Академический Документы
Профессиональный Документы
Культура Документы
8.
1.
2.
3.
4.
5.
6.
7.
1-
c) hour
48.
Minimum density of gabions is ___________.
In which DPWH item is emulsified asphalt not suitable?
b) 3 hours
d) 72 hours
a) 1,000 kg/cu. m
c) 1,400 kg/cu. m
a) Item 301
c) Item 304
b) 1,200 kg/cu. m
d) 1,500 kg/cu. m
b) Item302
d) Item 308
38.
As a Materials Engineer, what will you do with major
honeycombed area that is considered as defective work? 49.
Soundness loss of field gabions is __________________.
28.
Unconfined compressive strength test is usually
a) Plaster
a) 9 % after 5 cycles
c) 11 % after 5 cycles
performed on ______.
a) Sandy b) Payment of the concrete will be made an adjustment
b) 10 % after 5 cycles
d) 12 % after 5 cycles
soils
c) Organic soils
c) Removed and replaced at the expensed of the
b) Silty soils
d) Clayey soils
contractor
50.
The heating temperature of reflector zed
thermoplastic material during application is _____
29.
Consolidation test is usually performed on ____ samples
39.
If the strength of control specimen does not meet the
a) 130 +/- 7* C
c) 200 +/- 7* C
a) Disturbed
c) Consolidated
requirement and not feasible to obtain cores due to
b) 150 +/- 7* C
d) 211 +/- 7* C
b) Undisturbed
d) both a & b
structural consideration, as a Materials Engineer what will
be your decision?
a)
51.
Submission of sample minimum quantity of material
30.
A concrete core sample having a maximum height of
Removed and replaced
for asphalt cement is -------.
less than _____ of its diameter before capping or height less b) Area will not be paid
a) 5 kg
c) 20 kg
than its diameter after capping shall not be tested.
c) Payment will be made at an adjusted price
b) 10 kg
d) 100 kg
a) 93 %
c) 95 %
b) 94 %
d) 96 %
40.
After concrete has been placed, it is advisable to
52.
For how many years does the small Contractor given to
maintain fully welted and in position for how many hours?
procure necessary testing equipment?
31.
The cohesion and internal friction of soil is tested by
a) 14 hours
c) 72 hours
a) 2 years
c) 5 years
a) Tri axial shear test
c) Bearing test
b) 24 hours
d) 15 18 hours
b) 4 years
d) 6 years
b) Direct shear test
d) All of the above
41.
Rock shall be excavated to a depth ____ below sub
53.
The depth of the weakened joints must not be less
32.
In concrete acceptance, core will be considered
grade within the limit of the roadbed
than ____ and a width of ___.
adequate if the average strength of the cores is equal to
a) 100 mm
c) 200 mm
a) 40 mm & 6 mm
c) 40 mm & 5 mm
what?
b) 150 mm
b) 50 mm & 5 mm
d) 50 mm & 6 mm
a) 80% of specified strength & if no single core is less than
75% of specified strength
b) 90% of specified
42.
Minimum penetration of all piles shall be ____.
54.
Used of bituminous cold mix for potholes patching
strength & if no single core is less than 80% of specified
a) 3 meter
c) 7 meter
during rainy/ wet period is acceptable
a) false
strength
c) 85% of specified strength & if
b) 6 meter
d) 4.5 meter
b) true
no single core is less than 75% of specified strength
43.
Piles shall not be driven within 7 meters of concrete 55.
In soil, all boring shall be carried to a depth of at least
33.
Before the cement is to be used, sampling must be
less than _____ old.
a) 7 days
____ below the proposed grade line.
done at least _____ before use.
c) 28 days
a) 0.50 m
c) 1.5 m
a) one week
c) two weeks
b) 14 day
b) 1.0 m
d) 1.8 m
b) 14 days
d) 12 days
44.
Paint contains _____ of pigment and _____ vehicle.
