Вы находитесь на странице: 1из 1

COMPLIANCE STATEMENT / SPECIFICATION COMPARISION SHEET

FOR AIR CURTAINS


Project: Construction of 2 New Schools
MEP Contractor: M/S. Gulf Lifa Co.
Specification Requirement
Spec.
AIR CURTAINS:
No
M.26

Air curtains shall be supplied and installed


above all the students entrances in the
areas as shown on the drawing.
Air curtains shall be provided to prevent the
loss of air conditioning due to opening of
doors by the incoming and outgoing
persons to and from the school building and
also to prevent / minimize infiltration of dirt,
dust / flying objects along with the nonconditioned outdoor air to the conditioned
area. Thus the air curtains shall provide an
invisible barrier for an unobstructed view for
the persons.
The air curtains shall be suitable for
continuous operation, fitted with heavy duty
motor. Air curtain shall be provided with
magnetic-switch with the doors so that they
will start when the door opens and stop
when the door closes. Each air curtain shall
be provided with three-speed regulator.

2VV Proposed
Make: 2VV
Noted

Comply

Comply

Remarks

Вам также может понравиться