Project
EPC 13 UTILITY PACKAGE
BI No. 1001055
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
Vendor's Name
COMPANY Name
Purchaser Name
: Hitachi, Ltd.
Plant Location
Project Name
: P-2171-001-A
: A, B, C, R
NEXT STATUS
RESUBMISSION DATE :
RESPONSIBLE DEPT./PERSON :
REVIEW DATE :
JOB No.
PO No.
Serial No.
V-XXXX-XXX-X-XXXX
V-2171-001-A-0076
EQUIPMENT No.
Date
30-Jul-2013
REV.
00A
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
OF
Date
Description
Prepared
Checked
Approved
00A
13 July 2013
First Issue
VR
KM
MY
Issue Date
Issue Purpose
From
Issue To
Approved
00A
13 July 2013
First Issue
Honeywell
HITACHI
HITACHI
96
NMR601.8
DOCUMENT TITLE
PAGE
TABLE OF CONTENTS
1 INTRODUCTION.......................................................................................7
1.1 Project Overview...............................................................................7
1.2 Purpose.............................................................................................7
1.3 Reference Documents......................................................................8
1.3.1 Saudi Aramco Standards.............................................................8
1.3.2 Project Specification Document...................................................8
1.3.3 Honeywell Project Document.......................................................8
1.4 Abbreviations....................................................................................9
1.5 Safety requirements during the Pre-FAT and FAT..........................12
1.5.1 Safety of Test Personnel............................................................12
1.5.2 Electric Shock Hazard................................................................12
1.5.3 Trip Hazards...............................................................................13
1.5.4 Injury from Hand Tools...............................................................13
1.5.5 Noise..........................................................................................14
1.5.6 Care of Equipment.....................................................................14
2 Overview................................................................................................15
2.1 Hardware tests................................................................................15
2.2 Application software tests...............................................................15
2.3 System functionality tests...............................................................15
2.4 System reliability test......................................................................16
3 PRE-REQUISITE....................................................................................17
3.1 System Equipment..........................................................................17
3.2 Documentation................................................................................17
3.3 Inspection and Vendor Pre-FAT Testing..........................................18
3.4 Test Equipment...............................................................................18
3.5 Other Prerequisites.........................................................................19
4 PERSONNEL REQUIREMENTS............................................................19
4.1 PCS Vendor Responsibilities.........................................................19
4.2 PCS Vendor Personnel:..................................................................19
4.3 CONTRACTOR Responsibilities.....................................................20
4.4 CLIENT Responsibilities.................................................................20
5 CONFIGURATION..................................................................................21
5.1 Management / Control....................................................................21
5.2 System Configuration......................................................................21
5.3 Test Configuration...........................................................................22
5.4 Simulation.......................................................................................22
5.5 Factory Untestable Items................................................................22
5.6 Test Database.................................................................................23
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
6 Testing....................................................................................................23
6.1 Structured Testing...........................................................................23
6.1.1 Test plan.....................................................................................23
6.1.2 Test schedule.............................................................................24
7 Mandatory Functional Tests................................................................26
7.1 Non-Fieldbus Tests.........................................................................26
7.2 Foundation Fieldbus Tests..............................................................27
7.2.1 Control Strategy Verification......................................................27
7.3 Unstructured Testing.......................................................................28
7.4 Reliability Test.................................................................................28
7.5 Retest Method.................................................................................28
8 TEST DOCUMENTATION.....................................................................29
8.1 Test Log...........................................................................................29
8.2 Test Result......................................................................................29
8.3 Test Discrepancies..........................................................................29
9 PROBLEM RESOLUTION.....................................................................30
9.1 Resolution During FAT....................................................................30
9.2 FAT Suspension / Resumption / Restart.........................................30
10 FACTORY ACCEPTANCE TEST REPORT...........................................31
1 FAT CERTIFICATE (PIB XX).................................................................32
12 APPENDIX 01 PROJECT SPECIFICATIONS....................................33
13 APPENDIX 03 TEST forms and record.............................................34
13.1 Physical Inspection of Cabinets, Operator Stations.......................34
13.1.1Operator Stations Check............................................................34
13.1.2System Cabinets Check.............................................................35
13.1.3Server Cabinets Check..............................................................36
13.1.4Network Cabinets Check...........................................................37
13.1.5FFPS System & Marshalling Cabinets Check...........................38
13.1.6DCS Marshalling Cabinets Check.............................................39
13.2 Servers and Stations Check...........................................................40
13.2.1Server Hardware Check DMZ-AVWS-01................................40
13.2.2Station Hardware Check .........................................................41
13.2.3Software Check .......................................................................42
13.3 Enterprise Model Check ...............................................................43
13.4 Server Configuration Check .........................................................44
13.5 Console & Flex Station Configuration Check..................................45
13.5.1Console / Flex Station NAME.................................................45
13.6 Printer Configuration Check............................................................46
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
13.6.1Printer - NAME...........................................................................46
13.7 Experion Nodes Check...................................................................47
13.7.1Server Redundancy Check - NAME..........................................47
13.7.2Upgrade of System Software Check - NAME............................49
13.8 Network Check................................................................................50
13.8.1Network Nodes Check...............................................................50
13.8.2FTE Redundancy Check............................................................51
13.8.3FTE Switch Redundancy Check - NAME..................................52
13.9 C300 Controller Nodes Check........................................................53
13.9.1Controller - NAME......................................................................53
13.10 C300 Controller Loop Check......................................................60
13.10.1 Analog Input..........................................................................60
13.10.2 Analog Output.......................................................................61
13.10.3 Digital Input...........................................................................62
13.10.4 Digital Output........................................................................63
13.11 C300 Point Configuration Check................................................64
13.12 C300 Control Loops Configuration Check..................................65
13.13 C300 Logic Configuration Check...............................................66
13.14 C300 Sequence Logic Configuration Check..............................67
13.15 HMI Display Check.....................................................................68
13.16 Safeview Check..........................................................................69
13.17 EPKS Security Check.................................................................70
13.18 EPKS Diagnostic Check.............................................................71
13.19 FIELD BUS ENGINEERING TESTS..........................................72
13.19.1 FF Configuration Offline Checks...........................................72
13.20 FF Configuration Online Check..................................................73
13.20.1 FF Segment Check...............................................................74
13.20.2 FIM Redundancy Test - NAME.............................................75
13.20.3 FF Bulk Power Supply Redundancy Check..........................76
13.20.4 FF Power Conditioner Module Redundancy Check.............77
13.21 ESD(SM) Communication Check...............................................78
13.21.1 SM -.......................................................................................78
13.21.2 Quick Builder Database Check.............................................80
14 APPENDIX 04 C300 LOOP CHECK record.......................................81
15 APPENDIX 05 C300 POINT CONFIGURATION check record.........82
16 APPENDIX 06 C300 LOGIC CONFIGURATION check record........83
17 APPENDIX 07 C300 SCM CONFIGURATION check record............84
18 APPENDIX 08 hmi DISPLAY CHECK record....................................85
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
OF
96
1
1.1
INTRODUCTION
Project Overview
Saudi Aramco intends to construct a 400 MBD grassroots refinery and hydrocarbon terminal facilities
within Jazan Economic City (JEC), Saudi Arabia located in south-west on the Red Sea coast. The
NMR601.8
DOCUMENT TITLE
PAGE
OF
96
strategic location of the refinery within JEC will leverage the existing distribution assets for products
transfers to the demand centers in the area.
