DETAIL DESIGN / IZVODAKI PROJEKAT

JOB / PROJEKAT

PANCEVO OIL REFINERY MODERNIZATION /


MODERNIZACIJA RAFINERIJE NAFTE PANEVO

CLIENT / INVESTITOR

NIS (Naftna Industrija Srbije) Petroleum Industry of Serbia

PLANT LOCATION /
LOKACIJA KOMPLEKSA

Pancevo Oil Refinery, Serbia


Rafinerija Nafte, Panevo, Srbija

PROJECT PART /
DEO PROJEKTA

F CIVIL PART

UNIT / OBJECT
POSTROJENJE / OBJEKAT

GENERALLY FOR ALL UNITS

PROJECT SECTION /
POGLAVLJE

Concrete Structures / Betonske konstrukcije

PROJECT ITEM /
CELINA

Calculation of concrete piles / Proraun betonskih ipova


STRUCTURAL CALCULATION / STATIKI PRORAUN

DOCUMENT /
BROJ DOKUMENTA

02163-100441-000391

COPY / BROJ KOPIJE


RESPONSIBLE DESIGNER /
ODGOVORNI PROJEKTANT
Copy

Delta Inenjering, Beograd


Nada Zori Gruji dipl.ing. 310 6308 03
Unit / Object seq.

Section

25

Item

FOR CONSTRUCTION PERMIT

POL

21.9.2011

VIT

21.9.2011

ZAK

21.9.2011

0.A

FOR CONSTRUCTION PERMIT

POL

19.8.2010

VIT

19.8.2010

PZD

19.8.2010

DATE

INIT.

DATE

INIT.

REV.

DESCRIPTION / OPIS

CLC SFOR 9101-01.009 (RS 1)

INIT.

SIGN.

PREPARED BY / URADIO

SIGN.

CHECKED BY / PROVERIO

SIGN.

DATE

APPROVED BY / ODOBRIO

/var/www/apps/conversion/tmp/scratch_4/301462886.doc

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
2 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

CONTENT / SADRAJ
Sheet/ Strana
1.

introduction.......................................................................................................... 3

2.

GEotechnical conditions......................................................................................3

3.

REcommended foundation..................................................................................3

4.

Theory of calculations..........................................................................................4

5.

conclusions........................................................................................................16

1.

UVOD................................................................................................................17

2.

geotehniki uslovi..............................................................................................17

3.

PREPORUENI NAIN FUNDIRANJA.............................................................17

4.

TeorIJSKI DEO PRORAUNA...........................................................................18

5.

ZAKLJUCI.......................................................................................................32

Total number of sheets / Ukupan broj strana:

LGB SFOR 2903-01.023 (RS 0)

31

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
3 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

1. INTRODUCTION

Because of the modernization and expansion of OIL RAFINERY PANCEVO, there was done a
geotechnical investigation to define geotechnical conditions of soils. Afterwards according to the results of
the geotechnical investigation several types of foundation were chosen.
This report concerns about only one type of foundation concrete driven and bored piles and
micro piles.
2. GEOTECHNICAL CONDITIONS

Geotechnical conditions were closely described in previous report of geotechnical conditions of soil
and foundation.
3. RECOMMENDED FOUNDATION

The upper layers of background are soft with bad characteristics up to 6.0 m under the terrain level.
These soils are not suitable for spread foundation of high and heavy objects. In this case we recommend to
use the deep foundation especially the concrete piles (driven piles Franki, bored piles CFA) ended in
resistant layer no.6 and 7.
Driven piles (Franki)
Because of the necessary length of the piles and because of slenderness ration we advise to design
diameter of piles 520 mm at least. The minimum distance between piles should be minimum 3.5 times
diameter of pile.
Bored piles (CFA)
In case of objects near by the existing constructions the driven pile foundation is not very suitable
technology of foundation. However CFA (continuous flight auger) is available. The possible diameter of
this type of pile is 400, 500 and 600 mm (but it suggested consulting the available diameters with
contractor). The minimum distance between piles should be minimum 3.5 times diameter of pile (for
diameter up to 500 mm) and 1.5 times diameter of pile (diameter upward 600 mm)
Micropiles
In case of objects near by the existing constructions and area requirements (where is not possible to
use the CFA technology) the micro piles could be used. The working place is cca 3.0 * 2.0 m with working
height 4.0 m. However the space requirements have to be consulted with contractor. Because of the
geotechnical conditions we recommend to use mainly micro piles with grouted root. The top of the root
but should be situated at least 3,0 m under the terrain level. If the micro piles with grouted root could
influence close objects during the realization then the micro piles without grouted root could be used. But
the bearing capacity of this type of micro piles is strongly lower.
Micro pile is very slender element with low bending capacity. But it could be solve by inclination of
the micro piles shaft.

