Вы находитесь на странице: 1из 12

LOAD DISTRIBUTION SCHEDULE

DB REF:

DB-G-N1E

DOHA CONVENTION CENTRE(BP-02B)

FED FROM :

SMDB-LL1-N1E2

LOCATION :GROUND FLOOR, SECTOR 2, ELECTRICAL ROOM

IFC REF:

GN/E2-00-01/02

LOAD DETAILS

RATING OF
INCOMER

CKT
NO.

3
40A TP
ISOLATOR
4

BREAKER
RTG. IN
AMPS

CKT WIRE
SIZE mm2

R1

10

2x1.5+1x1.5

A1 Light @Sector-1&2,parking bay.

Y1

10

2x1.5+1x1.5

18','24-2' ,'A3' & Exit Lights @ S-1&2,Foyer,Admin&Paint Workshop

B1

10

2x1.5+1x1.5

9' &Exit Light Lines @ Sector-2,Stair case,parking bay

R2

10

2x1.5+1x1.5

PHASE

Ref.Voltage

LOADS IN
Watts/UNIT

CONTROLLED
BY

106

LCP-G-N2

2+3+2+3

62+39+45+8

LCP-G-N2

8+1

80+8

LCP-G-N2

A1&Exit Lights @ S-2,Parking Bay

10+4

106+8

LCP-G-N2

DESCRIPTION

QUANTITY

Y2

10

2x1.5+1x1.5

24-2''15-2/1'&'18' ,Exit Lights @ S-2,Bistro&Paint workshop

2+1+1+4

68+39+62+8

LCP-G-N2

B2

10

2x1.5+1x1.5

A1&Exit Lights @ Sector-2&3, Parking bay

11+6

106+8

LCP-G-N2

R3

10

2x1.5+1x1.5

24-2''15-2/1'&'18' ,'A2',Exit Lights @ S-2&3,Bistro&Paint workshop

1+2+1+2+3

68+39+62+106+8

LCP-G-N2

Y3

10

SPARE

B3

10

SPARE

R4

10

SPARE

Y4

10

SPARE

B4

10

SPARE

R5

10

SPARE

Y5

10

SPARE

B5

10

SPARE

R6

10

SPARE

Y6

10

SPARE

B6

10

SPARE
TOTAL CONNECTED LOAD PER PHASE(W)

INCOMING CABLE: 1x4C-10mm2 FIRE RATED CABLE


1C-10mm2 ECC

Phase

Frequency

50 Hz

LOAD PER CIRCUIT- WATT


REMARKS
R

636
370
648
1092
269
1108
444
0
0
0
0
0
0
0
0
0
0
0
2172

DEMAND FACTOR
MAXIMUM DEMAND LOAD/PHASE(KW)

415/240 V

639

1756

1.00
2.172

0.639

TOTAL MAXIMUM DEMAND LOAD (KW)

4.567

CONNECTED LOAD CURRENT(A)

7.942

1.756

LOAD DISTRIBUTION SCHEDULE


DB REF:

DB-G-N2E

DOHA CONVENTION CENTRE(BP-02B)

FED FROM :

SMDB-LL1-N2E1

LOCATION :GROUND FLOOR, SECTOR 5, ELECTRICAL ROOM

IFC REF:

GN/E2-00-02/03

LOAD DETAILS

RATING OF
INCOMER

CKT
NO.

4
40A TP
ISOLATOR
5

BREAKER
RTG. IN
AMPS

CKT WIRE
SIZE mm2

R1

10

2x1.5+1x1.5

A1&Exit Light @Sector-3,parking bay.