Jazan Refinery will be a semi-conversion refinery that processes 400 MBD of crude oil of either
100% Arabian Medium crude or a mixture of 50/50 AM/Arabian Heavy crudes which will be supplied
from Saudi Aramcos AH and AM crude supply systems on the Eastern province.
In addition, the refinery will upgrade 45 MBD of Jeddah Refinery intermediate feed stocks (Naphtha,
Distillate, and Vacuum Gas Oil) to high quality finished products.
1.2
Purpose
This document defines the criteria and administrative details associated with the performance
of the Factory Acceptance Test (FAT) that will be conducted as part of Honeywell scope of
work for CCR & PIB-053 (EPC13 -HITACHI) for Jazan Refinery and Marine Terminal Project.
This Document is prepared based on guideline provided in the SAEP-1634. This document
describes the conditions, requirements, plans, procedures, success criteria and
responsibilities for performance of the FAT.
This document will be used to guide and control the performance of the FAT. It will also be used as
the basis for monitoring progress and for determining satisfactory completion of the FAT.
1.3
1.3.1
1.3.2
1.3.3
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
Reference Documents
Document Title
23-SAMSS-010
SABP-Z-002C
34-SAMSS-820
34-SAMSS-821
SAES-Z-001
SAEP-1634
Document Name
J95-J-VE-536031
DCS Specification
J95-J-VE-536021
J95-J-VE-536003
PCS Specification
J95-J-VE-536011
Document Name
01055-XX-DCS-DLD
01055-XX-DCS-BOM
01055-XX-PCS-SDD
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
1.4
Abbreviations
Abbreviations
AC
AI
ANSI
AO
APC
API
ARC
ASCII
ASM
BMS
CCB
CCR
CCS
CCTV
CDR
CM
CMS
CPU
CRMS
DAHS
DC
DCS
DD
DFS
DI
DMR
DO
DSA
ECC
EPC
ES-C
ESD
ES-F
ESV
ETP
EWS
FAT
FDM
FEED
FF
FFPS
FIM
Description
Alternating current
Analog Input
American National Standards Institute
Analog Output
Advanced Process Control
American Petroleum Institute
Advanced Regulatory Control
American Standard Code for Information Interchange.
Abnormal Situation Management
Burner Management System
Central Control Building
Central Control Room
Compressor Control System
Closed Circuit Television
Critical Design Review
Control Modules
Condition Monitoring System
Central Processing Unit
Corrosion Monitoring system
Data Acquisition and Historization System
Direct current
Distributed Control System
Device Description
Detailed Functional Specifications
Digital Input
Dual Modular Redundancy
Digital Output
Distributed Server Architecture
Emergency Control Center
Engineering, Procurement and Construction
Experion Console Station
Emergency Shutdown (System)
Experion Flex Station
Experion Server
External Termination Panel
Engineering Workstation
Factory Acceptance Test
Field Device Manager
Front End Engineering Design
Foundation Fieldbus
FOUNDATION Fieldbus Power Supply
Fieldbus Interface Module
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
FO
FOPP
FTE
HIST
HMI
HVAC
HWL
I/O
IAMS
IEEE
IFAT
JB
LAN
LAS
LIMS
MC
MCC
MCC
MFACP
MIS
MOV
MPS
MTBF
MTS
MTTF
MTTR
N/A
NMR
OPC
OTS
OWS
P&ID
PAN
PAT
PCN
PCS
PDR
PFD
PIB
PID
PI
PV
QA/QC
QMR
RAID
RTD
RTU
Fiber Optic
Fiber Optic Patch Panel
Fault Tolerant Ethernet
Host Interoperability Supporting Testing
Human-Machine Interface
Heating, Ventilating and Air Conditioning
Honeywell
Input/Output
Instrument Asset Management System
Institute of Electrical and Electronics Engineers
Integrated Factory Acceptance Test
Junction Box
Local Area Network
Link Active Scheduler
Laboratory Information Management System
Marshalling Cabinet
Mechanical Completion Certificate
Motor Control Center
Main Fire Alarm Control Panel
Management Information System
Motor Operated Valve
Machinery Protection System
Mean Time Between Failures
Maintenance Training System
Mean Time to Failure
Mean Time to Repair
Not Applicable
Non Material Requirement
OLE for Process Control
Operator Training System
Operator Workstation
Piping and Instrument Diagram
Process Automation Network
Performance Acceptance Test
Process Control Network
Process Control System
Preliminary Design Review
Process Flow Diagram
Process Interface Building
Proportional Integral Derivative
Plant Information (System)
Process Variable
Quality Assurance/Quality Control
Quadruple Modular Redundant
Redundant Array of Independent Discs
Resistance Temperature Detector
Remote Terminal Unit
10
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
SAEP
SAES
SAMA
SAMSS
SAN
SAT
SCADA
SER
SOE
SP
SRR
11
OF
96
1.5
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
12
OF
96
1.5.1
1.5.2
The main voltages used with the staged equipment are 240/110VAC and 24VDC. VAC presents a risk
of electric shock if care is not taken. The paragraphs below describe steps to manage the risk of
electric shock.
Ensure the equipment is electrically isolated e.g. unplug the power lead from the outlet; or
switch the circuit breaker to the OFF position. Place electrical danger tags as necessary.
Using a multi-meter, always test for zero voltage before working on AC Voltage circuits.
Ensure that the multi-meter is calibrated and the test leads are in a satisfactory condition. It is
good practice to first check the multi-meter by testing for voltage at a known voltage source
(e.g. general power outlet).
1.5.3
1.5.4
1.5.5
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
13
OF
96
Confirm that the circuit has been wired and tested by a licensed electrician.
Ensure Perspex covers are in place over live AC terminals, conductors and bus bars.
24VDC presents less of a danger than 240VAC, but personnel should be aware that the bulk
24VDC power supply can provide a high current. As with 240VAC, all test personnel should
take care not to short circuit any wiring. Metal wristwatches or jewellery should not be worn
when working in live panels.
Trip Hazards
Ensure that all cables are installed relatively neatly and away from walkways. Securely fasten
cables with cable-ties or floor tape as necessary;
All rubbish and old packaging should be kept out of the way or discarded if not required;
To avoid injury from hand tools, only use tools that are in a satisfactory condition. Always use
the correct tool for the job. If the task appears too difficult, or too much force is required, then
almost certainly there is a more suitable tool available.
