WEEKLY PROGRESS SUMMARY FOR MECHANICAL WORKS AS ON 21/05/2014


Project : LULU BOWSHER PHASE II
Activity ID

Activity Name

(*)Start

(*)Finish

BASEMENT FLOOR
FBZA1090

INSTALLATION AND TESTING OF FIRE FIGHTING PIPES

4/16/2012

FBZA1130
FBZA1120

INSTALLATION OF UPRIGHT SPRINKLERS IN PARKING AREA


FIRE HOSE REEL CABINET INSTALLATION WORKS

11/24/2013
5/16/2013

9/17/2012
12/7/2013
8/24/2013

FBMR1040

INSTALLATION AND TESTING OF FIRE FIGHTING PIPES IN BASEMENT MECHANICAL ROOM

10/12/2012

22/10/2012

FBMR1050

FIXING OF FIRE FIGHTING VALVES AND ACCESSORIES IN BASEMENT MECHANICAL ROOM

10/23/2013

11/3/2013

FBMR1060

INSTALLATION OF FIRE GRP WATER TANKS IN BASEMENT MECHANICAL ROOM

9/30/2013

10/22/2013

FBMR1070
HBZA1130
HBZA1120
HBZA1140
HBZA1150
HBZA1006
HBZA1016
HBZA1050
HBZA1060

FIXING OF PUMPS IN BASEMENT MECHANICAL ROOM


FIXING OF HVAC VALVES & ACCESSORIES IN BASEMENT
HVAC PIPE INSULATION WORKS IN BASEMENT
FIXING OF FANS & FAN COIL UNITS IN BASEMENT
FIXING OF AIR OUTLETS IN BASEMENT
PRE INSULATED DUCT INSTALLATION WORKS IN BASEMENT
FIXING OF HVAC DUCT ACCESSORIES(DAMPERS) IN BASEMENT
FIXING OF FANS IN BASEMENT BETWEEN GRIDS B3/14 - 18/19
FIXING OF FANS IN BASEMENT BETWEEN GRIDS B3/14 - 18/29

10/6/2013
5/20/2013
5/7/2013
10/22/2013
9/17/2013
8/15/2012
10/1/2013
11/19/2013
11/19/2013

10/22/2013
9/16/2013
7/22/2013
11/18/2013
10/21/2013
9/23/2012
10/8/2013
12/5/2013
12/5/2013

PBMR1040

LAYING OF EXPOSED WATER SUPPLY PIPES IN BASEMENT MECHANICAL ROOM

PBMR1060
PBMR1050

INSTALLATION OF BOOSTER PUMPS IN BASEMENT MECHANICAL ROOM


INSTALLATION OF COLD WATER TANKS IN BASEMENT MECHANICAL ROOM

Page 1

5/14/2012
10/23/2013
9/30/2013

10/31/2012
10/30/2013
10/22/2013

TASK

FGZA1070
FGZA1080
FGZA1090
HGZA1210
HGZA1190

GROUND FLOOR
FIXING OF PENDENT SPRINKLERS IN GROUND FLOOR
FIRE HOSE REEL CABINET FIXING WORKS IN GROUND FLOOR
INSTALLATION OF FM-200 SYSTEMS IN GROUND FLOOR
FIXING OF FANS & FAN COIL UNITS IN GROUND FLOOR
FIXING OF AIR OUTLETS IN GROUND FLOOR

12/15/2013
6/6/2013
1/29/2014
11/19/2013
10/1/2013

1/28/2014
9/2/2013
2/11/2014
1/2/2013
11/4/2013

PGZA1130

INSTALLATION OF DRAINAGE SUNDRIES & SANITARY FIXTURES IN GROUND FLOOR

7/18/2013

9/5/2013

FFZA1070
FFZA1080
HFZA1120
HFZA1160
HFZA1210
HFZA1200
PFZA1100

FIRST FLOOR
FIXING OF PENDENT SPRINKLERS IN FIRST FLOOR
FIRE HOSE REEL CABINET FIXING WORKS IN FIRST FLOOR
PRE INSULATED DUCT WORKS IN FIRST FLOOR
FIXING DUCT ACCESSORIES(DAMPERS) IN FIRST FLOOR
FIXING OF FANS AND FAN COIL UNITS IN FIRST FLOOR
FIXING OF AIR OUTLETS IN FIRST FLOOR
WATER SUPPLY PIPES INSULATION WORKS IN FIRST FLOOR

