Вы находитесь на странице: 1из 1

Company

LOGO

Contractor

Client :
LIGHTING AND SMALL POWER INSPECTION CHECKLIST

Project Title :
Type of Work :
Location :

No.
A

Date :

Main
Contractor

Items To Be Checked

Clients
Consultant

Remarks

Preparatory

1.

Material and product as per approved catalogue, sample and


specification

2.

Correct sizes, position and location as per approved drawing

3.

Approved Work Method Statement

RFWI No :

Ref. Drawing No :

Installation

4.

All cables or wires installed as per approved shop drawing and


specification.

5.

Wall and floor penetration are properly sealed.

6.

No visible damage and defects.

7.

Accessible for maintenance.

8.

Sufficient clearance in-between other services.

9.

Correct IP rating of fittings, switches and socket outlets

10.

Correct height, spacing and alignment of socket outlets and


switches

B.1

Underground Cabling

11.

Correct depth, bedding, backfill material and protective cable


cover/marking

12.

Compaction and top finishing as per surrounding areas


Others (please state).

C
13.

Completion
Testing: continuity, insulation, polarity, earthing, devices etc
done.

Status of Inspection
We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document.
Checked By
Main-Contractor

Verified By
Clients Consultant

Acknowledged By
ER/ERA

Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable , X = Not Acceptable, - = Not Applicable

Вам также может понравиться