Вы находитесь на странице: 1из 1

Bureau Veritas Industry & Facilities Division

BV Job nr: PU/CNP-14/040

PUNCH LIST SUMMARY /

BV

MEPL 2*350MW for India Project /: Hangzhou Kaixin Cast Steel Co.,

Ltd.
DESCRIPTION OF FINDINGS /
No.

Component/Item

Support

bearing housing

CORRECTIVE ACTION VERIFIED /

Raised
Picture /

Verified

Status

Description /

Date

The manufactory submitted the quality

Xuguang Gu

The external diameter of the support

document 1001, 1002 to show

2015-9-24

bearing housing was out of tolerance in

the support bearing housing can return

Description /

Date

according to the
1#

Date of Update: 2015-11-4

to use. These two documents were

drawing(770047-D5-46001-Rev. A)

Xuguang Gu

approved by Mr. Jiangguo Zhang and

Closed

Drawing requirement:

2015-9-24

Mr. Zhong Wang from Shanghai Boiler

1056(-0.358~-0.098)mm

Works Ltd.

Actual dimension:
1056(-0.62~0.50)mm

The external diameter of the transition


1#

Support

bearing

housing(2#
transition pad)

BVI closed this item base on the

pad was out of tolerance in according to


the drawing(770047-B5-46004-Rev. A)
Drawing requirement:

Email : Engg team had accepted


Xuguang Gu
2015-9-24

530(-0.044~0)mm

for manufacture clarification against


open points on 2015Nov 3

Kang Li
2015-11-4

closed

Actual dimension:
530(-0.055~0.050)mm

BV Inspector:

Manufacturer:

Date: 2015-9-24

Date:

Page 1 / 1

Bureau Veritas Punch List

P&U China 05/2011