MATERIAL SCHEDULE
ITEM
1. Laterite filling (4.6 cu yard trips)
November, 2015
QTY
RATE
TOTAL
29.00
10,000.00
290,000.00
2,650.00
1,600.00
4,240,000.00
126.00
17,000.00
2,142,000.00
169.00
25,000.00
4,225,000.00
2,110.00
2,500.00
5,275,000.00
10.00
9,800.00
98,000.00
1,380.00
1,000.00
1,380,000.00
101.00
4,500.00
454,500.00
2. Cement (bags)
MATERIAL SCHEDULE
75,000.00
4,544,875.00
22,724,375.00
915.00
18.00
19.00
196.00
131.00
262.00
648.00
231.00
116.00
116.00
27.00
1,600.00
17,000.00
25,000.00
2,700.00
#REF!
#REF!
1,000.00
10,000.00
10,000.00
9,500.00
30,000.00
1,464,000.00
306,000.00
475,000.00
529,200.00
#REF!
#REF!
648,000.00
2,310,000.00
1,160,000.00
1,102,000.00
810,000.00
150,000.00
#REF!
#REF!
9.00
5.00
75.00
5.00
95.00
13.00
180,000.00
1,500.00
12,000.00
1,500.00
1,500.00
18,000.00
1,620,000.00
7,500.00
900,000.00
7,500.00
142,500.00
234,000.00
535,500.00
3,447,000.00
Page 1
ITEM
TOILET
SUBSTRUCTURE
1. Laterite filling (7 cu yard trips)
2. Rock bulder (trips)
3. Cement (bags)
4. Sharp sand (10 cu yd trip)
5. Aggregates machine crushed (10 c.y trip)
6. BRC wire mesh (15x2.1m)/rolls
7. Timber (25x300mm)/lengths twice used
8. 230mm thick block/nr
9.Polythene membrane/roll 120m2
10. Sundries (nails, props, binding wire etc)
11. Labour
Sub-total
ROOF
1. Cement /bags
2. Sharp sand (10 cu. yd trip)
3. Aggregates machine crushed (10 cu.y trip)
4. 12mm ditto
5. 10mm MS bar/lengths
6. 150x50mm hardwood/lengths
7. 100x50mm ditto
8. 25x300mm hardwood/lengths
9. 0.77mm Aluminium roofing sheet/m
10. Sundries (nails)/item
11. Labour
Sub-total
INTERNAL AND EXTERNAL WALLS
1. 230mm blocks (nr)
2. 150mm blocks (nr)
3. Cement (bags)
4. Sharp sand (10 cu yd trip)
5. Labour
Sub-total
WINDOWS
1. Cement (bags)
2. Sharp sand (10 cu yd trip)
3. Aggregates machine crushed (10 c.y trip)
4. 12mm HTS bar/lengths
5. 10mm MS bar (lengths)
6. Timber (25x300mm) lengths
Powder coated standard profile aluminium
window in tinted glass
7. Composite casement and projected Window
size 1200x600mm (nr)
Steelburgalar bar
8. Burgalar bar size 1200x600mm (nr)
9. Labour
MATERIAL SCHEDULE
QTY
RATE
TOTAL
6.00
2.00
146.00
2.00
4.00
5.00
6.00
1,309.00
2.00
10,000.00
22,000.00
1,600.00
17,000.00
25,000.00
9,800.00
1,000.00
150.00
4,500.00
60,000.00
44,000.00
233,600.00
34,000.00
100,000.00
49,000.00
6,000.00
196,350.00
9,000.00
40,000.00
192,987.50
964,937.50
9.00
1.00
1.00
15.00
34.00
32.00
16.00
14.00
112.00
1,600.00
17,000.00
25,000.00
#REF!
#REF!
550.00
420.00
1,500.00
1,850.00
14,400.00
17,000.00
25,000.00
#REF!
#REF!
17,600.00
6,720.00
21,000.00
207,200.00
50,000.00
#REF!
#REF!