Y1

10

2x1.5+1x1.5

24-2','15-1','18' & Exit Lights @ S-3,Bistro-2&Paint Workshop

B1

10

2x1.5+1x1.5

A1&Exit @ Sector-4,Janitor,parking bay

R2

10

2x1.5+1x1.5

24-2''15-2/1','18' &Exit Lights @ S-4,Bistro&Paint workshop

PHASE

DESCRIPTION

Ref.Voltage

LOADS IN
Watts/UNIT

CONTROLLED
BY

11+6

106+8

LCP-G-N6

2+1+1+3

39+68+62+8

LCP-G-N6

10+6

106+8

LCP-G-N6

8+5

106+8

LCP-G-N6

QUANTITY

Y2

10

2x1.5+1x1.5

A1&Exit Lights @ S-4&5,Janitor,Parking bay

10+6

106+8

LCP-G-N6

B2

10

2x1.5+1x1.5

24-2''15-2/1','18' &Exit Lights @ S-4,Bistro&Paint workshop

2+1+1+3

39+68+62+8

LCP-G-N6

R3

10

SPARE

Y3

10

SPARE

B3

10

SPARE

R4

10

SPARE

Y4

10

SPARE

B4

10

SPARE

R5

10

SPARE

Y5

10

SPARE

B5

10

SPARE

R6

10

SPARE

Y6

10

SPARE

B6

10

SPARE

R7

10

SPARE

Y7

10

SPARE

B7

10

SPARE

R8

10

SPARE

Y8

10

SPARE

B8

10

SPARE
TOTAL CONNECTED LOAD PER PHASE(W)

INCOMING CABLE: 1x4C-10mm2 FIRE RATED CABLE


1C-10mm2 ECC

Phase

Frequency

50 Hz

LOAD PER CIRCUIT- WATT


R

REMARKS
B

1214
232
1108
888
1108
232
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2102

1340

2.102

1.340

DEMAND FACTOR
MAXIMUM DEMAND LOAD/PHASE(KW)

415/240 V

1340

1.00

TOTAL MAXIMUM DEMAND LOAD (KW)

4.782

CONNECTED LOAD CURRENT(A)

8.316

1.340

LOAD DISTRIBUTION SCHEDULE


DB REF:

DB-G-S1E

DOHA CONVENTION CENTRE(BP-02B)

FED FROM :

SMDB-LL1-S1E1

LOCATION :GROUND FLOOR, SECTOR 18, ELECTRICAL ROOM

IFC REF:

GN/E2-00-02/03

LOAD DETAILS

RATING OF
INCOMER

CKT
NO.

3
40A TP
ISOLATOR
4

BREAKER
RTG. IN
AMPS

CKT WIRE
SIZE mm2

R1

10

2x1.5+1x1.5

Exit Light @Sector-18

Y1

10

2x1.5+1x1.5

Exit Light @ Sector-17

B1

10

2x1.5+1x1.5

R2

10

PHASE

Ref.Voltage

LOADS IN
Watts/UNIT

CONTROLLED
BY

LCP-G-S1

LCP-G-S1

Exit Light @ Sector-9

12

LCP-G-S1

2x1.5+1x1.5

Exit Lights @ Sector-18

12

LCP-G-S1

DESCRIPTION

QUANTITY

Y2

10

2x1.5+1x1.5

36','24-2' Light @ Sector-18,Women Toilet&cleaning

4+3

62+39

LCP-G-S1

B2

10

2x1.5+1x1.5

Exit Light @ Sector-18,Entrance-2

LCP-G-S1

R3

10

2x1.5+1x1.5

36' Light @ Sector-18,Men&Women Toilet

62

LCP-G-S1

Y3

10

2x1.5+1x1.5

Exit Light @ Sector-19,Entrance-3

LCP-G-S1

B3

10

2x1.5+1x1.5

36','38-3' Light @ Sector-18&19,Men toilet&Women Preyer hall

3+3

62+35

LCP-G-S1

R4

10

2x1.5+1x1.5

Exit Lights @ Sector-19&20

12

LCP-G-S1

Y4

10

2x1.5+1x1.5

Exit Light @ Sector-19,Entrance-4

LCP-G-S1

B4

10

2x1.5+1x1.5

36','24-1' Light @ Sector-19,Men&Women Toilet

6+2

62+32

LCP-G-S1

R5

10

2x1.5+1x1.5

36','26','28','24-2' Light @ S-19,Women Toilet&Acc.Catalogue

3+2+2+1

62+120+78+39

LCP-G-S1

Y5

10

2x1.5+1x1.5

36','16','24-1','24-2' Light @ Sector-19,Coat&Women Toilet

3+2+2+1

62+75+32+39

LCP-G-S1

B5

10

2x1.5+1x1.5

80-2','26','80-1','43' &Exit Light @ Sector-17&18

1+1+2+4+1

28+120+28+35+8

LCP-G-S1

R6

10

SPARE

Y6

10

SPARE

B6

10

SPARE
TOTAL CONNECTED LOAD PER PHASE(W)

