FALIH SDN BHD

JOB SAFETY ANALYSIS

JSA/PILING
DOC. NO.

1 OF 5
PAGE NO.

Project

Ladang 3, Kuala Terengganu

Ref. No

HI / PILING

Title

Hazard Identification

Date Start

Nov 19, 2011

Scope / Location

Piling for Substructure

March 19, 2012

Personal Protective
Equipment
Safety Equipment

Safety helmet / safety boot /goggles

Completion
Date
Prepared By

Machinery / Tool /
Equipment

Fire extinguisher / signage / safety


signage
1. Hydraulic Injection Piling
machine-3 nos.

Remark
Manpower

2. Mobile crane -25 ton

No
1

WORK ACTIVITY
1. Mobilization of 3 numbers of
hydraulic piling machine, tool
equipments, counter weight and
parts to site.
2. Mobilization of various sizes
of spun piles to site.
Installation, testing &
commissioning of piling
machinery & equipments.
Survey work for piling point &
Install survey peg / Marking on
ground

Lift-up of spun piles of various


size & weight and piling works

Mohd Yahizan

HAZARD IDENTIFIED
1. Hit by machine & parts
during unloading activity.
2. Hit by spun piles during
lifting down from trailers

1. Struck by moving parts


during installation of machine

Supervisor 2
Surveyor 1
Chainman 1
Cut-off pile head 2
Piling Operator-3
Piling Worker - 10

SAFETY CONTROL
1. Ensure safe download
procedure.
2. Ensure mobile crane &
wire rope in good
working condition
.
1. Installation manual

1. Surveyor/chainman knock
down by piling machine

1. Beware movement of
piling machinery.

2. Trip & fall into exposed


pile hole.

2. Cover-up exposed pile


holes

1. Wire rope snapped during


lifting of spun pile into piling
machine.

1. Regular checking of
wire rope sling before
lifting of spun piles.

REF
1. SOP
2.Crane
checklist.
3.Delivery
Schedule
Machinery
Manual

Piling Plan.
.

Welding of extension piles.

1. Spark & toxic gas from


welding works

Piling machine / generator set


leaks oil onto ground

Ground contamination with


oil.

2. Replace damaged wire


rope.
1. Wear eye protection.
2. Wear gas mask.
1. Regular maintenance
of machinery & gen set.
2. Provide drip tray.

1.PM Crane
2. PMA
3.SOK

Welder
Certification
EQA 1974

FALIH SDN BHD

JOB SAFETY ANALYSIS

JSA/PILING
DOC. NO.

Project

Ladang 3, Kuala Terengganu

Ref No

Title

Risk Assessment of Worker

Date

ESTIMATED MANPOWER
Total workforce per day

ASSESSMENT POINT
No of Worker
04
58
9 12
13 -16
17 - 20

App. 17 workers

RAW / PILING
November 19, 2011

Working Hours

No of Point
1
2
3
4
5

2 OF 5
PAGE NO.

8 hours per day

Exposure/Day
0 2
34
5-6
7-8
9 - 10

No of Point
1
2
3
4
5

No of
Worker
Exposed
4

Point
A

Exposure
hour/day

Point
B

Point C
(A + B)

2. Struck by moving parts during installation,


testing & commissioning of piling machines.

3. Knock down by piling machine during survey


& pegging work.

4. Lift-up of spun piles from ground into piling


machines & piling works

5. Spark & toxic gas from welding of extension


piles.

6. Trip & fall into exposed pile hole in ground.

10

7. Operate piling machinery without Sijil


Operator Krin from JKKP.

8. Excessive black smoke from exhaust.

9. Oil leakage from hydraulic & machinery.

10. Excessive noise exposure.

TYPE OF HAZARD / RISK / DANGER


1. Hit by falling machine, equipments, spun
piles during unloading from low loader, trailers

FALIH SDN BHD

JOB SAFETY ANALYSIS

JSA/PILING
DOC. NO.

3 OF 5
PAGE NO.

Project

Ladang 3, Kuala Terengganu

Ref No

QRT / PILING

Title

Qualitative Risk Table

Date

November 19, 2011

Accident Likelihood

Point

Injury Consequences

Point

Risk

Point

Highly Unlikely
Unlikely
Likely
Very Likely

0
1
2
3

Nil
Minor Injury
Major Injury
Fatal

0
1
2
3

Nil
Low
Medium
High

0
1
2
3

Type of Hazard /Risk /


Danger

Accident
Likelihood

Point
D

Injury
Consequences

Point
E

Risk

Point
F

Point G
(D + E + F)

1. Hit by falling piles /


machines.

Likely

Major Injury

High

2. Struck by moving parts


of machine during install.

Likely

Minor Injury

Low

3. Knock down during


survey /pegging

Likely

Minor Injury

Low

4. Lift-up piles into


machine & piling works

Likely

Fatal

High

5. Spark & toxic gas from


welding

Likely

Minor Injury

Medium

6. Trip & fall into pile


hole in ground.

