1- DATOS GENERALES
A-POR PESO
MATERIALES

UNIDAD

CEMENTO

BL.

FIERRO, CLAV. ETC

KG

MADERA

P2

LADRILLO

UN

CALAMINA

UN

YESO

BLS

PINTURA

GL

OTROS

KG

AFECTO IGV
1,112.00
2,030.00
2,153.00
40.00
6.00
15.00
1,000.00

PESO.UNIT.
42.50
1.00
1.00
4.50
3.00
25.00
3.50
1.00

PESO.TOTAL
47,260.00
2,030.00
2,153.00
120.00
150.00
52.50
1,000.00

PESO TOTAL

52,765.50

B1-POR VOLUMEN: MATERIALES DE CANTERA: AFIRMADO


EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA GRUESA
M3
PIEDRA CHANCADA M3
PIEDRA GRANDE
M3
PIEDRA MEDIANA
M3
MATERIAL AFIRMAD M3
HORMIGN
M3
MADERA
P2

VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
COSTO (M3-KM) S/.
DMT:
COSTO:

AFECTOS IGV
0.00
0.00
0.00
0.00
135.00
0.00

SIN IGV

135.00
8.00
16.88
17.00
1.30
8.32
1,460.16

B2-POR VOLUMEN: MATERIALES DE CANTERA: PIEDRA GRANDE

135.00

EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA GRUESA
M3
PIEDRA CHANCADA M3
PIEDRA GRANDE
M3
PIEDRA MEDIANA
M3
MATERIAL SELECC M3
HORMIGN
M3
MADERA
P2

VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
COSTO (M3-KM) S/.
DMT:
COSTO:

AFECTOS IGV
0.00
0.00
630.00
1.40
0.00
0.00

SIN IGV

631.40
8.00
78.93
79.00
1.30
5.40
4,432.43

B3-POR VOLUMEN: MATERIALES DE CANTERA: ARENA GRUESA Y HORMIGON


EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA GRUESA
M3
PIEDRA CHANCADA M3
PIEDRA GRANDE
M3
PIEDRA MEDIANA
M3
MATERIAL SELECC M3
HORMIGN
M3
MADERA
P2

VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
COSTO (M3-KM) S/.
DMT:
COSTO :

AFECTOS IGV
39.27
0.00
0.00
0.00
0.00
15.92

SIN IGV

55.19
8.00
6.90
7.00
1.30
7.32
525.19

B4-POR VOLUMEN: MATERIALES DE CANTERA: PIEDRA CHANCADA 3/4"


EN AGREGADOS Y MADERA
DESCRIPC.
UNIDAD
ARENA GRUESA
M3
PIEDRA CHANCADA M3
PIEDRA GRANDE
M3
PIEDRA MEDIANA
M3
MATERIAL SELECC M3
HORMIGN
M3
MADERA
P2

VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
COSTO (M3-KM) S/.
DMT:
COSTO :

AFECTOS IGV
0.00
86.00
0.00
0.00
0.00
0.00

SIN IGV

86.00
8.00
10.75
11.00
1.30
9.32
1,041.98

RESUMEN POR VOLUMEN:(B1+B2+B3+B4)

7,459.76

EN TUBERIA
UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.
CAPACIDAD DEL CAMION EN TUBOS / VIAJE
ML
No de tubos
Tub, 1"
3,360.00
U
Tub,1 1/2"
1,690.00
U
Tub 2:"
994.00
U
Tub, 3"
470.00
U
Tub 4":
259.00
U
Tub 6:" U-PVC
110.00
U
Tub 8" U-PVC
65.00
U
Tub 6'; CSN
160.00
U
Tub 8'; CSN
80.00
U
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN

No VIAJES

2- FLETE TERRESTRE

UNIDAD QUE DA COMPROBANTE


CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
FLETE POR KG

FLETE POR PESO


FLETE POR VOLUMEN
AGREGADOS
TUBERIA
COSTO TOTAL FLETE TERR.

UNIDAD DE TRANSPORTE
UNIDAD QUE NO DA COMPROBANTE
8.00 CAPACIDAD DEL CAMION ( M3 )
700.00 COSTO POR VIAJE S/.
8,500.00 CAPACIDAD DEL CAMION (KG)
0.0824 FLETE POR
AFECTO IGV
4,347.88
7,459.76
11,900.00

SIN IGV

FLETE POR PESO =Peso Total * Flete por peso


FLETE POR VOLUMEN=No viajes*costo por viaje

11,807.64

3- FLETE FLUVIAL
UNIDAD DE TRANSPORTE QUE DA COMPROBANTE
UNIDAD DE TRANSPORTE QUE NO DA COMPROB.
CAPACIDAD DEL BOTE EN PESO
(KG)
CAPACIDAD DEL BOTE EN VOLUMEN (M3)
COSTO POR VIAJE
COSTO POR PESO
AFECTO IGV

SIN IGV

FLETE POR PESO =Peso Total * Flete por peso


FLETE POR VOLUMEN=No viajes*costo por viaje

FLETE POR PESO


FLETE POR VOLUMEN
AGREGADOS
TUBERIA
COSTO TOTAL FLETE FLUV
4- FLETE EN ACEMILA DENTRO DE OBRA
La tubera ser transportada por peones
Costos de transporte por viaje
Acemila S/.
1.00
Peon S/.
0.50
Cantidad (KG)

Unidades de
Carga

Peso total tubera de agua


Peso total tubera desague CSN
Peso total tubera desague PVC
Numero bolsas de cemento
500.00
Peso resto de materiales
1,000.00
Agregados Total en Kilos
Carguio
COSTO TOTAL DEL FLETE EN ACEMILA S/.

Capacidad de
Carga
2
2
2
1
1
1

AFECTO IGV
11,807.64

80
80
80
1
60
60

500.00
16.67

Flete no
Afecto a IGV

250.00
500.00
100.00
850.00

RESUMEN FLETE TOTAL


FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILA

Nmero de
Viajes

SIN IGV

850.00

FLETES TOTALES S/.

11,807.64

850.00

12,657.64