00
114.000.00
9.000.00
2.625.00
15.187.68
489.802.68
48.980.27
538.782.95
538.780.00

245.000.00
63.500.00
170.000.00
18.000.00
62.000.00
76.000.00
90.000.00
105.000.00
595.235.00

275.000.00
65.000.00
203.000.00
20.000.00
62.000.00
76.000.00
90.000.00
105.000.00
628.615.00

245.000.00
16.510.00
5.100.00
18.000.00
62.000.00
228.000.00
18.000.00
2.625.00
28.571.28
623.806.28
62.380.63
686.186.91
686.180.00

275.000.00
16.900.00
6.090.00
20.000.00
62.000.00
228.000.00
18.000.00
2.625.00
30.173.52
658.788.52
65.878.85
724.667.31
724.660.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A078

1M2 DINDING MARMER EX CITATAH UK. BESAR


Marmer Ex Citatah uk. besar
Semen PC + Campuran khusus
Pasir Pasang
Campuran kedap air
Pekerja

Tukang batu
Kepala Tukang batu
Mandor

Alai Bantu

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.0250
0.0480

m2
zak

m3

lot
oh
oh
oh
oh
lot

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A079

1M2 LANTAI MARMER EX CITATAH UK. KECIL


Marmer Ex Citatah uk. kecil

Semen PC + Campuran khusus


Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alai Bantu

A080

530

Jumlah
Keuntungan Max.
Jumlah
Oibulatkan
1M2 DINDING MARMER EX CITATAH UK. KECIL
Marmer Ex Citatah uk. kecil
Semen PC + Campuran khusus
Pasir Pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Alat Bantu
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.1000
0.0250
0.0320

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.0250
0.0480

m2
zak

m3

lot
oh
oh
oh
oh
lot

m2
zak

m3

lot
oh
oh
oh
oh
lot

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& iNTERIOR

Eo1s1

34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

Bata Merah (5x11x22 em)

70.0000

bh

Semen PC

1
A081

KOEF SAT.

URAl AN

NO.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNMJ\11) (MAXIMUM)
7=(3x5) 8=(3x6)
6
5

1M2 PASANGAN DIN DING BATAMERAH 1 PC: 2PP,TBL 1/2 BATA


500.00

550.00

35.000.00

38.500.00
24.635.00

18.9500

kg

1.270.00

1.300.00

24.066.50

Pasir Pasang

0.0380

m3

170.000.00

203.000.00

6.460.00

7.714.00

Pekerja

0.3000

oh

62.000.00

62.000.00

18.600.00

18.600.00

Tukang batu

0.1000

oh

76.000.00

76.000.00

7.600.00

7.600.00

Kepala Tukang batu

0.0100

oh

90.000.00

90.000.00

900.00

900.00

Mandor

0.0150

oh

105.000.00

105.000.00

1.575.00

1.575.00

94.201.50

99.524.00

9.420.15

9.952.40

Jumlah
Keuntungan Max.

A082

Jumlah

103.621.65

109.476.40

Dibulatkan

103.620.00

109.470.00

1 M2 PASANGAN DINDING BATA MERAH 1 PC: 3PP.TBL 1/2 BATA


Bata Merah (5x11x22 em)

70.0000

Semen PC

bh

500.00

550.00

35.000.00

14.3700

kg

1.270.00

1.300.00

18.249.90

38.500.00

Pasir Pasang

0.0400

m3

170.000.00

203.000.00

6.800.00

18.681.00

Pekerja

0.3000

oh

62.000.00

62.000.00

18.600.00

8.120.00

Tukang batu

0.1000

oh

76.000.00

76.000.00

7.600.00

18.600.00
7.600.00

Kepala Tukang batu

0.0100

oh

90.000.00

90.000.00

900.00

Mander

0.0150

oh

105.000.00

105.000.00

1.575.00

900.00

88.724.90

1.575.00

8.872.49

93.976.00

Jumlah
Keuntungan Max.

A083

Jumlah

97.597.39

9.397.60

Dibulatkan

97.590.00

103.370.00

550.00

35.000.00

38.500.00
14.950.00

1 M2 PASANGAN DINDING BATA MERAH 1 PC: 4PP,TBL 1/2 BATA


Bata Merah (5x11x22 em)

70.0000

Semen PC

bh

500.00

11.5000

kg

1.270.00

1.300.00

14.605.00

Pasir Pasang

0.0430

m3

170.000.00

203.000.00

7.310.00

8.729.00

Pekerja

0.3000

oh

62.000.00

62.000.00

18.600.00

18.600.00
7.600.00

Tukang batu

0.1000

oh

76.000.00

76.000.00

7.600.00

Kepala Tukang batu

0.0100

oh

90.000.00

90.000.00

900.00

900.00

Mandor

0.0150

oh

105.000.00

105.000.00

1.575.00

1.575.00

85.590.00

90.854.00

8.559.00

9.085.40

Jumlah
Keuntungan Max.

A084

Jumlah

94.149.00

99.939.40

Dibulatkan

94.140.00

99.930.00

1M2 PASANGAN DINDING BATAMERAH 1 PC: 5PP,TBL 1/2BATA


70.000.00

bh

500.00

550.00

35.000.00

38.500.00

Semen PC

9.6800

kg

1.270.00

1.300.00

12.293.60

12.584.00

Pasir Pasang

0.0450

m3

170.000.00

203.000.00

7.650.00

9.135.00

Pekerja

0.3000

oh

62.000.00

62.000.00

18.600.00

18.600.00

Tukang batu

0.1000

oh

76.000.00

76.000.00

7.600.00

7.600.00

Kepala Tukang batu

0.0100

oh

90.000.00

90.000.00

900.00

900.00

Mandor

0.0150

oh

105.000.00

105.000.00

Bata Merah (5x11x22 em}

Jumlah
Keuntungan Max.

1.575.00

1.575.00

83.618.60

88.894.00

8.361.86

8.889.40

Jumlah

91.980.46

97.783.40

Dibulatkan

91.980.00

97.780.00

Eotst 34

TAHUN

XXI 2015

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

531

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAIAN

1
A084a

1 M2 PASANGAN DIN DING BATA MERAH 1 PC: 3PP,TBL 1 BATA


Bata Merah (5x11x22 em)
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatka

A084e

1 M2 PASANGAN DINDING BATA MERAH 1 PC: 5PPTBL 1 BATA


Bata Merah (5x11x22 em)
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntunaan Max.
Jumlah
Dibulatka

A084e

140.0000
43.5000
0.0800
0.6000
0.2000
0.0200
0.0300

140.0000
32.9500
0.0910
0.6000
0.2000
0.0200
0.0300

bh

kg
m3
oh
oh
oh
oh

bh

kg
m3
oh
oh
oh
oh

500.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

550.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

70.000.00
55.245.00
13.600.00
37.200.00
15.200.00
1.800.00
3.150.00
196.195.00
19.619.50
215.814.50
215.810.00

70.000.00
56.550.00
16.240.00
37.200.00
15.200.00
1.800.00
3.150.00
207.140.00
20.714.00
227.854.00
227.850.00

500.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

550.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

70.000.00
41.846.50
15.470.00
37.200.00
15.200.00
1.800.00
3.150.00
184.666.50
18.466.65
203.133.15
203.130.00

77.000.00
42.835.00
18.473.00
37.200.00
15.200.00
1.800.00
3.150.00
195.658.00
19.565.80
215.223.80
215.220.00

140.0000
26.5500
0.0930
0.6000
0.2000
0.0200
0.0300

140.0000
22.2000
1.1020
0.6000
0.2000
0.0300

bh

kg

500.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

550.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

70.000.00
33.718.50
15.810.00
37.200.00
15.200.00
1.800.00
3.150.00
176.878.50
17.687.85
194.566.35
194.560.00

77.000.00
34.515.00
18.879.00
37.200.00
15.200.00
1.800.00
3.150.00
187.744.00
18.744.40
206.518.40
206.510.00

m3
oh
oh
oh
oh

bh

kg

500.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

550.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

70.000.00
28.194.00
17.340.00
37.200.00
15.200.00
1.800.00
3.150.00
172.884.00
17.288.40
190.171.40
190.170.00

77.000.00
28.860.00
20.706.00
37.200.00
15.200.00
1. 800. oc
3.150.00
183.916.00
18.391.60
202.307.60
202.300.00

m3
oh
oh
oh
oh

500.00
1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

550.00
1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

70.000.00
23.495.000
20.740.00
37.200.00
15.200.00
1.800.00
3.150.00
171.585.00
17.158.50
188.743.50
188.740.00

77.000.00
24.050.00
24.766.00
37.200.00
15.200.00
1.800.00
3.150.00
183.166.00
18.316.60
201.482.60
201.480.00

1 M2PASANGANDINDINGBATAMERAH 1 PC:6PP,TBL 1 BATA


Bata Merah {5x11x22 em)
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

532

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MNM..M) (MAXIMUM)
5
6
7=(3x5) 8=(3x6)

1 M2PASANGAN DINDINGBATAMERAH 1 PC:4PP,TBL 1 BATA


Bata Merah (5x11x22 em)
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatka

A084d

KOEF SAT.