INCOMING CABLE: 1x4C-10mm2 FIRE RATED CABLE


1C-10mm2 ECC

Frequency

50 Hz

LOAD PER CIRCUIT- WATT


REMARKS
R

32
40
96
96
365
32
372
32
291
96
32
436
543
439
352
0
0
0
1139

DEMAND FACTOR
MAXIMUM DEMAND LOAD/PHASE(KW)

415/240 V

Phase

908

1207

1.00
1.139

0.908

TOTAL MAXIMUM DEMAND LOAD (KW)

3.254

CONNECTED LOAD CURRENT(A)

5.659

1.207

LOAD DISTRIBUTION SCHEDULE


DB REF:

DB-G-S2E

DOHA CONVENTION CENTRE(BP-02B)

FED FROM :

SMDB-LL1-S2E2

LOCATION :GROUND FLOOR,SECTOR-20, ELECTRICAL ROOM

IFC REF:

GN/E2-00-02/03

LOAD DETAILS

RATING OF
INCOMER

CKT
NO.

3
40A TP
ISOLATOR
4

Ref.Voltage

PHASE

BREAKER
RTG. IN
AMPS

CKT WIRE
SIZE mm2

DESCRIPTION

QUANTITY

LOADS IN
Watts/UNIT

CONTROLLED
BY

R1

10

2x1.5+1x1.5

36','38-3','A3'&exit Light @ Sector-19,Men Preyer hall&Men Toilet

3+3+2+1

62+28

LCP-G-S3

Y1

10

2x1.5+1x1.5

Exit Light @ Sector-20,Entrance-5

LCP-G-S3

B1

10

2x1.5+1x1.5

24-2','26','10','28'&Exit Light @ S-21,Coat,Security&Cleaning

1+1+4+1+1

39+120+120+78+8

LCP-G-S3

R2

10

2x1.5+1x1.5

Exit Lights @ Sector-20,External side

LCP-G-S3

Y2

10

2x1.5+1x1.5

A2&Exit Light @ Sector-21,stair case

3+2

106+8

LCP-G-S3

B2

10

2x1.5+1x1.5

A2,A3&Exit Light @ Sector-21.

1+2+2

106+106+8

LCP-G-S3

R3

10

SPARE

Y3

10

SPARE

B3

10

SPARE

R4

10

2x1.5+1x1.5

36' Lights @ Sector-20,Women toilet

2x1.5+1x1.5

36','24-1' Light @ Sector-19,Men&Women Toilet

Y4

10

B4

10

R5

10

SPARE

Y5

10

SPARE

10

SPARE

R6

10

SPARE

Y6

10

SPARE

B6

10

SPARE
TOTAL CONNECTED LOAD PER PHASE(W)

INCOMING CABLE: 1x4C-10mm2 FIRE RATED CABLE


1C-10mm2 ECC

Frequency

50 Hz

270
32
725
48
334
334
0
0
0

62

LCP-G-S3

6+2

62+32

LCP-G-S3

186
0
436
0
0
0
0
0
0
504

DEMAND FACTOR
MAXIMUM DEMAND LOAD/PHASE(KW)

LOAD PER CIRCUIT- WATT

SPARE

B5

415/240 V

Phase

366

1495

1.00
0.504

0.366

TOTAL MAXIMUM DEMAND LOAD (KW)

2.365

CONNECTED LOAD CURRENT(A)

4.113

1.495

REMARKS

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I12-4-NA4-3

DB TYPE

INCOMER SWITCH

FED FROM :
LOCATION

IFC REF: EDG-BMD-6034

100A AMP SWITCH / 100AMP MAINS

LOAD DETAILS

MDB-0I3-3

10,000 RMS SYMMETRICAL (Amps) (I.C)

240 VOLTS, 1 PHASE, 2 WIRE + E

FOURTH FLOOR

SURFACE MOUNTED,IP 32
LOAD DETAILS

LOAD WATTS
MCB
AMPS

CKT WIRE SIZE mm

16*

2x4+1x4

CKT NO.

