LIST OF MACHINE

S.No. NAME OF MACHINE M/C IDENTIFICATION


NO.
1 HYDRAULIC SHEARING MACHINE
PREVENTIVE MAINTENANCE CARD FR/7.5/03
REV-01
Name Of Machine Mig Welding Machine Schedule
Machine No. M.W. - 04 15 days/ Annual
5.General check-up like
PM to be taken up 1.Open Cover&RemoveDust by Blower bolts&cable connections
6.Annual Maintenance
2. Check for Heat-uo Connection Schdule on reverse

3.Measure current in each Phase

4.Check rotation of blower for smoothness

S. N. Due Date Status By Date Remarks

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27
PREVENTIVE MAINTENANCE CARD

Name Of Machine- Mig Welding Machine Schedule


Machine No.- M.W. - 02 15 days/ Annual

PM to be taken up 1.Open cover &Remove dust by Blower 5.General check-up like bolts cable connection

2.Check forHeat-uo Connection 6.Annual Maintenance Schedule on revese

3.Measure current in each Phase 7

4.Check rotation ofblower for Smoothness 8

S. N. Due Date Status By Date Remarks

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25
Annual Maintenance Schedule

1. Check & Replace Contactor

2.Check the Linear/Lead/ Holder

3. Check the Switch


Preventive Maintenance Card
Name Of Machine
Schedule
Machine No.
D/W/M/HY/Y

PM to be taken up 1
2
3
4

Sr. No. Due Date Status By Date


nce Card

Schedule

D/W/M/HY/Y

5
6
7
8

Remarks

`
PREVENTIVE MAINTENANCE CARD FR/7.5/03

REV-01

Name Of Machine- Hydraulic Notching Machine Schedule

Machine No.- K.C. - 01 15 days/ Annual

PM to be taken up 1. Check Oil Level 5.Genral Check-up like oil leakage & Nut,Bolt

2.Check Lever Spring Tension 6.Check Oil Pipe Lines

3.Check Die, Punch & Alignment 7. Annual Maintenance Scheduleon Reverse

4.Electric Connections 8

S. N. Due Date Status By Date Remarks


PREVENTIVE MAINTENANCE CARD REV
Name Of Machine
Hydraulic Punching Machine Schedule
Machine No.
H.P. - 01 15 days/ Annual

PM to be taken up 1. Check Oil Level 5.Genral Check-up like oil leakage & Nut,Bolts
2.Check Lever Spring Tension 6.Check Oil Pipe Lines

3.Check Die, Punch & Alignment 7. For Annual Maintenance Scheduleon Reverse

4.Electric Connections 8

Sr. No. Due Date Status By Date Remarks


Annual Maintenance Schedule

1. Check & Replace Hydraulic Oil

2. Check & Replace Oil Seal

3. Check Cylinder & Piston Condition

4. Check Slide

5. Painting if Rquired
Annual Maintenance Schedule

1. Check & Replace Hydraulic Oil

2. Check & Replace Oil Seal

3. Check Cylinder & Piston Condition

4. Check Slide

5. Painting if Required