1 M2 PASANGAN DINDING BATA MERAH 1 PC: 2PPTBL 1 BATA


Bata Merah (5x11x22 em)
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

AOB4b

140.0000
18.5000
0.1220
0.6000
0.2000
0.0200
0.0300

bh

kg
m3
oh
oh
oh
oh

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eotst34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

URAIAN

1
A0841

KOEF SAT.

2
1 M2 PASANGAN DINDING CONBLOK 20 AD.1 PC : 3 PP
Conblok 8 x 20 40
Semen PC
Pasir Pasang
Besi angkur dia. 8 mm
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

~084g

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNM.M) (MAXIMUM)
5
7=(3x5) 8=(3x6)
6

12.5000
30.3200
0.7280
0.2800
0.3500
0.1500
0.0150
0.0180

bh
kg
m3
kg
oh
oh
oh
oh

3.500.00
1.270.00
170.000.00
9.500.00
62.000.00
76.000.00
90.000.00
105.000.00

3.800.00
1.300.00
203.000.0
9.800.00
62.000.00
76.000.00
90.000.00
105.000.00

43.750.00
38.506.40
123.760.00
2.660.00
21.700.00
11.400.00
1.350.00
1.890.00
245.016.40
24.501.64
269.518.04
269.510.00

47.500.00
39.416.00
147.784.00
2.744.00
21.700.00
11.400.00
1.350.00
1.890.00
273.784.00
27.378.40
301.162.40
301.160.00

12.5000
24.2600
0.7720
0.2800
0.3500
0.1500
0.0150
0.0180

bh
kg
m3
kg
oh
oh
oh
oh

3.500.00
1.270.00
170.000.00
9.500.00
62.000.00
76.000.00
90.000.00
105.000.00

3.800.00
1.300.00
203.000.00
9.800.00
62.000.00
76.000.00
90.000.00
105.000.00

43.750.00
30.810.20
131.240.00
2.660.00
21.700.00
11.400.00
1.350.00
1.890.00
244.800.20
24.480.02
269.280.22
269.280.00

47.500.00
31.538.00
156.716.00
2.744.00
21.700.00
11.400.00
1.350.00
1.890.00
274.838.00
27.483.80
302.321.80
302.320.00

15.5040
0.0160
0.3000
0.1500
0.0150
0.0150

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

19.690.08
2.720. 00
18.600.00
11.400.00
1.350.00
1.575.00
55.335.08
5.533.51
60.868.59
60.860.00

20.155.20
3. 248.00
18.600.00
11.400.00
1,350.00
1.57.00
56.328.20
5.632.82
61.961.02
61.960.00

10.2240
0.0200
0.3000
0.1500
0.0150
0.0150

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300000
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

12.984.48
3.400.00
18.600.00
11.400.00
1.350.00
1.575.00
49.309.48
030.95
54.240.43
54.240.00

13.291.20
4.060.00
18.600.00
11.400.00
1.350.00
1.575.00
50.276.20
5.027.62
55.303.82
55.300.00

7. 7760
0.0230
0.3000
0.1500
0.0150
0.0150

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

9.875.52
3.910.00
18.600.00
11.400.00
1.350.00
1.575.00
46.710.52
4.671.05
51.381.57
51.380.00

110.108.80
4.669.00
18.600.00
11.400.00
1.350.00
1.575.00
47.702.80
4.770.28
52.473.08
52.470.00

1 M2 PASANGAN DINDING CONBLOK 20,AD.1 PC : 4PP


Conblok 8 x 20 40
Semen PC

Pasir Pasang
Besi angkur dia. 8 mm
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A085 1M2 PLESTERAN 1PC: 1PP TBL 15 MM
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatka
085a 1M2 PLESTERAN 1PC: 2PP, TBL 15 MM
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
KeuntunQan Max.
Jumlah
Dibulatka
A086 1M2 PLESTERAN 1PC: 3PP, TBL 15 MM
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatka

Eotst34

TAHUN

XXI 2015

JURNAL HARGASATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

533

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


URAl AN

NO.
1
AOB7

2
1 M2PL

KOEF SAT.
3

6.2400
0.0240
0.3000
0.1500
0.0150
0.0150

kg
m3

5.1840
0.0260
0.3000
0.1500
0.0150
0.0150

kg
m3

4.4160
0.0270
0.3000
0.1500
0.0150
0.0150

kg
m3

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MNM.M) (MAXIMUM)
5
6
7=(3x5) 8=(3x6)

1PC:4PP.TBL 15MM

Semen PC

Pasir Pasang
Pekerja
Tukang batu

Kepala Tukang batu

Mandor

oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

7.924.80
4.080.00
18.600.00
11.400.00
1.350.00
1.575.00
44.929.80
4.492.98
49.422.78
49.420.00

8.112.00
4.872.00
18.600.00
11.400.00
1.350.00
1.575.00
45.909.00
4.590.90
50.499.90
50.490.00

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

6.583.68
4.420.00
18.600.00
11.400.00
1.350.00
1.575.00
43.928.68
4.392.87
48.321.55
48.320.00

6. 739.20
5.278.00
18.600.00
11.400.00
1.350.00
1.575.00
44.942.20
4.494.22
49.436.42
49.430.00

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

5.608.32
4.590.00
18.600.00
11.400.00
1.350.00
1.575.00
43.123.32

5.740.00
5.481.00
18.600.00
11.400.00
1.350.00
1.575.00
44.146.80

Jumlah
Keuntungan Max.
Jumlah

Dibulatkan
A088

1 M2PLESTERAN 1 PC: 5PP TBL 15MM


Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu

Ao88a

Mandor
Jumlah
Keuntunoan Max.
Jumlah
Dibulatkan
1M2 PLESTERAN 1PC: 6PP, TBL 15 MM
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mandor

oh
oh
oh
oh

oh
oh
oh
oh

Jumlah
: 1\eun ungan Max.

4.JH,J6

Jumlah
Dibulatka

AOa8b

1M? 01
Semen PC
Pekerja
Tukang batu

Kepala Tukang batu


Mandor

3.9360
0.0280
0.3000
0.1500
0.0150
0.0150

kg
m3

3.4560
0.0290
0.3000
0.1500
0.0150
0.0150

kg
m3

oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatka

4_gg8.72
4.760.00
18.600.00
11.400.00
1.350.00
1.575.00
42.683.72
4.268.37
46.952.09
46.950.00

5.116.80
5.684.00
18.600.00
11.400.00
1.350.00
1.575.00
43.725.80
4.372.58
48.098.38
48.090.00

4.389.12
4.930.00
18.600.00
11.400.00
1.350.00
1.575.00
42.244.12
4.224.41
46.468.53
46.460.00

4.492.80
5.887.00
18.600.00
11.400.00
1.350.00
1575.00
43.304.80
4.330.48
47.635.28
47.630.00

1M2 PLESTERAN 1PC: 8PP, TBL 15 MM


Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu

Mandor
Jumlah

oh
oh
oh
oh

Keuntungan Max.
Jumlah
Dibulatkan

534

48.561.48
48.560.00

1100 700, TBL15 MM

Pasir Pasang

A088c

..,...,

47.435.65
47.430.00

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

EoJSJ 34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE j

URAl AN

NO.
1

A088d 1 M2PL
Semen PC
Pasir Pasang

KOEF SAT.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MAXIMUM)
(MINIMUM) (MAXIMUM) (MNM.M)
5
6
7=(3x5) 8=(3x6)

13.6320
0.0270
0.4000
0.2000
0.0200
0.0220

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

10.3680
0.0310
0.2600
0.2000
0.0200
0.0130

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

8.3200
0.0320
0.4000
0.2000
0.0200
0.0220

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1PC:2PP.TBL 20 MM

Pekerja

Tukang batu
Kepala Tukang batu
Mander

Jumlah
Keuntungan Max.
Jumlah
Dibu!atkan
A088e 1M2 PLESTERAN 1 PC: 3PP TBL 20MM
Semen PC
Pasir Pasang
Pekerja
Tukang batu
Kepala Tukang batu
Mander
Jumlah
Keuntunoan Max.

