Product X is made of two units of Y and three units of Z. Y is made of one unit of A and
two units of B. Z is made of two units of A and four units of C.
Lead time for X is one week; Y, two weeks; Z, three weeks; A, 2 weeks; B, one week;
and C, three weeks
Questions
a) Draw the bill of materials (product structure tree)
b) If 100 units of X are needed in week 10, develop a planning schedule showing when each
item should be ordered and in what quantity
X
Y
(2)
A
(1)
Z
(3)
B
(2)
A
(2)
C
(4)
b) MRP Table
Weeks
1
X
100
200
200
300
300
600
600
400
400
120
0
200
200
10
100
R
B
R
Z
120
0
LT=
1
LT=
2
LT=
3
LT=
2
LT=
1
LT=
3