LOAD SERVED

QTY

LOAD IN
WATTS/UNIT

LOAD VA
B

MICROWAVE

1845

1845

2050
6500

40*

2 x 10+ 1 x 10

KITCHEN COOKER OVEN

5850

5850

32*

4 x 4 + 2x 2.5

KITCHEN GENERAL S/O/HOOD (1)

108

972

1080

16*

2x4+1x4

REFRIGERATOR

346

346

384.44

16*

2x4+1x4

DISHWASHER

1980

1980

2200

16

SPARE

16

2x4+1x4

BMS-I12-01-016 (ELEC CLOSET)

225

225

250

63*

2 x 25 + 1 x 16

KITCHEN COOKER HOB

9450

9450

10500

16

SPARE

10

16

SPARE

11

16

SPARE

12

16

2 x 4 + 1 x 2.5

MSTR,BDRM 1-2 S/O LTG

108

648

720

13

16

2 x 4 + 1 x 2.5

MAJLIS,MAID S/O LTG

108

540

600

14

16

2 x 4 + 1 x 2.5

MAIN MAJLIS S/O LTG

108

432

480

15

16

2x4+1x4

LCP-I12-4-NA4

450

450

500

16

16

2x4+1x4

TR CLOSET#1

1125

2250

2500

17

16

2x4+1x4

TR CLOSET#2

1125

2250

2500

20

2x4+1x4

TVSS

100

SWITCH/DISCONNECTOR/RCD

18
19
20
21

TOTAL CL PER PHASE(W / VA)


INCOMING CABLE :

DEMAND FACTOR

27238

30264

###

###

###

###

###

###

0.6

1x4C 16 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC

ESTIIMATED DEMAND LOAD (KVA)

#VALUE!

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

#VALUE!

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

###

###

###

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I12-4-NA4-2

DB TYPE

INCOMER SWITCH

FED FROM :
LOCATION

IFC REF: EDG-BMD-6034

100A AMP SWITCH / 100AMP MAINS

LOAD DETAILS

MDB-0I3-3

10,000 RMS SYMMETRICAL (Amps) (I.C)

240 VOLTS, 1 PHASE, 2 WIRE + E

FOURTH FLOOR

SURFACE MOUNTED,IP 32
LOAD DETAILS

LOAD WATTS
CKT WIRE SIZE mm

16

2x4+1x4

FCU-011 (BEDROOMS)

2085

2085

2317

16

2x4+1x4

APARTMENT EXHAUST VALVES

112.5

225

250

16*

2x4+1x4

MASTER BATH SHAVER S/O

450

450

500

32

4 x 4 + 2x 4

MASTER BDRM GENERAL S/O (1)

108

540

600

16*

2x4+1x4

BEDROOM#2 SHAVER S/O

450

450

500

16

2 x 4 + 1 x 2.5

BEDROOM 1-2 LTG (AL1,AL2,AD1,AL6,JB,AF1-4)

8,1,2,2,5,2
5

108

540

600

CKT NO.

LOAD SERVED

QTY

32

4x 4 + 2 x 4

BEDROOM#2 GENERAL S/O (1)

16*

2 x 4 + 1 x 2.5

MAJLIS,KITCHEN,BDRM 2 AREA LTG

LOAD IN
WATTS/UNIT

LOAD VA

MCB
AMPS

16*

2x4+1x4

BATHROOM#1 SHAVER S/O

450

450

500

10

32

4x4+2x4

BEDROOM#1 GENERAL S/O (1)

108

540

600
500

11

16*

2x4+1x4

MAID BATHROOM SHAVER S/O

450

450

12

32

4x4+2x4

MAID GENERAL S/O (1)

108

432

480

13

16

2x4+1x4

FCU-012 (MAJLIS)

2085

2085

2317

1728

6912

7680

14

40

2 x 10 + 1 x 4

MACHO SHADE CNTRLS 1-4

15

16*

2 x 4 + 1 x 2.5

MASTER,DINING,MAIN MAJLIS LTG (AL1,AL5,AD1,F1,AF1-6,AMR-11)

15,6,4,2,1,4

16

16

2 x 4 + 1 x 2.5

BEDROOM LTG (AL1,AL2,AL3,AD1,JB,AL6,AD17,AF1-8)

2,1,3,1,2,2,2,1

17

16

SPARE

18

20

2x4+1x4

TVSS

100

SWITCH/DISCONNECTOR/RCD

19
20
21

TOTAL CL PER PHASE(W / VA)


INCOMING CABLE :

DEMAND FACTOR

15159

16843

###

###

###

###

###

###

0.6

1x4C 16 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 ECC

ESTIIMATED DEMAND LOAD (KVA)

#VALUE!