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
4 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

4. THEORY OF CALCULATIONS

Bearing capacity of the driven pile (FRANKI) subjected to a compression load


The bearing capacity of pile subjected to compression load (factored load) contains two parts:

Bearing capacity of the piles shaft

Bearing capacity of the piles shoe

Figure 1. Scheme of the pile


Bearing capacity of the piles shaft

Where:
Ufd - bearing capacity of the piles shaft
hi - thickness of the layer (in figure 1.)
fsi - shaft (skin) friction

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
5 / 31
By :
POL

Where:
xi - the contact stress in the appropriate layer
d - the design friction angle of the soil
cd - design cohesion
r1, r2 coefficient of the technology and coefficient of the length of the pile
(r1=1.0 ; r2 = 1.0 for Franki piles)

Where:
ori - the original geostatic stress
K2 coefficient of the lateral earth pressure z 10 m

K2 = 1.0

z > 10 m K2 = 1.2

d =
m

Where:
m - 12 m =1.5
> 12 m =

cd =

Where:
mc = 2

Bearing capacity of the piles shoe

LGB SFOR 2903-01.023 (RS 0)

mc

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
6 / 31
By :
POL

Where:
Ubd - bearing capacity of the piles shoe
As - area of the piles shoe
Rd -bearing resistance of the background under the piles shoe
K1 - coefficient of the length of the pile :

Where:
cd2, d2, 0, 1, 2, h1, h2, d, b - (in Fig.1)

Bearing capacity of the piles subjected to compression load :

Where:
Ufd - bearing capacity of the piles shaft
Ubd - bearing capacity of the piles shoe
Uvd - bearing capacity of the pile
Vd - compression load of the pile

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
7 / 31
By :
POL

02163
Rev.
Date

We place to a load-length graph for concrete FRANKI piles. Load is unfactored.


Load-length graph for level of the piles head 73.60 m.a.s.l.
load-length graph for level of the piles head 73.60 m.a.s.l.
load(unfactored)
[kN]
1300
1040
910
780
650

LGB SFOR 2903-01.023 (RS 0)

length [m]
11,7
9,7
8,6
7,7
7

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
8 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

Bearing capacity of the bored pile (CFA) subjected to a compression load


The bearing capacity of the bored pile (CFA) for a compression load could be determined from the
stress-strain diagram (Masopust 1978).

Figure 2. Stress strain diagram of single bored pile


Where:
Qyu the limit of the mobilization of the shaft (skin) friction
sy - corresponding settlement to the limit of the mobilization of the shaft friction
Qsu ultimate piles shaft resistance
Qbu ultimate piles shoe resistance

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
9 / 31
By :
POL

Figure 3. Scheme of the bored pile

Loading interval 0< Q < Qyu

Where:
Qsu ultimate piles shaft resistance
qsi ultimate shaft (skin) friction

Where:
a, b coefficient of the regression (Fig.4)
di , Di (Fig.3)

Where:
LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
10 / 31
By :
POL

02163
Rev.
Date

e, f coefficient of the regression (Fig.4)


L , d0 (Fig.3)

Figure 4. Table of the coefficient of the regression for all types of the soil

Where:
coefficient of the piles shoe load
q s weighted average of the shaft (skin) friction

q0 stress at the piles shoe corresponding sy


L , d0 (Fig.3)

Where:
coefficient of the piles shoe load
Qsu ultimate piles shaft resistance
Qyu the limit of the mobilization of the shaft (skin) friction

LGB SFOR 2903-01.023 (RS 0)

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
11 / 31
By :
POL

Where:
Qyu the limit of the mobilization of the shaft (skin) friction
E s deformation modulus of the soil

d - (Fig.3)

Where:
I1 coefficient of the settlements
Rk reduction coefficient

Figure 5. graph of the I1

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
12 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

igure 6. graph of the Rk

Figure 7. Table of the coefficient of the deformation modulus for all types of the soil

The formula of the curve for the loading interval 0< Q < Qyu

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
13 / 31
By :
POL

Loading interval Qyu < Q < Qpu

Where:
Qpu the ultimate piles resistance
Qsu ultimate piles shaft resistance
Qbu ultimate piles shoe resistance

The formula of the curve for the loading interval Qyu < Q < Qpu

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
14 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

We place to a load-length graph for bored concrete CFA piles. Load is unfactored.
Load-length graph for level of the piles head 73.6 m.a.s.l.

