Вы находитесь на странице: 1из 18

Sigtto Questionnaire

Page 1 of 18

Questions adopted from:

Ship Information Questionnaire


for Gas Carriers
LPG/C ECOLE

Oil Companies International Marine Forum


Society of International Gas Tanker & Terminal Operators

Sigtto Questionnaire

Page 2 of 18

Page 3 of 18

Sigtto Questionnaire

B1 CARGO GENERAL INFORMATION


1.1

List products which the ship is certified to carry

1.2

Minimum allowable tank temperature

-48

1.3

Maximum permissible tank pressure

7,0 Barg

1.4

List grades which can be loaded or


discharged simultaneously
List grades which can be transported simultaneously

1.5

1.6
1.7

Number of products that can be conditioned


by reliquefaction simultaneously
State natural tank segregations (NB. Separation must
be by the removal of spools or the insertion of blanks)

Ammonia
N-Butane
I-Butane
Acetaldehyde
Butadiene
Butylene
Dimethylamine
Isopropylamine
Monoethylamine
Propane
Propylene
Vinyl Cloride (VCM)
Vinylethylether
Isoprene Monomer
Propylene Oxide
Iso-Pentane
Pentane
Pentene
Diethylether
C

2
2
2
2

B2 CARGO TANK
2.1
2.2
2.3

Type and Materials of Cargo Tanks


Maximum Allowable Relief Valve
Settings
Safety Valve Set Pressure - if Variable
Give Range of Pilot Valves

Independent Type "C", Fine Grain


7,0 Barg
0,5 / 1,5 / 4,85 / 7,0 Barg
50%

2.4

Maximum Vacuum

2.5

Maximum Cargo Density

2.6

Maximum rate of cool-down

2.7

State any limitations regarding partially


filled tanks

None

State allowable combinations of filled


and empty tanks

None

2.8

0,970

3
T/m

5 C/hr

Page 4 of 18

Sigtto Questionnaire

B3 CARGO TANK CAPACITIES


Tank Capacity m 3 Butane
Propane
Ammonia Butadiene VCM
(100%)
tonnes
C tonnes C tonnes C tonnes C tonnes C tonnes C
1001,6 -4
1072
619 10,4
598 -33
704 -25
1
442
255 10
247 -33
290 -25
413 -4
2
1763 1019 10
985 -33 1159 -25
1648,36 -4
3
4
5
6
7
8
3277 1893
1830
2153
0
3062,96
0
Totals

B4 LOADING RATE
4.1

From Refrigerated

4.2
4.3
4.4
4.5

Butane
Propane
Ammonia

4.6

Propylene

3
Rate m /h
Without Vapour
Return
450
450
460
450

4.7

V.C.M.

450

450

Butadiene

450

450

Storage
Product

4.8

From Pressure Storage

4.9
4.10
4.11
4.12
4.13

4.14

Special Remarks

With Vapour
Return

450
300
320
220

3
Rate m /h
Without Vapour
Product With Vapour
Return
Return
450
450
Butane 0-30
500
330
Propane 0
330
Propane 10
135
Propane 20
95
Propane 30

Page 5 of 18

Sigtto Questionnaire

B5 DISCHARGING - GENERAL
Cargo Pumps
centrifugal

Thune Eureka CL 80

5.1

Type of pumps

5.2

Number per tank

Tk 1&3: 2 Tk 2:1

5.3

Rate (per pump)

90

5.4

Delivery head

5.5

Maximum density

3
m /hr

120

mlc

0,970

MT/m

Booster Pump
centrifugal

Thune Eureka CP 80

5.6

Type of pump

5.7

Number

5.8

Rate (per pump)

180

5.9

Delivery head

120

mlc

5.10

Maximum density

0,680

MT/m

2
3
m /hr

Page 6 of 18

Sigtto Questionnaire

B6 DISCHARGE PERFORMANCE
Full Cargo Discharge Times (using all main pumps)
Fully
6.1
Propane - 40 C
Refrigerated:
Manifold Back
Pressure

6.2

Hours*
Without Vapour
Return

With Vapour
Return

6.3

1 Bar

10

10

6.4

5 Bar

10

10

10 Bar

15

15

*Indicate difference when manifold strainers are installed


6.5

Pressurized:

Propane 0 C
Manifold Back
Pressure

6.6

Hours
Without Vapour
Return

With Vapour
Return

6.7

1 Bar

10

10

6.8

5 Bar

10

10

10 Bar

8,5

8,5

B7 UNPUMPABLES
Tank no.