56.
The test that determine pile bearing capacity by
34.
Asphalt cement shall not be used while it is foaming
a) 20 % & 80 %
c) 79 % & 21 %
loading one or more pile and measuring settlement under
nor shall be heated at ____ at anytime after delivery.
b) 21 % & 79 %
d) 80 % & 20 %
load is _____.
a) 107*
c) 120*
a) Vane shear test
c) Pile load test
b) 159*
45.
Minimum thickness of bedding materials beneath the
b) Plate bearing test
pipe is _____.
a) 100 mm
35.
Moisture content of aggregate in bit mix shall not
c) 200 mm
57.
The weight of disturbed samples from hard auger or
exceed ____ of the time it is introduce into the mixing unit.
b) 150 mm
split spoon shall be at least ____.
a) 1.5 mass %
c) 1 mass %
a) 1 kg
c) 10 kg
b) 2.0 mass %
46.
Tolerance of gabion dimension is _________________.
b) 20 kg
d) 100 kg
a) +/- 1%
c) +/- 3 %
36.
Batching tolerance for Sand and Aggregate is ____.
b) +/- 2 %
d) +/- 4 %
58.
Submission of sample for testing for cement is _____.
a) 1 %
c) 3 %
a) 10 kg
c) 15 kg
b) 2 %
47.
Minimum size of galvanized wire mesh is ____________.
b) 20 kg
d) 40 kg
a) 2.0 mm
c) 2.7 mm
37.
Between stage of curing, concrete shall not be exposed b) 2.2 mm
d) 3.4 mm
59.
The length of Shelby Tube of an undisturbed sample is
for more than how many hours?
a) 24 hours
_____.
a) 10 long
27.
2-
c) 20 long
b) 18 long
69.
60.
80.
64.
74.
75.
3-
84.
85.
86.
How many hours do aggregate stockpile or binned for
draining before being batch?
a) 1 hour
c) 12 hours
b) 6 hours
d) 24 hours
76.
In the absence of beam mold in site, cylinder mold is 87.
66.
What is the relative strength of mortar at 7 & 28 days
allowed by specification. What is the required strength?
of fine aggregates, when tested for the effect of organic
a) 2,500 psi
c) b) 3,000 psi
d)
impurities, which is higher than the standard?
4,000 psi
a) not less than 90 %
c) not less than 95 %
b) not less than 80 %
d) not less than 98 %
77.
Prime coat shall be left undisturbed for at least _____. 88.
a) 6 hours
c) 24 hours
67.
What is the rate of loading for concrete beam tested
b) 12 hours
for flexural stress?
a) 110 150
psi/sec
c) 125 175 psi/sec
78.
The first phase of rolling the spread bituminous mix is
b) 115 150 psi/sec
d) 130 - 175 psi/sec
called breakdown rolling which is carried out by pneumatic89.
roller, temperature requirement must be _____.
68.
In concrete sampling paste shall be of normal
a) 200 225* F
c) 160 180* F
consistency of _____ when the rod settles to a point below
b) 190 199* F
d)150 185* F
the original surface in 30 secs.
a) 10 +/- 1 mm
c) 15 +/- 1mm
79.
How many gradation ranges for hot plant mix
90.
b) 11 +/- 1 mm
d) 20 +/- 1 mm
bituminous pavement are there in the blue book?
a) 5
c) 7
b) 6
d) 8
65.
91.
92.
93.
94.
95.
c) 50 grams
b) 25 grams
103.
107.
96.
The higher the value of PI of the soil, the weaker will be
the soil performance as a _____.
a) True
c) Depend
b) False
d) None of the above
108.
97.
_______ the Plasticity Index of group of soil
a) 0
c) 10
b) 6
d) 11
d) 100 grams
a) 50 mm
b) 75 mm
c) 100 mm
d) 150 mm
98.
99.
100.
101.
102.