Noise
During testing, normal shop activity may cause noise which exceeds the levels found in a normal
office environment. Normal staging is in areas which are separated from noise producing activities.
In the event that unplanned machining activities are required in the area of testing and the noise levels
and duration are expected to exceed OSHA or other applicable guidelines, the activity will be
performed during times when the testing personnel are not present. If this activity is required during
the testing, the personnel will be informed of the activity and its duration and personnel may vacate
the area or use ear protection.
Ear plugs will be available for use during testing.
1.5.6
Care of Equipment
NMR601.8
DOCUMENT TITLE
PAGE
14
OF
96
Ensure that all system hardware and test equipment is treated with care. Do not allow cuttings
of wire or swarf from drilling to fall into any electrical equipment where it may cause short
circuits.
Check the required supply voltage on equipment labels before connecting the power. Take care
not to connect the wrong voltage e.g. 240VAC instead of 24VDC.
Take care not to knock/bump hardware/wiring connections when moving around in the
cabinet.
Use personal static earthing when handling any of the DCS modules.
Do not use mobile phones or radios inside the DCS System cabinet when the system is online.
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
15
OF
96
Overview
Factory Acceptance Test (FAT) consists of the following phases.
2.1
2.2
2.3
Hardware tests
Point Database
Control Schemes
Logic Tests
2.4
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
16
OF
96
Checks continuous operation of the system for predefined time period without having any
failures in the system.
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
PRE-REQUISITE
3.1
System Equipment
3.2
Experion Servers
Experion consoles
Printers
Server cabinets
Network cabinets
Marshalling cabinets
Documentation
Logic Drawings
Control Schemes
P&IDs
Logic Narrative
17
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
3.3
18
OF
96
PCS Vendor will conduct Pre-FAT as per approved FAT procedure for Hardware and Software
configuration. Pre-FAT will be trial run of the FAT. Deficiency Log will be generated and
addressed if any deficiency found. Before commencing the FAT activities, the DCS cabinets will
be installed with earth/grounding and communication cables, powered up and Pre-FAT tested.
Inspection will be conducted before FAT as per COMPANY Inspection form.
Pre-FAT records will be generated based on the test results. PCS Vendor will maintain the
deficiency / action list until all items have been resolved. Pre-FAT results will be compiled and
submitted at the time of SRR (System Readiness Review). SRR will be planned and conducted
after completion of Pre-FAT and prior to FAT. SRR will be successfully completed after written
confirmation from COMPANY on deficiency / action list.
Honeywell DCS Systems will be verified as being ready for formal testing (FAT) as a requirement
of the SRR. After inspection and successful completion of SRR, system will be ready for FAT.
As-Built System at the completion of the System Readiness Review. The FAT shall not
begin until this documentation has been updated.
3.4
Test Equipment
During FAT, the following test equipment, calibrated in accordance with international standards
will be used to simulate the process variables or to measure output values.
Equipment
Quantity
Digital Multi-meter
Continuity Tester
NMR601.8
DOCUMENT TITLE
PAGE
3.5
19
OF
96
Other Prerequisites
CONTRACTOR shall arrange Foundation Fieldbus devices one of each type for device
communication and Functional testing.
CONTRACTOR shall arrange FF Junction box and Terminator.
PCS Vendor will arrange Type A cable for Testing.
All DCS equipment will be fully assembled and powered-up during pre-FAT. DCS equipment will
be powered-up for 72 hours before FAT.
PERSONNEL REQUIREMENTS
4.1
PCS Vendor will provide the personnel, documentation and approved test equipment to conduct
the Factory Acceptance Test. Technical personnel from engineering team will be responsible for
running structured tests. The personnel shall be capable of determining and resolving the root
cause of any technical problem encountered during FAT, within the scope of FAT.
4.2
NMR601.8
DOCUMENT TITLE
PAGE
4.3
20
OF
96
CONTRACTOR Responsibilities
CONTRACTOR will provide their representative familiar with design inputs and the plant
operations. The personnel made available must be authorized to sign acceptance at each stage
of testing.
CONTRACTOR Personnel:
Responsible Test Witness Leader
Responsible Test Witness Engineers
4.4
CLIENT Responsibilities
CLIENT will provide sufficient personnel familiar with the plant operations, Honeywell systems
and Instrumentation to witness tests performed by PCS Vendor in accordance with approved test
procedures.
The personnel made available must be authorized to sign acceptance at each stage of testing.
CLIENT Personnel:
Responsible Test Witness Leader
Responsible Test Witness Engineers
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
21
OF
96
CONFIGURATION
5.1
Management / Control
The FAT will be conducted as per approved FAT procedure. Each action will be performed as
indicated in the test procedure. Result will be documented as an observation. For all successful
tests, the test sheet will be marked as OK.
Changes to hardware and software will be documented in the deficiency Log sheet. The
deficiency log sheet will be attached to the test sheets and will comprise a complete record of all
observation during FAT.
5.2
System Configuration
Following system will be tested for complete Hardware and Software functionality.
C300 Controller: - It is redundant DCS controller. It will be installed in the DCS system cabinet.
Controller configuration and redundancy will be verified.
EPKS Server: - EPKS server is redundant server installed in the Server cabinet located in the
PIB. Server configuration and redundancy will be verified.
System Cabinet: - System cabinet will host C300 controller, FIM, PGM module and Series C IO
module.
Marshalling Cabinet - Field cable will be terminated in the Marshaling Cabinet.
FFPS Marshalling Cabinet: -Bulk power supply required for Foundation Fieldbus system will be
mounted in FF power supply cabinet.
Server Cabinet: - Rack mounted redundant Experion server will be installed in Experion server
with KVM switch.
Network Cabinet: - Network component like FTE switch, converter will be installed in the Network
Cabinet.
DCS Operator Console: - DCS operator station will be installed in the DCS operator console.
NMR601.8
DOCUMENT TITLE
PAGE
5.3
22
OF
96
Test Configuration
For any configuration change during FAT like Hardware/Software configuration deviation,
operation and performance deviation will be documented in sufficient detail. The effect of each
deviation and requirements will be described in detail.
Following items will be included:
Hardware/Software Configuration deviation
Operational and performance deviations
Reason for each deviation and affected requirements
5.4
Simulation
Conventional I/Os
Since entire set of actual field devices cannot be connected and used for process simulation during
FAT, simulation equipment will be used for all Hardwired IOs.
Loop Testing All I/Os will be tested using following simulation equipment.
DI simulation Jumper
DO simulation Lamp
AO simulation Multi-Meter
Logic testing During logic testing inputs (DI and AI) will be simulated from the hardwired input simulation panels
and DOs will be wired to lamp panels or LED panels.
FF I/Os
Since it is not possible to have all FF devices, FF JBs and cables at the FAT floor, the control
strategy related to FF will be checked by using simulation software.
5.5
The Integration of third party equipment with DCS will not be tested in FAT. In FAT PC based
simulator will be used to simulate third party System. The actual communication with third party
system will be checked during IFAT.
