NOMBRE DE LA OBRA
FECHA
August 2014
MINISTERIO DE LA PRODUCCIN
RESUMEN DE VALORIZACION
ANTECEDENTES
MONTO VALORIZADO
Valorizacion Bruta
Adelanto Directo
Adelanto de Materiales
175,291.19
35,058.23
60,565.72
Valorizacion Neta
3,509.39
82,642.85
I.G.V.
14,875.71
TOTAL A PAGAR
97,518.56
Reintegros
CONCLUSIONES
OBRA:
CONVOCATORIA:
PROPIETARIO:
MINISTERIO DE LA PRODUCCIN
CONTRATISTA:
CONSORCIO UNION
SUPERVISION:
VALOR REFERENCIAL:
1,115,998.07
945,761.08
PRESUPUESTO CONTRATADO:
1,004,398.26
851,184.97
ITEM
DESCRIPCION
UND.
METRADO
METRADOS
ESTRUCTURAS
ANTERIOR
ACTUAL
ACUMULADO
SALDO
01 OBRAS PROVISIONALES
01.01 CAMPAMENTO, OFICINAS PROVISIONALES
m2
35.00
35.00
35.00
est
1.00
0.50
0.50
0.50
01.03 GUARDIANIA
mes
8.00
3.60
3.60
4.40
98.41
45.00
45.00
53.41
m2
861.58
861.58
861.58
1.00
1.00
1.00
m2
2,153.94
2,065.00
88.94
2,153.94
glb
1.00
0.55
0.12
0.67
m2
54.69
54.69
m2
578.00
439.50
138.50
578.00
m2
90.00
76.75
0.42
77.17
m3
321.03
321.03
321.03
m3
28.32
28.32
28.32
m3
1,258.00
841.71
m3
154.00
m2
168.65
m3
86.48
46.65
m3
154.30
m2
55.77
m3
36.50
0.33
###
02 OBRAS PRELIMINARES
54.69
12.83
###
03 MOVIMIENTO DE TIERRAS
279.59
1,121.30
136.70
0.00
154.00
98.65
98.65
70.00
54.21
32.27
0.00
154.30
0.00
55.77
36.50
36.50
###
04 CONCRETO SIMPLE
7.56
###
05 CONCRETO ARMADO
05.01 CONCRETO EN ZAPATAS f 'c=210 kg/cm2
m3
81.93
81.93
81.93
kg
960.16
960.16
960.16
m3
46.82
46.82
46.82
m2
234.87
234.87
234.87
kg
804.22
804.22
804.22
kg
2,958.27
2,958.27
2,958.27
m3
50.57
44.05
44.05
m3
76.50
61.94
61.94
14.56
m2
863.72
617.82
617.82
245.90
m2
394.31
394.31
394.31
kg
7,245.07
7,245.07
7,245.07
m3
333.77
333.77
333.77
m2
885.34
885.34
885.34
kg
1,147.25
1,147.25
1,147.25
m3
106.15
99.50
6.65
106.15
m2
405.11
341.77
63.34
405.11
kg
5,922.68
5,735.79
186.89
5,922.68
m3
70.25
66.11
4.14
70.25
m2
435.51
388.15
47.36
435.51
kg
2,443.25
2,261.35
181.90
2,443.25
3,788.90
3,366.90
422.00
3,788.90
6.52
m3
84.66
45.62
45.62
39.04
kg
1,828.34
594.83
594.83
1,233.51
m3
2.49
2.49
2.49
m2
18.19
14.15
14.15
4.04
kg
155.35
141.34
###
14.01
155.35
###
p2
425.66
0.00
425.66
p2
327.69
0.00
327.69
45.00
0.00
45.00
m2
701.26
0.00
701.26
m2
701.26
0.00
701.26
m2
701.26
0.00
701.26
126.82
0.00
126.82
m2
475.00
0.00
475.00
194.50
0.00
194.50
1.00
1.00
1.00
54.00
50.00
50.00
4.00
m2
270.09
0.00
270.09
m2
270.09
0.00
270.09
###
07 PAVIMENTO EN ESTACIONAMIENTO
###
08 CONTROL DE CALIDAD
###
09 VARIOS
m2
270.09
0.00
270.09
OBRA:
CONVOCATORIA:
PROPIETARIO:
MINISTERIO DE LA PRODUCCIN
CONTRATISTA:
CONSORCIO UNION
SUPERVISION:
VALOR REFERENCIAL:
1,225,713.16
1,038,739.97
PRESUPUESTO CONTRATADO:
1,103,141.84
934,865.97
ITEM
DESCRIPCION
UND.
METRADO
METRADOS
ARQUITECTURA
ANTERIOR
ACTUAL
ACUMULADO
SALDO
01 ALBAILERIA
01.01 MURO DE CABEZA LADRILLO KK MEZCLA 1:4
m2
194.57
194.57
m2
1,168.24
668.64
m2
129.97
0.00
m2
1,168.24
622.44
m2
194.57
194.57
m2
966.85
243.76
m2
501.84
m2
641.67
m2
194.57
456.80
1,125.44
42.80
129.97
672.44
495.80
50.00
194.57
116.68
360.44
606.41
442.52
50.18
492.70
9.14
232.93
141.58
374.51
267.16
451.20
194.44
20.00
214.44
236.76
15.00
0.00
15.00
m2
60.12
0.00
60.12
60.12
m2
135.90
0.00
120.00
120.00
15.90
m2
123.00
123.00
m2
3.44
0.00
3.44
m2
2.96
0.00
2.96
m2
93.00
0.00
93.00
m2
274.00
0.00
274.00
m2
701.26
0.00
701.26
m2
74.16
0.00
74.16
03.10 CONTRAPISO DE 48 mm
m2
396.72
0.00
396.72
m2
268.86
0.00
268.86
614.65
19.65
19.65
595.00
476.90
0.00
476.90
137.41
0.00
137.41
m2
315.69
0.00
315.69
m2
135.62
0.00
135.62
m2
15.20
0.00
15.20
p2
265.20
0.00
265.20
m2
18.00
0.00
18.00
m2
8.00
0.00
8.00
m2
423.33
0.00
423.33
m2
15.00
0.00
15.00
m2
15.00
0.00
15.00
3.00
0.00
3.00
pza
1.00
0.00
1.00
pza
95.00
0.00
95.00
pza
2.00
0.00
2.00
pza
225.00
0.00
225.00
m2
82.50
0.00
82.50
m2
98.13
0.00
98.13
m2
641.67
0.00
641.67
m2
2,831.50
0.00
2,831.50
m2
445.52
0.00
445.52
m2
390.42
0.00
390.42
###
03 PISOS Y PAVIMENTOS
04 CONTRAZOCALOS
###
05 ZOCALOS
05.01 ZOCALOS CERAMICOS 0.40X0.40
###
06 CARPINTERIA DE MADERA
###
07 CARPINTERIA METALICA
###
08 CERRAJERIA
###
###
10 PINTURA
##
11 CIELORRASOS
11.01 FALSO CIELORASO CON PANELES
##
12 VARIOS
12.01 MAMPARA DE VIDRIO
m2
240.53
0.00
240.53
m2
314.27
138.08
138.08
176.19
m2
60.00
0.00
60.00
m2
431.33
0.00
431.33
m2
52.27
0.00
52.27
8.00
0.00
8.00
25.00
0.00
25.00
m2
75.00
0.00
75.00
m2
647.87
0.00
647.87
glb
1.00
1.00
1.00
pza
1.00
0.00
1.00
9.00
9.00
0.00
pza
3.00
0.00
3.00
m2
10.90
0.00
10.90
OBRA:
CONVOCATORIA:
PROPIETARIO:
MINISTERIO DE LA PRODUCCIN
CONTRATISTA:
CONSORCIO UNION
SUPERVISION:
VALOR REFERENCIAL:
PRESUPUESTO CONTRATADO:
ITEM
DESCRIPCION
109,828.66
93,075.14
98,845.79
83,767.62
UND.
METRADO
METRADOS
SANITARIAS
ANTERIOR
ACTUAL
ACUMULADO
SALDO
01 SISTEMA DE DESAGUE
01.01 TUBERIA PVC PARA DESAGUE D= 4"
235.00
205.00
145.00
350.00
-115.00
140.00
138.00
55.00
193.00
-53.00
pto
14.00
14.00
14.00
pto
18.00
18.00
18.00
pza
26.00
24.00
24.00
2.00
350.00
233.00
373.00
-23.00
glb
1.00
1.00
195.35
175.35
155.00
330.35
-135.00
175.02
155.02
145.00
300.02
-125.00
100.05
80.00
80.00
160.00
-59.95
100.52
70.00
70.00
140.00
-39.48
30.00
10.00
10.00
20.00
10.00
pto
52.00
41.00
41.00
82.00
-30.00
140.00
1.00
pto
3.00
3.00
pza
60.80
2.00
2.00
4.00
56.80
305.23
180.37
150.00
330.37
-25.14
glb
1.00
0.00
1.00
glb
1.00
0.00
1.00
04.01 INODORO PARA FLUXOMETRO TREBOL MODELO: TOP PIECE FLUX-INSTITUCIONAL INCL.
pza
21.00
0.00
21.00
pza
20.00
0.00
20.00
pza
4.00
0.00
4.00
04.04 URINARIOS MURALES PARA FLUXOMETRO MARCA: TREBOL MODELO MURAL - BAMBI INC
pza
7.00
0.00
7.00
pza
4.00
0.00
4.00
8.00
0.00
8.00
19.00
0.00
19.00
pza
8.00
0.00
8.00
pza
52.00
0.00
52.00
pza
27.00
0.00
27.00
28.00
0.00
28.00
glb
1.00
0.00
1.00
12.00
2.00
2.00
10.00
195.00
0.00
195.00
OBRA:
CONVOCATORIA:
PROPIETARIO:
MINISTERIO DE LA PRODUCCIN
CONTRATISTA:
CONSORCIO UNION
SUPERVISION:
VALOR REFERENCIAL:
300,614.50
254,758.05
PRESUPUESTO CONTRATADO:
270,553.05
229,282.25
ITEM
DESCRIPCION
UND.
