Академический Документы
Профессиональный Документы
Культура Документы
Well Number:
MOL
Casing Size:
Casing Weight:
P-110
Casing ID:
Open Hole ID:
Displacement Rate:
Oil Based Mud Density:
Top of Cement:
Height of Tail Slurry:
KOT-1
9.625 in
53.5 lbs/ft
8.535 in
12.25 in
8.00 bpm
15.66 lbs/gal
4,921.3'
1,470.6'
10.75
60.7
9.66
1.88 SG
1,500 m
448 m
Casing TD:
Baffle Collar @:
Previous Casing size:
Previous Casing ID:
Previous Casing TD @:
Open Hole excess %:
Equivalent open hole ID w/excess:
Cased hole excess:
Length of 10-3/4" Csg
Length of 9-5/8" Csg
874.0 bbl 139.0 m
1.82 hrs
5.7 bbl
0.9 m
3,701.0 m
12,142.39 ft
12,062.34 ft
3,677 m
13.375 in
12.347 in
1,995 m
6,543.64 ft
15.0% x's cement
12.60 in
0.00% x's cement
24.4 m
133.14 m
3,567.9 m
1,622 '
459.1 bbl
459.1 bbl
Lead Slurry
Chemical
Amount
Lbs
Class-"G"
SSA-1: DB
Hi- Dense: DB
Halad-567: PH
CFR-3: PH
Gasstop: PH
Halad-322: PH
HR-5: PH
D-Air 3000L: gpb
94.00
0.00%
15.00%
0.40%
0.00%
0.00%
0.20%
0.23%
0.05
67.17 MT
0.00 Lbs
22,207.83 Lbs
592.21 Lbs
0.00 Lbs
0.00 Lbs
296.10 Lbs
340.52 Lbs
10.48 Gal
1,575.0
359 bbl
Fresh water
5.59 gal/sk
or
210 bbl
Total Mix Fluid:
5.59 gal/sk
Slurry Density:
1.94 SG
16.2 ppg
Slurry Yield:
1.28 ft3/sk
Total Slurry Yield:
2,016 ft3
57.08 m
359 bbl
Slurry Pump Rate:
5.00 bpm
Slurry Pump Time:
1.20 hrs
Reported Thickening Time:
7:33 hrs:min
BHST/BHCT: F
214F
170F
101.1C
76.7C
BHST gradient:
1.10 F/100'
Cement
321
Sks
24.4 m
80.1 '
94.00
35.00%
30.00%
0.50%
0.25%
0.40%
0.00%
0.25%
0.05
Amount
Lbs
320.8
100.0 bbl
13.68 MT
10,555.87 Lbs
9,047.89 Lbs
150.80 Lbs
75.40 Lbs
120.64 Lbs
0.00 Lbs
75.40 Lbs
2.75 Gal
BATCH MIXED
Fresh water
7.21 gal/sk
or
55 bbl
7.21 gal/sk
1.98 SG
16.5 ppg
1.75 ft3/sk
561 ft3
15.90 m
100 bbl
5.00 bpm
0.33 hrs
5:23 hrs:min
214F
170F
101.1C
76.7C
1.10 F/100'
----0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total
Quantity
1,896 sks
10,555.9 lbs
31,255.7 lbs
743.0 lbs
75.4 lbs
120.6 lbs
296.1 lbs
415.9 lbs
13.2 gal
Unit
Package
Unit
Price-$
67.17 MT
4.79 MT
14.18 MT
14.86 sx 50 Lb
1.51 sx 50 Lb
2.41 sx 50 Lb
5.92 sx 50 Lb
8.32 sx 50 Lb
2.65 Can - 5gal
Page 1
1,995 m
10,672 '
Top of Tail
3,253 m
12,062 '
12,142 '
85.0 bbl
13.5 m
Open Hole height - excess:
1,325.1'
Density:
15.9 ppg
Water gal/bbl
27.70
Tuned Spacer lbs/bbl
6.00
Tunnel Gel lbs/bbl
4.00
Barite* lbs/bbl
388.00
D-Air 3000L gal/bbl
0.10
Musol gal/bbl
1.20
Pen-5M gal/bbl
0.60
Losurf-259 gal/bbl
0.60
*Barite & Bentonite furnished by client
Lead US$
Baffle Collar
9-5/8" Float Shoe
3,677 m
3,701 m
Capacity
0.07076 bbl/ft: 9-5/8" casing
0.14577 bbl/ft: open hole (gauge)