NMR601.8
DOCUMENT TITLE
PAGE
5.6
23
OF
96
Test Database
The FAT will be conducted with latest approved database from the Contractor.
For any database, change during FAT will be documented in sufficient detail. The effect of each
deviation and requirements on system performance will be studied and described in detail. This
includes replacement / addition / deletion of tags / tag parameters.
6
Testing
The system equipment to be tested during FAT comprises of all hardware and software as per the DCS
BOM (Bill of Material) document and approved configuration design from contractor.
The equipment will be staged and integrated in accordance with the approved system architecture
requirements.
6.1
Structured Testing
NMR601.8
DOCUMENT TITLE
PAGE
Schedule
Description Of Activity
Day 1
Day 2
Week 1
Day 3
Day 4
Day 5
Week 2
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Week 3
Day 13
Day 14
Week 4
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20
Week 5
Day 21
Day 22
Day 23
24
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
Week
Week 6
Schedule
Day 24
Description Of Activity
Day 25
Day 26
Day 27
Day 28
Day 29
Day 30
25
OF
96
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
Non-Fieldbus Tests
Replacement Test
IO Module
Upgrade of Software
EPKS Server
Loop Test
Security Test
Spare Capacity
C300 Controller
IO Module
Diagnostic Check
Visual Inspection
26
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
7.2
27
OF
96
The following are mandatory tests for Fieldbus portion of the system. Since Input and Output
functions are resident in the functions blocks inside fieldbus devices; integrating all the fieldbus
segments with the Fieldbus control unit and wiring at Factory Acceptance Test will not be
possible. Not all Fieldbus Devices and FF field cables will be available during FAT. In practice, it
is difficult to gather all devices and components at one place for Factory Acceptance Tests due to
various constraints.
Following tests will be carried on Sample FF Segment.
Verify that system register the fieldbus device using plug and play function (Plug & play
means unique address assignment to each fieldbus on the segment by H1 card. This test will
be performed to validate automatic address assignment to the device on segment, in case of
duplicate address. Device commissioning & loading will be performed manually)
Loop check Loop check will be done using one sample test device. This device will be
assigned to each segment to check the loop. RTD Simulation will be included in Test
Equipment.
NMR601.8
DOCUMENT TITLE
PAGE
7.3
28
OF
96
Unstructured Testing
Any unstructured test / any test outside the approved FAT procedure will be conducted after FAT
conclusion. After completion of structured testing, a 5 days period will be reserved for
unstructured testing. The effect of unstructured test on system performance will be studied and
discussed before performing any such test.
7.4
Reliability Test
It is the test for continuous operation of the system over a significant period without failure,
indicating the availability of the system in all situations.
For Pre-FAT the system will be fully installed with all configuration loaded and all IOs connected
with simulation panel. The pre-FAT check will be done on the system and test record will be
generated.
After Pre-FAT the customer will perform the FAT/IFAT on the same system. Thus, the system will
be continuously tested as per different tests procedure of FAT and IFAT.
7.5
Retest Method
Any discrepancy found during testing, will be corrected by PCS Vendor Engineer. The retest will
be conducted as per FAT procedure.
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
29
OF
96
TEST DOCUMENTATION
8.1
Test Log
All identified tests will be performed 100% to ensure the integrity of Hardware and Software.
Each action will be performed as indicated in the test procedure with the result observed. The
Fat Test Sheets will be marked OK for each successful step and unsuccessful test will be
marked as NOT OK. If the result does not correspond to the expected result, the FAT Test
Sheets will be marked as Not OK and an entry will be made in the Deficiency log sheet.
8.2
Test Result
At the end of FAT, the hardcopy of Deficiency Logs & Test Sheets will be generated as a FAT
record. All test results / records will be signed by PCS Vendor, CONTRACTOR and CLIENT
representatives. One set will be copied to CONTRACTOR.
8.3
Test Discrepancies
FAT discrepancies will be documented in the form of FAT Deficiency Log Sheet.
The Deficiency Log will note the date of occurrence of a problem, problem report number,
description of problem, action taken to correct the problem, status of resolution, and date of
resolution. Deficiency log will also record all changes to hardware and software. Copy of
deficiency log will be included in Final FAT document. The format of the deficiency log sheet will
be provided at the time of FAT.
PO No. V2171001-A
NMR601.8
DOCUMENT TITLE
PAGE
30
OF
96
PROBLEM RESOLUTION
9.1
The FAT will be performed as per approved FAT procedure. Test discrepancy observed during
the test will be logged in deficiency log sheet.
If the deficiency is due to PCS Vendor, PCS Vendor engineer will rectify the fault. Status will be
updated to CLIENT / CONTRACTOR to enable them to repeat the test. Acceptance of deficiency
rectification will be signed by CONTRACTOR / CLIENT and PCS Vendor authorized
representatives. If the above mentioned re-test fails, then this test will be rescheduled at the later
time. On successful completion of a test, the test sheet will be marked as OK.
If the deficiency is due to new requirements from the CONTRACTOR / CLIENT, it will be
recorded in the log sheet as Not in Scope. If PCS Vendor accepts to implement the same, it will
be recorded as Accepted, and if not accepted, the same will be recorded as Not Accepted. For
such additional customer requirement, a formal Change Order Log will be raised, as defined in
contract, to identify the time impact and cost impact wherever applicable.
All parties will agree the deficiency logs and Change Order Log and depending upon the scale of
the change it will either be implemented before the end of FAT, or completed on site
9.2
If it is seemed impossible to continue the test, the test will be terminated. If, on the contrary, it is
possible to continue, a new test date will be scheduled. If the test is not acceptable, the test
sheet will not be signed off.
.
NMR601.8
DOCUMENT TITLE
PAGE
31
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
32
OF
96
Start Date
End Date
--------------
For Aramco
CLIENT
For XXX
CONTRACTOR
For Honeywell
PCS Vendor
Title:
Title:
Title:
Date:
Date:
Date:
------------
NMR601.8
DOCUMENT TITLE
PAGE
33
Description
Automation Design Criteria
Emergency Shutdown System
Burner Management System
Process Control System Overview
Process Control System Integration
PCS Configuration Guidelines
Control and Marshalling Cabinets Specification in
Maintenance Training System
Management Information System
Fieldbus Foundation Specification
Hart Specification
Smart Valve Monitoring System SVMS
Smart Shutdown Valve Monitoring System SZVMS
Alarm Management System
Data Acquisition & Historization System
Instrument Asset Management
Fire Detection System
Gas Detection System
PCS System Design Document
Distributed Control System
Emergency Notification Alarm System
Instrument Block Diagram Emergency Notification Alarm
Operator Console CCR Area 1
Operator Console CCR Area 2
Operator Console CCR Area 3
Operator Console CCR Area 4
Operator Console CCR Area 5
Operator Console CCR Area 6
CCR ENG/MAN Console
Typical PIB Maintenance Console
DCC Console
Emergency Communication Console CCR
Maintenance Training Console
Control and Instrumentation Philosophy
Automation Scope Of Supply SRU, Utilities and offsite
PCS I/O Summary WUC Scope
Process Control System Vendor Services
Operator Training Simulator
Condition and Vibration Monitoring System (CMS/VMS/FFVMS)
Inspection and Testing of Electronics Systems
Compressor Control System (CCS)
CCR Layout
Document No
PP-118009
PP-118158
PP-118159
PP-118160
PP-118161
PP-118163
PP-118164
PP-118167
PP-118168
PP-118169
PP-118170
PP-118171
PP-118172
PP-118173
PP-118174
PP-118175
PP-118180
PP-118181
PP-118228
PP-118231
PP-118281
PP-118282
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118394
PP-418002
PP-118390
PP-118162
PP-118166
PP-118176
PP-118151
PP-118178
PP-111011
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
Sr. No
45
Description
34
OF
96
Document No
PP-118900
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify and document that all the Hardware are
installed.
