200 /MVA/ rated power. At the first view, for the peak load it
looks ok. But for the minimum loading the first temptation
will be to have in operation only one transformer, which can
handle that power. But that it is forbidden. If for some
reasons that single transformer goes out of service the
connection through that power substation is interrupted.
Always it must be at least two transformers in operation.
That is, now at the minimum loading, each transformer is
loaded with 50 /MVA/, that is 25% of its rated power, and
this is not an economical operation.
Also it must be counted that periodically units must go into a
maintenance process. If on the above power substation there
are installed only two transformers, and since the operation
cannot remain with only one transformer, it means that no
transformer can go out for a maintenance schedule, which of
course cannot be accepted.
Im = (1 + Zmn
x Vn
Sn*
Ym0) x --- + (Ym0 + Yn0 + Zmn x Ym0 x Yn0)
Vn*
2
3
4
5
6
7
8
Wednesday, February 29
Monday, March 19
Monday, March 19
Monday, April 2
Monday, April 2
Monday, April 16
Monday, April 30