3
1

7.1

Liquid

0,04

0,02

0,04

Total m

0,1

B8 VAPORISING UNPUMPABLE
8.1

Process used

8.2

Time to vaporise liquid unpumpables remaining


- Propane

Hot Gas
after full cargo discharge
< 3 hrs

8.3

- Butane

< 3 hrs

8.4

- Ammonia

< 3 hrs

8.5

- Propylene

< 3 hrs

8.6

- Butadiene

< 3 hrs

8.7

- VCM

< 3 hrs

Page 7 of 18

Sigtto Questionnaire

B9 RELIQUEFACTION PLANT
9.1

Plant design conditions

9.3
9.4
9.5
9.7

Plant type
Single stage/direct
Two stage/direct
Simple Cascade
Coolant type

9.8

Compressors
Type and Makers Name

9.9

Number

9.10

Capacity (per unit)

9.11

Are they Oil-Free

- Air Temperature

+45

- Sea Temperature

+32

Sulzer K 105-2F
3
425

3
m / hr

B10 COOLING CAPACITY


10.1
10.2

State Cooling Capacity for kcal/hr for Propane

10.3

@ - 42 C
@ - 20 C
@

- 5 C

320000

kcal/hr
kcal/hr
kcal/hr

10.4
10.5

Butane
Propylene

@
@

-5 C
-20 C

480000

kcal/hr
kcal/hr

10.6

Ammonia

-15 C

600000

kcal/hr

Page 8 of 18

Sigtto Questionnaire

B11 CARGO TEMPERATURE LOWERING CAPABILITY


(Time taken to lower the temperature of ...at sea with sea temperature + 15 C)
11.1

Propane

from

11.2

18 C to - 42 C 166 hrs

11.3

from - 5C to - 42 C 138 hrs


from - 38 C to - 42 C 30 hrs

11.4

from + 20 C to - 0,5 C 26 hrs

11.5

from + 10 C to - 0,5 C 12 hrs

11.6

Butane

from + 20 C to - 0,5 C

hrs

11.7
11.8
11.9

from + 10 C to - 0,5 C
ISO Butane from + 10 C to
- 5C

hrs
hrs

Ammonia

from

0C to

-30C 130 hrs

11.11

Ammonia
Ammonia

from
from

-5 C to
-25 C to

-30C 120 hrs


-30C 36 hrs

11.12

Ammonia

from

20 C to

-5C 42 hrs

11.10

B12 INERT GAS


Main I.G. Plant
Smit Ovens GIN/ST 350/310

12.1

Type of Plant

12.2

Capacity

12.3

Type of Fuel Used

MGO

12.4

Composition of IG

0,3-14-200ppm-200ppm-Balance

12.5

Lowest dewpopint achievable

12.6

Used for

3
I.G. 350, N2 210 m /hr

-40

Gas freeing

Auxiliary I.G. or Nitrogen Plant

12.7

Type of System

12.8

Capacity

12.9

Composition of IG

12.10
12.11

(O2 - Co2 - Co - Nox - N2)


Lowest dewpoint achievable
Used for
Nitrogen

12.12

Liquid storage capacity:

12.13

Daily Boil-of loss

12.14

Maximum supply pressure:

12.15

Supply capacity

12.16

Used for

12.17

HP Nitrogen

3
m /hr

0,5

m3
200

Bar
3
m /hr

nm

Sigtto Questionnaire

Page 9 of 18

Page 10 of 18

Sigtto Questionnaire

B13 CARGO TANK INERTING / DE-INERTING


13.1 Time Taken From Fresh Air to Under 0,5% O2 at - 25 C Dewpoint

50 hrs

13.2 Time Taken From Cargo Vapour to Fully Inert at - 25 C Dewpoint when:
- I.G. density less than product

28 hrs

- I.G. density greater than product

hrs

B14 GAS FREEING TO FRESH AIR


14.1
14.2

Plant used
Time taken from fully inerted condition to fully
breathable fresh air

Inert gas and portable fans


Approx

24

hrs

Page 11 of 18

Sigtto Questionnaire

B15 CHANGING CARGO GRADES


15.1

To
From

Propane

Butane

Ammonia

VCM

Time I.G. Used Time I.G. Used Time I.G. Used


Time I.G. Used
3
3
3
3
(m )
(Hours)
(m )
(m )
(Hours)
(Hours) (m )
(Hours)
60
60
13000
Propane
60
60
13000
Butane
60
60
* 60
Ammonia
60
13000
60
13000
60
VCM
Note any operation that cannot be carried out at sea or any other comments:
* Restrictions may apply

B16 DECK TANK CAPACITIES


3

16.1

Propane capacity

16.2

Butane capacity

16.3

Ammonia capacity

16.4

Maximum Allowable Relief Valve Setting

16.5
16.6

Lowest Permissible Temperature


Materials

m
3

m
3

Barg
C

B17 PRE-LOADING COOLDOWN


In the table below, show time and quantity of coolant required to cooldown
cargo tanks from ambient temperature and fully gassed up state sufficient to
allow loading to commence.