6/23/2013
7/1/2013
11/6/2012
4/24/2013
7/29/2013
7/29/2013
6/13/2013

9/18/2013
7/24/2013
1/3/2013
5/25/2013
9/8/2013
9/8/2013
7/3/2013

PFZA1130

INSTALLATION OF DRAINAGE SUNDRIES & SANITARY FIXTURES IN FIRST FLOOR

8/8/2013

SFZD1090
SFZD1070
HSZB1160
HSZB1120
HSZB1130
HSZB1190
HSZB1180
HSTT1000
HSTT1010

SECOND FLOOR
FIXING OF PENDENT SPRINKLERS IN SECOND FLOOR
FIRE HOSE REEL CABINET FIXING WORKS IN SECOND FLOOR
FIXING HVAC VALVES & ACCESSORIES IN SECOND FLOOR
PRE INSULATED DUCT INSTALLATION WORKS IN SECOND FLOOR
FIXING DUCT ACCESSORIES(DAMPERS) IN SECOND FLOOR
FIXING FANS AND FAN COIL UNITS IN SECOND FLOOR
FIXING AIR OUTLETS IN SECOND FLOOR
LAYING OF HVAC PIPES IN 2ND FLOOR TECHNICAL TERRACE
FIXING OF HVAC VALVES & ACCESSORIES IN 2ND FLOOR TECHNICAL TERRACE

10/9/2013
7/25/2013
6/30/2013
3/24/2013
6/10/2013
11/19/2013
10/29/2013
10/19/2013
11/11/2013

Page 2

9/4/2013
11/23/2013
9/21/2013
10/3/2013
8/11/2013
9/22/2013
1/6/2014
11/21/2013
11/10/2013
11/27/2013

TASK

11/20/2013
8/12/2013

HSTT1020
HSTT1030

HVAC PIPE INSULATION WORKS IN 2ND FLOOR TECHNICAL TERRACE


LAYING OF CONDENSATE DRAIN PIPES IN 2ND FLOOR TECHNICAL TERRACE

10/29/2013
8/6/2013

HSTT1040

CONDENSATE DRAIN PIPE INSULATION WORKS IN 2ND FLOOR TECHNICAL TERRACE

10/26/2013

HSTT1050
HSTT1060
HSTT1080
HSTT1090
HSTT1100

GI DUCT WORKS IN 2ND FLOOR TECHNICAL TERRACE


FIXING DUCT ACCESSORIES IN 2ND FLOOR TECHNICAL TERRACE
FIXING FAN COIL UNITS IN 2ND FLOOR TECHNICAL TERRACE
FIXING AIR HANDLING UNITS IN 2ND FLOOR TECHNICAL TERRACE
FIXING FANS IN 2ND FLOOR TECHNICAL TERRACE

10/19/2013
11/11/2013
10/22/2013
10/22/2013
10/29/2013

10/28/2013
11/10/2013
11/19/2013
10/28/2013
11/7/2013
11/14/2013

PSZA1130

INSTALLATION OF DRAINAGE SUNDRIES & SANITARY FIXTURES IN SECOND FLOOR

7/1/2013

11/17/2013

10/13/2013
8/12/2013
5/13/2013
7/24/2013
11/19/2013
10/29/2013
5/12/2013
7/24/2013
7/15/2013
7/1/2013

11/18/2013
8/8/2013
9/3/2013
10/8/2013
1/6/2014
11/26/2013
8/12/2013
8/28/2013
9/1/2013
11/24/2013

9/25/2013
11/12/2013
10/19/2013
11/5/2013
11/12/2013

10/17/2013
11/28/2013
10/26/2013
11/14/2013
11/14/2013

FTZB1050
FTZB1080
HTZB1070
HTZB1100
HTZB1160
HTZB1170
PTZA1060
PTZA1070
PTZA1080
PTZA1090
HTRF1000
HTRF1010
HTRF1020
HTRF1030
HTRF1040