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

#VALUE!

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

###

###

###

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I02-B1M-NTH4-1

IFC REF: P1B - DWG-I01-02-EDG-BMD-6031

100A AMP SWITCH / 100AMP MAINS

DB TYPE

INCOMER SWITCH

LOAD DETAILS

22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM :

SMDB-I02-NTH4

LOCATION

ELEC

240 VOLTS, 1 PHASE, 2 WIRE + E

SURFACE MOUNTED,IP 32 ENCLOSURE


LOAD DETAILS

CKT NO.

MCB
AMPS

CKT WIRE SIZE mm2

LOAD SERVED

QTY

LOAD IN
WATTS/UNIT

LOAD
WATTS

16*

16*

2x4+1x4

SPUR OUTLET FOR DAP PANEL

108

432

480

2x4+1x4

SPUR OUTLET FOR MOTORISED DAMPER

108

432

480

16*

2x4+1x4

CORRIDOR GENERAL S/O

108

324

360

16*

2x4+1x4

GARAGE WP S/O

108

216

240

16*

2x4+1x4

STOR,ELEV PIT GENERAL S/O

1,2

108,540

1188

1320

16*

2x4+1x4

MAID GENERAL S/O

108

432

480

16*

2x4+1x4

KITCHEN MICROWAVE S/O

1845

1845

2050

32*

4 x 4+ 2 x 4

KITCHEN GENERAL S/O(1)

108

756

840

40*

2 x10+1 x10

KITCHEN COOKER OVEN/HOB RIGHT

5850

5850

6500

10

40*

2 x10+1 x10

KITCHEN COOKER OVEN/HOB RIGHT

5940

5940

6600

11

16*

2x4+1x4

KITCHEN REFRIGERATOR S/O

346

346

384

12

16*

2x4+1x4

KITCHEN DISHWASHER S/O

1980

1980

2200

13

16*

4x4+2x4

KITCHEN HOOD S/O

1037

1037

1152

14

32

2x6+1x6

TR CLOSET S/O

2250

4500

5000

15

32

2x6+1x6

TR CLOSET S/O

2250

4500

5000

16

16

17
18
19
20
21

SPARE

16
20

LOAD
VA

SPARE
2x4+1x4

TVSS

100

SWITCH/DISCONNECTOR/RCD
TOTAL CL PER PHASE(W / VA)

29778

33087

INCOMING CABLE :

DEMAND FACTOR

0.5

1x2C 25 mm2 XLPE/LSF/SWA/LSF +


1C 16 mm2 ECC

ESTIIMATED DEMAND LOAD (KVA)

16.5

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

14.9

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

33.1

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I02-B1M-NTH4-2

IFC REF: P1B - DWG-I01-02-EDG-BMD-6031

100A AMP SWITCH / 100AMP MAINS

DB TYPE

INCOMER SWITCH

LOAD DETAILS

22,000 RMS SYMMETRICAL (Amps) (I.C)

FED FROM :

DB-I02-NTH4

LOCATION

ELEC

240 VOLTS, 1 PHASE, 2 WIRE + E

SURFACE MOUNTED,IP 32 ENCLOSURE


LOAD DETAILS

CKT NO.

MCB
AMPS

CKT WIRE SIZE mm2

LOAD SERVED

QTY

LOAD IN
WATTS/UNIT

LOAD
WATTS

16*

2x4+1x4

UTILITY ROOM WASHER S/O

1980

1980

2200

25*

2x4+1x4

UTILITY ROOM DRYER S/O

3510

3510

3900

16*

2x4+1x4

FCU-TA-BM-001

283

283

314

16*

2x4+1x4

DRIVER GENERAL S/O

108

432

480

16*

2x4+1x4

BATH SHAVER S/O

450

450

500

16

2x4+1x4

CORRIDOR GENERAL S/O

108

216

240

16*

2x4+1x4

BATH SHAVER S/O

450

450

500

16

2x4+1x4

UTILITY ROO GENERAL S/O

108

216

240

16

2x4+1x4

BATH EXHAUST VALVE , SEF-TA-BM-001

2,1

315,60

290

322

10

16

2x4+1x4

NAC PANEL

512

512

569

11

16

2x4+1x4

MOTORISED SHADE CONTROLS

1728

3456

3840

12

16

SPARE

13

16

SPARE

14

16

SPARE

15

16

16

32

2x6+1x6

TR CLOSET S/O

2250

4500

5000

17

32

2x6+1x6

TR CLOSET S/O

2250

4500

5000

20

2x4+1x4

TVSS

18
19
20
21

LOAD
VA

SPARE

63

SWITCH/DISCONNECTOR/RCD
TOTAL CL PER PHASE(W / VA)