24.800.00
15.200.00
1.800.00
2.310.00
66.012.64
6.601.26
72.613.90
72.610.00

17.721.60
5.481.00
24.800.00
15.200.00
1.800.00
2.310.00
67.312.60
6.731.26
74.043.86
74.040.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

13.167.36
5.270.00
16.120.00
15.200.00
1.800.00
1.365.00
52.922.36
5.292.24
58.214.60
58.210.00

13.478.40
6.293.00
16.120.00
15.200.00
1.800.00
1.365.00
54.256.40
5.425.54
59.682.04
59.680.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

10.566.40
5.440.00
24.800.00
15.200.00
1.800.00
2.310.00
60.116.40

10.816.00
6.496.00
24.800.00
15.200.00
1.800.00
2.310.00
61.422.00

Jumlah
Dibulatkan
A088f 1 M2 PLESTERAN 1PC : 4PP, TBL 20 MM
Semen PC
Pasir Pasang
Pekerja

Tukang batu
Kepa!a Tukang batu
Mandor
Jumlah
Mumungan Max.
Jumlah
Dibulatka
i

A088o 1 M2DO

Semen PC
Pekerja

Tukang batu

Kepa!a Tukang batu


Mander

b.l4L.LU

67.554.20
67.560.00

6.9120
0.0350
0.4000
0.2000
0.0200
0.0220

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

8778.24
5.950.00
24.800.00
15.200.00
1.800.00
2.310.00
58.838.24
5.883.82
64.722.06
64.720.00

8.985.60
7.105.00
24.800.00
15.200.00
1.800.00
2.310.00
60.200.60
6.020.06
66.220.66
66.220.00

5.8880
0.0360
D.4000
0.0200
0.0200
0.0220

kg
m3
oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

7.477.76
6.120.00
24.800.00
15.200.00
1.800.00
2.310.00
57.707.76
5.770.78
63.478.54
63.470.00

7.654.40
7.308.00
24.800.00
15.200.00
1.800.00
2.310.00
59.072.40
5.907.24
64.979.64
64.970.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatka

A088h 1 M2 PLESTERAN 1PC : 6PP, TBL 20 MM


Semen PC
Pasir Pasang
Pekerja

Tukang batu
Kepala Tukang batu
Mander

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

TAHUN

0.011.04

66.128.04
66.120.00

1PC: 5PP. TBL 20 MM

Pasir Pasang

Eotst 34

17.312.64
4.5go.oo

XXI 2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

535

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


URAIAN

NO.

AOBBi 1M? PI O<TOON

~
KOEF SAT.
3

0.5000
0.0130
0.0800
G.4000
0.0400
0.0040

kg
m3

4.3200
0.0060
0.3000
0.1000
0.0100
0.0150

kg
m3

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNM1v1) (MAXIMUM)
5
6
7=(3x5) 8=(3x6)

; 1PC:1PP. LBR 10 MM

Semen PC

Pasir Pasang
Pekerja

Tukang batu
Kepala Tukang batu
Mandor

oh
oh
oh
oh

1.270.00
170.000.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

635.00
2.210.00
4.g6o.oo
30.400.00
3.600.00
420.00
42.225.00
4.222.50
46.447.50
46.440.00

650.00
2.63g.oo
4.g60.00
30.400.00
3.600.00
420.00
42.669.00
4.266.90
46,g35.90
46.930.00

1.270.00
170.000.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
203.000.00
62.000.00
76.000.00
90.000.00
105.000.00

5.486.40
1.020.00
18.600.00
7.600.00
900.00
1.575.00
35.181.40
3.518.14
38.699.54
38.690.00

5.616.00
1.218.00
18.600.00
7.600.00
goo.oo
1.575.00
35.509.00
3.550.90
39.059.90
39.050.00

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A088j 1M2 PLESTERAN CIPRAT 1 PC: 2PP,
Semen PC
Pasir Pasang
Pekerja

Tukang batu
Kepala Tukang batu
Mandor

oh
oh
oh
oh

.l.,mloh

Keuntungan Max.
Jumlah
Dibulatkan

A088k 1 M2FINISHINGSIAR PASANGANDINDINGBATAMERAH(=20M)


Semen PC
Pasir Pasang
Pekerja
Tukang batu

Kepala Tukang batu

3.1080
0.1500
0.0750
0.0080
0.0080

oh
oh
oh
oh

kg

1.6000
0.0700
0.0350
0.0040
0.0040

oh
oh
oh
oh

1.270.00
62.000.00
76.000.00
90.000.00
105.000.00

1.300.00
62.000.00
76.000.00
90.000.00
105.000.00

3.g47.16
g.300.00
5.700.00
720.00
840.00
20.507.16
2.050.72
22.557.88
22.550.00

4.040.40
g.300.00
5.700.00
720.00
840.00
20.600.00
2.060.04
22.660.44
22.660.00

1.270.001
62.000.00
76.000.00
go.ooo.oo
105.000.00

1.300.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

2.032.00
4.340.00
2.660.00
360.00
420.00
9.812.00
981.20
10.793.20
10.790.00

2.080.00
4.340.00
2.660.00
360.00
420.00
9.860.00
986.00
10.846.00
10.840.00

1.270.00
170.000.00
62.000,00
76.000.00
go.ooo.oo
105.000.00

1.300.00
62.000.00
76.000.00
go.ooo.oo
105.000.00

8.051.80
2.040.00
18.600.00
11.400.00
1.350.00
1.575.00
43.016.80
4.301.68
47.318.48
47.310.00

8.242.00
2.436.00
18.600.00
11.400.00
1.350.00
1.575.00
43.603.00
4.360.30
47.963.30
47.960.00

Mandor

Jumlah

Keuntungan Max.
Jumlah
Dibulatka
A0881 1M2 ANISHINGSIAR PASANGAN DINDINGCONBI.OK EKSI'OSE(.sM)
Semen PC
Pekerja
Tukang batu
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatka
A088m 1M2 FINISHINGSIAR PASANGAN BATU KALIADUKAN 1PC:2PP
Semen PC
Pasir Pasang
Pekerja

Tukang batu
Kepala Tukang batu
Mandor
Jumtah
Keuntungan Max.
Jumtah
Dibulatkan

536

6.3400
0.0120
0.0300
0.1500
0.0150
0.0150

kg

kg
m3

oh
oh
oh
oh

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

Eotst 34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1
A089

KOEF SAT.

URAIAN

NO.

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MNfVLM)
(MAXIMUM)
(MAXIMUM)
(MINIMUM)
7=(3x5) 8=(3x6)
5
6

Semen PC

3.2500

kg

1.270.00

1.300.00

4.127.50

4.225.00

2
1M2ACIAN PC
Pekerja

0.2000

oh

62.000.00

62.000.00

12.400.00

12.400.00

Tukang batu

0.1000

oh

76.000.00

76.000.00

7.600.00

7.600.00

Kepala Tukang batu

0.0100

oh

go.ooo.oo

go.ooo.oo

goo.oo

goo.oo

Mander

0.0100

oh

105.000.00

105.000.00

1.050.00

1.050.00

26.077.50

26.175.00

2.607.75

2.617.50

Jumlah

28.685.25

28.792.50

Dibulatkan

28.680.00

28.7go.oo

453.g37.50

453.g37.50

Jumlah

Keuntungan Max.

A090

1 UNIT SEPTITANK 2, 5 X1,5 X2M+REMBESANYA(Kantor


Type Besar)
Galian Tanah

7.5000

m3

60.525.00

60.525.00

Pasir Urug

0.3570

m3

130.000.00

149.000.00

46.410.00

53.193.00

Lanta Kerja t::: 10 em

3.7500

m3

64.319.99

69.545.58

241.199.96

260.795.93

Pas. Bata 1PC : 2 PS + Plesteran

25.000

m3

94.201.50

99.524.00

2.355.037.50

2.488.10

Plat beton penutup & balok

0.5000

m3

9.237.034.97

9.589.059.25

4.618.517.48

4.794.529.62

Pipa PVC 4" jenis AW + sambungan

9.0000

m1

44.000.00

48.000.00

396.000.00

432.000.00

Pipa GIP 1 1/2"

2.0000

m1

69.166.67

435.000.00

138.333.33

870.000.00

Galiantanah untuk rembesan

5.6250

m3

60.525.00

60.525.00

340.453.13

340.453.13

Pas. ljuk

9.0000

kg

9.000.00

10.000.00

81.000.00

90.000.00

Urugan kerikil 3,5 em

1.7500

m3

34.500.00

36.500.00

60.375.00

63.875.00

Pipa PVC

6.0000

m1

68.000.00

75.000.00

408.000.00

450.000.00

Urugan kemball perataan tanah

1.8750

m3

16.371.50

16.371.50

30.696.56

30.696.56

Tambahan Upah

0.0850

is

9.169.960.47

10.327.580.74

4~

Ber!obang jenis AW

779.446.64

877.844.36

9.949.407.10

11.205.425.11

994.940.71

1.120.542.51

Jumlah

10.944.347.82

12.325.967.62

Dibulatkan

10.944.340.00

12.325.960.00

272.362.50

272.362.50

Jumlah
Keuntungan Max.

