Академический Документы
Профессиональный Документы
Культура Документы
Weekly Ins
1. Maintenance Master Schedule
2. Supervisor / Technician
3. Executive / Engineer
Documentation
Start
Shift : Morning
Weekly Schedule
comment
based on
standard
compariso
Time :
< 0815hrs
Goo
d
Result
Verify
abnormalities
Contracto
Verify
abnormalities
No Good
In-house
Inspect the
machine
Job Instruction
verify the problem
Form No. : MN-ENG-008
predict countermeasure
Report
abnormalities
Job Receive
Back to Normal
Condition
No
Yes
Actual rootcause
Contracto
ER AIR COMPRESSOR
Inspection
mment
sed on
andard
parison
ntractor
Confirmed
5. Document Controller
6. Supplier / Contractor
Maintenance
Performance Data
Update
Call supplier /
contractor
Repair / service
the machine
ntractor
Call supplier /
contractor
Repair / service
the machine
rootcause & countermeasure
Generate service
report
explaination and suggestion
predict rootcause
2. Supervisor / Technician
3. Executive / Engineer
Documentation
Start
Verified checklist
Preventive Maint.
Schedule
Study
Perform task
Good
Good
1.
2.
3.
4.
Job Activities
Check Compresser Temperature
Dryer Filter Cleaning
Air Filter Cleaning
Motor Case Cleaning
Collect Data.and
Report
Result
No Good
1.
2.
3.
4.
No Good
No Good
Adjust the
Schedule
Verify
abnormalities
Report abnormalities
Job Instruction
Job Receive
Back to Normal
Condition
No
Yes
Actual rootcause
Complete KMMS
form
Form No. : MN-ENG-008
Contracto
ER AIR COMPRESSOR
Preventive Maintenance)
4. Asst. Manager / Manager
Confirmed
5. Document Controller
Update
Maintenance
Performance Data
Update
6. Supplier / Contractor
ontractor
Call supplier /
contractor
Confirmed the
KMMS form
Form no. :
MN-ENG-004