SERVICE ENTRANCE CONDUCTORS

SMALL APPLIANCES
GENERAL LIGHTING
DRYER
TOTAL

= 5040VA
= 272A
= 1500VA
= 6812VA

APPLICATION OF DEMAND FACTORS


FIRST 3000VA AT 100% DF
= 3000VA
NEXT (6812 - 3000)VA AT 35%DF = 1334.2VA
NET COMPUTED LOAD
= 4334.2VA
NET COMPUTED LOAD + OTHER LOADS
4334.2VA + 6400VA + 11270VA = 22004.2VA

TOTAL FULL LOAD CURRENT


I = 22004.2VA / 230V
=95.67A
Use: 2 - 30mm2 THW Cu wire
32 mm diameter RSC
SERVICE EQUIPMENT
1. INVERSE TIME CIRCUIT BREAKER = [3000VA +
1334.2VA + 6400VA + 3x8A(230V) + 10A(230V)
+ 250%x12A(230V)] / 230V
=25501.8VA / 230V
=110.67A
2. NON-TIME DELAY FUSE=[3000VA + 1334.2VA +
6400VA + 3x8A(230V) + 10A(230V) +
300%x12A(230V)] / 230V
=116.67A

Use: 1. One 125 AT, 2 pole, 240V case circuit breaker


or
2. Use one 200A, 2PST, 250V safety switch with two
125A renewable fuses