A091

1 UNIT SEPTITANK 2, 5 X1,5 X1,5 M+REMBESANYA(Kantor


TypeKecil)
Galian Tanah

4.5000

60.525.00

60.525.00

Pasir Urug

0.2142

m3

130.000.00

149.000.00

27.846.00

31.915.80

Lanta Kerja 1=10 em

2.2500

m3

63.319.99

69.545.58

144.719.98

156.477.56

Pas. Bata 1PC : 2 PS + Plesteran

15.0000

m3

94.201.50

99.524.00

1.413.022.50

1.492.860.00

Plat beton penutup & balok

0.30000

m3

9.237.034.97

9.589.059.25

2.771.110.49

2.876.717.77

5.4000

m1

44.000.00

48.000.00

237.600.00

259.200.00

Pipa PVC 4" jenis AW + sambungan

ED!SI

m3

Pipa GIP 1 1/2"

1.2000

m1

69.166.67

435.000.00

83.000.00

522.000.00

Galiantanah untuk rembesan

3.3750

m3

60.525.00

60.525.00

204.271.88

204.271.88

Pas. ljuk

5.4000

kg

9.000.00

10.000.00

48.600.00

54.000.00

Urugan keriki! 3,5 em

1.0500

m3

34.500.00

36.500.00

36.225.00

38.325.00

Pipa PVC 4n Ber!obang jenis AW

9.0000

m1

68.000.00

75.000.00

612.000.00

675.000.00

Urugan kembali perataan tanah

1.1250

m3

16.371.50

16.371.50

18.417.94

18.417.94

Tambahan Upah

0.0920

is

5.869.176.28

6.601.548.45

539.964.22

607.342.46

Jumlah

6.409.140.50

7.208.890.00

Keuntungan Max.

640.9143.05

720.889.09

Jumlah

7.050.054.55

7.929.779.99

Dibulatkan

7.050.050.00

7.929. 770.00

34

TAHUN

XXI 2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

&

INTERIOR

537

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAl AN

1
A092

Pipa GIP 1 112"


Galiantanah untuk rembesan
Pas. !juk
Urugan kerikil 3,5 em
Pipa PVC 4" Berlobang jenis AW
Urugan kembali perataan tanah
Tambahan Upah
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

2.2500
0.1071
1.1250
7.5000
0.1500
9.0000
0.6000
1.6875
2.7000
0.5250
9.0000
0.5625
0.0650

m3
m3
m2
m3
m3
m1
btg
m3
kg
m3
m1
m3
is

60.525.00
130.000.00
64.319.99
94.201.50
9.237.034.97
44.000.00
69.166.67
60.525.00
9.000.00
34.500.00
68.000.00
16.371.50
3.517. 788.14

60.525.00
149.000.00
69.545.58
99.524.00
9.589.059.25
48.000.00
435.000.00
60.525.00
10.000.00
36.500.00
75.000.00
16.371.50
3.940.674.22

138.181.25
13.923.00
72.359.99
706.511.25
1.385.555.25
396.000.00
41.500.00
102.135.94
24.300.00
18.122.50
612.000.00
9.208.97
228.656.23
3.746.444.37
374.644.44
4.121.088.81
4.121.080.00

136.181.25
15.957.90
78.238.78
746.430.00
1.438.358.89
432.000.00
261.000.00
102.135.94
27.000.00
19.162.50
675.000.00
9.208.97
256.143.82
4.196.818.05
419.681.80
4.616.499.85
4.616.490.00

0.2500
0.1250
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0250

It
It
bh
lbr
oh
oh
oh
oh
lot

92.000.00
48.000.00
18.000.00
3.000.00
62.000.00
76.000.00
90.000.00
105.000.00
65.630.00

98.000.00
50.000.00
22.000.00
4.000.00
62.000.00
76.000.00
90.000.00
105.000.00
67.920.00

23.000.00
6.000.00
180.00
1.500.00
9.920.00
21.280.00
2.700.00
1.050.00
1.640.75
67.270.75
6.727.08
73.997.83
73.990.00

24.500.00
6.250.00
220.00
2.000.00
9.920.00
21.280.00
2.700.00
1.050.00
1.698.00
69.618.00
6.961.80
76.579.80
76.570.00

0.2500
0.1250
0.0100
0.5000
0.2000
0.3000
0.0300
0.0100
0.0250

It
It
bh
lbr
oh
oh
oh
oh
lot

58.000.00
40.000.00
18.000.00
3. 000.00
62.000.00
76.000.00
90.000.00
105.000.00
60.130.00

62.000.00
45.000.00
22.000.00
4. 000.00
62.000.00
76.000.00
90.000.00
105.000.00
62.295.00

14.500.00
5.000.00
180.00
1.500.00
12.400.00
22.800.00
2.700. 00
1.050.00
1.503.25
61.533.25
6.163.33
67.796.58
67.790.00

15.500.00
5.625.00
220.00
2.000.00
12.400.00
22.800.00
2.700.00
1.050.00
1.557.38
63.852.38
6.385.24
70.237.61
70.230.00

0.1750
0.1600
0.0100
0.5000
0.1600
0.2800
0.0300
0.0100
0.0450

kh
kg
bh
lbr
oh
oh
oh
oh
lot

16.000.00
12.000.00
18.000.00
3.000.00
62.000.00
76.000.00
90.000.00
105.000.00
41.350.00

18.000.00
13.000.00
22.000.00
4.000.00
62.000.00
76.000.00
90.000.00
105.000.00
42.400.00

2.800.00
1.920.00
180.00
1.500.00
9.920.00
21.280.00
2.700.00
1.050.00
1.860. 75
43.210.75
4.321.08
47.531.83
47.530.00

3.150.00
2.080.00
220.00
2.000.00
9.920.00
21.280.00
2.700.00
1.050.00
1.908.00
44.308.00
4.430.80
48.738.80
48.730.00

1 M2 PENGECATAN DIN DING VINILEX 3X


Cat tembok Vinilex
Planmir tembok
rol cat
ampelas
pekerja
tukang cat
kepala tukang cat
mandor
steger werk
Jumlah
Keuntungan Max.
Jum!ah
Dibulatkan

538

1M2 PENGECATAN PLAFON DAN DIN DING INTERIOR ICI


Cat tembok ICI
Cat dasar sebelum pengecatan
rol cat
ampelas
pekerja
tukang cat
kepa!a tukang cat
mandor
steger werk
Jumlah
Keuntunoan Max.
Jumlah
Dibulatkan

A095

1M2 PENGECATAN BETON ICI EKSTERIOR


Cat tembok ICI
Alkali lCI sebelum pengecatan
rol cat
ampelas
pekerja
tukang cal
kepala tukang cat
mandor
steger werk
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A094

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNM1v1) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1 UNIT SEPTITANK 1 X1,5 X2M+REMBESANYA (Rumah


Kapasitas KecUl
Galian Tanah
Pasir Urug
Lanla Kerja 1=10 em
Pas. Bata 1PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan

A093

KOEF SAT.

JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KONSTRUKSI

& INTERIOR

Eotst 34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

URAIAN

NO.

1
A096

KOEF SAT.