THIRD FLOOR
FIXING OF PENDENT SPRINKLERS IN THIRD FLOOR
FIRE HOSE REEL CABINET FIXING WORKS IN THIRD FLOOR
PRE INSULATED DUCT INSTALLATION WORKS IN THIRD FLOOR
FIXING DUCT ACCESSORIES(DAMPERS) IN THIRD FLOOR
FIXING FANS & FAN COIL UNITS IN THIRD FLOOR
FIXING AIR OUTLETS IN THIRD FLOOR
LAYING OF EXPOSED WATER SUPPLY PIPES IN THIRD FLOOR
WATER SUPPLY PIPES INSULATION WORKS IN THIRD FLOOR
FIXING OF PLUMBING VALVES AND ACCESSORIES IN THIRD FLOOR
INSTALLATION OF DRAINAGE SUNDRIES & SANITARY FIXTURES IN THIRD FLOOR
Roof Floor
LAYING OF HVAC PIPES IN ROOF FLOOR
FIXING HVAC VALVES & ACCESSORIES IN ROOF FLOOR
HVAC PIPE INSULATION WORKS IN ROOF FLOOR
LAYING OF CONDENSATE DRAIN PIPES IN ROOF FLOOR
CONDENSATE DRAIN PIPE INSULATION WORKS IN ROOF FLOOR

Page 3

TASK

HTRF1050
HTRF1060
HTRF1080
HTRF1090
HTRF1100
PRFA1000
PRFA1010
PRFA1020
PRFA1030
PRFA1040

PRE INSULATED WORKS IN ROOF FLOOR


FIXING DUCT ACCESSORIES IN ROOF FLOOR
FIXING FAN COIL UNITS IN ROOF FLOOR
FIXING AIR HANDLING UNITS IN ROOF FLOOR
FIXING FANS IN ROOF FLOOR
LAYING OF EXPOSED DRAINAGE & VENT PIPES IN ROOF FLOOR
LAYING OF EXPOSED WATER SUPPLY PIPES IN ROOF FLOOR
WATER SUPPLY PIPES INSULATION WORKS IN ROOF FLOOR
FIXING OF PLUMBING VALVES & ACCESSORIES IN ROOF FLOOR
INSTALLATION OF DRAINAGE SUNDRIES IN ROOF FLOOR

Page 4

9/22/2013
10/16/2013
10/22/2013
10/29/2013
10/29/2013
11/5/2013
11/12/2013
11/19/2013
11/26/2013
12/3/2013

10/15/2013
10/26/2013
10/28/2013
11/9/2013
11/14/2013
11/11/2013
11/18/2013
11/25/2013
12/2/2013
12/9/2013

TASK

Planned
Progress

Actual
Progress

100%

97%

100.00%
100%

95%
85%

100%

0%

100%

0%

100.00%

50%

100.00%
100%
100.00%
100.00%
100.00%
100%
100%
100.00%
100.00%

0%
100%
95%
96.00%
0%
95%
100%
80%
75%

100%

95%

testing balance

100%
100.00%

95%
100%

Pumps installed at site.

REMARKS
Lulu materials area and temperory pump room area balance.Lulu
materials has to be removed

Suction and delivery headersWill be shifted from stage I pump room

Has to be shifted from stage

Page 5

TASK

100.00%
100%
0.00%
100.00%
100%

10%
60%
20%
99%
0%

Toilet sprinklers completed.False ceiling work on hold


Fire Cabinet Recess block work balance

100%

75%

EWC installation finished.

100.00%
100.00%
100%
100%
100.00%
100.00%
100%

40%
95%
99%
99%
70%
0%
100%

Waitig for ceiling confirmation from LULU .

100%

70%

100.00%
100.00%
100.00%
100%
100%
100.00%
100.00%
100.00%
100.00%

15%
100%
100%
94%
75%
92%
0%
97%
97%

Sanitary Fixtures balance.After completion of all other works inside


toilet to avoid material damage.
toilets completed

Only branches balance


volume dampers balance

Ahu Connection and flushing progress

Page 6

TASK

100.00%
100.00%

94%
0%

100.00%

0%

100.00%
100%
100.00%
100.00%
100.00%

45%
38%
70%
99%
0%

100.00%

70%

100.00%
100.00%
100%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

25%
99%
93.5%
75%
38%
0%
100%
100%
100%
65%

100%
100.00%
100%
100%
100.00%

93%
92%
91%
0%
0%

0.125

volume dampers balance

Rerouting and rework for AHU shifting progress

Page 7

TASK

100%
100%
100%
100%
100.00%
100%
100.00%
100.00%
100.00%
100.00%

0%
0%
0%
100%
25%
96%
0%
0%
0%
0%

Page 8