40,000 TON/YEAR
1. Estimation By Table 21
Equipment
acetic vaporizer
Air heater
Fluid bed reactor
decanter
Heater
distillation column
Vinyl acetate
condenser
reboiler
Air Compressor
cooler
TOTAL
Amou
nt
1
1
1
1
1
1
Worker(s)/Unit/
Shift
(asumption)
1/2(asumption)
(asumption)
(asumption)
Labor Estimation
(Worker/shift)
(asumption)
1
1
1
10
(asumption)
(asumption)
(asumption)
Total Labor :
worker
worker
3.5
4
shift
shift
Total Labor for 4 shift available
worker
4
x 4 shift=16 worker
shift
3.5
2. Estimation By Table 22
Operating
labor and
supervisio
n
workhours
ton
Maintenanc
e labor and
supervision
workhours
ton
bbl
day
Stea
Fuel
m
MMBtu
lb
h
h
ton
yr
or
capacity
Power
kWh
Water
gph
Chemical plants
Acetone
Acetic acid
Butadiene
Ethylene oxide
Formaldehyde
Hydrogen
peroxide
Isoprene
Phosphoric acid
Polyethylene
Urea
Vinyl acetate
100
10
100
100
100
100
100
10
100
100
100
0.518
1.483
0.345
0.232
0.259
0.288
0.230
1.85
0.259
0.238
0.432
0.315
0.984
0.285
0.104
0.328
0.352
0.325
0.442
0.295
0.215
0.528
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1.73
....
0.01
2
4.88
34.6
2.62
0.81
0.18
0.23
0.33
1.34
310
180
130
140
200
160
710
40
450
135
275
5.18
0.58
0.73
0.148
0.029
0.186
0.001
0.03
0.0004
0.0002
0.27
Figure 2. Figure 6.8 from Plant Design And Economics page 198
3 5 employeehours
day processing step
Number of operating labor for 5 proscessing step (heatingreaction-cooling-flash separating-destilation-reboiling)
35 employeehours
210 employeehours
x 6 processing step=
day processing step
day
Number Of Labor with working time 8 hours-shift/day
210 employee hours
1 day
26 employee
x
=
day
8 hoursshift
shift
Total Labor for 4 shift available
2 6 employee
x 4 shift=104 Employee
shift
PLANT DESIGN
MAHDI
03121003085