DIgSILENT

PowerFactory
Application Example

Transmission System
Contingency Analysis
1 Description
Study case number 02 which is linked to the High Load operation scenario refers to this
simulation. The two variations defining the wind parks are active (Stage 1 WPEast is set as
recording). The contingency analysis is performed using the Single Time Phase Option and
considering all the N-1 contingencies for lines and transformers.

2 PowerFactory Project Information


Name of Project: Transmission_Example
Name of Study Case: 02_Contingency (High Load)

Transmission System - Contingency Analysis

DIgSILENT GmbH
Heinrich-Hertz-Strasse 9
D-72810 Gomaringen
Tel.: +49 7072 9168 - 0
Fax: +49 7072 9168 - 88
http://www.digsilent.de
e-mail: mail@digsilent.de

Transmission System - Contingency


Analysis
Published by
DIgSILENT GmbH, Germany
Copyright 2013. All rights
reserved. Unauthorised copying
or publishing of this or any part
of this document is prohibited.
Doc. Rev. No. 2,
18 April 2013

Transmission System - Contingency Analysis