Hardware and Approved drawings issued for construction shall be available
Console Drawings - NMR602.5 & 6
Test Procedure
No.
Test#
1.1
1.4
1.5
1.6
1.2
1.3
TEST Result
OK
NOK
RTST OK
1.7
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
35
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify and document that all the Hardware are
installed
Hardware and Approved drawings issued for construction shall be available
System Cabinet Drawings - NMR602.5 & 6
Test Procedure
No.
Test#
1.1
1.2
1.3
1.4
1.5
TEST Result
OK
NOK
RTST OK
1.6
1.7
1.8
1.9
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
36
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify and document that all the Hardware are
installed
Hardware and Approved drawings issued for construction shall be available
Server Cabinet Drawings - NMR602.5 & 6
Test Procedure
No.
Test#
1.1
1.2
1.3
1.4
1.5
TEST Result
OK
NOK
RTST OK
1.6
1.7
1.8
1.9
1.10
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
37
OF
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify and document that all the Hardware are
installed
Hardware and Approved drawings issued for construction shall be available
Network Cabinet Drawings - NMR602.5 & 6
Test Procedure
No.
Test#
1.1
1.2
1.3
1.4
1.5
OK
NOK
RTST OK
1.6
1.7
1.8
1.9
TEST Result
BY:
DATE:
SIGNATURE:
96
NMR601.8
DOCUMENT TITLE
PAGE
38
OF
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify and document that all the Hardware are
installed
Hardware and Approved drawings issued for construction shall be available
FFPS Cabinet Drawings - NMR602.5 & 6
Test Procedure
No.
Test#
1.1
1.2
1.3
1.4
1.5
OK
NOK
RTST OK
1.6
1.7
1.8
1.9
TEST Result
BY:
DATE:
SIGNATURE:
96
NMR601.8
DOCUMENT TITLE
PAGE
39
OF
Purpose
The purpose of this test is to verify and document that all the Hardware are
installed
Pre-requisite
Hardware and Approved drawings issued for construction shall be available
Reference Document
Marshalling Cabinet Drawings - NMR602.5 & 6
Test Procedure
TEST Result
No.
1
Test#
1.1
1.2
1.3
1.4
1.5
1.6
1.7
OK
NOK
RTST OK
1.8
1.9
1.10
BY:
DATE:
SIGNATURE:
96
NMR601.8
DOCUMENT TITLE
PAGE
40
OF
96
The purpose of this test is to verify and document that all the Server / Work
station PC Hardware are installed, configured and working properly
Windows 2008 Server Operating System must be loaded for the Servers and
Win 7 Operating System must be loaded on all the Work station PCs
Pre-requisite
Reference Document
Test Procedure
Required
No.
Test#
1.1
(DELL R710)
1.2
438 GB
1.3
1.4
1.5
4 GB
OK
NOK
RTST
OK
Windows 2008
BY:
DATE:
TEST Result
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
41
OF
96
The purpose of this test is to verify and document that all the Server / Work
station PC Hardware are installed, configured and working properly
Windows 2008 Server Operating System must be loaded for the Servers and
Win 7 Operating System must be loaded on all the Work station PCs
Pre-requisite
Reference Document
Test Procedure
Required
No.
Test#
1.1
(DELL T3500)
1.2
320 GB
1.3
1.4
1.5
4 GB
OK
NOK
RTST
OK
Win 7
BY:
DATE:
TEST Result
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
42
OF
96
Reference Document
The purpose of this test is to verify and document that the Experion Software is
installed and configured on servers and stations as specified and working
properly.
Windows 2008 Server Operating System must be loaded for the Servers and
Win 7 Operating System must be loaded on all the Work station PCs
Experion PKS software must be loaded.
Server must be ON and log on as administrator
Software License Certificate
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
43
OF
96
No.
Test#
1.1
2
2.1
2.2
3
The purpose of this test is to verify the Enterprise Model for the project.
Server must be On
NMR602.17: System Architecture Dwg
NMR602.2: Asset Configuration
Network Design Document
Test Procedure
FAT TEST
Detail Test Item
OK
NOK
RTST OK
Enterprise Servers
Verify System name as defined in NMR602.11.
Verify the system contains Servers as defined in
NMR602.11.
3.1
Asset Model
From Configuration Studio, open the Asset Builder
and verify that the Asset tree is configured as defined
in the section 3.1 of NMR602.2: Attachment#06 Asset Configuration.
Purpose: Overall acceptance of this module by Customer
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
44
OF
No.
Test#
OK
NOK
RTST OK
BY:
DATE:
SIGNATURE:
96
NMR601.8
DOCUMENT TITLE
PAGE
45
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
46
OF
96
NAME
The purpose of this test is to verify the configuration of Console and Flex Station
Pre-requisite
Reference Document
Station must be On
NMR602.2: Console Configuration
Test Procedure
No.
Test#
1.1
1.2
1.3
1.4
TEST Result
OK
NOK
RTST OK
1.5
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
47
OF
96
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
48
OF
96
The purpose of this test is to verify that the server redundancy (Server A &
Server B) is working properly.
Pre-requisite
Reference Document
No.
1
Test#
1.1
1.2
1.3
1.4
1.6
1.7
1.8
1.9
TEST Result
OK
NOK
RTST OK
NMR601.8
DOCUMENT TITLE
PAGE
49
OF
96
NAME
Purpose
The purpose of this test is to verify that the server redundancy (Server A &
Server B) is working properly.
Pre-requisite
Reference Document
No.
Test#
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
50
OF
96
The purpose of this test is to verify the upgrade of firmware in redundant Series
C IOM
The Controller in ON
The redundant IOM to be tested is configured and loaded in the system
The redundant IOM to be tested is in IDLE state
Reference Document
Test Procedure
No.