Product
17.1

Quantity of
Time (Hours)
Coolant With Vapour
Without
Required
Return Line
Return Line

17.2

Propane

33 Rate max 10

17.3

Butane

33 Rate max 10

17.4

Ammonia

33 Rate max 10

VCM

33 Rate max 10

Page 12 of 18

Sigtto Questionnaire

B18 VAPORISER
Re-heater

18.1

Type of Vaporiser

18.2

Number fitted

18.3

Capacity (per unit) - Propane

18.4

Liquid supply rate

18.5

Delivery temperature

1
180

3
m /hr Vapour

600

m /hr Liquid

18.6

Capacity (per unit) - Ammonia

18.7

Liquid supply rate

18.8
18.9

Delivery temperature
Capacity (per unit) - Nitrogen

18.10

Liquid supply rate

18.11

Delivery temperature

C
3

m /hr Vapour
3

m /hr Liquid

C
3

m /hr Vapour
3

m /hr Liquid

B19 BLOWER
19.1

Type of Blower

I.G. plant

19.2

Rates capacity

350

m /hr

19.3

Delivery pressure

Barg

Page 13 of 18

Sigtto Questionnaire

B20 CARGO RE-HEATER


Villa Scambiatori

20.1 Type of Re-Heater

20.2 Number Fitted

Seawater

20.3 Heating Medium


Discharge rates with sea water at 15 C
to raise product temperature
20.4 - for Propane from - 42 C to - 5 C
20.5 - for Ammonia from - 33 C to 0 C

180

110

m /hr

m /hr

20.6 Cargo Heater Curve

B21 HYDRATE CONTROL


21.1
21.2
21.3

Type of Depressant with Freezing Point Temperature


Quantity of Depressant carried
Means of injection Any
other system used

-97,8

C
litres

Page 14 of 18

Sigtto Questionnaire

B22 CARGO MEASUREMENT


22.1

Level Gauges
Are level gauges

22.2

Manufacturer

22.3

Type

22.4

Rated Accuracy

22.5

Certifying Authority

Local

Remote
Enraf Nonius
806

dL=+- (2,5 + 0,18xL) mm


Class/Owner/Service Comp.

Temperature Gauges

22.6

Manufacturer

22.7

Type

22.8

Rated Accuracy

22.9

Certifying Authority

Eckardt
T1 174 19"
Class/Owner/Service Comp.

Pressure Gauges
22.10 Manufacturer
22.11 Type
22.12 Rated Accuracy

Rosemount
1151 GP
+- 0,25 %

22.13 Certifying Authority

Class/Owner/Service Comp.

Oxygen Analyser
22.14 Manufacturer

Teledyne

22.15 Type
Fixed Gas Analyser
22.16 Manufacturer
22.17 Type
22.18 Are Cargo tank Calibration Tables Available
22.19 Measuring Company
22.20 Certifying Company
22.21 Calibration Calculated to
22.22 Tables Established to
22.23 Trim and List Corrections Available
22.24 Temperature Corrections Available
22.25 Float Gauge Tape Corrections Available

320 P
Drger
Exytron 5010
SGS
cm
mm

Page 15 of 18

Sigtto Questionnaire

B23 CARGO SAMPLING


23.1

Cargo Tank:
Sample Level
Top
Middle
Bottom

23.2 Can samples be drawn from

-Tank Vapour Outlet


- Manifold Liquid Line
- Manifold Vapour Line
- Pump Discharge Line

23.3 State Connection Type and Size

1/2" NPT M

Page 16 of 18

Sigtto Questionnaire

B24 CARGO MANIFOLD

Page 17 of 18

Sigtto Questionnaire

B25 CARGO MANIFOLD REDUCER


State number of reducers carried on board and
their
flange rating and size:
25.1 ANSI Class 300

8" x 6", 6" x 4"


6" x 3"
4" x 2"PN25, 4" x 4"PN25

25.2 ANSI Class 300 to Class 150

25.3 ANSI Class 150

8" x 6", 6" x 6", 4" x 2"

6"/300 x 6" PN25


4"/300 x 4"PN16
6"/300 x 4"PN25

B26 CONNECTIONS TO SHORE FOR ESD AND COMMUNICATIONS


SYSTEMS
26.1

Is ESD connection to Shore available


If Yes, which of the following systems are fitted:
Pneumatic
Electrical

26.2

26.3

Fibre Optic
Type of Plug Used:
Pneumatic
Electrical
Fibre Optic
Is Hose or Cables Available on
Board Specify Length

Electrical

Pneumatic

26.4
26.5

Electrical
Fibre Optic
Is Connection Available for Telephone Line
Are Connections Available on Both Sides of Vessel

30

Page 18 of 18

Sigtto Questionnaire

B27 MANIFOLD DERRICK / CRANE


27.1
27.2

Is Manifold Derrick Provided


Is Manifold Crane Provided

27.3

Is Lifting Equipment Same Port and Starboard

27.4

If No, give details


State SWL at Maximum Outreach

tonnes
tonnes

0,9

B28 STORES HANDLING


28.1

Stores Crane/Derrick Location and SWL

Boatdeck

0,5

tonnes

Вам также может понравиться