Вы находитесь на странице: 1из 4

NO

WORK ITEM

DESCRIPTION

INDUCTION
ITEM

Piling

Jacking process
Jointing
Final set

Yes (English)

Reinforcement

Material stock placement


Fabrication (bending&cutting)
Assembling (overlap, cover, distance)

yes (Indonesia)

Form work

Material (condition, type, placement)


Panel installation (Flatness, thightness,straightness)
Stagging and support

N/Y

Concrete work

Incoming delivery
Casting process
Curing and protection

yes (indo)

Steel structure

Storage, erection
Clamping (fixing, welding)

Yes (Indonesia)

Roofing/Cladding

Material (condition, placement)


Insulation
Roof sheet (fixing, flashing, eaves and encloser)

Brick/block wall

Material (condition, placement)


Installation process (alignment, verticality, lintel, anchor)

N/Y

Yes (Indonesia)

Dry wall/Ceiling

Material (type, placement)


Frame (CNP, metal stud, metal furring)
Panel installation (fixing,jointing,cornering)

Yes (Indonesia)

Painting

Material (storage,type)
Surface condition (moisture, smoothness)

N/Y

Door and window

Material (storage)
Installation (position, level, swing direction,alignment)
Accessories

N/Y

ACP

Material (storage)
Surface preparation (smoothness, M/E facilities, waterproofing)
Frame and bracket (type, fixing)
ACP Installation (alignment, fixing,sealing)

Waterproofing

Surface condition ( smoothness, moisture, cleanlines)


WP Aplication
Water ponding test

N/Y

N/Y

DATE
PLAN

DATE

protection

APRIL
10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Вам также может понравиться