0.15414 bbl/ft: open hole (excess)
Mix Water
Dead Vol
Lead
0.0 bbl
448 m
Annular Volume
0.05578 bbl/ft:9-5/8" casing x open hole (gauge)
0.06415 bbl/ft:9-5/8" casing x open hole (excess)
0.05810 bbl/ft:9-5/8" casing x 13-3/8" casing
5.35 hrs
5.05 hrs
Tail Slurry
Cement
1,575
Sks
Mix water:
6,544 '
1,258 m
Tuned Spacer
Total Slurry Volume:
1,500 m
495 m
4,128 '
Wellbore Volume
w/o excess w/excess
Casing x open hole annular volume:
312.3 bbl
359.1 bbl
Casing x casing annular volume:
94.3 bbl
94.3 bbl
Total annulus:
406.6 bbl
453.4 bbl
Casing capacity:
859.2 bbl
859.2 bbl
Total wellbore volume: 1,265.8 bbl 1,312.6 bbl
201.2 m
208.7 m
9-5/8" Casing
4,921 '
Top of Lead
Tail US$
$12.58 $19,813.80
$0.08
$0.00
$0.17 $3,775.33
$12.00 $7,106.51
$2.65
$0.00
$9.94
$0.00
$4.13 $1,222.91
$2.69
$916.00
$34.00
$356.37
$33,190.91
Total US$
$4,036.26
$844.47
$1,538.14
$1,809.58
$199.81
$1,199.15
$0.00
$202.82
$93.63
$9,923.85
Spacer Cost:
Pre-Flush Cost:
Total:
$23,850.05
$844.47
$5,313.47
$8,916.08
$199.81
$1,199.15
$1,222.91
$1,118.82
$450.00
$43,114.77
$3,835.54
$363.93
$47,314.24
$92.44
$99.24
$45.12
$7.28
Pre-Flush
Volume:
Volume
Open Hole height - excess:
Density:
Diesel*
gal/bbl
42.00
Hyflo-IV
gal/bbl
0.42
*Diesel furnished by client
403.9m
1.91 SG
2,355 gal
510 lbs
340 lbs
32,980 lbs
9 gal
102 gal
51 gal
51 gal
50.0 bbl
779.5'
7.5 ppg
2,100 gal
21 gal
US$
US$
$1.76
$0.18
$0.00
$34.00
$6.88
$17.74
$19.24
Total
$897.60
$61.20
$0.00
$289.00
$701.76
$904.74
$981.24
$3,835.54
7.9 m
237.6m
US$
$0.00
$17.33
Total-$
$363.93
CEMENTING DEPARTMENT
Report :
PK13-Z-296
Customer
Company Rep:
MD / TVD [ft/m]
Well:
Field:
Rig:
KOT-01
KOT
TOL [ft/m]
TOC [ft/m]
Csg OD / OH [in]
MOL
12221
3725
9.625
JOB PURPOSE
TYPE OF SLURRY
Date:
13-Aug-13
12.82"
Type of Slurry
Slurry Density [ppg]
Slurry Yield [cuft/sk]
Water Req.[gal/sk]
Total Mix Fluid [gal/sk]
Mix Water Density [ppg]
Composition Per Sack
LEAD
16.20
1.28
5.59
5.59
8.33
Packaging
Sk-Drum
Pre-hydrated
Pre-hydrated time
Additive Mixed in:
Water Sample:
Cement Sample
Yes
Type of Test
60 min
Downhole Slurry Density (ppg)
Water
Downhole Slurry Yield (cuft/sk)
Job Sample Temperature Gradient [F/100 ft]:
Job Sample
Water pH :
570
Mixed In
Class G
Err:520
lb/sk
Cement
Dry Blend Material
% bwoc
Cement
Hi-Dense
15.00
HALAD 322
0.20
% bwoc
Halad-567
HR-5
D-AIR 3000L
0.40
0.23
0.05
% bwoc
% bwoc
gal/bbl
Job Test
16.20
1.28
1.10
7.00
Addition
Req.
Lot Number
dry blended
23-2013-1
Function / Description
dry blended
Err:520
Water
prehydrated
Err:520
Water
Water
Water
prehydrated
110911
prehydrated
prehydrated
Err:520
Temp.