Test#
1.1
Click Start on the task bar and choose Run to open the
Run dialog box
1.2
Click the Browse button to open the Browse dialog box
1.3
Navigate to the directory location -> C:Program
Files\Honeywell\Experion PKS\Engineering
Tools\System\Firmware\CTools
1.4
Launch CTools application by executing CTools.exe file
1.5
Wait for the module listing table to appear in the CTool
window
1.6
Check the module for which firmware to be upgraded
1.7
Select Load FW button to start firmware upgrade
1.8
Monitor progress of the upgrade in the status message
box and the status column.
Upon completion of up gradation, exit from CTool
application.
Purpose: Overall acceptance of this module by Customer
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
51
OF
96
No.
Test#
The purpose of this test is to verify IP address, FTE Device Index applicable to
all nodes in the Network.
All nodes are powered on and connected to the network.
Network Design Document
System Architecture Drawing
Test Procedure
TEST Result
Detail Test Item
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
52
OF
96
The purpose of this test is to verify that the FTE redundancy is working properly.
Experion Nodes connected on FTE Network
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
53
OF
96
The purpose of this test is to verify that the Network Switch redundancy is working
properly.
All applicable Nodes connected to Network Switch.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
54
OF
96
Power Check
NAME
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify and document that all the power (AC and DC
voltage) on the IO Panels is present and connected as per System Cabinet
Drawings
Cabinet must be Energized.
System Cabinet Drawings NMR602.6
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.9.1.2
55
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the controller redundancy is working
properly
Controller & Station must be Energized.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.9.1.3
56
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the IO Link Cable redundancy is working
properly
C300 must be Energized.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.9.1.4
57
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the Power supply redundancy is working
properly
C300 must be Energized.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.9.1.5
58
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the IO Module redundancy is working
properly
C300 & IOMs must be Energized.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.9.1.6
59
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify the on line replacement of the redundant
Series C IO Module
C300 must be Energized.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.9.1.7
60
OF
96
Purpose
Pre-requisite
The purpose of this test is to verify the requirement of spare capacity and
expansion is met in C300 controller and IO Modules.
C300 must be energized.
IOMs are energized
Reference Document
Test Procedure
No.
Test#
Verify that Controller is not loaded more than 60 % Call up the controller detail display on the station and
1.1
verify the CPU statistics ->check parameter
CPUFREEAVG
Call up the CEE detail display on the station and
1.2
verify the Memory statistics -> check FREEMEMINK
Purpose: Overall acceptance of this module by Customer
TEST Result
OK
NOK
RTST OK
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
61
OF
96
13.10.1
Analog Input
Analog Input Loop Check
Purpose
Pre-requisite
Reference Document
No
Test#
1.1
The purpose of this test is to verify that each Analog input is configured and
working properly.
The Station must be Open. Contractor to provide a gas detector and a four wire
transmitter for loops verification
Spare points will be configured temporarily for this test
IO Assignment, Wiring details, Marshalling Cabinet Drawings
Test Procedure
TEST Result
Detail Test Item
OK
NOK
RTST OK
Open Control module point detail display for desired Analog Input
in the station.
1.2
Connect the signal simulator to the Analog input marshalling
terminals as per the wiring diagrams / details
Note: Spare points will be checked from the RTP location
1.3
Supply a 4mA signal input with the signal simulator to simulate
the 0% value of the input range. Verify that the point value is
equal to the Expected Value at 0% and the correct units are
displayed.
1.4
Repeat above step with 8, 12, 16 and 20mA signals.
1.5
Simulate a signal that will cause the value of the point to rise
above the high alarm limit (if applicable) by 5%. Verify and record
values of the alarm that appear on the alarm summary (tag,
priority and alarm value).
Simulate as per above step for low alarms. This low & high alarm
test can be done for one point and for rest of the points, alarm
limits can be verified by database comparison with the inputs
provided by Contractor.
1.6
Repeat above steps for all Analog Inputs.
Purpose: Overall acceptance of this module by Customer
BY:
DATE:
SIGNATU
RE:
NMR601.8
DOCUMENT TITLE
PAGE
13.10.2
62
OF
96
Analog Output
Analog Output Loop Check
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that each Analog output is configured and
working properly.
The Station must be Open.
Spare points will be configured temporarily for this test
IO Assignment, Wiring details, Marshalling Cabinet Drawings
Test Procedure
No.
Test#
Detail Test Item
1
1.1
Set the Loop Calibrator to the current scale.
1.2
Connect the Loop Calibrator to the selected
Analog output point field cable TB terminals in the
marshalling cabinet
Note: Spare points will be checked from the RTP
location.
1.3
Open the Control Module point detail display of
the desired Analog output point.
Force the output signal to a 0% value of the
output range. Verify that the observed value is
equal to the Expected Value at 0%. Record the
value displayed on the digital Multi-meter on the
form.
1.4
Repeat above step for 50% and 100 % values.
1.5
Repeat the above steps for all the Analog outputs
Purpose: Overall acceptance of this module by Customer
OK
BY:
DATE:
TEST Result
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.10.3
63
OF
96
Digital Input
Digital Input Loop Check
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that each Digital input is configured and
working properly.
The Station must be Open.
Spare points will be configured temporarily for this test
IO Assignment, Wiring details, Marshalling Cabinet Drawings
Test Procedure
No.
Test#
Detail Test Item
1
1.1
Open Control module point detail display for desired
Digital Input in the station
1.2
Connect a jumper across the field cable TB terminals
in the marshalling cabinet for the selected digital
input.
Note: Spare points will be checked from the RTP
location.
1.3
At this point the digital input is set to CLOSE. Verify
that the observed status is equal to the expected.
Record the status displayed on the form.
1.4
Disconnect the jumper from the terminals. At this
point the digital input is set to OPEN. Verify that the
observed status is equal to the expected. Record the
status displayed on the form.
1.5
Verify alarms, if the digital input is configured for
alarms as required. This test can be done for one
point and for rest of the points alarm parameters cab
be verified by database comparison with the inputs
provided by Contractor.
1.6
Repeat the above steps for all the Digital inputs
Purpose: Overall acceptance of this module by Customer
OK
BY:
DATE:
TEST Result
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.10.4
64
OF
96
Digital Output
Digital Output Loop Check
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that each Digital output is configured and
working properly.
The Station must be Open.
Spare points will be configured temporarily for this test
IO Assignment, Wiring details, Marshalling Cabinet Drawings
Test Procedure
No.
Test#
Detail Test Item
1
1.1
Set the digital Multi-meter to the Voltage scale.
1.2
Connect the Multi-meter to the field cable TB
terminals in the marshalling cabinet for the selected
digital Output point.
Note: Spare points will be checked from the RTP
location.
1.3
Open the corresponding Control Module point detail
display for the selected Digital output point.
1.4
Force the output signal to ON. Verify that the
observed value is 24V DC. Record the value
displayed on the digital Multi-meter on the form.
1.5
Repeat above step with output signal as OFF. Verify
that the observed value is 0V DC. Record the value
displayed on the digital Multi-meter on the form.
