DESCRIPTION

Boiler tube metallography


TDBFP-1B/Thrust Bearing -UT
Boiler ww tube cut samples preparation - Investigation
TDBFP-1B/DIAPHGRAM RING & BLADES -DPT
TDBFP-1B/DIAPHGRAM RING BUTTERING -UT
TDBFP-1B/DIAPHGRAM RING -DPT
TDBFP-1B/ PUMP REAR BEARING - DPT & UT
TDBFP-1B/ PUMP FRONT BEARING - DPT & UT
PMI - DESH Nozzle - TG Floor
BOILER#1 - Leak identification
27.11.2015 Boiler#1 - 2spool pieces Visual & RT CLEARED
Boiler#1 - 2spool pieces Fin weld- Visual & DPT CLEARED

LOCATION
BOILER#1
TG FLOOR
Near ESP#1
TPCIL/WORKSHOP
TPCIL/WORKSHOP
TPCIL/WORKSHOP
TG FLOOR
TG FLOOR
TG FLOOR
Front ww
Front ww
Front ww

CONCLUSION
Report forwarded
CLEARED
Report forwarded
RING - REPAIR
CLEARED
CLEARED
CLEARED
CLEARED
CLEARED - P22

RECORD
APT REPORT
APT REPORT
QA REPORT
APT REPORT

REMARKS
APT
APT
QA/TPCIL
DECL
APT
DECL