Gel Strength
[F]
80
170
600
300
96
69
115
Temp[F]
PV
200
73
51
100
42
35
6
8
10
3
5
7
[cP]
81.0
51.0
10 Min [lbs/100ft2]
n'
170
Pumping Time
50 Bc
7:21
Hrs:Min
API SCHEDULE
59
Pumping Time
70 Bc
7:33
Hrs:Min
7800
7:43
Hrs:Min
12:00
24:00
36:00
48:00
60:00
72:00
In Prog
214
Method Used
UCA
3000
Temperature correspond to
BHST of Well
0.00%
at 0 angle
73.00
cc/30 min
at Temperature (F)
###
at Temperature (F)
Requested by :
Approved By :
Customer Approval :
Tested By:
Date:
Date:
Ammar/ Jahanzaib
13-Aug-13
RESULTS CONTAINED IN THIS REPORT ARE PERFORMED IN ACCORDANCE WITH HALLIBURTON GLOBAL LABORATORY BEST PRACTICES.
THIS REPORT IS BASED ON SOUND ENGINEERING PRACTICE, BUT BECAUSE OF VARIABLE WELL CONDITIONS AND OTHER INFORMATION THAT MUST BE RELIED UPON, HALLIBURTON MAKES NO
WARRANTY, EXPRESS OR IMPLIED, AS TO THE ACCURACY OF THE DATA OR OF ANY CALCULATIONS OR OPINIONS EXPRESSED HEREIN. YOU AGREE THAT HALLIBURTON SHALL NOT BE LIABLE FOR
ANY LOSS OR DAMAGE WHETHER DUE TO NEGLIGENCE OR OTHERWISE ARISING OUT OF OR IN CONNECTION WITH SUCH DATA CALCULATIONS OR OPINIONS.
THIS REPORT IS THE PROPERTY OF HALLIBURTON SERVICES AND NEITHER IT NOR ANY PART THEREOF NOR A COPY THEREOF IS TO BE PUBLISHED OR DISCLOSED WITHOUT FIRST SECURING
THE EXPRESS WRITTEN APPROVAL OF LABORATORY MANAGEMENT; IT MAY HOWEVER, BE USED IN THE COURSE OF REGULAR BUSINESS OPERATIONS BY ANY PERSON OR CONCERN
Confirmation Test
Pilot Test
13-Aug-13
Other
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
YP
lbf/100ft
15.1
18.1
K'
170.0
170.0
CEMENTING DEPARTMENT
Report :
PK13-Z-297
Customer
Company Rep:
MD / TVD [ft/m]
Well:
Field:
Rig:
KOT-01
KOT
TOL [ft/m]
TOC [ft/m]
Csg OD / OH [in]
MOL
12221
9.625
JOB PURPOSE
TYPE OF SLURRY
Date:
3725
13-Aug-13
12.82"
Type of Slurry
Slurry Density [ppg]
Slurry Yield [cuft/sk]
Water Req.[gal/sk]
Total Mix Fluid [gal/sk]
TAIL
16.50
1.75
7.21
7.21
8.33
Packaging
Sk-Drum
Pre-hydrated
Pre-hydrated time
Additive Mixed in:
Water Sample:
Cement Sample
Yes
Type of Test
60 min
Downhole Slurry Density (ppg)
Water
Downhole Slurry Yield (cuft/sk)
Job Sample Temperature Gradient [F/100 ft]:
Job Sample
Water pH :
570
Mixed In
Class G
Err:520
lb/sk
Cement
Dry Blend Material
% bwoc
Cement
% bwoc
Cement
Hi-Dense
SSA-1
30.00
35.00
Gas stop
0.40
% bwoc
Halad-567
CFR-3
HR-5
D-AIR 3000L
0.50
0.25
0.25
0.05
% bwoc
% bwoc
% bwoc
gal/bbl
Pilot Test
16.50
1.75
1.10
7.00
Addition
Req.
Lot Number
dry blended
27-2013-1
Function / Description
dry blended
Err:520
Err:520
Water
prehydrated
Err:520
Water
Water
Water
Water
prehydrated
Err:520
Err:520
Err:520
Err:520
dry blended
prehydrated
prehydrated
110911
prehydrated
Err:520
Temp.