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
15 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

Bearing capacity of the pile subjected to a tensile load


The bearing capacity of the pile for a tensile load is done by the resistance of the piles shaft only.
The theory is the same as in the shaft resistance for the compression load, but the coefficient of the
tensile capacity is used. The recommended value is 2.5.

U td

U fd

Ufd - bearing capacity of the piles shaft


Utd - bearing capacity of the tensile pile
t coefficient of the tensile load t=2.5
We place to a load-length graph for concrete Franki piles. Load is unfactored.
Load-length graph for level of the piles head 73.6 m.a.s.l.
load(unfactored)
[kN]
166
145
120
95
70

LGB SFOR 2903-01.023 (RS 0)

length [m]
12
11
10
9
8

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
16 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

Bearing capacity of the micro piles

Where:
d Diameter of the micro pile
Lti the length of the micro pile root
i skin friction in appropriate soil layer
mz load coefficient (compression mz=1,0; tension mz=0,8)

Figure 7. Table of the appropriate skin friction for all types of soil

5. CONCLUSIONS

The upper layers of the background (up to depth 5.5 - 6.0 m under the terrain level) are of
bad geotechnical characteristics and the ground-water level could vary from 71-74 m.a.s.l.
These soils are not suitable for spread foundation of high and heavy objects. In this case we
recommend to use the deep foundation especially the concrete piles (driven piles Franki,
bored piles CFA) ended in resistant layer no.6 and 7.
The real soil conditions and technology of driven piles could strongly influence the
bearing capacity of piles and settlements of objects therefore we recommend to realize load
test of one non-system driven pile. The results of the test should confirm the presumptions of
the design and could lead to the better results of the bearing capacity and consequently to
savings. Some investigation results of FRANKI Grundbau GmbH company mention up to 30%
of saving for similar geological conditions.

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

1.

Proj. No.
Doc. No.02163-100441-000391
Sheet :
17 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

UVOD

Za potrebe modernizacije i proirenja Rafinerije nafte Panevo, uradjena su geotehnika ispitivanja


kako bi se definisali geotehniki uslovi tla. Na osnovu rezultata geotehnikih ispitivnja, odabano je
nekoliko naina fundiranja.
Ovaj izvetaj obradjuje samo jedan nain fundiranja betonskim pobijenim i buenim ipovima i
mikroipovima.
2. GEOTEHNIKI USLOVI

Geotehniki uslovi su detaljno opisani u prethodnom izvetaju o geotehnikim uslovima tla i


fundiranja.
3. PREPORUENI NAIN FUNDIRANJA

Gornji slojevi su meki sa loim karakteristikama do 6,0 m ispod nivoa terena. Ovi slojevi nisu
pogodni za plitko fundiranje visokih i tekih objekata. U ovom sluaju, preporuujemo korienje dubokih
temelja, a posebno betonske ipove (pobijni ipovi Franki, bueni ipovi CFA) koji se zavravaju u
otpornom sloju br. 6 i 7.
Pobijeni ipovi (Franki)
Zbog potrebne duine ipova i stepena vitkosti savetujemo da se predvidi prenik ipova od najmanje
520 mm. Minimalno rastojanje izmedju ipova treba da bude najmanje 3,5 prenika ipa.
Bueni ipovi (CFA)
U sluaju objekata koji se nalaze u blizini postojeih konstrukcija, temelj na pobijenim ipovima nije
najpogodniji nain fundiranja. Medjutim, na raspolaganju stoje bueni ipovi CFA. Dozvoljeni prenik ove
vrste ipova je 400, 500 i 600 mm (ali, u vezi sa raspoloivim prenicima, treba konsultovati izvodjaa).
Minimalno rastojanje izmedju ipova treba da bude najmanje 3,5 prenika ipa (za prenike do 500 mm),
odnosno 1,5 prenik ipa (prenici preko 600 mm).
Mikroipovi
U sluaju objekata koji se nalaze u blizini postojeih konstrukcija i ako zbog uslova terena nije
mogue korienje CFA tehnologije, mogu se koristiti mikroipovi. Radni prostor je oko 3,0 * 2,0 m sa
radnom visinom od 4,0 m. Bez obzira na ovo, treba konsultovati izvodjaa u pogledu potrebog radnog
prostora. Zbog geotehnikih uslova, preporuujemo da se koriste uglavnom mikroipovi sa injektiranim
korenom. Vrh korena treba da bude najmanje 3,0 m ispod nivoa terena. Ako tokom izvodjenja
mikroipovi sa injektiranim korenom mogu uticati na objekte u blizini, mogu se koristiti mikroipovi bez
injektiranog korena. Medjutim, nosivost ovog tipa mikroipova je znaajno manja.
Mikroip je vrlo vitak elemenat male nosivosti na savijanje. Medjutim, ovo se moe reiti nagibom
stabla mikroipa.