0.2000
0.1600
0.0100
0.0500
0.2000
0.2800
0.0300
0.0100
0.0425

kg
kg
bh
lbr
oh
oh
oh
oh
lot

16.000.00
12.000.00
18.000.00
3.000.00
62.000.00
76.000.00
90.000.00
105.000.0
44.230.00

18.000.00
13.000.00
22.000.00
4.000.00
62.000.00
76.000.00
90.000.00
105.000.00
45.330.00

3.200.00
1.920.00
180.00
1.500.00
12.400.00
21.280.00
2.700.00
1.050.00
1.879.78
46.109.78
4.610.98
50.720.75
50.720.00

3.600.00
2.080.00
220.00
2.000.00
12.400.00
21.280.00
2.700.00
1.050.00
1.926.53
47.256.53
4.725.65
51.982.18
51.980.00

0.1750
0.1600
0.0100
0.5000
0.1040
0.1820
0.0195
0.0100
0.0450

kg
kg
bh
lbr
oh
oh
oh
oh
lot

14.000.00
12.000.00
18.000.00
3.000.00
62.000.00
76.000.00
90.000.00
105.000.00
29.135.00

15.000.00
13.000.00
22.000.00
4.000.000
62.000.00
76.000.00
90.000.00
105.000.00
30.010.00

2.450.00
1.920.00
180.00
1.500.00
6.448.00
13.832.00
1.755.00
1.050.00
1.311.08
30.446.08
3.044.61
33.490.68
33.490.00

2.625.00
2.080.00
220.00
2.000.00
6.448.00
13.832.00
1.755.00
1.050.00
1.350.45
31.360.45
3.136.05
35.496.50
34.490.00

0.2000
0.1600
0.0100
1.0000
0.5000
0.1040
0.1820
0.0195
0.0100

kg
kg
bh
lot
lbr
oh
oh
oh
oh

14.000.00
12.000.00
18.000.00
862.50
3.000.00
62.000.00
76.000.00
90.000.00
105.000.00

15.000.00
13.000.00
22.000.00
900.00
4.000.00
62.000.00
76.000.00
90.000.00
105.000.00

2.800.00
1.920.00
180.00
862.50
1.500.00
6.448.00
13.832.00
1.755.00
1.050.00
30.347.50
3.034.75
33.382.25
33.380.00

3.000.00
2.080.00
220.00
900.00
2.000.00
6.448.00
13.832.00
1.755.00
1.050.00
31.285.00
3.128.50
34.413.50
34.410.00

20.000.00
23.000.00
44.000.00
3.000.00
6.000.00
9.000.00
62.000.00
76.000.00
90.000.00
105.000.00

22.000.00
25.000.00
45.000.00
4.000.00
8.000.00
12.000.00
62.000.00
76.000.00
90.000.00
105.000.00

3.340.00
1.909.00
8.800.00
1.200.00
900.00
450.00
12.400.00
22.800.00
2.700.00
1.050.00
55.549.00
5.554.90
61.103.90
61.100.00

3.674.00
2.075.00
9.000.00
1.600.00
1.200.00
600.00
12.400.00
22.800.00
2.700.00
1.050.00
57.099.00
5.709.90
62.808.90
62.800.00

1 M2 PENGECATAN PLAFON VINILEX 3X

Cat tembok Vinilex


Plamir tembok
rol cat
ampelas
pekerja
tukang cat
kepala tukang cat

mandor
steger werk
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A097

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNMJ'vl) (MAXIMUM)
6
7=(3x5) 8=(3x6)
5

1M2 PENGECATAN DIN DING SAN LEX 13X\


Cat tembok Sanlex
Plamir tembok
rol cat
ampe!as
pekerja
tukang cat
kepala tukang cat

mandor
steger werk
Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

A098

1M2 PENGECATAN PLAFON SAN LEX I3XI


Cat tembok Sanlex
Plamir tembok
rol cat
steger werk
ampelas
pekerja
tukang cat
kepala tukang cat
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A099

1 M2 PENGECATAN KAYU 13XI BERIKUT MENI


Meni kayu
Plamir kayu
Cat kayu merk SEIV
ampelas kayu
Minyak cat terpentin
Kwas 3"

pekerja
tukang cat
kepala tukang cat
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

EDIS/

34

TAHUN XXI

2015

0.1670
0.0830
0.2000
0.4000
0.1500
0.0500
0.2000
0.3000
0.0300
0.0100

JURNAL HARGASATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

539

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


URAl AN

NO.

HARGA SAT. HARGA SAl JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MNM..M) (MAXIMUM)
6
7=(3x5) 8=(3x6)
5

Meni besi

0.1670

kg

20.000.00

22.000.00

cat besi merk SEIV

0.2000

kg

44.000.00

45.000.00

3.340.00
8.800.00

ampelas Besi

D.4000
0.1500

lbr

3.000.00

4.000.00

1.200.00

1.600.00

minyak cat thiner B

11r

20.000.00

22.000.00

3.000.00

3.300.00

1
A100

KOEF SAT.

1M2 PENGECATAN BESI (3X)

Kwas 3"

0.0500

bh

9.000.00

12.000.00

450.00

600.00

0.2000

oh

62.000.00

62.000.00

12.400.00

12.400.00

tukang cat

0.3000

oh

76.000.00

76.000.00

22.800.00

22.800.00

kepala tukang cat

0.0300

oh

90.000.00

90.000.00

2.700.00

2.700.00

mandor

0.0100

oh

105.000.00

105.000.00

1.050.00

1.050.00

55,740.00

57.124.00

Jumlah

5.574.00

5.712.40

Jumlah

61.314.00

62.836.40

Dibulatkan

61,310.00

62.830.00

1M2 PLITURAN BANGUNAN (BIASA)


Dempul plitur {dempul dasar)

0.0300

kg

27.000.00

34.000.00

810.00

1.020.00

wood filler

0.2000

kg

29.000.00

40.000.00

5.800.00

8.000.00
560.00

oker putih

0.0200

kg

25.000.00

28.000.00

500.00

oker warna

0.0100

kg

25.000.00

28.000.00

250.00

280.00

batu apung (gosok)

0.1000

kg

18.000.00

20.000.00

1. 800.00

2.000.00
32.000.00

siriak ex india

0.2000

kg

150.000.00

160.000.00

30.000.00

kwas 3"

0.0100

bh

9.000.00

12.000.00

90.00

120.00

spirtus

0.2000

11r

12.000.00

15.000.00

2.400.00

3.000.00

ampelas kayu

0.1000

lbr

3.000.00

4.000.00

300.00

400.00

pekerja

0.2500

oh

62.000.00

62.000.00

15.500.00

15.500.00

tukang cat plitur

0.2850

oh

76.000.00

76.000.00

21.660.00

21.660.00

kepala tukang cat /plitur

0.0400

oh

0.0200

oh

90.000.00
105.000.00

3.600.00
2.100.00

3.600.00

mandor

90.000.00
105.000.00

84,810.00

90.240.00

Jumlah
Keuntungan Max.

A102

2.100.00

8.481.00

9.024.00

Jumlah

93.291.00

99.264.00

Dibulatkan

93,290.00

99.260.00

1M2 PLITURAN BANGUNAN (BIASA)


Dempu! plitur (dempul dasar)

0.0300

kg

27.000.00

34.000.00

810.00

1.020.00

wood filler

0.2000

kg

29.000.00

40.000.00

5.800.00

8.000.00

melamik

0.3500

kg

40.000.00

42.000.00

14.000.00

14.700.00

oker pulih

0.0200

kg

25.000.00

28.000.00

500.00

560.00

oker warna

0.0100

kg

25.000.00

28.000.00

250.00

280.00

ba1u apung (gosok)

0.1000

kg

18.000.00

20.000.00

1.800.00

2.000.00
32.000.00

siriak ex india

0.2000

kg

150.000.00

160.000.00

30.000.00

kwas

0.0100

bh

9.000.00

12.000.00

90.00

120.00

spirtus

0.2000

ltr

12.000.00

15.000.00

2.400.00

3.000.00

ampelas kayu

0.1000
0.2500

lbr

3.000.00

4.000.00

300.00

400.00

pekerja

oh

62.000.00

62.000.00

15.500.00

15.500.00
21.660.00

3~

tukang cat plitur

0.2850

oh

76.000.00

76.000.00

21.660.00

kepala tukang cat /plitur

0.0400

oh

90.000.00

90.000.00

3.600.00

3.600.00

mandor

0.0200

oh

105.000.00

105.000.00

2.100.00

2.100.00

98.810.00

104.940.00

Jumlah

Keuntungan Max.

540

9.000.00

pekerja

Keuntungan Max.

A101

3.674.00

9.881.00

10.494,00

Jumlah

108.691.00

115.434.00

Dibulatkan

108.690.00

115.430.00

JuRNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

EDJS/

34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

URAIAN

NO.