METRADO
METRADOS
ELECTRICAS
ANTERIOR
ACTUAL
ACUMULADO
SALDO
01 CIRCUITOS DERIVADOS
01.01 SALIDA PARA CENTROS DE LUZ
pto
68.00
63.00
68.00
pto
8.00
8.00
5.00
8.00
pto
46.00
46.00
46.00
pto
3.00
3.00
3.00
pto
16.00
16.00
16.00
pto
32.00
32.00
32.00
pto
2.00
2.00
2.00
02 CAJAS
02.01 CAJA DE PASE GALVANIZADA PESADO 150X150X50 MM
3.00
2.00
3.00
12.00
12.00
1.00
12.00
8.00
8.00
8.00
pza
3.00
0.00
3.00
1,280.00
1,280.00
0.00
680.00
0.00
695.00
0.00
680.00
680.00
-
695.00
05 TUBERIAS
05.01 TUBERIA DIAMETRO 4" PVC SAP
116.00
90.00
26.00
116.00
170.00
105.00
65.00
170.00
150.00
80.00
70.00
150.00
136.00
70.00
66.00
136.00
138.00
105.00
33.00
138.00
119.00
105.00
14.00
119.00
35.00
0.00
35.00
85.00
0.00
85.00
7.00
0.00
7.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
1.00
0.00
1.00
06 ARTEFACTOS
07 VARIOS
OBRA:
CONVOCATORIA:
PROPIETARIO:
MINISTERIO DE LA PRODUCCIN
CONTRATISTA:
CONSORCIO UNION
SUPERVISION:
VALOR REFERENCIAL:
224,840.00
190,542.37
PRESUPUESTO CONTRATADO:
202,356.00
171,488.14
ITEM
DESCRIPCION
UND.
METRADO
METRADOS
AIRE ACONDICIONADO
ANTERIOR
ACTUAL
ACUMULADO
SALDO
GLB
0.55
1.00
0.55
0.45
OBRA:
CONVOCATORIA:
PROPIETARIO:
MINISTERIO DE LA PRODUCCIN
CONTRATISTA:
CONSORCIO UNION
SUPERVISION:
VALOR REFERENCIAL:
41,000.00
34,745.76
PRESUPUESTO CONTRATADO:
36,900.00
31,271.19
ITEM
DESCRIPCION
UND.
METRADO
METRADOS
ELEVADORES
ANTERIOR
ACTUAL
ACUMULADO
SALDO
GLB
1.00
0.00
1.00
ITEM
02
02.01
02.02
02.03
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.02
04.03
04.04
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
05.09
05.10
05.11
05.12
05.13
05.14
05.15
05.16
05.17
05.18
05.19
05.20
05.21
05.22
05.23
05.24
05.24.01
05.24.02
05.24.03
06
06.01
06.02
06.03
07
07.01
07.02
DESCRIPCION
ESTRUCTURAS
OBRAS PRELIMINARES
DESMONTAJE DE CONSTRUCCION DE MADERA
m2
54.69
1.00
DEMOLICION MUROS
m2
578.00
20.00
m2
90.00
20.00
m3
321.03
3.50
m3
28.32
3.00
m3
1,258.00
20.00
m3
154.00
50.00
m2
168.65
10.00
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
m3
86.48
5.00
m3
154.30
20.00
m2
55.77
15.00
m3
36.50
10.00
CONCRETO ARMADO
CONCRETO EN ZAPATAS f 'c=210 kg/cm2
m3
81.93
12.50
kg
960.16
200.00
m3
46.82
12.00
m2
234.87
6.00
kg
804.22
100.00
kg
2,958.27
300.00
m3
50.57
10.00
m3
76.50
5.00
m2
863.72
6.00
m2
394.31
6.00
kg
7,245.07
200.00
m3
333.77
8.00
m2
885.34
6.00
kg
1,147.25
50.00
m3
106.15
6.00
m2
405.11
12.00
kg
5,922.68
180.00
m3
70.25
6.33
m2
435.51
13.50
kg
2,443.25
100.00
3,788.90
160.00
m3
84.66
9.00
kg
1,828.34
100.00
5.00
m3
2.49
ENCOFRADO Y DESENCOFRADO
m2
18.19
4.00
kg
155.35
55.00
p2
425.66
1.00
PARASOL DE MADERA
p2
327.69
1.00
45.00
3.00
m2
701.26
180.00
m2
701.26
180.00
PAVIMENTO EN ESTACIONAMIENTO
07.03
07.04
07.05
07.06
09
09.01
09.02
09.03
01
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
04
04.01
04.02
04.03
05
05.01
06
06.01
06.02
06.03
06.04
06.05
06.06
07
07.01
07.02
07.03
08
08.01
08.02
08.03
ALBAILERIA
m2
701.26
120.00
126.82
35.00
m2
475.00
13.50
194.50
40.00
CONFORMACION DE SUBRASANTE
m2
270.09
100.00
m2
270.09
70.00
m2
270.09
68.00
m2
194.57
5.50
m2
1,168.24
12.00
m2
129.97
10.00
m2
1,168.24
17.00
m2
194.57
15.00
m2
966.85
17.00
m2
501.84
15.00
m2
641.67
15.00
451.20
16.00
m2
15.00
25.00
VARIOS
ARQUITECTURA
PISOS Y PAVIMENTOS
BASE AFIRMADA E=0.15m
m2
60.12
200.00
m2
135.90
50.00
m2
123.00
12.50
m2
3.44
18.00
m2
2.96
20.00
m2
93.00
18.00
m2
274.00
7.90
PISO ADOQUINADO
m2
701.26
18.00
PISO VINILICO
m2
74.16
18.00
CONTRAPISO DE 48 mm
m2
396.72
100.00
m2
268.86
10.00
614.65
17.00
476.90
24.00
137.41
30.00
m2
315.69
16.00
m2
135.62
4.00
m2
15.20
8.00
p2
265.20
4.00
m2
18.00
4.00
m2
8.00
1.00
m2
423.33
2.00
m2
15.00
1.00
m2
15.00
1.00
3.00
1.00
CONTRAZOCALOS
ZOCALOS
ZOCALOS CERAMICOS 0.40X0.40
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
CERRADURA PARA PUERTA PRINCIPAL PESADA
pza
1.00
4.00
pza
95.00
4.00
pza
2.00
1.00
08.04
09
09.01
09.02
10
10.01
10.02
10.03
11
11.01
12
12.01
12.02
12.03
12.04
12.05
12.06
12.07
12.08
12.09
12.10
12.11
12.12
12.13
12.14
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
03
03.01
04
04.01
04.02
04.03
04.04
04.05
04.06
SISTEMA DE DESAGUE
pza
225.00
12.00
m2
82.50
3.00
VIDRIO TEMPLADO
m2
98.13
3.00
m2
641.67
35.00
m2
2,831.50
35.00
m2
445.52
20.00
m2
390.42
6.50
MAMPARA DE VIDRIO
m2
240.53
5.00
m2
314.27
6.00
m2
60.00
10.00
PLANCHAS DE POLICARBONATO
m2
431.33
8.00
m2
52.27
30.00
8.00
20.00
25.00
12.00
COBERTURA VEGETAL
m2
75.00
25.00
PINTURA
CIELORRASOS
FALSO CIELORASO CON PANELES
VARIOS
m2
647.87
29.00
glb
1.00
1.00
pza
1.00
1.00
9.00
50.00
pza
3.00
1.00
m2
10.90
1.00
235.00
20.00
140.00
20.00
pto
14.00
4.00
pto
18.00
6.00
pza
26.00
3.00
350.00
200.00
glb
1.00
1.00
195.35
30.00
175.02
30.00
100.05
25.00
100.52
25.00
30.00
20.00
pto
52.00
3.00
pto
3.00
2.00
pza
60.80
6.00
305.23
200.00
glb
1.00
1.00
glb
1.00
0.50
pza
21.00
1.00
pza
20.00
1.00
pza
4.00
1.00
pza
7.00
1.00
pza
4.00
1.00
8.00
1.00
SANITARIAS
04.07
04.08
04.09
04.10
04.11
05
05.01
06
06.01
07
07.01
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.02
02.03
03
03.01
04
04.01
04.02
04.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
CIRCUITOS DERIVADOS
19.00
1.00
pza
8.00
1.00
pza
52.00
3.00
pza
27.00
7.00
28.00
1.00
glb
1.00
1.00
12.00
7.00
195.00
10.00
pto
68.00
4.00
pto
8.00
4.20
pto
46.00
5.00
pto
3.00
3.00
pto
16.00
3.00
pto
32.00
8.00
pto
2.00
8.00
3.00
6.00
12.00
6.00
8.00
10.00
pza
3.00
2.00
ELECTRICAS
CAJAS
1,280.00
150.00
680.00
16.00
695.00
16.00
116.00
28.00
170.00
28.00
150.00
28.00
136.00
28.00
138.00
28.00
119.00
28.00
35.00
8.00
85.00
80.00
ARTEF. COLGANTES
7.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TUBERIAS
ARTEFACTOS
VARIOS
TIEMPO
54.69
11.00
4.97
28.90
4.00
7.23
4.50
1.00
4.50
91.72
2.00
45.86
9.44
1.00
9.44
62.90
1.00
62.90
3.08
3.00
1.03
16.87
1.00
16.87
17.30
2.00
8.65
7.72
1.00
7.72
3.72
1.00
3.72
3.65
1.00
3.65
6.55
1.00
6.55
4.80
1.00
4.80
3.90
1.00
3.90
39.15
3.00
13.05
8.04
1.00
8.04
9.86
1.00
9.86
5.06
1.00
5.06
15.30
