The Control
Station during
kick circulation
Operator must
know:
Mud-Gas Separator
(Gas Buster)
Siphon Break
Gas Outlet
Mud legs
Inlet
Baffles
Access
Cover
1/3
Height
should be external
often undersized by contractors
Flush
to
Shaker
Mud
Leg
4 Clean Out
ExxonMobil
Accumulator Design
Volume Requirements
Accumulator useable fluid volume sufficient to provide 1.5
times the volume needed to:
close all rams
close one annular
open the HCV
and retain a minimum operating pressure of 1200 psi on
the accumulator bottle pressure without the assistance of
pumps.
Accumulator Precharge
Precharge is needed
because control fluid
is incompressible
Normal precharge is
1000 psi for 3000
psi systems
p =1000
psi
10 gallons
precharge
d
with
Nitrogen
Gas
p =3000
psi
10
3.3
6
6.6
4
p =1000
psi
10 gallons
precharge
d
with
Nitrogen
Gas
p =3000
psi
10
3.3
6
6.6
4
p =1200
psi
8.3
5
1.6
5
p =1200
psi
4.9
9
Useable
Fluid