DAILY PROGRESS PQT and Production Asphalt Enamel Coating


Madura BD Field Development - EPCI Project
PT. COOEC INDONESIA
Prod. Date
:
Date of Issue :

3-Jan-16
4-Jan-16

Summary Production of Asphalt Enamel and Concrete Production


Asphalt Enamel Coating
ACC
Prod.

Concrete Weight Coating

Repair

Reject

WIP
(Repair
Balance +Reject)

ACC
Total
Prod

No

Production Date

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

Friday, December 11, 2015

10

10

Saturday, December 12, 2015

38

Monday, December 14, 2015

78

Tuesday, December 15, 2015

18

47

55

15

20

20

Wednesday, December 16, 2015

35

20

75

21

41

41

Thursday, December 17, 2015

57

20

95

44

44

Friday, December 18, 2015

42

15

110

45

Monday, December 21, 2015

44

23

133

50

Tuesday, December 22, 2015

89

12

145

42

42

103

10

Wednesday, December 23, 2015

91

10

155

48

90

65

11

Saturday, December 26, 2015

93

162

26

116

12

Sunday, December 27, 2015

79

11

173

32

13

Monday, December 28, 2015

82

12

185

14

Tuesday, December 29, 2015

103

10

15

Wednesday, December 30, 2015

106

16

Thursday, December 31, 2015

17
18

Accum
Balance Reject d. Accumulation Strip off
After Rep.

Accum

Strip off

Balance

WIP
(Repair
+Reject)

Total

Reject d.

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

PQT Concrete Weight Coating

Continues to PQT Concrete Weight Coating (Thickness 90 mm) = 2 pcs

Reject
Accum
Balance
After Rep.

Repair d.

Accum

After Rep.

(pcs)

(pcs)

(pcs)

(pcs)

(pcs)

48

81

20

80

41

76

44

80

45

45

58

50

50

72

53

53

156

104

56

56

121

104

46

56

56

102

100

148

25

56

56

81

90

25

173

12

56

56

68

94

195

173

22

56

56

78

113

11

206

15

188

18

56

56

74

117

40

210

10

198

12

56

56

68

44

Saturday, January 02, 2016

51

214

198

16

62

62

78

61

Sunday, January 03, 2016

40

223

198

25

62

62

87

49

19

20

21

22

23

0
TOTAL PRODUCTION 1096

Repair d. Accum After Rep.

Repair

223

Total ACC : Prpd +


After Repair

1294

62

(pcs)

1381

Remarks

PQT Asphalt Enamel Coating

0
5

PT. KHI Pipe Industries

M. YUSUF

PT. COOEC INDONESIA

GATOT, S

HCML

SRIMULJANTO