1
A103

KOEF SAT.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MNMJ'v1) (MAXIMUM)
5
7=(3x5) 8=(3x6)
6

0.0154
0.2000
0.1500
0.3000
0.0300
0.0750

m3
kg
oh
oh
oh
oh

5.900.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

6.800.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

90.860.00
3.000.00
9.300.00
23.400.00
2.760.00
7.875.00
137.195.00
13.719.50
150.914.50
150.910.00

104.720.00
3.400.00
9.300.00
23.400.00
2.760.00
7.875.00
151.455.00
15.145.00
166.600.50
166.600.00

0.0154
0.2000
0.1500
0.3000
0.0300
0.0750

m3
kg
oh
oh
oh
oh

4.000.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

4.500.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

61.600.00
3.000.00
9.300.00
23.400.00
2. 760.00
7.875.00
107.935.00
10.793.50
118.728.50
118.720.00

69.300.00
3.400.00
9.300.00
23.400.00
2.760.00
7.875.00
116.035.00
11.603.50
127.638.50
127.630.00

0.0163
0.2500
0.2000
0.3000
0.0300
0.0100

m3
kg
oh
oh
oh
oh

4.000.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

4.500.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

65.200.00
3.750.00
12.400.00
23.400.00
2.760.00
1.050.00
108.560.00
10.856.00
119.416.00
119.410.00

73.350.00
4.250.00
12.400.00
23.400.00
2.760.00
1.050.00
117.210.00
11.721.00
128.931.00
128.930.00

0.3750
0.0300
0.1000
0.1000
0.0100
0.0050

lbr
kg
oh
oh
oh
oh

53.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

55.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

19.875.00
600.00
6.200.00
7.800.00
920.00
525.00
35.920.00
3.592.00
39.512.00
39.510.00

20.625.00
660.00
6.200.00
7.800.00
920.00
525.00
36.730.00
3.673.00
40.403.00
40.400.00

0.3640
0.1100
0.1000
0.0500
0.0050
0.0050

lbr
kg
oh
oh
oh
oh

46.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

60.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

16.744.00
2.200.00
6.200.00
3.900.00
460.00
525.00
30.029.00
3.002.90
33.031.90
33.030.00

21.840.00
2.420.00
6.200.00
3.900.00
460.00
525.00
35.345.00
3.534.50
38.879.50
38.870.00

1M2PAS.RANGKAPI.AFON(50X100CM),KAYUKAMPERBANJAR
Kaso-kaso 5/7 kamper banjar
paku 7cm-10cm
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah

A104

Keuntunqan Max.
Jumlah
Dibulatkan
1M2PAS. RANGKAPLAFON (50X100CM\ KAYU BORNEO SUPER
Kaso-kaso 5/7 borneo super
paku 7cm-10cm
pekerja
tukang kayu

kepala tukang kayu


mandor
Jumlah
Keuntungan Max.
Jumlah

A105

Dibulatkan
1M2PAS. RANGKAPLAFON (60X60CM), KAYU BORNEO SUPER
Kaso-kaso 5/7 borneo super
paku 7cm-10cm

pekerja
tukang kayu
kepala tukang kayu

mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A106

1M2PASBAHANPI.AFONTRIP!.EK-PEN\JTUPF\IIDARANGKANYA
Triplek 4mm (120x240 em)
paku triplek
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jum!ah
Dibulatkan

A107

1M2PASBAHANPLNON GYPSUM BOARD 9MM PENUTUP


PADA RANGKANYA
Gypsum boaed 9mm (120x240)
paku skrup
pekerja
tukang kayu
kepala tukang kayu

mandor
Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

EDIS/34 TAHUN

XXI 2015

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

541

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


URAl AN

NO.

1
A108

KOEF SAT.
3

1.1000
0.0100
0.0300
0.0700
0.0070
0.0040

m2
kg

1.1000
0.0100
0.0300
0.0700
0.0070
0.0040

m2
kg

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1 M2 PAS. BAHAN PLAFON ASSES SEMEN 5 MM PENUTUP


PAnA
YA

OA"r.""

Asbes semen 5mm


Paku triplek
pekerja
tukang kayu
kepala tukang kayu

I manrlor

oh
oh
oh
oh

15.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000 00

17.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

16.500.00
200.00
1.860.00
5.460.00
644.00
420.00
25.084.00
2.508.00
27.592.40
27.590.00

18.700.00
220.00
1.860.00
5.460.00
644.00
420.00
27.304.00
2.730.00
30.034.40
30.030.00

12.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.200.00
200.00
1.860.00
5.460. 00
644.00
420.00
?1 7R4 nn

14.300.00
220.00
1.860.00
5.460.00
644.00
420.00

Jumlah
Keuntunoan Max.
Jumlah
Dibulatkan

A109

1 M2PAS. BAHAN PLAFON ETERNIT 4MM(1X1) PADA


RANGKANYA
Granit 4mm {1x1}
paku tripleks
pekerja
tukang kayu
kepala tukang kayu

oh
oh
oh
oh

moon<

23.960.00

""'"

" nn
2.290.40
"104.40
25.190.00

2.178.40

Jumlah

M,
Jumlah
Dibulatkan

A109a 1 M2PAS. PLAFON LAMBRIZINGKAYU KAMfERBANJAR. TBL9MM


Kayu papan kamper banjar
paku tripleks

pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

0.0150
0.0100
0.8000
0.8000
0.0800
0.0400

m3
kg

1.5000
0.0500
0.1000
0.1000
0.0100
0.0050

m3
kg

oh
oh
oh
oh

7.000.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

7.500.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

105.000.00
200.00
49.600.00
62.400.00
7.360.00
4.200.00
228.760.00
22.876.00
251.636.00
251.630.00

112.500.00
220.00
49.600.00
62.400.00
7.360.00
4.200.00
236.280.00
23.628.00
259.908.00
259.900.00

92.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

95.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

138.000.00
1.000.00
6.200.00
7.800.00
920.00
525.00
154.445.00
15.444.50
169.889.50
16g.880.00

142.500.00
1.100.00
6.200.00
7.800.00
920.00
525.00
15g.045.00
15.g04.50
174.g49.50
174.940.00

13.000.00
6.000.00
62.000.00
78.000.00
92.000.00
105.000.00

15.000.00
7. 000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.650.00
900.00
3.720.00
4.680.00
552.00
315.00
- 23.817.M
2.381.70
26.198.78
?6.190.00

15.750.00
1.050.00
3.720.00
4.680.00
552.00
315.00
-26.067.0.0
2.606. 70
28.673.70
,. 070 00

A109b 1M2PASPLAFON AKUSTIK UK. (60X120) CM


Akustik uk. 60x120 em
paku trip!ek
pekerja
tukang kayu
kepa!a tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

oh
oh
oh
oh

A109c 1M2PAS LIST PROFIL GYPSUM


List profil gypsum L-10 CM
Tepung gypsum
pekerja
tukang kayu
kepala tukang kayu
mandor

1.0500
0.1500
0.0600
0.0600
0.0060
0.0030

m'
kg

oh
oh
oh
oh

Jumlah
Keuntungan Max.
Jumlah

Oibulalkan

542

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

Eotst 34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

NO.

URAl AN

KOEF SAT.

A109d 1M' PAS. LIST PROFIL KAYU KAMPER BANJAR 4X1


list profil kamper banjar 4x1
Paku triplek

1.0500
0.0100
0.0500
0.0500
0.0050
0.0030

m'

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
5
7=(3x5) 8=(3x6)
6
11.000.00
20.000.00
62.000.00
78.000.00
92.000.00
105.000.00

13.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

11.550.00
200.00
3.100.00
3.900.00
460.00
315.00
19.525.00
1.952.50
21.477.50
21.470.00

13.650.00
220.00
3.100.00
3.900.00
460.00
315.00
21.645.00
2.164.50
23.809.30
23.800.00

7.000.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

7.500.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

77.000.00
750.00
6.200.00
15.600.00
1.840.00
525.00
101.915.00
10.191.50
112.106.50
112.100.00

82.500.00
850.00
6.200.00
15.600.00
1.840.00
525.00
107.515.00
10.751.50
118.266.50
118.260.00

7.000.000.00
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

7.500.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

75.600.00
1.500.00
6.200.00
15.600.00
1.840.00
525.00
101.265.00
10.126.50
111.391.50
111.390.00

81.000.00
1.700.00
6.200.00
15.600.00
1.840.00
525.00
106.865.00
10686.50
117.551.50
117.550.00

5.900.000.00
15.000.00
98.000.00
35.000.00
62.000.00
78.000.00
92.000.00
105.000.00

