PROYECTO
TRAMO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
FECHA
MATERIALES
ALAMBRE NEGRO RECOCIDO # 16
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA CALAMINA
ACERO DE REFUERZO FY=4200 GRADO 60
CEMENTO PORTLAND TIPO I (42.5KG)
YESO EN BOLSAS DE 25 KG.
CARTEL DE OBRA INC.INSTALACION Y TRANSP
REGLA DE MADERA
MADERA 2" X 3"
MADERA TORNILLO INC.CORTE P/ENCOFRADO
ZARANDA DE FIERRO DE CONSTRUCCIN
BREA
PINTURA ESMALTE
CALAMINA
UNIDAD
KG
KG
KG
KG
BOL
BOL
GLB
P2
P2
P2
UND
KG
GLN
PZA
FLETE TERRESTRE
COSTO FLETE POR KG (HUANCAYO-PALERMO)
FLETE TOTAL ( S/. )
0.15
5,187.55
CANTIDAD
31.39
68.43
4.00
253.13
738.40
59.39
1.00
9.17
680.00
579.01
12.44
11.40
1.55
40.00
PESO UNIT.
1.00
1.00
1.00
1.00
42.50
25.00
60.00
0.50
0.50
0.50
20.00
1.00
3.50
10.00
TOTAL (KG)
SUBTOTAL
31.39
68.43
4.00
253.13
31,382.19
1,484.81
60.00
4.58
340.00
289.51
248.78
11.40
5.44
400.00
34,583.66
FLETE DE EXPLOSIVOS
PROYECTO
UNIDAD
m
m
und
kg
kg
FLETE TERRESTRE
COSTO FLETE POR KG (LIMA-PALERMO)
FLETE TOTAL ( S/. )
S/. 0.400
9,939.78
CANTIDAD
30,184.74
14,033.07
46,336.40
3,508.27
9,267.28
PESO UNIT.
0.10
0.15
0.15
1.00
1.00
TOTAL (KG)
SUBTOTAL
3,018.47
2,104.96
6,950.46
3,508.27
9,267.28
24,849.44