20795

23106

INCOMING CABLE :

DEMAND FACTOR

0.5

1x2C 25 mm2 XLPE/LSF/SWA/LSF +


1C 16 mm2 ECC

ESTIIMATED DEMAND LOAD (KVA)

11.6

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

10.4

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

23.1

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I02-1-NTH4-1

DB TYPE

INCOMER SWITCH

FED FROM :

DB-I02-NTH4

LOCATION

ELEC ( I13.04:A.04 )

IFC REF: P1B - DWG-I01-02-EDG-BMD-6031

100A AMP SWITCH / 100AMP MAINS

LOAD DETAILS

22,000 RMS SYMMETRICAL (Amps) (I.C)

240 VOLTS, 1 PHASE, 2 WIRE + E

SURFACE MOUNTED,IP 32 ENCLOSURE


LOAD DETAILS

CKT NO.

MCB
AMPS

CKT WIRE
SIZE mm2

LOAD SERVED

QTY

LOAD IN
WATTS/UNIT

LOAD WATTS

16

2x4+1x4

SPUR OUTLET FOR MOTORIZED DAMPER

108

432

VA

480

16

16*

2x4+1x4

CORRIDOR GENERAL S/O

108

324

360

32*

4x4+2x4

LIVING ROOM GENERAL S/O(1)

108

648

720

16*

2x 4 + 1 x 4

STUDYROOM GENERAL S/O

108

432

480

16

2x4+1x4

EXHAUST VALVES

315

945

1050

16*

2x4+1x4

CORR BATHROOM SHAVER S/O

450

450

500

16*

2x4+1x4

BATHROOM SHAVER S/O

450

450

500

32*

4x4+2x4

BEDROOM GENERAL S/O(1)

108

540

600

10

16*

2x 4 + 1 x 4

MASTER BATH SHAVER S/O

450

450

500

11

32*

4x4+2x4

MASTER BEDROOM GENERAL S/O(1)

108

648

720

12

32

2x6+1x6

MECHO SHADE CNTRL 1,2&3

1728

5184

5760

13

32

2x6+1x6

MECHO SHADE CNTRL 4,5,6

1728

5184

5760

14

16

SPARE

15

16

SPARE

16

16

SPARE

17

16

SPARE

18
19
20
21

20

SPARE

LOAD

2x4+1x4

63

TVSS

SWITCH/DIXCONNECTOR/RCD
TOTAL CL PER PHASE(W / VA)

15687

17430

INCOMING CABLE :

DEMAND FACTOR

0.5

1x2C 25 mm2 XLPE/LSF/SWA/LSF +


1C 16 mm2 ECC

ESTIIMATED DEMAND LOAD (KVA)

8.7

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

7.8

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

17.4

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I02-0-NTH4-1

DB TYPE

INCOMER SWITCH

FED FROM :

DB-I02-NTH4

LOCATION

ELEC

CKT NO.

MCB
AMPS

16

IFC REF: P1B - DWG-I01-02-EDG-BMD-6032

100A AMP SWITCH / 100AMP MAINS

LOAD DETAILS

22,000 RMS SYMMETRICAL (Amps) (I.C)

240 VOLTS, 1 PHASE, 2 WIRE + E

SURFACE MOUNTED,IP 32 ENCLOSURE


LOAD DETAILS

CKT WIRE
SIZE mm2

LOAD SERVED

QTY

LOAD IN
WATTS/UNIT

LOAD
WATTS

LOAD
VA

SPARE

16

16*

2x4+1x4

LOBBY GENERAL S/O

SPARE
2

108

216

240

32*

2x4+1x4

LIVING ROOM GENERAL S/O(1)

108

756

840

16*

2x4+1x4

BATH SHAVER S/O

450

450

500

16*

2x4+1x4

BATH EXHAUST VALVE

315

630

700

16*

2x4+1x4

KITCHEN JB

100

100

111

32*

4 x 4+ 2 x 4

KITCHEN GENERAL S/O(1)