4-
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.
and all water should be in the drum by the end of the _15_
seconds of the mixing period
145.
134.
135.
5-
167.
168.
169.
170.
171.
172.
173.
174.
175.
176.
177.
178.
193.
194.
Plant-mixed bituminous mixtures should be sampled in
accordance with the Standard Method of Sampling
Bituminous Mixture. A sample not less than ______ kg is
taken and place in sample bag that would insure against
contamination. This is taken every 75 cu m or 130 tons 195.
of
mix.
Ans.. 10 kgs
The bearing blocks of the compression machine
should be at least _____ greater than the diameter196.
of
the specimen.
Ans.. 3.0 %
The bottom bearing block shall be at least _____ thick
197.
when new
Ans. 1.0
( 22.50 mm )
The bottom bearing block shall be at least _______ thick
after any resurfacing operations..
Ans. 0.9
198.
( 22.50 mm )
The curing temperature of a specimen before testing
is ______.
Ans. 18*C to
24*C
199.
The apparatus used to determine the flash point of
asphaltic material is called ____
Ans.
Cleveland Open Cup
200.
The asphalt samples for ductility and penetration test
should be subjected to water bath at a temperature of 25*C
for ____.
Ans.. 11/2 hours
201.
6-
course.
a) 20-14
b) 0 12
202.
203.
204.
c) 0 6
212.
The number of specimen samples in testing concrete
hollow block is _____.
a) 6 pcs./20,000 units (3 for absorption test and 3 for
strength test )
b) 4
pcs./20,000 units
c) 8 pcs./20,000 units
Is it really necessary to cure concrete specimen?
a) Yes
c) No
b) None of the two
213.
205.
206.
207.
208.
209.
210.
211.
a) 221.
b) Stability Test
c) Viscosity
c) 224.
flat
c) flat
225.
7-
231.
242.
232.
233.
234.
235.
236.
237.
247.
257.
238.
248.
239.
240.
241.
8-
261.
a) 12 mass percent
10 mass percent
262.
263.
264.
b) 15 mass percent
282.
265.
266.
267.
268.
269.
270.
9-
293.
294.
295.
296.
297.
298.
299.
311.
a) 4,000
306.
a)
307.
300.
301.
302.
a)
312.
a) 1
315.
316.
10 -
c) unstable soil
d) good
a)
323.
332.
324.
325.
326.
327.
328.
329.
330.
331.
349.
11 -
354.
355.
356.
357.
358.
359.
360.
361.
362.
364.
The required thickness of the thermoplastic paint in
PCCP is __________.
a) 3.2 to 4.8
mm.
c) 3.3 to 3.8 mm.
b) 3.0 to 4.5 mm.
d) 3.2 to 4.0 mm
12 -
asphalt
b) tar
c) emulsion
d) none of the above
382.
383.
384.
385.
386.
387.
388.
389.
390.
391.
392.
393.
406.
13 -
420.
421.
422.
423.
424.
428.
425.
426.
427.
440.
The glass beads shall have a minimum refractive index
of ______ .
Ans. 1.50
The white thermoplastic material shall not exceed a
yellowish index of ______.
Ans. 0.12
The thermoplastic material shall have a maximum
percent residue of _____ after heating at 8 +/- 0.5 hours at
218 +/- 2*C
Ans. 28%
441.
The softening point of thermoplastic paint should be
_______.
Ans.
102.5+/-9.5*C
442.
What kind of water shall be used in laboratory test
especially if it deals with chemical?
Ans.
Distilled Water
Liquid limit brass cup with a sample is raised and 443.
allowed to drop sharply on the base through a height of
what?
Ans. 10 mm.
How many rotation per second will the crank of a
liquid limit device be rotated?
Ans. 2
rotation per seconds
444.
What is the required size of calibrated sand used for
FDT ?