1.00
15.30
143.95
3.00
47.98
65.72
10.00
6.57
36.23
1.00
36.23
41.72
1.00
41.72
147.56
3.00
49.19
22.95
1.00
22.95
17.69
1.00
17.69
33.76
1.00
33.76
32.90
1.00
32.90
11.11
1.00
11.11
32.26
1.00
32.26
24.43
1.00
24.43
23.68
1.00
23.68
9.41
1.00
9.41
18.28
1.00
18.28
0.50
1.00
0.50
4.55
1.00
4.55
2.82
1.00
2.82
425.66
30.00
14.19
327.69
23.00
14.25
15.00
1.00
15.00
3.90
1.00
3.90
3.90
1.00
3.90
12
13
14
5.84
1.00
5.84
3.62
1.00
3.62
35.19
9.00
3.91
4.86
1.00
4.86
2.70
1.00
2.70
3.86
1.00
3.86
3.97
1.00
3.97
35.38
5.00
7.08
97.35
4.00
20.00
13.00
1.00
8.10
68.72
4.00
15.00
12.97
1.00
10.00
56.87
5.00
10.00
33.46
3.00
10.00
42.78
4.00
10.00
28.20
2.00
10.00
0.60
1.00
5.00
0.30
1.00
9.00
2.72
1.00
4.00
9.84
1.00
7.00
0.19
0.00
7.00
0.15
0.00
3.00
5.17
1.00
4.00
34.68
4.00
7.00
38.96
6.00
6.00
4.12
0.00
5.00
3.97
0.00
5.00
26.89
3.00
7.00
36.16
9.00
4.00
19.87
6.00
3.00
4.58
0.00
5.00
19.73
3.00
5.00
0.00
25.00
33.91
1.00
25.00
1.90
0.00
25.00
66.30
2.00
25.00
4.50
0.00
25.00
8.00
0.00
25.00
211.67
8.00
25.00
15.00
0.00
25.00
15.00
0.00
25.00
3.00
0.00
25.00
0.25
0.00
2.00
23.75
11.00
2.00
2.00
0.00
4.00
18.75
9.00
2.00
27.50
9.00
3.00
32.71
16.00
2.00
18.33
3.00
6.00
80.90
8.00
10.00
22.28
5.00
4.00
60.06
4.00
15.00
48.11
12.00
4.00
52.38
17.00
3.00
6.00
2.00
3.00
53.92
17.00
3.00
1.74
0.00
5.00
0.40
0.00
4.00
2.08
1.00
2.00
3.00
1.00
2.00
22.34
4.00
5.00
1.00
0.00
3.00
1.00
0.00
2.00
0.18
0.00
2.00
3.00
0.00
4.00
10.90
2.00
4.00
11.75
0.00
82.00
7.00
0.00
82.00
3.50
0.00
40.00
3.00
0.00
40.00
8.67
0.00
9.00
1.75
0.00
4.00
1.00
0.00
15.00
6.51
0.00
67.00
5.83
0.00
67.00
4.00
0.00
15.00
4.02
0.00
15.00
1.50
0.00
15.00
17.33
0.00
40.00
1.50
0.00
40.00
10.13
2.00
5.00
1.53
0.00
5.00
1.00
0.00
23.00
2.00
0.00
20.00
21.00
10.00
2.00
20.00
10.00
2.00
4.00
2.00
2.00
7.00
3.00
2.00
4.00
4.00
1.00
8.00
8.00
1.00
19.00
19.00
1.00
8.00
8.00
1.00
17.33
4.00
4.00
3.86
0.00
4.00
28.00
7.00
4.00
1.00
0.00
4.00
1.71
0.00
5.00
19.50
1.00
15.00
17.00
0.00
34.00
1.90
0.00
2.00
9.20
3.00
3.00
1.00
0.00
3.00
5.33
1.00
3.00
4.00
1.00
3.00
0.25
0.00
3.00
0.50
0.00
2.00
2.00
0.00
3.00
0.80
0.00
2.00
1.50
0.00
2.00
8.53
2.00
3.00
42.50
7.00
6.00
43.44
7.00
6.00
4.14
0.00
70.00
6.07
0.00
73.00
5.36
0.00
75.00
4.86
0.00
68.00
4.93
0.00
66.00
4.25
0.00
77.00
4.38
0.00
7.00
1.06
0.00
7.00
7.00
0.00
10.00
1.00
0.00
7.00
1.00
#VALUE!
5.00
1.00
0.00
7.00
1.00
0.00
10.00
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129
130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152
153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173
174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192
193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211
212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230
231 232 233 234 235 236 237 238 239 240
DESCRIPCION
CUADRILLA UNITARIA
UNIDAD DE PRODUCCION
METRADO
UPNITARIA
ESTRUCTURAS
caq
OP
OP eq pes
OF
PE
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS P/ZAPATAS Y CI
m3
321.03
m3
28.32
30.0000
m3
1,258.00
200.0000
m3
154.00
100.0000
m2
168.65
1.0000
3.50
0.1000
3.0000
6.0000
1.0000
0.1000
1.0000
4.0000
120.00 0.1000
1.0000
1.0000
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEM
m3
86.48
m3
154.30
25.0000
0.1000
2.0000
1.0000
2.0000
4.0000
20.00 0.2000
2.0000
1.0000
2.0000
4.0000
2.0000
m2
55.77
15.00
m3
36.50
80.0000
0.2000
1.7000
2.0000
1.00
1.0000
4.0000
1.0000
1.00
1.0000
4.0000
CONCRETO ARMADO
CONCRETO EN ZAPATAS f 'c=210 kg/cm2
m3
81.93
kg
960.16
300.00 0.1000
12.50
1.0000
m3
46.82
18.00 0.2000
1.0000
m2
234.87
14.00
kg
804.22
300.00 0.1000
kg
2,958.27
300.00 0.1000
m3
50.57
10.00
1.0000
m2
394.31
14.00
1.0000
1.0000
1.0000
1.0000
6.0000
1.0000
1.2000
0.4000
1.0000
1.0000
1.0000
1.0000
1.00
1.0000
4.0000
1.2000
0.4000
DURACION VELO
EN DIAS
CIDA
D DE PROD REND
PROD UCTIV IMIEN
TR
TP
TO
UCCI IDAD
ON
TIEMP
O
UNITA
RIO
TU
N
CUADR
ILLAS
91.7200
6.0000
15.0000
15.0000
0.9400
1.0000
0.9400
6.2900
1.0000
6.2900
1.5400
1.0000
1.4100
1.0000
3.4600
7.7200
MAQUINARIA
TRACTOR DE
ORUGAS DE
140-160 HP
COMPACTADO
R VIBRATORIO
TIPO
PLANCHA 7
HP
CARGADOR
SOBRE
LLANTAS 8095 HP 1.5-1.75
yd3
MEZCLADORA
DE
CONCRETO
TAMBOR 18
HP 11 p3
0.4375
0.4375
2.2857
1.0000
3.7500
1.2500
0.8000
6.0000
25.0000
3.5714
0.2800
1.5400
2.0000
12.5000
2.5000
0.4000
1.4100
2.0000
15.0000
7.5000
0.1333
1.0000
3.4600
4.0000
3.1250
0.3472
2.8800
1.0000
1.0000
7.7200
8.0000
2.5000
0.2778
3.6000
1.0000
3.7200
1.0000
3.7200
4.00
1.8750
0.5068
1.9733
0.4600
1.0000
0.4600
1.0000
10.0000
1.2500
0.8000
1.00
6.5500
1.0000
6.5500
7.0000
1.5625
0.2232
4.4800
1.0000
3.2000
1.0000
3.2000
3.0000
37.5000
18.7500
0.0533
2.6000
1.0000
2.6000
3.0000
2.2500
0.2500
4.0000
16.7800
1.0000
15.0000
15.0000
1.7500
0.6731
1.4857
2.6800
1.0000
2.6800
3.00
37.5000
18.7500
0.0533
9.8600
1.0000
9.8600
10.00
37.5000
18.7500
0.0533
5.0600
1.0000
5.0600
5.0000
1.2500
0.1786
5.6000
28.1700
2.0000
15.0000
15.0000
1.7500
0.6731
1.4857
1.0000
1.0000
1.0000
1.0000
1.0000
AQUINARIA
VIBRADOR A
GASOLINA 1
3/4", 4 HP
CIZALLA PARA
ACERO
CONSTRUCCI
ON HASTA 1"
CAMION
PIEDRA
VOLQUETE 4 PIEDRA
CHANCADA
X 2 140-210 HP GRANDE DE 8"
DE 1/2"
6 m3
PIEDRA
CHANCADA
DE 3/4"
CEMENTO
ARENA
PORTLAND
GRUESA
TIPO I (42.5 kg)
5.0000
0.5040
3.0450
1.0000
0.6720
0.5355
2.6460
0.50
1.0000
7.3605
0.56
10.2165
0.5460
0.5565
10.2165
0.5460
0.56
10.2165
0.5460
0.5000
1.0000
0.5000
0.5000
1.0000
MATERIALES
HORMIGON
(PUESTO EN
OBRA)
MATERIAL DE
RELLENO
CLASIFICADO
0.1100
AGUA
ALAMBRE
NEGRO
RECOCIDO #
16
MADERA
TORNILLO
CLAVOS
0.0100
0.0300
0.8715
0.1050
0.19
0.3000
0.9030
0.1500
5.4700
0.1500
5.4700
0.1700
5.3200
0.09
0.1953
0.0300
0.1953
0.3000
0.0300
0.0300
0.1953
0.3000
ACERO
CORRUGADO Herr (%)
fy=4200 kg/cm2
GRADO 60
5.0000
5.0000
1.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
1.0100
2.0000
3.0000
2.0000
1.0100
2.0000
1.0100
2.0000
3.0000
2.0000
CONCRETO SIMPLE
Proporcion
a/c
Cemento(bolsas)
1:10+30%PM
0.8000
2.9000
0.4800
Agua (m3)
0.1000
5% Desper.
