RATE ANALYSIS
DESCRIPTION OF THE WORK

ITEM

Standard Brickwork

DESCRIPTION OF ITEM

UNIT

QUANTITY

RATE (Rs)

Data for standard brickwork in 1:6 cement sand mortar in 220mm thick walls in g

Labor

Material

Labor

Material

Material

Labour

Material

Labour

Skilled Labor (SK)


Unskilled Labour(U/SK)
Allow 3% on labour for tools
Allow 3% on scaffolding
Cement
Sand
Bricks (1000 s)
(A) Total cost for brick work

Day
Day

2.40
4.05

1,000.00
800.00

50kg Bags
m3
Nos

3.25
0.60
1.25

750.00
1,800.00
6,800.00

Data for 15mm thick to walls in 1:1:5 lime-cement-sand mortar finished smooth w
(Internally)
Skilled Labor (SK)
Day
1.61
1,000.00
Unskilled Labour(U/SK)
Day
1.61
800.00
Allow 2.5% on labour for tools
Allow 2.5% on scaffolding
Cement
50kg Bags
Sand
m3
Lime
m3
(b1) Cost for internal Plaster
Use 90% of cost of internal plaster rate for external wall
(B) Total cost for plaster

0.86
0.21
0.04

750.00
1,800.00
7,600.00

Data for Painting.


Paint internal walls with primer and two coats of emulation Paint
Primer
Lts
0.75
372.00
Emulsion Paint
Lts
1.51
412.00
Unskilled Labour(U/SK)
Day
Allow 3% on labour for tools & scaffolding
(c1) Cost for internal paint

2.00

Paint external walls with two coats of external emulation Paint


Emulsion Paint
Lts
1.51
Unskilled Labour(U/SK)
Day
Allow 3% on labour for tools & scaffolding

1.00

800.00

460.00
800.00

(C) Total cost for painting


=
=

1. Total cost to complete 10 m2 in ground floor (A+B+C)


Cost for 1 m2
2. Total cost to complete 10 m2 in first floor (( A+B)*1.05+C*1.03))
Cost for 1 m2

=
=

3.

Total cost to complete 10 m2 in second floor ( A*1.07+B*1.1+C*1.06)) =


Cost for 1 m2

RATE ANALYSIS
DESCRIPTION OF THE WORK
ITEM

Wire cut Brickwork

DESCRIPTION OF ITEM

UNIT

QUANTITY

RATE (Rs)

Data for standard brickwork in 1:6 cement sand mortar in 220mm thick walls in g

Labor

Material

Skilled Labor (SK)


Unskilled Labour(U/SK)
Allow 3% on labour for tools
Allow 3% on scaffolding
Cement
Sand
Bricks (1000 s)
(D) Total cost for brick work

Day
Day

2.40
4.05

1,000.00
800.00

50kg Bags
m3
Nos

2.70
0.55
1.20

750.00
1,800.00
9,880.00

Total cost to complete 10 m2 in ground floor (D+b1+c1)


4. Cost for 1 m

Total cost to complete 10 m2 in first floor (( D+b1)*1.05+c1*1.03))

5. Cost for 1 m2

Total cost to complete 10 m2 in first floor ( D*1.07+b1*1.1+c1*1.06)

6. Cost for 1 m

Cost Comparison Table

Standared brickwork

Wire-Cut
brickwork

Ground Floor

3,036.64

2,7

First Floor

3,180.34

2,9

Second floor

3,270.05

2,9

k
AMOUNT (Rs)
cement sand mortar in 220mm thick walls in ground floor (10 m 2)
2,400.00
3,240.00
169.20
169.20
2,437.50
1,080.00
8,500.00
17,995.90

17,995.90

1:5 lime-cement-sand mortar finished smooth with putty floating,(10m2)


1,610.00
1,288.00
72.45
72.45
645.00
378.00
304.00
4,369.90
3,932.91
8,302.81

4,369.90
8,302.81

279.00
622.12
1,600.00
48.00
2,549.12

2,549.12

694.60
800.00
24.00
1,518.60
4,067.72

4,067.72

30,366.43
3,036.64

3,036.64

31,803.40
3,180.34

3,180.34

32,700.49
3,270.05

3,270.05

k
AMOUNT (Rs)
cement sand mortar in 220mm thick walls in ground floor (10 m 2)
2,400.00
3,240.00
169.20
169.20
2,025.00
990.00
11,856.00
20,849.40

20,849.40

27,768.42
2,776.84

2,776.84

29,105.86
2,910.59

2,910.59

29,817.82
2,981.78

ost Comparison Table


Wire-Cut
brickwork
2,776.84
2,910.59
2,981.78

2,981.78