108

648

720

40*

2 x10+1 x10

KITCHEN COOKER OVEN/HOB RIGHT

5850

5850

6500

10

40*

2 x10+1 x10

KITCHEN COOKER OVEN/HOB RIGHT

5940

5940

6600

11

16*

2x4+1x4

KITCHEN MICROWAVE S/O

1845

1845

2050

12

16*

2x4+1x4

KITCHEN REFRIGERATOR S/O

346

346

384

13

32

4x4+2x4

DINING GENERAL S/O(1)

108

540

600

14

32

4x4+2x4

DINING GENERAL S/O(1)

108

648

720

15

16*

2x4+1x4

PORCH WP S/O

108

108

120

16

16

2x4+1x4

SPUR OUTLET FOR DAP PANEL

108

432

480

17

16

2x4+1x4

SPUR OUTLET FOR DAP PANEL,CCTV

108

432

480

20

2x4+1x4

TVSS

18
19
20
21

100

SWITCH/DISCONNECTOR/RCD
TOTAL CL PER PHASE(W / VA)

18941

21046

INCOMING CABLE :

DEMAND FACTOR

0.5

1x2C 25 mm2 XLPE/LSF/SWA/LSF +


1C 16 mm2 ECC

ESTIIMATED DEMAND LOAD (KVA)

10.5

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

9.5

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

21.0

LOAD DISTRIBUTION SCHEDULE


DOHA LAND - PHASE 1 B
DB NAME

DB-I1-B1-NCP

DB TYPE

RCCB

SHOP DWG REF : CQB-ETA-CQ002-EGN-DRG-10918,CQB-ETA-CQ002-EPW-DRG-10918,

63A RCCB / 125A MAINS

LOAD DETAILS

22,000 RMS SYMMETRICAL (Amps) (I.C)

415 VOLTS, 3 PHASE, 4 WIRE + E

SURFACE MOUNTED,IP 32 ENCLOSURE

FED FROM SMDB-I1-B1-N3


LOCATION STOR I12.BM:5.12
CKT NO.

PHASE

MCB
AMPS

LOAD DETAILS
CONDUIT
SIZE mm2

CKT + GND WIRE


SIZE mm2

LOAD SERVED

QTY

LOAD IN
WATTS/UNIT

LOAD WATTS
R

LOAD VA

LOAD VA
B

LOAD WATTS
R

LOAD IN
WATTS/UNIT

QTY

LOAD SERVED

CKT + GND WIRE


SIZE mm2

CONDUIT
SIZE mm2

MCB
AMPS

R1
1

Y1

16

25

4x4+1x4

CPCHP-I01-BM-101

5.59

5.59

CPCHP-I01-BM-102

4x4+1x4

25

16

25

4x4+1x4

CPCHP-I01-BM-103

1.12

1.12

CPCHP-I01-BM-104

4x4+1x4

25

16

25

4x4+1x4

CPCHP-I01-BM-105

5.59

5.59

CPCHP-I01-BM-106

4x4+1x4

25

16

R9

11

R8
16

25

4x4+1x4

CPCHP-I01-BM-107

1.12

1.12

CPCHP-I01-BM-108

B7

Y6
B6

R7
Y7

R6
16

B5

Y4
B4

R5
Y5

R4
16

B3

Y2
B2

R3
Y3

CKT NO.

R2

B1

PHASE

4x4+1x4

25

16

Y8

B8
SPARE

SPACE

R10

Y9

16

SPACE

SPACE

Y10

B9

SPACE

SPACE

B10

R11

SPACE

SPACE

R12

Y11

SPACE

SPACE

Y12

B11

SPACE

SPACE

B12

TOTAL CL PER PHASE(W / VA)


INCOMING CABLE :

DEMAND FACTOR

1x4C 16 mm2 XLPE/LSF/SWA/LSF + 1C 16 mm2 PVC CPC G/Y

ESTIIMATED DEMAND LOAD (KVA)

*=30mA RCBO **=100mA RCBO

ESTIIMATED DEMAND LOAD (KW)

(1) = RING MAIN PRINCIPLE

PHASE BALANCE - KVA (R,Y,B) RESPECTIVELY

0.8
0.0
0.0
0.00

0.00

0.00

TOTAL CL (KVA)

TOTAL CL (KW)

0.0

0.0

10

12