Very Likely

Minor Injury

High

7. Unlicensed operator

Likely

Nil

Nil

8. Excessive black smoke

Likely

Nil

Nil

9. Oil leakage from


machines

Likely

Nil

Nil

10. Noise pollution

Likely

Nil

Nil

FALIH SDN BHD

JOB SAFETY ANALYSIS

JSA / PILING
DOC. NO.

4 OF 5
PAGE NO.

Project

Ladang 3, Kuala Terengganu

Ref No

HR / PILING

Title

Hazard Ranking

Date

November 19, 2011

Type of Hazard / Risk /Danger

Point H
(C + G )

Hazard Ranking

1. Hit by falling machine, equipments, spun piles during unloading


from low loader, trailers.

10

2. Struck by moving parts during installation, testing &


commissioning of piling machinery.

3. Knock by piling machine during survey / pegging work.

4. Lift-up of spun piles of various size & weight into piling machine
and piling works.

13

5. Spark & toxic gas from welding of extension piles.

6. Trip & fall into exposed pile hole in the ground.

14

7. Operate piling machinery without SOK license.

8. Excessive black smoke from exhaust.

9. Oil leakage from machines.

10. Noise pollution from piling activities.

14

10

FALIH SDN BHD

JOB SAFETY ANALYSIS

JSA / PILING
DOC. NO.

5 OF 5
PAGE NO.

Project

Ladang 2, Kuala Terengganu

Ref No

RSM / PILING

Title

Recommended Safety Measures

Date

November 19, 2011

No

Work Activity

Recommended Safety Measures

Remark

Unloading of spun pile, piling


machine parts & equipments.

1. Unload material / parts / spun piles in safe manner.


2. Inform workers during Safety Briefing of unloading
activities.
3. Secure unloading area from trespassers.

Delivery Schedule
Safety Briefing
Falling object
hazard

Install piling machinery parts


and equipments.

1. Ensure safe installation procedures for machinery


parts.
2. Work in pairs.

Machinery Manual
Tool Box Meeting

Survey work
& pegging

1. Beware of movement of piling machine.


2. Ensure personal safety around machine

Piling Schedule

Lifting of spun pile into piling


machine

1. Ensure piling machine, lifting gear, wire rope sling


in good condition.
2. Check for fatigue, damaged, bird cage & broken
wires.

Piling machine
checklist

Welding of extension piles

1. Welders to wear gas mask.


2. Provide fire extinguisher at welding area.
3. Ensure welders possess welding certificate.

Welding safety

Trip & fall into pile hole

1. To cover-up exposed pile hole.

Operating piling machine

1. Operators to possess Sijil Operator Krin fro JKKP


2. To operate in safe manner.

SOK
Piling Plan

Excessive black smoke

1. To ensure periodic maintenance of piling machine.


2. To ensure compliance to environmental regulations.

Maintenance Sch
EQA 1984

Oil leakage from machines.

1. To maintain machinery in good condition.


2. Provide drip tray for leaking oil.

EQA 1984

10

Noise pollution from piling


works.

1. Wear ear protection at high noise level areas.


2. Ensure noise level kept to minimum.

Ear protection

CONTROL COPY NO

FALIH SDN BHD


JOB SAFETY ANALYSIS FOR PILING WORKS.
for

CADANGAN MEMBINA & MENYIAPKAN 1 BLOK RUMAH


MAMPU MILIK YANG MENGANDUNGI 24 LAPIS KEDIAMAN
(407 UNIT), 7 LAPIS TEMPAT LETAK KERETA BERTINGKAT
DAN KERJA-KERJA INFRASTRUKTUR
YANG BERKAITAN DI ATAS
LOT KERAJAAN, LADANG TOK PELAM
MUKIM BANDAR, DAERAH KUALA TERENGGANU,
KUALA TERENGGANU,
TERENGGANU DARUL IMAN.

DOCUMENT NO: JSA / PILING


JKKP SITE REGISTRATION NO: TG/

JSA / PILING

NOVEMBER 19, 2011

Doc. No.

Date

MOHD YAHIZAN
Safety & Health Officer

Work Activity No.1: Unloading of spun piles/ material / machinery parts / equipments from trailers /
Hazard: Falling object from lifting activities.
Safety Control Measures: 1. Beware of lifting activities. 2. Secure lifting area against trespassers.

Work Activity No.2: Installation of machinery / equipments.


Hazard: Struck by moving parts.
Safety Control Measures: Beware of moving parts of machinery.

Work Activity No.3: Survey work / pegging / marking point for piling.
Hazard: Knock down by piling machine.
Safety Control Measures: Beware of machinery/ Wear luminous safety vest.

Work Activity No.4: Lifting of spun pile into piling machine.


Hazard: Spun fall down due to breakage of wire rope sling..
Safety Control Measures: Beware of lifting & piling by piling machinery

Work Activity No.5: Welding of extension pile.


Hazard: Spark & toxic gas from welding activities..
Safety Control Measures: Wear gas mask / Use blower to blow away gases..

Work Activity N0. 6: Exposed pile hole in ground.


Hazard: Trip & fall due to uncovered hole.
Safety Control Measures: Cover-up pile hole with plywood.