Вы находитесь на странице: 1из 4

QUOTATION

Lt no gvr/bh/wo/72/2011
dt 21.10.2011
To,
M/S- Brundhaban Durga,
ADDRESS:At/PO-Charbhal,
DIST-Kalahandi,Orissa,
Ph:9178888569.
AC NO-SBISUB: - Work Order For Labour Supply For Concreting
Of Retaining Wall From 96.440Km-96.480Km Of NH-201.

Sir,
With Reference to your quotation for above said work Dt 21.10.2011 and
negotiations and with you,we have pleasure in issuing this work order to carry out
the below mentioned work,with the following terms and conditions.
Sno

Item Of Work

Unit

Quantity

Labour Rate(RS

Labour for PCC

Cum

400.00

Labour for retaining wall


concre with shuttering

Cum

600.00

Labour for steel bending

MT

Labour sand filling

Cum

150.00

Labour for earth cutting or


other work

No/day

120.00

3500.00

1. Retaining wall work within chainange 96.440km-96.480km near Kalapola


Company to provide shuttering materials and mixture machine, vibrators, pvc pipes.
2. Every 15 Days bill will be raised for payment as per clause enclosed.
Accepted by
GVR infra project ltd
Brundabam Durga(Party)
Authorised Signatorry

For

Work Order
dt 10.12.2011
G.yesuratnam,
Bhamavaram(Post),
Vatayavee(Mandal),
Krishna(Dist)

AC NO-SBISUB: - Quotation For Laying of bituminous Works at


95 KM-143KM of NH-201.

Sir,
With Reference to your quotation for above and negotiations and with you,
we have pleasure in issuing this work order to carry out the below mentioned work,
with the following terms and conditions.
Sl no

Item Of Work
1

Laying DBM(or) BC

RS
6.50rs ton

Conductions
Minimum 400 Ton Per Day

Labour ideal Charge

250 (Per Head)

Due to Short fall bituminous paver and plant and any


other problem laying is not done.

Labour used from other


work

250 (Per head)

Using of compersior (or) distubution purpose)

Accepted by
For GVR infra project ltd

G.yesuratnam,(party)
Authorized Signatory

QUOTATION
dt 28/02/2012
To,
The Project Manager
GVR INFRA PROJECT LTD,
Junagarh, odisha.
PAN CARD NO: CCCPK1923J-

Sir,

SUB: - Surath khamari quotes following rates for


above said work and please negotiate and issue me work
order.

S.no

Item Of Work

Unit

Labour for Shuttering &


deshuttering for wing walls

Cum

Labour for steel bending &


fixing, transporting etc...

MT

Labour for gate by chute

Cum

Quantity

Labour Rate(RS
100.00
3500.00
120.00

Drain at change 117+700- 3*3 Box culvert And 119+500- 3*3 Box culvert wing
walls.
.
1. I accept any recoveries, deductions as per applicable time to time
2. Deduct 5% Security as per agreement Which will be released after finalization of
bill.
3. I accept the all measurements enclosed as per clauses of agreement with
company.
Accepted by
GVR infra project ltd

Surath khamari (Party)


Authorised Signatory

For