3.0450
0.8715
0.5040
0.1050
Cemento(bolsas)
1.0000
CONCRETOf'c=140 kg/cm2
Proporcion
a/c
f'c=140 kg/cm2
0.6100
Proporcion
1:12+30%PM
4.0000
0.7500
1:2,5:3,5
7.0100
0.5100
0.6400
5% Desper.
7.3605
0.5355
0.6720
Agua (m3)
a/c
Cemento(bolsas)
0.8000
2.5200
0.8600
0.4800
0.0900
5% Desper.
2.6460
0.9030
0.5040
0.0945
Cemento(bolsas)
1.0000
CONCRETOf'c=210 kg/cm2
Proporcion
a/c
f'c=210 kg/cm2
0.4500
C
H
A
C
H
A
p
3.0000
0.5000
42.5 0.01349206
611.638114 0.22653263
34
0.034
688.138114 0.2740247
cantidadd de materiales
2.52
0.86
0.09
0.48
1:2,0:2
9.7300
0.5200
0.5300
5% Desper.
10.2165
0.5460
0.5565
0.69 V
FACTOR CEMENTO
2.5180212
Agua (m3)
0.1840
0.1932
Agua (m3)
0.1860
0.1953
bplsas
CONTRATISTA:
CONSORCIO UNION
SUPERVISOR:
2,557,622.37
2,301,860.14
DESCRIPCIN
MONTO
CONTRATADO
SIN IGV (S/.)
VALORIZACIN (V)
VALORIZACION
ANTERIOR
(S/.)
ACTUAL
(S/.)
% DE AVANCE
ACUMULADO
ACUMULADO
(S/.)
2,301,860.14
866,660.57
175,291.19
1,041,951.76
45.27%
Presupuesto Estructuras
851,184.97
629,927.78
60,171.16
690,098.94
81.08%
Presupuesto Arquitectura
934,865.97
91,097.28
39,597.62
130,694.90
13.98%
Presupuesto Sanitario
83,767.62
30,681.72
5,923.14
36,604.86
43.70%
Presupuesto Electricas
229,282.25
20,635.30
69,599.27
90,234.57
39.36%
171,488.14
94,318.49
0.00
94,318.49
55.00%
Presupuesto Elevadores
31,271.19
0.00
0.00
0.00
0.00%
TOTAL CONTRACTUAL
2,301,860.14
866,660.57
175,291.19
1,041,951.76
100.00%
37.65%
7.62%
45.27%
REAJUSTES (R)
29,910.05
3,509.39
33,419.44
Presupuesto Estructuras
28,689.78
-147.24
28,542.54
Presupuesto Arquitectura
127.35
2,390.11
2,517.46
Presupuesto Sanitario
793.47
542.32
1,335.79
Presupuesto Electricas
299.45
724.20
1,023.65
0.00
0.00
0.00
Presupuesto Elevadores
0.00
0.00
0.00
Avances en porcentaje
SALDO POR
VALORIZAR (S/.)
1,259,908.38
1,259,908.38
45.27%
54.73%
45.14%
252,541.70
48.47%
377,714.19
DEDUCCIONES (D)
699.74
692.78
1,392.52
Presupuesto Estructuras
564.86
254.08
818.94
Presupuesto Arquitectura
107.18
143.99
251.17
Presupuesto Sanitario
34.63
32.17
66.80
Presupuesto Electricas
29.59
226.01
255.61
-36.52
36.52
0.00
0.00
0.00
0.00
-348.18
-159.00
-507.18
Presupuesto Estructuras
-465.87
-42.12
-507.99
Presupuesto Arquitectura
284.80
121.57
406.37
Presupuesto Sanitario
-49.11
10.72
-38.39
Presupuesto Electricas
-118.00
-249.17
-367.17
0.00
0.00
0.00
Presupuesto Elevadores
0.00
0.00
0.00
896,219.06
178,266.80
1,074,485.86
460,372.03
172,772.10
35,058.23
207,830.33
Presupuesto Estructuras
170,236.99
125,985.57
12,034.23
138,019.80
Presupuesto Arquitectura
25,578.94
186,973.19
17,659.42
7,919.52
Presupuesto Sanitario
16,753.53
6,136.35
1,184.63
7,320.98
Presupuesto Electricas
45,856.45
4,127.06
13,919.85
18,046.91
34,297.63
18,863.70
0.00
18,863.70
6,254.24
0.00
0.00
0.00
732,944.25
294,664.34
60,565.72
355,230.06
Presupuesto Estructuras
334,765.38
247,085.87
23,601.83
270,687.70
Presupuesto Arquitectura
Presupuesto Elevadores
293,494.28
29,560.87
12,431.39
41,992.26
Presupuesto Sanitario
31,114.37
11,396.32
2,200.07
13,596.39
Presupuesto Electricas
73,570.22
6,621.28
22,332.43
28,953.71
0.00
0.00
0.00
0.00
Presupuesto Elevadores
0.00
0.00
0.00
0.00
467,436.44
95,623.95
563,060.39
428,782.62
82,642.85
511,425.47
0.00
0.00
0.00
GASTOS DE LICITACION
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
428,782.62
82,642.85
511,425.47
77,180.87
14,875.71
92,056.59
505,963.49
97,518.56
603,482.06
RETENCIONES ( C )
S/. 97,518.56
SUPERVISOR:
PLAZO DE EJECUCION
CONTRATISTA:
CONSORCIO UNION
ENTREGA DE TERRENO
12-03-14
PRESUPUESTO BASE:
S/. 1,115,998.07
13-03-14
PRESUPUESTO CONTRATADO:
S/. 1,004,398.26
FECHA DE TERMINO
07-11-14
VALORIZACION
ITEM
DESCRIPCION - ESTRUCTURAS
ACUMULADO ANTERIOR
METRADO
PARCIAL
AVANCE ACTUAL
% DE
AVANCE
METRADO
PARCIAL
ACUMULADO ACTUAL
% DE
AVANCE
METRADO
PARCIAL
% DE AVANCE
METRADO
VALORIZADO
01 OBRAS PROVISIONALES
01.01 CAMPAMENTO, OFICINAS PROVISIONALES
01.02 MOVILIZACION Y DESMOV. DE EQUIPOS Y HERRAMIENTAS
01.03 GUARDIANIA
01.04 CERCO PROVISIONAL
01.05 LIMPIEZA DE TERRENO MANUAL
01.06 CARTEL DE OBRA DE 3.50 X 5.00 EN BORNER, inc. estruct. e inst.
01.07 TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
01.08 LIMPIEZA PERMANENTE Y FINAL DE OBRA
35.00
2,182.25
1.00
0.00
0.00
0.00
35.00
2,182.25
1.00
0.00
0.00
0.50
1,832.16
0.50
0.00
0.00
0.00
0.50
1,832.16
0.50
0.50
1,832.16
3.60
4,536.00
0.45
0.00
0.00
0.00
3.60
4,536.00
0.45
4.40
5,544.00
45.00
2,072.25
0.46
53.41
2,459.53
0.54
98.41
4,531.78
1.00
0.00
0.00
861.58
2,550.28
1.00
0.00
0.00
0.00
861.58
2,550.28
1.00
0.00
0.00
1.00
1,088.84
1.00
0.00
0.00
0.00
1.00
1,088.84
1.00
0.00
0.00
2,065.00
2,684.50
0.96
88.94
115.62
0.04
2,153.94
2,800.12
1.00
0.00
0.00
0.55
808.92
0.55
0.12
176.49
0.12
0.67
985.41
0.67
0.33
485.35
0.00
02 OBRAS PRELIMINARES
02.01 DESMONTAJE DE CONSTRUCCION DE MADERA
02.02 DEMOLICION MUROS
02.03 DEMOLICION DE PISO DE CEMENTO PULIDO
54.69
784.80
1.00
0.00
0.00
0.00
54.69
784.80
1.00
0.00
439.50
8,368.08
0.76
138.50
2,637.04
0.24
578.00
11,005.12
1.00
0.00
0.00
76.75
1,125.16
0.85
0.42
6.16
0.00
77.17
1,131.32
0.86
12.83
188.09
321.03
8,388.51
1.00
0.00
0.00
0.00
321.03
8,388.51
1.00
0.00
0.00
28.32
376.94
1.00
0.00
0.00
0.00
28.32
376.94
1.00
0.00
0.00
841.71
27,835.35
0.67
279.59
9,246.04
0.22
1,121.30
37,081.39
0.89
136.70
4,520.67
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTO CORRIDOS
03.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
03.03 ELIMINACION DE DESMONTE CON EQUIPO
03.04 AFIRMADO DE 4" PARA LOSA DE CONCRETO
03.05 NIVELACION Y COMPACTACION DEL TERRENO CON EQUIPO LIVIANO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
154.00
1,219.68
98.65
189.41
0.58
0.00
0.00
0.00
98.65
189.41
0.58
70.00
134.40
46.65
5,859.71
0.54
25.30
3,177.93
0.29
71.95
9,037.64
0.83
14.53
1,825.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
154.30
35,737.42
04 CONCRETO SIMPLE
04.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
04.02 CONCRETO f'c=140 kg/cm2 PARA LOSA
04.03 ENCOFRADO Y DESENCOFRADO EN LOSA CONCRETO SIMPLE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.77
3,024.41
36.50
724.53
1.00
0.00
0.00
0.00
36.50
724.53
1.00
0.00
0.00
05 CONCRETO ARMADO
81.93
19,923.74
1.00
0.00
0.00
0.00
81.93
19,923.74
1.00
0.00
0.00
960.16
4,224.70
1.00
0.00
0.00
0.00
960.16
4,224.70
1.00
0.00
0.00
46.82
11,625.41
1.00
0.00
0.00
0.00
46.82
11,625.41
1.00
0.00
0.00
234.87
16,861.32
1.00
0.00
0.00
0.00
234.87
16,861.32
1.00
0.00
0.00
804.22
3,538.57
1.00
0.00
0.00
0.00
804.22
3,538.57
1.00
0.00
0.00
2,958.27
13,016.39
1.00
0.00
0.00
0.00
2,958.27
13,016.39
1.00
0.00
0.00
44.05
11,343.76
0.87
4.50
1,158.84
0.09
48.55
12,502.60
0.96
2.02
520.19
61.94
15,950.79
0.81
11.60
2,987.23
0.15
73.54
18,938.02
0.96
2.96
762.26
617.82
45,829.89
0.72
170.00
12,610.60
0.20
787.82
58,440.49
0.91
75.90
5,630.26
394.31
29,249.92
1.00
0.00
0.00
0.00
394.31
29,249.92
1.00
0.00
0.00
7,245.07
31,878.31
1.00
0.00
0.00
0.00
7,245.07
31,878.31
1.00
0.00
0.00
333.77
91,930.27
1.00
0.00
0.00
0.00
333.77
91,930.27
1.00
0.00
0.00
885.34
45,462.21
1.00
0.00
0.00
0.00
885.34
45,462.21
1.00
0.00
0.00
1,147.25
5,047.90
1.00
0.00
0.00
0.00
1,147.25
5,047.90
1.00
0.00
0.00
99.50
24,433.22
0.94
5.20
1,276.91
0.05
104.70
25,710.13
0.99
1.45
356.06
341.77
23,001.12
0.84
60.20
4,051.46
0.15
401.97
27,052.58
0.99
3.14
211.32
5,735.79
25,237.48
0.97
89.00
391.60
0.02
5,824.79
25,629.08
0.98
97.89
430.72
66.11
17,605.09
0.94
3.10
825.53
0.04
69.21
18,430.62
0.99
1.04
276.95
388.15
16,791.37
0.89
35.20
1,522.75
0.08
423.35
18,314.12
0.97
12.16
526.04
2,261.35
9,949.94
0.93
79.20
348.48
0.03
2,340.55
10,298.42
0.96
102.70
451.88
3,366.90
5,151.36
0.89
262.00
400.86
0.07
3,628.90
5,552.22
0.96
160.00
244.80
45.62
14,124.41
0.54
18.00
5,572.98
0.21
63.62
19,697.39
0.75
21.04
6,514.19
594.83
2,617.25
0.33
950.00
4,180.00
0.52
1,544.83
6,797.25
0.84
283.51
1,247.44
2.49
854.84
1.00
0.00
0.00
0.00
2.49
854.84
1.00
0.00
0.00
14.15
952.30
0.78
4.04
271.89
0.22
18.19
1,224.19
1.00
0.00
0.00
141.34
681.26
0.91
14.01
67.53
0.09
155.35
748.79
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
425.66
8,964.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
327.69
8,434.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.00
2,832.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
701.26
3,387.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
701.26
3,387.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
701.26
5,553.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
126.82
1,501.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
475.00
20,548.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
194.50
2,112.27
07 PAVIMENTO EN ESTACIONAMIENTO
08 CONTROL DE CALIDAD
1.00
268.80
1.00
0.00
0.00
0.00
1.00
268.80
1.00
0.00
0.00
50.00
976.50
0.93
0.00
0.00
0.00
50.00
976.50
0.93
4.00
78.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
270.09
1,304.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
270.09
2,139.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
270.09
11,260.05
559,935.81
53,485.47
613,421.28
143,187.57
15.00%
83,990.37
8,022.82
92,013.19
21,478.14
10.00%
55,993.58
5,348.55
61,342.13
14,318.76
699,919.76
66,856.84
766,776.60
178,984.47
161,086.02
629,927.78
60,171.16
690,098.94
I.G.V.
113,387.00
10,830.81
124,217.81
28,995.47
TOTAL
743,314.78
71,001.97
814,316.75
190,081.49
FACTOR DE RELACION =
90.00%
74.01%
7.07%
81.08%
18.92%
60.76%
20.83%
81.60%
18.40%
SUPERVISOR:
PLAZO DE EJECUCION
CONTRATISTA:
CONSORCIO UNION
ENTREGA DE TERRENO
12-03-14
PRESUPUESTO BASE:
S/. 1,225,713.16
13-03-14
PRESUPUESTO CONTRATADO:
S/. 1,103,141.84
FECHA DE TERMINO
07-11-14
VALORIZACION
DESCRIPCION - ARQUITECTURA
ITEM
ACUMULADO ANTERIOR
METRADO
PARCIAL
AVANCE ACTUAL
% DE
AVANCE
METRADO
PARCIAL
ACUMULADO ACTUAL
% DE
AVANCE
METRADO
PARCIAL
% DE AVANCE
METRADO
VALORIZADO
01 ALBAILERIA
01.01 MURO DE CABEZA LADRILLO KK MEZCLA 1:4
194.57
15,641.48
1.00
0.00
0.00
0.00
194.57
15,641.48
1.00
0.00
0.00
668.64
23,168.38
0.57
456.80
15,828.12
0.39
1,125.44
38,996.50
0.96
42.80
1,483.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
129.97
16,022.70
622.44
10,718.42
0.53
250.00
4,305.00
0.21
872.44
15,023.42
0.75
295.80
5,093.68
194.57
3,152.03
1.00
0.00
0.00
0.00
194.57
3,152.03
1.00
0.00
0.00
243.76
4,197.55
0.25
350.00
6,027.00
0.36
593.76
10,224.55
0.61
373.09
6,424.61
442.52
8,195.47
0.88
50.18
929.33
0.10
492.70
9,124.80
0.98
9.14
169.27
232.93
4,313.86
0.36
241.58
4,474.06
0.38
474.51
8,787.92
0.74
167.16
3,095.80
194.44
2,595.77
0.43
20.00
267.00
0.04
214.44
2,862.77
0.48
236.76
3,160.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00
180.75
0.00
0.00
0.00
60.12
687.77
1.00
60.12
687.77
1.00
0.00
0.00
0.00
0.00
0.00
120.00
2,679.60
0.88
120.00
2,679.60
0.88
15.90
355.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
123.00
3,012.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.44
151.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.96
101.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
93.00
4,087.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
274.00
13,157.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
701.26
26,823.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.16
3,381.70
03.10 CONTRAPISO DE 48 mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
396.72
8,382.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
268.86
16,360.13
04 CONTRAZOCALOS
19.65
199.05
0.03
0.00
0.00
0.00
19.65
199.05
0.03
595.00
6,027.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
476.90
3,257.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
137.41
2,625.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
315.69
13,890.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
135.62
25,687.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.20
1,716.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
265.20
27,830.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.00