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
18 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

4. TEORIJSKI DEO PRORAUNA

Nosivost pobijenog ipa (FRANKI) podvrgnutog optereenju na pritisak


Nosivost ipa podvrgnutog optereenju na pritisak (proraunsko optereenje) sastoji se iz dva dela

Nosivost stabla ipa

Nosivost osnove ipa

Slika 1. Crte ipa


Nosivost stabla ipa

Gde je:
Ufd - nosivost stabla ipa
hi - debljina sloja (na slici 1.)
fsi - trenje povrine stabla ipa.

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia

Proj. No.
Doc. No.02163-100441-000391
Sheet :
19 / 31
By :
POL

Structural Calculation - Concrete Piles

Gde je:
xi - kontaktni napon u odgovarajuem sloju
d - proraunski ugao trenja tla
cd - proraunska kohezija
r1, r2 koeficijent tehnologije i koeficijent duine ipa
(r1=1.0 ; r2 = 1.0 za Franki ipove)

Gde je:
ori - prvobitni geostatiki napon
K2 koeficiijent bonog pritiska zemlje z 10 m K2 = 1.0
z > 10 m K2 = 1.2
d =

Gde je:
m - 12 m =1.5
> 12 m =

cd =
c

mc

Gde je:
mc = 2

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
20 / 31
By :
POL

Nosivost osnove ipa

Gde je:
Ubd - nosivost osnove ipa
As - povrina osnove ipa
Rd - nosivost tla ispod osnove ipa
K1 - koeficijent duine ipa :

Gde je :
cd2, d2, 0, 1, 2, h1, h2, d, b - (in Fig.1)

Nosivost ipa podvrgnutog optereenju na pritisak

Gde je:
Ufd - nosivost stabla ipa
Ubd - nosivost osnove ipa
Uvd - nosivost ipa
Vd - optereenje na pritisak ipa
LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
21 / 31
By :
POL

02163
Rev.
Date

Unosimo u krivu optereenjeduina za betonske FRANKI ipove. Optereenje je


nefaktorisano.
Kriva optereenjeduina za nivo glave ipa 73.60 m.a.s.l.
Kriva optereenjeduina za nivo glave ipa 73.60 m.a.s.l.
Optereenje
(normativno)[kN]
1300
1040
910
780
650

LGB SFOR 2903-01.023 (RS 0)

Duina [m]
11,7
9,7
8,6
7,7
7

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
22 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

Nosivost buenog ipa (CFA) podvrgnutog optereenju na pritisak


Nosivost buenog ipa (CFA) podvrgnutog optereenju na pritisak se moe odrediti iz dijagrama
napon izduenje (Masopust 1978).

Slika 2. Dijagram napon izduenje jednog buenog ipa


Gde je:
Qyu granica mobilizacije trenja (povrine) stabla ipa
sy sleganje koje odgovara granici mobilizacije trenja stabla
Qsu kritina otpornost stabla ipa
Qbu kritina otpornost osnove ipa

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
23 / 31
By :
POL

Slika 3. Skica buenog ipa

Interval optereenja 0< Q < Qyu

Gde je:
Qsu kritina otpornost stabla ipa
qsi kritino trenje (povrine) stabla ipa

Gde je:
a, b koeficijent regresije (Sl. 4)
di , Di (Sl. 3)

Gde je:
LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
24 / 31
By :
POL

e, f koeficijent regresije (Sl. 4)


L , d0 (Sl. 3)

Slika 4. Tablica koeficijenta regresije za sve vrste tla

Gde je:
koeficijent optereenja na osnovu ipa
q s izraunata srednja vrednost trenja (povrine) stabla ipa

q0 naprezanje na osnovi ipa jednak sy


L , d0 (Fig.3)

Gde je:
koeficijent optereenja na osnovu ipa
Qsu kritina otpornost stabla ipa

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
25 / 31
By :
POL

Qyu granica mobilizacije trenja (povrine) stabla ipa

Gde je:
Qyu granica mobilizacije trenja (povrine) stabla ipa
Es

modul deformacije tla

d - (Sl. 3)