6.800.000.00
17.000.00
105.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

165.200.00
2.250.00
84.280.00
19.600.00
12.400.00
46.800.00
5.520.00
1.050.00

190.400.00
2.550. 00
90.300.00
20.160.00
12.400.00
46.800.00
5.520.00
1.050.00

.luml'h

' " 1nn nn

"o 1Rn nn

Keuntungan Max.
Jumlah
Dibulatkan

33.710.00
370.810.00
370.810.00

36.918.00
406.098.00
406.090.00

7.080.000.00
18.750.00
35.000.00
372.000.00
1.404.000.00
165.600.00
31.500.00
9.106.850.00
910.685.00
10.017535.00
10.017530.00

8.160.000.00
21.250.00
36.000.00
372.000.00
1.404.000.00
165.600.00
31.500.00
10.190.350.00
1.019.035.00
11.209.385.00
11.209.380.00

pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah

kg
oh
oh
oh
oh

Keuntungan Max.
Jumlah
Dibulatkan

A110

1 M1 PEKERJAAN LIST PLANGK KAYU KAMPER BANJAR 3130


Kayu papan 3x30 em kamper banjar
paku5-7cm
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan

A111

0.0110
0.0500
0.1000
0.2000
0.0200
0.0050

m3

0.0108
0.0100
0.1000
0.2000
0.0200
0.0050

m3

kg
oh
oh
oh
oh

1M2 PEKERJAAN LIST PLANK KAYU KAMPER BANJAR 3/20

Kayu papan 3x20 em kamper banjar


paku 5 - 7 em
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
KeuntunQan Max.
Jumlah
Dibulatkan
A111a 1M2 Fl\5. DIN DING PEMISAH /PARTS! TEAKWOOD RANGKAP,

kg
oh
oh
oh
oh

RANGKA KAYU KAMPER BANJAR


Kayu kamper banjar uk. 6/12 em
Paku 5-10 em
Teakwood 4mm uk. 120x240 em

Lem pulih (FOX)


pekerja
tukang kayu
kepala tukang kayu
mandor

A112

m3

kg
lbr

kg
oh
oh
oh
oh

1 M3 KUSEN KAYU KAMPER BANJAR


Kayu kamper banjar
Paku 10 em
Lem putih FOX
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

EDISJ

0.0280
0.1500
0.8600
0.5600
0.2000
0.6000
0.0600
0.0100

34

TAHUN

XXI 2015

1.2000
1.2500
1.0000
6.0000
18.0000
1.8000
0.3000

m3

kg
kg
oh
oh
oh
oh

5.900.000.00
15.00.00
35.000.00
62.000.00
78.000.00
92.000.00
105.000.00

6.800.000.00
17.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

543

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


URAIAN

NO.
1

KOEF SAT.
3

1.2000
1.2500
1.0000
6.0000
18.0000
1.8000
0.3000

m3

1.1000
1.2500
1.0000
7.000D
21.0000
2.1000
0.35DO

m3

1.100D
1.2500
1.0DDO
7.0000
21.DOOO
2.1 ODD
0.3500

m3

0.0400
0.50DO
1.0000
3.0000
0.30DO
O.D500

m3

D.0400
0.5000
1.0000
3.0000
0.300D
0.0500

m3

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
5
6

1 M3KUSEN KAYU BORNEO SUPER

A113

Kayu balok borneo super


Paku 10 em

Lem putih FOX


pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

4.000.000.0C
15.DOO.OC
35.000.0
62.000.0
78.000.0
92.DOO.O
1D5.000.0

4.500.000.00
17.DOO.OO
36.DOO.OO
62.000.DO
78.000.00
92.000.00
105.000.00

4.800.000.00
18.750.00
35.000.DO
372.DOO.OD
1.404.DOO.OO
165.600.00
31.500.00
6.826.850.00
682.685.00
7.509.535.00
7.509.530.00

5.400.000.00
21.250.00
36.000.DO
372.000.00
1.404.DOO.OO
165.600.00
31.500.00
7.430.350.00
743.035.00
8.173.385.00
8.173.380.00

9.80D.DOO.O
15.0DO.D
35.000.0
62.000.0
78.000.0
92.000.0
105.000.00

10.000.000.DD
17.000.00
35.DOO.OO
62.000.00
78.000.00
92.000.DO
1D5.DOO.OO

10.560.00
18.750.00
35.0DO.DO
434.000.00
1.638.000.00
193.200.0D
36. 75D. DO
12.915.700.00
1.291.570.00
14.207.270.00
14.207.270.00

11.000.000.00
21.250.00
36.0DO.DO
434.000.0D
1.638.DOD.OO
193.200.00
36.750. DO
13.359.200.00
1.335.920.00
14.695.120.00
14.695.120.00

9.000.00D.OO
15.000.0
35.DOO.O
62.000.0
78.DOO.O
92.DDO.O
1D5.DDO.D

9.400.000.00
17.0DO.DO
36.000.0D
62.000.00
78.000.0D
92.00D.OD
105.0DO.OD

9.900.000.DO
18.75D.OD
35.000.00
434.DOD.OO
1.638.000.00
193.200.00
36.750.00
12.255.700.00
1.225.570.00
13.481.270.00
13.481.270.00

1D.340.000.00
21.250.0D
36.00D.OD
434.00D.OO
1. 638. DOD. DO
193.200.00
36.750.00
12.699.200.00
1.269.920.00
13.969.120.DO
13.969.120.00

9.800.DDD.O 10.400.0DO.OO
35.000.0
36.0DO.DO
62.000.00
62.000.DO
78.000.00
78.000.00
92.000.00
92.000.00
105.DDO.O
105.0DO.DD

392.0DO.OD
17.50D.OO
62.000.00
234.000.00
27.600.00
5.25D. OD
738.350.00
73.835.00
812.185.00
812.180.00

416.000.00
18.00D.OD
62.00D.OO
234.000.00
27.600.00
5. 250. DO
762.850.00
76.285.00
839.135.00
839.130.00

9.000.000.0
35.000.0
62.000.0
78.000.0
92.000.0
105.000.0

360.000.00
17.5DO.DO
62.000.00
234.000.00
27.600.00
5.250.00
706.350.00
70.635.00
776.985.00
776.980.00

376.000.DO
18.000.00
62.000.00
234.000.0D
27. 60D. OD
5.250.00
722.850.00
72.285.00
795.135.00
795.130.00

kg
kg
oh
oh
oh
oh

A114 1M3 KUSEN KAYU KAMPER SAMARINDA


Kayu Balok kamper samerinda
paku 10 em

lem pulih FOX


pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

kg
kg
oh
oh
oh
oh

1 M3 KUSEN KAYU JATI JABAR KLAS 2

A115

Kayu balok jati jabar kls 2

PAKU 10 CM
Lem putih FOX
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

kg
kg
oh
oh
oh
oh

1M2 DAUM PINTU PANIL KAYU SAMARINDA

A116

Papan kayu kamper samarinda

Lem putih (FOX)


pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan

A117

kg
oh
oh
oh
oh

1 M3 DAUN PINTU PANIL KAYU JATI JABAR KLS 2


Rangka + panil kayu jati jabar kls 2
Lem putih FOX
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntung~m Max.
I

kg
oh
oh
oh
oh

9.400.000.00
36.DOO.OO
62.000.00
7B.DOO.OO
92.000.00
105.000.00

Jumlah
Dibulatkan

544

JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI

& INTERIOR

Eotst 34

TAHUN

XXI 2015

JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE

1
A118

KOEF SAT.

URAIAN

NO.