Ans. Any
clean, dry, free- flowing, uncemented and passing # 10 and
retained # 200 sieve
What is the degree of compaction of soil having a 445.
maximum dry density of 2,250 kg/cu. m. and wet density of
soil from hole is equivalent to 2,335 kg/cu. m. and average
moisture content of 8.85%?
Ans. % degree of compaction = (dry density/Max. dry
density ) x 100
= [2,335/
446.
(1+8.85/100)] / 2,250 x 100
= ( 2,145.15/2,250 ) x 100
= 9.34%
What is the standard diameter of an orifice in FDT sand
cone?
Ans. 447.
( 12.7 mm )
Soil properties can be improved by ____________.
a) Adequate compaction
c) Maximizing
14 -
water content
binder
b) Additional
d) Stabilization
a)
448.
449.
450.
451.
452.
453.
454.
455.
456.
457.
c) six ( 6 )
d) four ( 4 )
468.
a)
469.
15 -
a) seven ( 7 )
b) three ( 3 )
473.
474.
475.
476.
477.
478.
479.
480.
481.
482.
c) 20
b) 15
d) 25
How many rotation per second will the crank of a liquid
483.
limit device be rotated?
a) three ( 3 )
rotations per second
b) two and a half (2 ) rotations per second
c) two ( 2 ) rotations per second
d) one and a half ( 1 ) rotations per second
What is the required size of calibrated sand used for484.
FDT?
a) passing
sieve No. 30 retained No. 200
b) passing sieve No. 20 retained No. 200
c) passing sieve No. 10 retained No. 200
d) None of the above
485.
When placing concrete, what is the required
temperature of concrete?
a)
less than 29*C
c) less than 30*C
b) less than 28*C
d) less than 31*C
486.
In PCCP coring, what is the specified thickness of an
individual measurement that shall not be included in the
average?
a) less than 20 mm.
c) less than 25 mm.
b) more than 20 mm.
d) more than 25 mm. 487.
__________ is the wearing away of the pavement
surface caused by the dislodging of aggregate particles.
a) Rutting
c) Shoving
488.
b) Raveling
d) Corrugation
This is the stage in compaction in which all free air is
expelled and replaced by water, if further pressure is
applied to the soil mass, the tendency is to reduce its
volume.
a) wetting stage
c) saturation stage
489.
b) swelling stage
d) none of the above
In this stage, additional water replaces some of the
entrapped air and the soil particles move closer together
with a resulting increase in density.
a) wetting stage
c) lubricating stage
b) swelling stage
d) all of the above
490.
All boring during soil exploration survey shall generally
be carried to a depth of at least ______ meter below the
proposed grade line.
a) one ( 1 )
c) 0.30
491.
b) two and half ( 2 )
d) 0.50
What is the factor that will influence the construction of
stabilized road?
a) Depletion of
the supply of economically available materials
b) High cost involved in the construction of the
492.
conventional types of road
c) If
the road structure may be built by stages, and a properly
designed road might function briefly as a wearing course
d) All of the above
What is the meaning of ASTM?
a) American Standard for Testing Materials
493.
b) American Standard for Testing and Materials
16 -
c) 30
b) 8
d) 3/8
The coarse aggregate used in Bituminous Concrete is
_________.
a) retained
on a 2.36 mm. ( No. 8 sieve )
b) retained on a 4.75 mm (No. 4 sieve )
c) retained on a 19.00 mm. ( No. sieve )
d) both a and b
As Materials Engineer, will you permit the use of
salvage soil aggregate for lie stabilized road mix base
course?
a) Yes
c) It depends
b) No
d) Let the DPWH Project Engineer to
decide
Is the accredited private testing laboratories owned by
companies involved in the supply of construction materials
for DPWH project be allowed to test their own products?
a) Yes
c) It depends
b) No
d) Either a or c
For small projects where the quantity of steel bars is
less than 10,000 kgs. What may be required as a basis of
acceptance.