Gde je:
I1 koeficijent sleganja
Rk koeficijent korekcije

Slika 5. Kriva I1

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
26 / 31
By :
POL

Slika 6. Kriva Rk

Slika 7. Tablica koeficijenta modula deformacije za sve vrste tla


Formula krive za interval optereenja 0< Q < Qyu

LGB SFOR 2903-01.023 (RS 0)

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia

Proj. No.
Doc. No.02163-100441-000391
Sheet :
27 / 31
By :
POL

Structural Calculation - Concrete Piles

02163
Rev.
Date

Interval optereenja Qyu < Q < Qpu

Gde je:
Qpu kritina otpornost ipa
Qsu kritina otpornost stabla ipa
Qbu kritina otpornost osnove ipa

Formula krive za interval optereenja Qyu < Q < Qpu

Unosimo u krivu optereenjeduina za buene betonske CFA ipove. Optereenje je


nefaktorisano.

Kriva optereenjeduina za nivo glave ipa 73.6 m.a.s.l.


diameter 400 mm
load(unfactored)[kN]
380
330
279
228
183

LGB SFOR 2903-01.023 (RS 0)

length [m]
10
9
8
7
6

diameter 500 mm
load(unfactored)[kN]
480
417
353
290
232

length [m]
10
9
8
7
6

diameter 600 mm
load(unfactored)[kN]
581
505
429
353
280

length [m]
10
9
8
7
6

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

LGB SFOR 2903-01.023 (RS 0)

Proj. No.
Doc. No.02163-100441-000391
Sheet :
28 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia

Proj. No.
Doc. No.02163-100441-000391
Sheet :
29 / 31
By :
POL

Structural Calculation - Concrete Piles

02163
Rev.
Date

1
2011-09-21

Nosivost ipa podvrgnutog optereenju na zatezanje


Nosivost ipa optereenog na zatezanje se postie samo preko otpora stabla ipa.
Princip je isti kao i kod otpornosti ipa na optereenje na pritisak, ali se koristi koeficijent nosivosti
na zatezanje. Preporuena vrednost je 2,5.

U td

U fd

Ufd - nosivost stabla ipa


Utd - nosivost zateznog ipa
t koeficijent optereenja na zatezanje t=2.5
Unosimo u krivu optereenjeduina za betonske Franki ipove. Optereenje je nefaktorisano.

Kriva optereenjeduina za nivo glave ipa 73.6 m.a.s.l.


optereenje
(normativno)[kN]
166
145
120
95
70

LGB SFOR 2903-01.023 (RS 0)

duina [m]
12
11
10
9
8

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

Proj. No.
Doc. No.02163-100441-000391
Sheet :
30 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21

Nosivost mikroipova

Gde je:
d Prenik mikroipa
Lti duina korena mikroipa
i povrinsko trenje u odgovarajuem sloju zemlje
mz koeficijent optereenja (sabijanje mz=1,0; zatezanje mz=0,8)

Slika 7. Tablica odgovarajueg povrinskog trenja za sve vrste tla

5. ZAKLJUCI

Gornji slojevi tla (do dubine 5,5 6,0 m ispod nivoa terena) imaju loe geotehnike
karakteristike a nivo podzemnih voda moe da varira izmedju 71 i 74 m.a.s.l. Ovakva tla nisu
pogodna za plitko temeljenje visokih i tekih objekata. U ovom sluaju preporuujemo
korienje dubokog temeljenja, posebno betonskih ipova (pobijeni ipovi Franki, bueni
ipovi CFA) koji se zavravaju u otpornom sloju br. 6 i 7.
Stvarni uslovi tla i tehnologija pobijanja ipova mogu znatno da utiu na nosivost ipova i
sleganje objekata. Zato preporuujemo da se izvre testovi optereenja na jednom pobijenom
probnom ipu koji nije deo sistema. Rezultati testa treba da potvrde pretpostavke projekta i
mogu da dovedu do boljih rezultata u pogledu nosivosti, a time i do uteda. Neki rezultati
ispitivanja kompanije FRANKI Grundbau GmbH spominju utede do 30 % u slinim geolokim
uslovima.

LGB SFOR 2903-01.023 (RS 0)

CB&I Lummus s.r.o.


Structural Calculations / Statiki proraun
Subject

Pancevo Oil Refinery Modernization Project


NIS Petroleum Industry of Serbia
Structural Calculation - Concrete Piles

LGB SFOR 2903-01.023 (RS 0)

Proj. No.
Doc. No.02163-100441-000391
Sheet :
31 / 31
By :
POL

02163
Rev.
Date

1
2011-09-21