1.6
Repeat the above steps for all the Digital outputs
Purpose: Overall acceptance of this module by Customer
OK
BY:
DATE:
TEST Result
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
65
OF
96
The purpose of this test is to verify that the points configured in the system is as
per the database provided by the Contractor and agreed default parameters in
the FDS.
The Station must be Open.
Software database provided by the Contractor
Test Procedure
No.
Test#
Detail Test Item
1
1.1
Exports parameters for Tag name, Description, Eng.
Unit, Asset, Low Range, High Range, Alarm Trip
points, Alarm Priority, State Texts, Control Action,
Input Direction from system in to access database
1.2
Import the Contractor provided database in to the
above access database.
1.3
Compare the two databases and generate report for
the discrepancies if any.
Purpose: Overall acceptance of this module by Customer
OK
BY:
DATE:
TEST Result
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
66
OF
96
The purpose of this test is to verify that each Control Loop is configured as per
the design inputs provided by contractor and working properly.
The Station must be Open, Server is running with simulation software
Control narratives provided by the Contractor.
Control/Logic diagrams developed and submitted by Honeywell.
Test Procedure
TEST Result
Test#
Detail Test Item
OK
Call up the respective Control Module detail display
Check input, output connections and the point
configuration
1.3
Simulate PV for the input points from the software.
1.4
Observe the calculated value and compare with expected
values as per reference document
1.5
Check alarm as per reference document
1.6
Simulate the PV for the Complex loop from the software
and verify the functionality of the complex loop including
the initialisation.
1.7
Check for BADPV behaviour.
Purpose: Overall acceptance of this module by Customer
1
No.
1.1
1.2
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
67
OF
96
The purpose of this test is to verify that each Logic is configured as per the
design inputs provided by Contractor and working properly.
Pre-requisite
The Station must be Open. The Server is running with simulation software
Reference Document
Logic requirements provided by the Contractor.
Control/Logic diagrams developed and submitted by Honeywell.
Test Procedure
TEST Result
No.
Test#
Detail Test
OK
Item
1
1.1
Call up the respective Control Module point detail
display
1.2
Check input, output connections and the point
configuration
1.3
Simulate PV for the input points from the software
1.4
Observe the PV status.
1.5
Observer the output points status as per the
LOGIC requirements
1.6
Simulate the fail condition for the each input and
observe the LOGIC outputs status as envisaged
in the design inputs provided by Contractor
1.7
Check behaviour of the logic for bad input values
Purpose: Overall acceptance of this module by Customer
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
68
OF
96
The purpose of this test is to verify that each Sequence Logic is configured as per
the design inputs provided by contractor and working properly.
The Station must be Open.
The Server is running with simulation software
Control narratives provided by the Contractor.
Control/Logic diagrams developed and submitted by Honeywell.
Test Procedure
TEST Result
Test#
Detail Test Item
OK
Call up the respective Sequence Control Module point detail
display
1.2
Simulate PV for the input points from the software
1.3
Observe the output change at respective Control Module
points as per the Sequence Logic
1.4
Check Sequence for Start-up/Hold/Shutdown handlers
conditions
1.5
Check Sequence code if enough documentation/comments is
available (Parameter declaration, usage of variables etc.)
Purpose: Overall acceptance of this module by Customer
1
No.
1.1
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
69
OF
96
No.
The purpose of this test is to verify that each display screen is configured as
specified and working properly.
The Station must be Open.
The Server is running with simulation software.
Display sketches provided by the Contractor
Approved HMI Display Philosophy (PCDD Document)
Contractor comments on the Display prints provided by Honeywell.
Test Procedure
TEST Result
Test#
Detail Test
OK
Item
1
1.1
Call up the Display Schematic on the station screen
1.2
Check the call-up time
1.3
Check for the static layout of the schematic
1.4
Check for the colour code, background colour and
thickness of the various lines as per HMI FDS
1.5
Check displayed data for completeness and
correctness, such as location, accuracy with respect to
the tag names, reading values, target actions, call up of
face plates etc.
1.6
Check appropriate pushbutton / selection / target
functionality
1.7
Check the dynamic behaviour of shapes, data texts, etc.
in the graphic display
1.8
Open the display in the editor mode and verify the
Display performance using Display Performance
Analysis Tool
Purpose: Overall acceptance of this module by Customer
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
70
OF
96
No.
The purpose of this test is to verify that the safeview works properly
The Station must be Open.
Display Schematics
Approved HMI Display Philosophy (PCDD Document)
Test Procedure
TEST Result
Test#
Detail Test
OK
Item
1
1.1
Verify that the safeview starts up properly
1.2
Verify that the command window is correctly invoked
1.3
Verify that the status bar is invoked correctly
1.4
Verify that different display types allocated to different
windows are invoked correctly
1.5
Verify that the faceplate is invoked correctly
1.6
Verify that minimize and maximize buttons work properly
1.7
Verify that safe view is configured as per PCDD
document
Purpose: Overall acceptance of this module by Customer
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
71
OF
96
The purpose of this test is to verify standard Experion Group Policies, Experion
users accounts and its security access level
The Domain Controller is On.
The Station is open
Pre-requisite
Reference Document
Test Procedure
No.
Detail Test
OK
Item
1
1.1
Log on to Domain Controller using Domain Administrator
account
1.2
Go to Start->All Programs->Admin Tools->Group Policy
Management
1.3
Verify if standard Experion Group Policies are
configured as per expectations
(Expectation: Standard Experion Policies->Honeywell
Product Administrator Role, Honeywell Engineering
Role, Honeywell Operational Role)
1.4
Go to Start->All Programs->Admin Tools->Active
Directory Users and Computers
1.5
Verify if Standards Windows Global groups are
configured
(Expectation: Standard Global Groups->DCS
Administrators, Engineers, Supervisors, Operators, Ack
View Only Users, View Only Users, DCS Domain
Servers)
1.6
On Experion server verify users configuration for
security and control level as per scope of responsibility
Purpose: Overall acceptance of this module by Customer
TEST Result
Test#
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
72
OF
96
Reference Document
Test Procedure
No.
Detail Test
OK
Item
1
1.1
Verify the status of system component, system alarms
on the System status display.
Call up System status display in Station
View > System Status
All alarms indicated on the system status display have
to be verified.
Note: Many alarms will be there during the FAT because
of disconnected field devices or equipment
Purpose: Overall acceptance of this module by Customer
TEST Result
Test#
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
73
OF
96
13.19.1
Purpose
Pre-requisite
Reference Document
No.
Detail Test
OK
Item
1
1.1
Open FF IO in control builder
1.2
Verify FF Segment Allocation
1.3
Verify FF Device make and Model
1.4
Verify FF Device Addresses
1.5
Check FF device transmitter range, process range,
transmitter unit and process unit
1.6
Check Order in CM configuration
1.7
Check whether correct DD File is being used for
each make of devices.
1.8
Check detail display and faceplate for the tag
1.9
Verify alarm setting if any
1.10
Repeat same procedure for all FF devices
Purpose: Overall acceptance of this module by Customer
TEST Result
Test#
NOK
BY:
DATE:
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
74
OF
96
Purpose
Pre-requisite
Reference Document
Test Procedure
No.