a) P.E. Certificate
c) Inspection Report
b) Mill Certificate
d) All of the above
Lumber is considered well seasoned when its moisture
content is between _________.
a) 10 to 16%
c) 10 to 14%
b) 14 to 18%
d) 15 to 20%
Flushing of bitumen to the surface after belting or
screeding the hot mixture denotes rich mixture.
a) true
b) false
neither of
the two
Unsuitable materials are those materials containing
detrimental quantities of organic materials, such as grass,
roots, and sewerage and those that is _____________.
a) high organic soils
b) soils with liquid limit exceeding 80 and / or PI > 55
c) soils with very low density, 800kg/cu. m. or below
d) all of the above
The set of cylinders for each project shall be numbered
consecutively beginning with 1 and three specimens should
be identified as A, B, and C. At the early stage of pouring,
the laboratory should be requested to break the A
cylinders at 7 days to check what?
a) If
the structure should be put in service at early stage
b) to check the mix design
c) To check if there is unusual development when
admixture is used
d) All of
the above
The field specimen should be cured from 4 to 7 days at
the project under moist conditions obtained by __________.
a) covering with wet sand
b) covering with saw-dust
503.
504.
505.
506.
507.
508.
509.
510.
511.
512.
17 -
auger sampler
sampler
b) thin-walled
d) Post-hole auger sampler
a) Portland Cement
c) Air-Retaining Portland Cement
530.
531.
532.
533.
b) Hydraulic Cement
d) All of the above
534.
535.
536.
537.
538.
549.
552.
18 -
562.
563.
564.
565.
566.
567.
568.
569.
570.
579.
P.I. requirement for item 104 (selected common
borrow) is __________.
Ans. 6
maximum
L.L. requirement for item 104 (selected common
borrow) is ____________.
Ans. 30
maximum
580.
571.
572.
591.
What is the standard diameter of an orifice in FDT sand
cone?
Ans. inch
(12.7 mm.)
573.
582.
574.
19 -
593.
594.
595.
596.
597.
598.
599.
600.
601.
609.
How to compute for the compressive strength of
concrete cylinder sample?
Ans.
CS = P/A
where: P = loads, lbs.
A = area, sq. m.
A = [rD(sq)] / 4 = 28.27 sq. m
610.
At what age should a concrete beam sample be tested
for flexural test?
Ans. 4
days
611.
625.
626.
602.
603.
604.
628.
20 -
633.
634.
635.
636.
637.
638.
639.
640.
641.
642.
643.
644.
653.
What is being determined in a core sample from
asphalt pavement/
Ans.
thickness of pavement and density of pavement
654.
All records regarding quality control such as
accomplishment, daily activities, weather etc. are recorded
in a ________.
Ans. Materials Log Book
21 -
664.
665.
666.
667.
668.
669.
670.
671.
672.
673.
674.
685.
22 -
695.
696.
697.
707.
The higher penetration grade or softer asphalt is used
in____________.
Ans. cold climate
698.
699.
700.
701.
709.
720.
When tar is used, what is the temperature that the
mixture shall be placed?
Ans.
66*C to 107*C
721.
723.
What control during the mixing and compaction is of
great significance in the strength of the resulting
pavement?
Ans. temperature
724.
704.
705.
728.
The compacted pavement shall have a density equal to
or greater than ___________.
Ans. 97% of
the laboratory compacted density
706.
729.
702.
703.
726.
How is the rolling be done?
Ans. It should begin from the side and proceed
longitudinally parallel toward the road centerline, each trip
overlapping one half the rollers width
727.
23 -
730.
731.
732.
733.
734.
735.
736.
737.
738.
a)743.
751.
Ans.
Ans.
1) by covering the concrete with mats saturated with water
2) thoroughly wetting the pavement
3) by ponding
4) by applying curing compound after finishing of the
surface
24 -
a) Group Index
c) Plasticity Index
b) Liquid Limit
d) Plastic Limit
25 -