1,888.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
3,686.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
423.33
257,257.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00
5,806.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00
8,398.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
9,877.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
106.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.00
8,711.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
569.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
225.00
3,773.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.50
14,840.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
98.13
28,094.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
641.67
12,525.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,831.50
55,270.88
05 ZOCALOS
05.01 ZOCALOS CERAMICOS 0.40X0.40
06 CARPINTERIA DE MADERA
07 CARPINTERIA METALICA
08 CERRAJERIA
10 PINTURA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
445.52
8,625.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
390.42
22,214.90
11 CIELORRASOS
11.01 FALSO CIELORASO CON PANELES
12 VARIOS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
240.53
17,469.69
138.08
5,757.94
0.44
0.00
0.00
0.00
138.08
5,757.94
0.44
176.19
7,347.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
2,025.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
431.33
19,314.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.27
722.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
291.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
2,693.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.00
2,892.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
647.87
20,142.28
1.00
3,035.41
1.00
0.00
0.00
0.00
1.00
3,035.41
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2,212.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
364.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
2,076.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.90
3,140.73
80,975.36
35,197.88
116,173.24
714,818.71
15.00%
12,146.30
5,279.68
17,425.99
107,222.81
10.00%
8,097.54
3,519.79
11,617.32
71,481.87
101,219.20
43,997.35
145,216.55
893,523.39
91,097.28
39,597.62
130,694.90
804,171.05
16,397.51
7,127.57
23,525.08
144,750.78
107,494.79
46,725.19
154,219.98
90.00%
948,921.83
9.74%
4.24%
13.98%
86.02%
0.00%
0.27%
0.27%
99.73%
SUPERVISOR:
PLAZO DE EJECUCION
CONTRATISTA:
CONSORCIO UNION
ENTREGA DE TERRENO
12-03-14
PRESUPUESTO BASE:
S/. 109,828.66
13-03-14
PRESUPUESTO CONTRATADO:
S/. 98,845.79
FECHA DE TERMINO
07-11-14
VALORIZACION
ACUMULADO ANTERIOR
DESCRIPCION - SANITARIAS
ITEM
METRADO
PARCIAL
AVANCE ACTUAL
% DE
AVANCE
METRADO
PARCIAL
ACUMULADO ACTUAL
% DE
AVANCE
METRADO
PARCIAL
% DE AVANCE
METRADO
VALORIZADO
01 SISTEMA DE DESAGUE
01.01 TUBERIA PVC PARA DESAGUE D= 4"
205.00
4,128.70
0.87
30.00
604.20
0.13
235.00
4,732.90
1.00
0.00
0.00
138.00
2,650.98
0.99
2.00
38.42
0.01
140.00
2,689.40
1.00
0.00
0.00
14.00
1,258.32
1.00
0.00
0.00
0.00
14.00
1,258.32
1.00
0.00
0.00
18.00
2,103.48
1.00
0.00
0.00
0.00
18.00
2,103.48
1.00
0.00
0.00
24.00
3,605.52
0.92
0.00
0.00
0.00
24.00
3,605.52
0.92
2.00
300.46
233.00
330.86
0.67
117.00
166.14
0.33
350.00
497.00
1.00
0.00
0.00
1.00
525.00
1.00
0.00
0.00
0.00
1.00
525.00
1.00
0.00
0.00
175.35
3,649.03
0.90
20.00
416.20
0.10
195.35
4,065.23
1.00
0.00
0.00
155.02
3,128.30
0.89
20.00
403.60
0.11
175.02
3,531.90
1.00
0.00
0.00
80.00
910.40
0.80
20.05
228.17
0.20
100.05
1,138.57
1.00
0.00
0.00
70.00
1,234.80
0.70
30.52
538.37
0.30
100.52
1,773.17
1.00
0.00
0.00
10.00
256.20
0.33
10.00
256.20
0.33
20.00
512.40
0.67
10.00
256.20
41.00
2,569.06
0.79
11.00
689.26
0.21
52.00
3,258.32
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
388.11
2.00
107.06
0.03
2.00
107.06
0.03
4.00
214.12
0.07
56.80
3,040.50
180.37
450.93
0.59
124.86
312.15
0.41
305.23
763.08
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
630.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,278.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
5,670.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
5,999.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
316.00
04.04 URINARIOS MURALES PARA FLUXOMETRO MARCA: TREBOL MODELO MURAL - BAM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
2,730.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
439.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
208.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
475.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
359.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.00
3,100.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
481.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.00
3,360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
833.47
2.00
364.00
0.17
0.00
0.00
0.00
2.00
364.00
0.17
10.00
1,820.00
0.00
0.00
25.00
1,505.25
0.13
25.00
1,505.25
0.13
170.00
10,235.70
05 ADITAMENTOS VARIOS
05.01 ADITAMENTOS VARIOS
06 CAMARAS DE INSPECCCION
06.01 CAJA DE REG. ALB. 12"X24" TAPA CONCRETO
07 DRENAJE PLUVIAL
07.01 SUMINISTRO E INSTALACION DE DRENAJE PLUVIAL INCL. ACCESORIOS
TOTAL COSTO DIRECTO
0.00
27,272.64
5,265.02
32,537.66
41,922.43
6,288.36
GASTOS GENERALES
15.00%
4,090.90
789.75
4,880.65
UTILIDAD
10.00%
2,727.26
526.50
3,253.77
4,192.24
34,090.80
6,581.27
40,672.08
52,403.03
30,681.72
5,923.14
36,604.87
47,162.73
5,522.71
1,066.17
6,588.88
8,489.28
36,204.43
6,989.31
43,193.75
55,652.01
SUBTOTAL
FACTOR DE RELACION =
I.G.V.
TOTAL
AVANCE REAL DE OBRA (%)
AVANCE PROGRAMADO DE OBRA (%)
90.00%
36.63%
7.07%
43.70%
56.30%
5.88%
7.91%
13.79%
86.21%
SUPERVISOR:
PLAZO DE EJECUCION
CONTRATISTA:
CONSORCIO UNION
ENTREGA DE TERRENO
12-03-14
PRESUPUESTO BASE:
S/. 300,614.50
13-03-14
PRESUPUESTO CONTRATADO:
S/. 270,553.05
FECHA DE TERMINO
07-11-14
VALORIZACION
ACUMULADO ANTERIOR
DESCRIPCION - ELECTRICAS
ITEM
METRADO
PARCIAL
AVANCE ACTUAL
% DE
AVANCE
METRADO
PARCIAL
ACUMULADO ACTUAL
% DE
AVANCE
METRADO
PARCIAL
% DE AVANCE
METRADO
VALORIZADO
01 CIRCUITOS DERIVADOS
63.00
4,581.36
0.93
5.00
363.60
0.07
68.00
4,944.96
1.00
0.00
0.00
8.00
562.88
1.00
0.00
0.00
0.00
8.00
562.88
1.00
0.00
0.00
46.00
2,683.18
1.00
0.00
0.00
0.00
46.00
2,683.18
1.00
0.00
0.00
3.00
293.13
1.00
0.00
0.00
0.00
3.00
293.13
1.00
0.00
0.00
16.00
1,458.88
1.00
0.00
0.00
0.00
16.00
1,458.88
1.00
0.00
0.00
32.00
2,102.08
1.00
0.00
0.00
0.00
32.00
2,102.08
1.00
0.00
0.00
2.00
68.38
1.00
0.00
0.00
0.00
2.00
68.38
1.00
0.00
0.00
2.00
96.18
0.67
1.00
48.09
0.33
3.00
144.27
1.00
0.00
0.00
12.00
544.08
1.00
0.00
0.00
0.00
12.00
544.08
1.00
0.00
0.00
8.00
240.64
1.00
0.00
0.00
0.00
8.00
240.64
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1,757.52
0.00
0.00
0.00
624.00
22,332.96
0.49
624.00
22,332.96
0.49
656.00
23,478.24
0.00
0.00
0.00
340.00
16,711.00
0.50
340.00
16,711.00
0.50
340.00
16,711.00
0.00
0.00
0.00
380.00
19,554.80
0.55
380.00
19,554.80
0.55
315.00
16,209.90
02 CAJAS
02.01 CAJA DE PASE GALVANIZADA PESADO 150X150X50 MM
05 TUBERIAS
05.01 TUBERIA DIAMETRO 4" PVC SAP
90.00
944.10
0.78
26.00
272.74
0.22
116.00
1,216.84
1.00
0.00
0.00
105.00
1,101.45
0.62
65.00
681.85
0.38
170.00
1,783.30
1.00
0.00
0.00
80.00
839.20
0.53
70.00
734.30
0.47
150.00
1,573.50
1.00
0.00
0.00
70.00
734.30
0.51
66.00
692.34
0.49
136.00
1,426.64
1.00
0.00
0.00
105.00
1,079.40
0.76
33.00
339.24
0.24
138.00
1,418.64
1.00
0.00
0.00
105.00
1,013.25
0.88
14.00
135.10
0.12
119.00
1,148.35
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
35.00
3,514.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
85.00
1,283.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
2,261.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
20,073.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
23,801.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
10,550.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3,956.27
06 ARTEFACTOS
07 VARIOS
15.00%
UTILIDAD
10.00%
18,342.49
61,866.02
80,208.51
2,751.37
9,279.90
12,031.28
123,597.92
18,539.69
1,834.25
6,186.60
8,020.85
12,359.79
SUBTOTAL
22,928.11
77,332.52
100,260.64
154,497.40
FACTOR DE RELACION =
20,635.30
69,599.27
90,234.58
139,047.66
3,714.35
12,527.87
16,242.22
25,028.57
24,349.65
82,127.14
106,476.80
164,076.23
I.G.V.