2,662.00
1,177.00
35.00
2.00
150.00
120.00
1,800.00
17,000.00
399,300.00
141,240.00
63,000.00
34,000.00
114,757.20
752,297.20
9.00
1.00
1.00
12.00
14.00
16.00
1,600.00
17,000.00
25,000.00
#REF!
950.00
1,000.00
14,400.00
17,000.00
25,000.00
#REF!
13,300.00
16,000.00
5.00
16,200.00
81,000.00
5.00
6,840.00
34,200.00
#REF!
Page 2
ITEM
Sub-total
MATERIAL SCHEDULE
QTY
RATE
TOTAL
#REF!
Page 3
ITEM
DOORS
1. Cement (bags)
2. Sharp sand (7 cu yd trip)
3. Aggregates machine crushed (7 c.y trip)
4. 12mm HTS bar (lengths)
5. 10mm MS bar (lengths)
6. Timber (25x300mm) lengths
7. Heavy duty solid core flush door size
900x2100mm (nr)
8. Ditto door size 750x2100mm(nr)
Metalwork
9. DIA frame type 33 (nr)
10. DIA frame type 30 (nr)
11. Labour
Sub-total
WALL FINISHES
1. Cement (bags)
2. White cement (bags)
3. Plaster sand (trips)
4. Ceramic patterned wall tiles/m2
5. Emulsion paint/drum
6. Labour
Sub-total
FLOOR FINISHES
1. Cement (bags)
2. Sharp sand (trips)
3. Imported fully Vitrified ceramic tiles (m2)
4. Labour
Sub-total
CEILING FINISHES
1. PVC ceiling /m2
2. 50x50mm hardwood/lengths
3. Labour
Sub-total
PLUMBING INSTALLATIONS
1. White WC complete/nr
2. White wash hand basin/nr
3. Pilkinton mirror 600x600mm/nr
4. Toilet roll holder/nr
Pipe work
5. Allow for piping and soakway septic tank/item
6. Labour
Sub total
ELECTRICAL INSTALLATIONS
1. Allow for complete electrical installation/item
MATERIAL SCHEDULE
QTY
RATE
TOTAL
5.00
0.32
0.46
2.00
2.00
2.00
2.00
1,600.00
17,000.00
25,000.00
#REF!
#REF!
1,000.00
18,000.00
8,000.00
5,440.00
11,500.00
#REF!
#REF!
2,000.00
36,000.00
8.00
18,000.00
144,000.00
2.00
8.00
4,500.00
4,500.00
32.00
5.00
2.00
435.00
9.00
1,600.00
2,500.00
20,000.00
1,500.00
3,200.00
51,200.00
12,500.00
40,000.00
652,500.00
28,800.00
141,300.00
926,300.00
28.00
1.00
72.00
1,600.00
17,000.00
1,800.00
44,800.00
17,000.00
129,600.00
38,280.00
229,680.00
85.00
110.00
1,100.00
200.00
93,500.00
22,000.00
23,100.00
138,600.00
8.00
8.00
8.00
8.00
10,000.00
9,500.00
1,500.00
500.00
80,000.00
76,000.00
12,000.00
4,000.00
9,000.00
36,000.00
#REF!
#REF!
500,000.00
134,400.00
806,400.00
500,000.00
Page 4
ITEM
Sub-total
SUMMARY
HANGAR
TAXI WAY
Sub-total
TOILET
SUBSTRUCTURE
ROOF
INTERNAL AND EXTERNAL WALLS
WINDOWS
DOORS
WALL FINISHES
FLOOR FINISHES
CEILING FINISHES
PLUMBING INSTALLATIONS
ELECTRICAL INSTALLATIONS
TOTAL
MATERIAL SCHEDULE
QTY
RATE
TOTAL
500,000.00
22,724,375.00
#REF!
#REF!
964,937.50
#REF!
752,297.20
#REF!
#REF!
926,300.00
229,680.00
138,600.00
806,400.00
500,000.00
#REF!
Page 5