[F]
80
170
600
235
Temp[F]
Gel Strength
300
202
141
200
143
109
PV
100
85
62
6
12
9
3
8
6
10 Min [lbs/100ft2]
[cP]
175.5
118.5
n'
170
Pumping Time
50 Bc
5:17
Hrs:Min
API SCHEDULE
59
Pumping Time
70 Bc
5:23
Hrs:Min
7800
5:31
Hrs:Min
12:00
24:00
36:00
48:00
60:00
72:00
in prog
214
Method Used
UCA
3000
Temperature correspond to
BHST of Well
NIL
at 0 angle
42
cc/30 min
at 45 angle
at Pressure (psi)
at Temperature (F)
###
at Temperature (F)
Requested by :
Approved By :
Customer Approval :
Tested By:
Date:
Date:
Ammar/ Jahanzaib
13-Aug-13
RESULTS CONTAINED IN THIS REPORT ARE PERFORMED IN ACCORDANCE WITH HALLIBURTON GLOBAL LABORATORY BEST PRACTICES.
THIS REPORT IS BASED ON SOUND ENGINEERING PRACTICE, BUT BECAUSE OF VARIABLE WELL CONDITIONS AND OTHER INFORMATION THAT MUST BE RELIED UPON, HALLIBURTON MAKES NO
WARRANTY, EXPRESS OR IMPLIED, AS TO THE ACCURACY OF THE DATA OR OF ANY CALCULATIONS OR OPINIONS EXPRESSED HEREIN. YOU AGREE THAT HALLIBURTON SHALL NOT BE LIABLE FOR
ANY LOSS OR DAMAGE WHETHER DUE TO NEGLIGENCE OR OTHERWISE ARISING OUT OF OR IN CONNECTION WITH SUCH DATA CALCULATIONS OR OPINIONS.
THIS REPORT IS THE PROPERTY OF HALLIBURTON SERVICES AND NEITHER IT NOR ANY PART THEREOF NOR A COPY THEREOF IS TO BE PUBLISHED OR DISCLOSED WITHOUT FIRST SECURING
THE EXPRESS WRITTEN APPROVAL OF LABORATORY MANAGEMENT; IT MAY HOWEVER, BE USED IN THE COURSE OF REGULAR BUSINESS OPERATIONS BY ANY PERSON OR CONCERN
AND EMPLOYEES THEREOF RECEIVING SUCH FROM HALLIBURTON SERVICES.
Confirmation Test
Pilot Test
13-Aug-13
Other
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
YP
lbf/100ft
26.7
22.6
K'
170.0
170.0
Report :
Company:
MOL
Well:
Field:
Rig:
KOT-1
KOT
Job Type:
TVD [ft/m]
9-5/8" Casing
12221
Date:
3725
13-Aug-13
MD [ft/m]
TOL [ft/m]
TOC [ft/m]
Csg OD / OH [in]
9-5/8"
12.82"
Type of Spacer
Tuned Spacer
Type of Mud
OBM
Spacer Density
15.90 ppg
Mud Density
15.66 ppg
Addition
Req.
Batch Number
Conc.
UOM
Addition Order
Location Water
Tuned Spacer E+
Tunnel Gel
Barite
Musol
Pen-5
Losurf-259
D-AIR 3000L
27.70
6.00
4.00
388.0
1.20
0.60
0.60
0.10
gal/bbl
Lb/BBl
Lb/BBl
Lb/BBl
gal/bbl
gal/bbl
gal/bbl
gal/bbl
1
2
3
4
5
6
7
8
Description
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Tuned Spacer Rheology
At Temp.
(F)
80
170
600
59
55
300
45
40
3
10
8
PV
(cp)
24.0
21.0
6
9
27
23
15
3
9
23
19
11
PV
(cp)
57.0
225.0
88.5
49.5
10
21.0
6
13
10
At Temp.
(F)
170
170
170
170
600
112
300
161
91
300
74
260
123
72
170
55
40
31
26
Requested by :
Hamza Aslam / Rana Ali
Tested By:
Younus Siddiqui/Ammar
Approved By :
Younus Siddiqui
Customer Approval :
Date:
Date:
Date:
13-Aug-13
13-Aug-13
Yp [ lb f /100ft 2]
Yp [ lb f /100ft 2]
YP
Spacer
M ud
13-Aug-13
214
170
Description
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
S
h
o
w
H
M
i
u
d
d
e
C
M
o
u
m
d
p
a
C
ti
o
b
m
il
p
it
a
yti
T
b
e
il
sit
tiy
n
T
g
e
s
ti
n
g
YP
Spa cer
Mud