TOTAL
90.00%
9.00%
30.36%
39.36%
60.64%
2.14%
2.90%
5.04%
94.96%
SUPERVISOR:
PLAZO DE EJECUCION
CONTRATISTA:
CONSORCIO UNION
ENTREGA DE TERRENO
12-03-14
PRESUPUESTO BASE:
S/. 224,840.00
13-03-14
PRESUPUESTO CONTRATADO:
S/. 202,356.00
FECHA DE TERMINO
07-11-14
VALORIZACION
DESCRIPCION - AIRE ACONDICIONADO
ITEM
ACUMULADO ANTERIOR
METRADO
PARCIAL
AVANCE ACTUAL
% DE
AVANCE
METRADO
PARCIAL
ACUMULADO ACTUAL
% DE
AVANCE
METRADO
PARCIAL
% DE AVANCE
METRADO
VALORIZADO
83,838.65
0.00
0.00
0.00
0.55
83,838.65
0.55
0.45
68,595.26
83,838.65
0.00
83,838.65
68,595.25
GASTOS GENERALES
15.00%
12,575.80
0.00
12,575.80
10,289.29
UTILIDAD
10.00%
8,383.87
0.00
8,383.87
6,859.53
104,798.32
0.00
104,798.32
85,744.07
94,318.49
0.00
94,318.49
77,169.66
16,977.33
0.00
16,977.33
13,890.53
111,295.82
0.00
111,295.82
SUBTOTAL
FACTOR DE RELACION =
90.00%
I.G.V.
TOTAL
AVANCE REAL DE OBRA (%)
AVANCE PROGRAMADO DE OBRA (%)
OBRA
0.55
91,060.19
55.00%
0.00%
55.00%
45.00%
0.00%
0.00%
0.00%
100.00%
SUPERVISOR:
PLAZO DE EJECUCION
CONTRATISTA:
CONSORCIO UNION
ENTREGA DE TERRENO
12-03-14
PRESUPUESTO BASE:
S/. 41,000.00
13-03-14
PRESUPUESTO CONTRATADO:
S/. 36,900.00
FECHA DE TERMINO
07-11-14
VALORIZACION
ACUMULADO ANTERIOR
DESCRIPCION - ELEVADORES
ITEM
METRADO
PARCIAL
AVANCE ACTUAL
% DE
AVANCE
METRADO
PARCIAL
ACUMULADO ACTUAL
% DE
AVANCE
METRADO
PARCIAL
% DE AVANCE
METRADO
VALORIZADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
27,796.61
0.00
0.00
0.00
27,796.60
GASTOS GENERALES
15.00%
0.00
0.00
0.00
4,169.49
UTILIDAD
10.00%
0.00
0.00
0.00
2,779.66
0.00
0.00
0.00
34,745.75
31,271.18
SUBTOTAL
0.00
0.00
0.00
I.G.V.
0.00
0.00
0.00
5,628.80
TOTAL
0.00
0.00
0.00
36,899.98
FACTOR DE RELACION =
90.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
100.00%
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
PRESUPUESTO REFERENCIAL
1,115,998.07
CON IGV
PRESUPUESTO CONTRATADO
1,004,398.26
CON IGV
INDICE BASE
INDICE
COEFICIENTE
INDICE
COEFICIENTE
FACTOR
INCIDENCIA
%
May-12
Jan-14
REAJUSTE
Jul-14
REAJUSTE
MANO DE OBRA
0.284
100.000%
448.25
498.10
0.316
523.70
0.332
0.121
46.281%
498.41
467.67
0.053
459.19
0.052
53.719%
216.58
218.23
0.065
217.20
0.065
0.21
100.000%
339.42
339.42
0.210
339.42
0.210
0.079
5.063%
445.65
455.19
0.004
468.30
0.004
HERRAMIENTA MANUAL
10.127%
290.26
298.19
0.008
293.19
0.008
48
84.810%
329.22
339.09
0.069
337.96
0.069
43
0.098
100.000%
559.60
572.02
0.100
582.28
0.102
39
0.208
100.000%
377.30
393.46
0.217
402.72
0.222
ESTRUCTURA
ELEMENTOS
SIMBOLO
IU
47
AA
03
05
AGREGADO GRUESO
21
MHF
32
FLETE TERRESTRE
37
Base:
K=
1.042
K=
1.064
OBRA
CONTRATISTA
SUPERVISOR
CONSORCIO UNION
PRESUPUESTO REFERENCIAL
1,225,713.16
CON IGV
PRESUPUESTO CONTRATADO
1,103,141.84
CON IGV
ARQUITECTURA
ELEMENTOS
SIMBOLO
IU
47
MANO DE OBRA
MP
54
PINTURA LATEX
44
CVL
79(80)
INDICE BASE
INDICE
COEFICIENTE
INDICE
COEFICIENTE
INCIDENCIA
%
May-12
Jan-14
REAJUSTE
Jul-14
REAJUSTE
0.199
100.000%
448.25
498.10
0.221
523.70
0.232
0.556
10.791%
363.01
369.48
0.061
373.45
0.062
43.345%
343.48
346.14
0.243
349.00
0.245
38.356%
105.41
106.06
0.028
105.89
0.028
FACTOR
0.073
40
LOSETA
13.699%
321.88
344.39
0.011
390.18
0.012
21
47.945%
339.42
339.42
0.035
339.42
0.035
26
CERRAJERIA NACIONAL
38.182%
360.06
359.50
0.042
359.81
0.042
17
BLOQUE Y LADRILLO
61.818%
665.47
682.87
0.070
672.49
0.069
30
0.062
100.000%
357.90
381.51
0.066
386.98
0.067
39
0.255
100.000%
377.30
396.46
0.268
402.72
0.272
BC
0.11
Base:
K=
1.045
K=
1.064
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
PRESUPUESTO REFERENCIAL
109,828.66
CON IGV
PRESUPUESTO CONTRATADO
98,845.79
CON IGV
INDICE BASE
INDICE
COEFICIENTE
INDICE
COEFICIENTE
INCIDENCIA
%
May-12
Jan-14
REAJUSTE
Jul-14
REAJUSTE
0.31
100.000%
448.25
498.10
0.344
523.70
0.362
0.085
47.059%
504.34
557.70
0.044
553.13
0.044
20.000%
275.39
280.55
0.017
281.89
0.017
31
DUCTO DE CONCRETO
32.941%
361.24
375.02
0.029
376.97
0.029
21
0.098
100.000%
339.42
339.42
0.098
339.42
0.098
72
TUBERIA DE PVC
0.126
100.000%
346.99
370.19
0.134
370.75
0.135
10
0.152
100.000%
345.54
371.67
0.163
382.51
0.168
39
0.229
100.000%
377.30
393.46
0.239
402.72
0.244
SANITARIAS
ELEMENTOS
SIMBOLO
IU
47
MANO DE OBRA
TDV
71
77
FACTOR
Base:
K=
1.068
K=
1.097
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
PRESUPUESTO REFERENCIAL
300,614.50
CON IGV
PRESUPUESTO CONTRATADO
270,553.05
CON IGV
ELECTRICAS
ELEMENTOS
SIMBOLO
IU
47
MANO DE OBRA
TA
72
TUBERIA PVC
12
30
07
39
INDICE BASE
INDICE
COEFICIENTE
INDICE
COEFICIENTE
INCIDENCIA
%
May-12
Jan-14
REAJUSTE
Jul-14
REAJUSTE
0.077
100.000%
448.25
498.10
0.086
523.70
0.090
0.108
55.556%
346.99
370.19
0.064
370.75
0.064
44.444%
295.17
300.37
0.049
298.61
0.049
0.08
100.000%
357.90
381.51
0.085
386.98
0.087
0.135
100.000%
598.55
606.27
0.137
594.59
0.134
0.6
100.000%
377.30
393.46
0.626
402.72
0.640
FACTOR
Base:
K=
1.047
K=
1.064
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
PRESUPUESTO REFERENCIAL
224,840.00
CON IGV
PRESUPUESTO CONTRATADO
202,356.00
CON IGV
SIMBOLO
IU
48
AIRE ACONDICIONADO
ELEMENTOS
FACTOR
INDICE BASE
INDICE
COEFICIENTE
INDICE
COEFICIENTE
INCIDENCIA
%
May-12
Jan-14
REAJUSTE
Jul-14
REAJUSTE
100.000%
328.27
339.09
1.033
337.96
1.030
Base:
K=
1.033
K=
1.030
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
PRESUPUESTO REFERENCIAL
41,000.00
CON IGV
PRESUPUESTO CONTRATADO
36,900.00
CON IGV
SIMBOLO
IU
48
ELEVADORES
ELEMENTOS
FACTOR
INDICE BASE
INDICE
COEFICIENTE
INDICE
COEFICIENTE
INCIDENCIA
%
May-12
Jan-14
REAJUSTE
Jul-14
REAJUSTE
100.000%
328.27
339.09
1.033
337.96
1.030
Base:
K=
1.033
K=
1.030
OBRA
DE
OBRA
DE
INFRAESTRUCTURA
ACONDICIONAMIENTO
DE
AREAS
DEL
CONTRATISTA
CONSORCIO UNION
PRESUPUESTO BASE
S/. 1,115,998.07
PRESUPUESTO CONTRATADO
S/. 1,004,398.26
S/.