JUMLAH
HARGA SAT. HARGA SAT. JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
7=(3x5) 8=(3x6)
6
5

0.0250
1.0000
0.3000
0.0300
0.8000
2.4000
0.2400
0.0400

m3
lbr
kg
kg
oh
oh
oh
oh

7.000.000.0
70.000.0
35.000.0
20.000.0
62.000.0
78.000.0
92.000.0
105.000.0

7.500.000.00
74.000.00
36.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

175.000.00
70.000.00
10.500.00
600.00
49.600.00
187.200.00
22.080.00
4.200.00
519.180.00
51.918.00
571.098.00
571.090.00

187.500.00
74.000.00
10.800.00
660.00
49.600.00
187.200.00
22.080.00
4.200.00
536.040.00
53.604.00
589.644.00
589.640.00

0.0256
1.0000
0.5000
0.0300
0.8000
2.4000
0.2400
0.0400

m3
lbr
kg
kg
oh
oh
oh
oh

7.000.000.0
70.000.0
35.000.0
20.000.0
62.000.0
78.000.0C
92.000.00
105.000.00

7.500.000.00
74.000.00
36.000.00
22.000.00
62.000.00
78.000.00
92.000.00
105.000.00

179.200.00
70.000.00
17.500.00
600.00
49.600.00
187.200.00
22.080.00
4.200.00
530.380.00
53.038.00
583.418.00
583.410.00

192.000.00
74.000.00
18.000.00
660.00
49.600.00
187.200.00
22.080.00
4.200.00
547.740.00
54.774.00
602.514.00
602.510.00

0.0250
1.0000
1.8000
0.0300
0.8000
0.8500
2.5500
0.2550
0.0430

m3
lbr
m2
kg
kg
oh
oh
oh
oh

7.000.000.0
38.000.0
25.000.0
20.000.0
35.000.0
62.000.00
78.000.00
92.000.00
105.000.0

7.500.000.00
40.000.00
27.000.00
22.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

175.000.00
38.000.00
45.000.00
600.00
28.000.00
52.700.00
198.900.00
23.460.00
4.515.00
566.175.00
56.617.50
622.792.50
622.790.00

187.500.00
40.000.00
48.600.00
660.00
28.800.00
52.700.00
198.900.00
23.460.00
4.515.00
585.135.00
58.513.50
643.648.50
643.640.00

0.0250
1.0000
0.5000
0.0300
0.8000
0.8500
2.5500
0.2550
0.0430

m3
lbr
lbr
kg
kg
oh
oh
oh
oh

7.000.000.0
38.000.0
93.000.00
20.000.0
35.000.0
62.000.00
78.000.00
92.000.00
105.000.0

7.500.000.00
40.000.00
95.000.00
22.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

175.000.00
38.000.00
46.500.00
600.00
28.000.00
52.700.00
198.900.00
23.460.00
4.515.00
567.675.00
56.767.50
624.442.50
624.440.00

187.500.00
40.000.00
47.500.00
660.00
28.800.00
52.700.00
198.900.00
23.460.00
4.515.00
584.035.00
58.403.50
642.834.50
642.430.00

1M2DAUN PINTU DDUBLETEAKWOODRANGKAKAYU BANJAR


Rangka papan kayu banjar
Teakwood 4mm uk. pintu (90x220 em)
Lem putih FOX

Paku triplek (1-2,5 em)


pekerja

tukang kayu
kepala tukang kayu
mandor

Jumlah
Keuntungan Max.

Jumlah
Dibulatkan

A119

AIIN PINT PANIL T


1
Rangka papan kayu banjar
Teakwood 4mm uk. pintu (90x220 em)

Lem putih FOX


Paku triplek (12,5 em)
pekerja
tukang kayu
kepala tukang kayu

mandor

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A120

1 M2 DAUN PINTUTRIPLEK UK PINTU LAPISALUMUNIUM IKMINC


Rangka papan kayu kamper banjar

Triplek 4mm ( ukuran pintu)


Alumunium shett 0,3 mm
Paku triplek
Lem putih FOX
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A121

1M2 DAUM PINTUTRIPLEK UK. PINTU LAPIS FORMIKA (KM/


WCI KAYU KAMPER BANJAR
Rangka papan kayu kamper banjar
Triplek 4mm (ukuran plntu)
Formika

Paku Triplek (12.5 em)


Lem putih (FOX)
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntunaan Max.
Jumlah
Dibulatkan

EoiSI

34

TAHUN XXI

2015

JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSJ

& INTERIOR

545

I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE


NO.

URAIAN

A122

1 M2DAUN PINTUTRIPLEK LAPIS SENG PLAT (KMIWC)


Rangka papan kayu kamper banjar
Triplek 4mm (ukuran pintu)

Seng pial BJLS30


Paku triplek

Lem pulih FOX


pekerja
tukang kayu
kepala tukang kayu
mandor

KOEF SAT.
3

HARGA SAT. HARGA SAT. JUMLAH


JUMLAH
(MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM)
5
6
7={3x5) 8=(3x6)

M2
kg
kg
oh
oh
oh
oh

7.000.000.00
38.000.00
28.000.00
20.000.00
35.000.00
62.000.00
78.000.00
92.000.00
105.000.00

7.500.000.00
40.000.00
30.000.00
22.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

175.000.00
38.000.00
50.400.00
600.00
28.000.00
52.700.00
198.800.00
23.460.00
4.515.00
571.575.00
57.157.50
628.732.50
628.730.00

187.500.00
40.000.00
54.000.00
660.00
28.800.00
52.700.00
198.900.00
23.460.00
4.515.00
590.535.00
59.053.50
649.588.50
649.580.00

0.0240
0.3000
0.8000
2.4000
0.2400
0.0400

m3
kg
oh
oh
oh
oh

9.800.000.00
35.000.00
62.000.00
78.000.00
92.000.00
105.000.00

10.400.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

235.200.00
10.500.00
49.600.00
187.200.00
22.080.00
4.200.00
508.780.00
50.878.00
559.658.00
559.650.00

249.600.00
10.800.00
49.600.00
187.200.00
22.080.00
4.200.00
523.480.00
52.348.00
575.828.00
575.820.00

0.0240
0.3000
0.8000
2.4000
0.2400
0.0400

m3
kg
oh
oh
oh
oh

9.800.000.00
35.000.00
62.000.00
78.000.00
92.000.00
105.000.00

10.400.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

235.200.00
10.500.00
49.600.00
187.200.00
22.080.00
4.200.00
508.780.00
50.878.00
559.658.00
559.650.00

249.600.00
10.800.00
49.600.00
187.200.00
22.080.00
4.200.00
523.480.00
52.348.00
575.828.00
575.820.00

0.0640
0.5000
1.0000
3.0000
0.3000
0.0500

m3
kg
oh
oh
oh
oh

9.800.000.00
35.000.00
62.000.00
78.000.00
92.000.00
105.000.00

10.400.000.00
36.000.00
62.000.00
78.000.00
92.000.00
105.000.00

627.200.00
17.500.00
62.000.00
234.000.00
27.600.00
5.250.00
973.550.00
97.355.00
1.070.905.00
1.070.900.00

665.600.00
18.000.00
62.000.00
234.000.00
27.600.00
5.250.00
1.012.450.00
101.245.00
1.113.695.00
1.113.690.00

1.2000
15.0000
5.6000
6.7000
20.1000
2.0100
0.3350

m3
kg
kg
oh
oh
oh
oh

5. 900.000.00
9.976.25
15.000.00
62.000.00
78.000.00
92.000.00
105.000.00

6.800.000.00
45.000.00
17.000.00
62.000.00
78.000.00
92.000.00
105.000.00

7.080.000.00
149.643.71
84.000.00
415.400.00
1.567.800.00
184.920.00
35.175.00
9.516.938.71
951.693.87
10.468.632.58
10.468.630.00

8.160.000.00
675.000.00
95.200.00
415.400.00
1.567.800.00
184.920.00
35.175.00
11.133.495.00
1.113.349.50
12.246.844.50
12.246.840.00

0.0250
1.0000
1.8000
0.0300
0.8000
0.8500
2.5500
0.2550
0.0430

m3
lbr

Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A123

1M2 DAUN JENDELA KACA (TANPA KACA) KAYU KAMPER


SAMAR!NDA
Rangka Kayu kamper Samarinda
Lem putih FOX
pekerja
tukang kayu
kepala tukang kayu

mandor
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
A124 1M2DAUNPINTU KACA(TANPAKACA)KAYUKAMPERSAMARINDA
Rangka kayu kamper samarinda
Lem putih FOX
pekerja

tukang kayu
kepala tukang kayu

mandor
Jumlah
Ke ntunoan Max.

Jumlah
Dibulatkan

A125

1M2 DAUM PINTU/ JENDELAJALUSIKAYUKAMPER SAMARJNDA


Rangka Kayu kamper Samarinda

Lem pulih (FOX)


pekerja

tukang kayu
kepala tukang kayu

mandor
Jumlah
Keuntungan Max.
Jumlah
Oibulatkan

A126

1M3 KUDA-KUDA OVERSTEKIKONSOL KAYU KAMPER


BANJAR (EXSPOSE)
Kayu Balok Kamper banjar
Besi strip tbl 5 em
Paku 8 -12 em
pekerja
tukang kayu
kepala tukang kayu
mandor
Jumlah
Keuntungan Max.
Jumlah
Dibu!atkan

546

JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI

& INTERIOR

EDIS/34 TAHUN

XX/2015