1.1
1.2
1.3
Test#
Detail Test
OK
Item
Note: This test will be done using one sample test device
from each make/model
Assign the sample test devices tags to a test segment in
Control Builder
Wire the devices to test segment physically
Check that the actual device is shown as un-commissioned
TEST Result
NOK
RTST OK
1.4
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.20.1
75
OF
96
FF Segment Check
FF Segment Check
Purpose
Pre-requisite
Reference Document
No.
TEST Result
Test#
Detail Test
OK
Item
Note: Each segment will be checked with one FF
device connected. The device will NOT be
matched / downloaded; we see that it appears on
the segment as un-commissioned device and thats
all)
NOK
RTST OK
1.1
BY:
DATE:
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.20.2
76
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the FIM redundancy is working properly.
FIMs must be synchronized
Test Procedure
No.
Test#
1.1
TEST Result
OK
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.20.3
77
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the Bulk Power supply redundancy is
working properly
FIMs must be Energized.
Test Procedure
No.
Test#
1.1
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.20.4
78
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the FF Power Conditioner Module
redundancy is working properly
FIMs must be Energized
Test Procedure
No.
Test#
1.1
1.2
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
79
OF
96
13.21.1
SM SM NAME
Purpose
Pre-requisite
Reference Document
No.
1
Test#
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
To verify that the communication between ESD systems and DCS systems is
configured and working properly.
Experion Servers and stations must be powered on.
C300 Controllers must be powered on.
SM Controllers must be powered on and connected to Experion network via
Control Firewall.
Network must be powered on.
NMR602.3
Test Procedure
TEST Result
OK
NOK
RTST OK
NMR601.8
DOCUMENT TITLE
PAGE
80
OF
96
SM NAME
Purpose
Pre-requisite
Reference Document
To verify that the communication between ESD systems and DCS systems is
configured and working properly.
Experion Servers and stations must be powered on.
C300 Controllers must be powered on.
SM Controllers must be powered on and connected to Experion network via
Control Firewall.
Network must be powered on.
NMR602.3
Test Procedure
TEST Result
No.
Test#
Detail Test Item
Purpose: Overall acceptance of this module by Customer
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
13.21.2
81
OF
96
Purpose
Pre-requisite
Reference Document
The purpose of this test is to verify that the points configured in the system is as
per the database provided by the Contractor and agreed default parameters in
the FDS.
The Station must be Open.
Software database provided by the Contractor, FDS
Test Procedure
No.
Test#
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2.1
2.2
2.3
2.4
2.5
2.6
2.7
3
Verify Supporting Logics according to PCN
Purpose: Overall acceptance of this module by Customer
TEST Result
OK
BY:
DATE:
NOK
RTST OK
SIGNATURE:
NMR601.8
DOCUMENT TITLE
PAGE
82
OF
96
Point
Type
IOM
Channel
CM Name
Marshalling
Cabinet
Marshalling
TB No
Result
NMR601.8
DOCUMENT TITLE
PAGE
83
OF
CM Name
Result
96
NMR601.8
DOCUMENT TITLE
PAGE
84
OF
CM / Logic Name
Result
96
NMR601.8
DOCUMENT TITLE
PAGE
85
OF
SCM Name
Result
96
NMR601.8
DOCUMENT TITLE
PAGE
86
OF
96
Graphic Name
Graphic Title
Result
NMR601.8
DOCUMENT TITLE
PAGE
87
OF
96
FF Segment
CM Name
Device
Result
NMR601.8
DOCUMENT TITLE
PAGE
88
OF
FF Segment
Result
96
NMR601.8
DOCUMENT TITLE
PAGE
89
OF
96
CONTROLLER
TAGNAME
Result
NMR601.8
DOCUMENT TITLE
PAGE
90
OF
96
Project No
JAZAN
Raised By
Date
Summary:
Description:
Category : Change
Change Authorized By :
Fault
Clarification
Work to Complete
Date
Honeywell Signature
SA
Date
Others
Contractor/Aramco Signature
Date
NMR601.8
DOCUMENT TITLE
PAGE
91
OF
96
Sl
No
Date
Project
Stage
Problem
report No
Description of
problem
Resolution
Corrective
action taken
Completion
date
Re
mark
NMR601.8
DOCUMENT TITLE
PAGE
92
OF
Project No
JAZAN Project
Item No
Raised By
Date
Summary:
Description:
Category : Change
Change Authorized By :
Fault
Clarification
Work to Complete
Date
Honeywell Signature
Date
SA
Others
Contractor/Aramco Signature
Date
96
NMR601.8
DOCUMENT TITLE
PAGE
93
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
SAEP-1624
SAEP-1626
SAEP-1628
SAEP-1630
SAEP-1634
SAEP-1636
SAEP-1638
SAEP-3101
SAEP-16
SAEP-302
SAEP-349
94
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
95
Description
Automation Design Criteria
Emergency Shutdown System
Burner Management System
Process Control System Overview
Process Control System Integration
PCS Configuration Guidelines
Control and Marshalling Cabinets Specification in
Maintenance Training System
Management Information System
Fieldbus Foundation Specification
Hart Specification
Smart Valve Monitoring System SVMS
Smart Shutdown Valve Monitoring System SZVMS
Alarm Management System
Data Acquisition & Historization System
Instrument Asset Management
Fire Detection System
Gas Detection System
PCS System Design Document
Distributed Control System
Emergency Notification Alarm System
Instrument Block Diagram Emergency Notification Alarm
Operator Console CCR Area 1
Operator Console CCR Area 2
Operator Console CCR Area 3
Operator Console CCR Area 4
Operator Console CCR Area 5
Operator Console CCR Area 6
CCR ENG/MAN Console
Typical PIB Maintenance Console
DCC Console
Emergency Communication Console CCR
Maintenance Training Console
Control and Instrumentation Philosophy
Automation Scope Of Supply SRU, Utilities and offsite
Document No
PP-118009
PP-118158
PP-118159
PP-118160
PP-118161
PP-118163
PP-118164
PP-118167
PP-118168
PP-118169
PP-118170
PP-118171
PP-118172
PP-118173
PP-118174
PP-118175
PP-118180
PP-118181
PP-118228
PP-118231
PP-118281
PP-118282
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118393
PP-118394
PP-418002
OF
96
NMR601.8
DOCUMENT TITLE
PAGE
Sr. No
38
39
40
41
42
43
44
45
Description
PCS I/O Summary WUC Scope
Process Control System Vendor Services
Operator Training Simulator
Condition and Vibration Monitoring System (CMS/VMS/FFVMS)
Inspection and Testing of Electronics Systems
Compressor Control System (CCS)
CCR Layout
Control Room Layout
96
Document No
PP-118390
PP-118162
PP-118166
PP-118176
PP-118151
PP-118178
PP-111011
PP-118900
OF
96