170,236.99
C=
S/.
851,184.97
K=
COEFICIENTE DE REAJUSTE
D = DEDUCCION
VRC = V x K - A x V / C (K / Ka - 1)
REINTEGROS POR AVANCE PROGRAMADO
(1)
(2)
(3)
(4)
(5)
(6)
VALORIZACION
K
A x V/C
K/Ka - 1
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
FECHA
1.00
31/03/14
32,606.67
1.044
34,041.36
6,521.33
0.0019
12.52
34,028.84
1,422.17
2.00
30/04/14
38,628.36
1.046
40,405.26
7,725.67
0.0038
29.36
40,375.90
1,747.54
3.00
31/05/14
152,204.05
1.047
159,357.64
30,440.81
0.0048
146.12
159,211.52
7,007.47
4.00
30/06/14
293,778.24
1.048
307,879.60
58,755.65
0.0058
340.78
307,538.82
13,760.58
5.00
31/07/14
177,308.86
1.045
185,287.76
35,461.77
0.0029
102.84
185,184.92
7,876.06
6.00
31/08/14
9,390.62
1.064
9,991.62
35,461.77
0.0211
748.24
9,243.38
-147.24
1,379.86
735,583.38
31,666.58
703,916.80
VxK
(8)
TOTAL
VALORIZ.
(7)
736,963.24
(2)
(3)
(4)
(5)
(6)
VALORIZACION
(4) - (7)
(8) - (2)
31/03/14
22,886.78
1.044
23,893.80
4,577.36
0.0019
8.79
23,885.01
998.23
30/04/14
41,783.53
1.046
43,705.57
8,356.71
0.0038
31.76
43,673.81
1,890.28
3.00
31/05/14
150,433.65
1.047
157,504.03
30,086.73
0.0048
144.42
157,359.61
6,925.96
4.00
30/06/14
244,454.18
1.048
256,187.98
48,890.83
0.0058
283.57
255,904.41
11,450.23
5.00
31/07/14
170,369.65
1.045
178,036.28
34,073.93
0.0029
98.81
177,937.47
7,567.82
6.00
31/08/14
60,171.16
1.064
64,022.11
12,034.23
0.0211
253.92
63,768.19
3,597.03
821.27
722,528.50
32,429.55
-147.24
K/Ka - 1
(5) x (6)
2.00
723,349.77
A x V/C
REINTEGRO
1.00
VxK
(9)
VRC
FECHA
690,098.95
(8)
TOTAL
VALORIZ.
(7)
OBRA
DE
OBRA
DE
INFRAESTRUCTURA
ACONDICIONAMIENTO
DE
AREAS
DEL
CONTRATISTA
CONSORCIO UNION
PRESUPUESTO BASE
S/. 1,225,713.16
PRESUPUESTO CONTRATADO
S/. 1,103,141.84
S/.
186,973.19
C=
S/.
934,865.97
K=
COEFICIENTE DE REAJUSTE
D = DEDUCCION
VRC = V x K - A x V / C (K / Ka - 1)
REINTEGROS POR AVANCE PROGRAMADO
(1)
(2)
(3)
(4)
(5)
(6)
VALORIZACION
K
A x V/C
K/Ka - 1
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
FECHA
1.00
31/03/14
0.00
1.045
0.00
0.00
0.0000
0.00
0.00
0.00
2.00
30/04/14
0.00
1.050
0.00
0.00
0.0048
0.00
0.00
0.00
3.00
31/05/14
0.00
1.051
0.00
0.00
0.0057
0.00
0.00
0.00
4.00
30/06/14
0.00
1.052
0.00
0.00
0.0067
0.00
0.00
0.00
5.00
31/07/14
2,513.81
1.052
2,644.53
502.76
0.0067
3.37
2,641.16
127.35
6.00
31/08/14
85,723.14
1.064
91,209.42
17,144.63
0.0182
312.03
90,897.39
5,174.25
315.40
93,538.55
5,301.60
88,236.95
VxK
(8)
TOTAL
VALORIZ.
(7)
93,853.95
(2)
(3)
(4)
(5)
(6)
VALORIZACION
(4) - (7)
(8) - (2)
31/03/14
6,477.68
1.045
6,769.18
1,295.54
0.0000
0.00
6,769.18
291.50
30/04/14
3,414.83
1.050
3,585.57
682.97
0.0048
3.28
3,582.29
167.46
3.00
31/05/14
8,416.44
1.051
8,845.68
1,683.29
0.0057
9.59
8,836.09
419.65
4.00
30/06/14
38,587.97
1.052
40,594.54
7,717.59
0.0067
51.71
40,542.83
1,954.86
5.00
31/07/14
34,200.35
1.052
35,978.77
6,840.07
0.0067
45.83
35,932.94
1,732.59
6.00
31/08/14
39,597.62
1.064
42,131.87
7,919.52
0.0182
144.14
41,987.73
2,390.11
254.55
137,651.06
6,956.17
2,390.11
K/Ka - 1
(5) x (6)
2.00
137,905.61
A x V/C
REINTEGRO
1.00
VxK
(9)
VRC
FECHA
130,694.89
(8)
TOTAL
VALORIZ.
(7)
OBRA
DE
OBRA
DE
INFRAESTRUCTURA
ACONDICIONAMIENTO
DE
AREAS
DEL
CONTRATISTA
CONSORCIO UNION
PRESUPUESTO BASE
S/. 109,828.66
PRESUPUESTO CONTRATADO
S/. 98,845.79
S/.
16,753.53
C=
S/.
83,767.62
K=
COEFICIENTE DE REAJUSTE
D = DEDUCCION
VRC = V x K - A x V / C (K / Ka - 1)
REINTEGROS POR AVANCE PROGRAMADO
(1)
(2)
(3)
(4)
(5)
(6)
VALORIZACION
K
A x V/C
K/Ka - 1
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
FECHA
1.00
31/03/14
0.00
1.073
0.00
0.00
0.0047
0.00
0.00
0.00
2.00
30/04/14
0.00
1.070
0.00
0.00
0.0019
0.00
0.00
0.00
3.00
31/05/14
0.00
1.070
0.00
0.00
0.0019
0.00
0.00
0.00
4.00
30/06/14
4,905.20
1.075
5,273.09
981.04
0.0066
6.47
5,266.62
361.42
5.00
31/07/14
6,645.59
1.076
7,150.65
1,329.12
0.0075
9.97
7,140.68
495.09
6.00
31/08/14
11,919.11
1.097
13,075.26
2,383.82
0.0272
64.84
13,010.42
1,091.31
81.28
25,417.72
1,947.82
23,469.90
VxK
(8)
TOTAL
VALORIZ.
(7)
25,499.00
(2)
(3)
(4)
(5)
(6)
VALORIZACION
(4) - (7)
(8) - (2)
31/03/14
0.00
1.073
0.00
0.00
0.0047
0.00
0.00
30/04/14
0.00
1.070
0.00
0.00
0.0019
0.00
0.00
0.00
3.00
31/05/14
7,130.14
1.070
7,629.25
1,426.03
0.0019
2.71
7,626.54
496.40
4.00
30/06/14
17,752.29
1.075
19,083.71
3,550.46
0.0066
23.43
19,060.28
1,307.99
5.00
31/07/14
5,799.29
1.076
6,240.04
1,159.86
0.0075
8.70
6,231.34
432.05
6.00
31/08/14
5,923.14
1.097
6,497.68
1,184.63
0.0272
32.22
6,465.46
542.32
67.06
39,383.62
2,778.76
542.32
K/Ka - 1
(5) x (6)
2.00
39,450.68
A x V/C
REINTEGRO
1.00
VxK
(9)
VRC
FECHA
36,604.86
(8)
TOTAL
VALORIZ.
(7)
0.00
OBRA
DE
OBRA
DE
INFRAESTRUCTURA
ACONDICIONAMIENTO
DE
AREAS
DEL
CONTRATISTA
CONSORCIO UNION
PRESUPUESTO BASE
S/. 300,614.50
PRESUPUESTO CONTRATADO
S/. 270,553.05
S/.
45,856.45
C=
S/.
229,282.25
K=
COEFICIENTE DE REAJUSTE
D = DEDUCCION
VRC = V x K - A x V / C (K / Ka - 1)
REINTEGROS POR AVANCE PROGRAMADO
(1)
(2)
(3)
(4)
(5)
(6)
VALORIZACION
N
FECHA
VALORIZ.
VxK
A x V/C
K/Ka - 1
(7)
(8)
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
1.00
31/03/14
0.00
1.052
0.00
0.00
0.0048
0.00
0.00
0.00
2.00
30/04/14
0.00
1.054
0.00
0.00
0.0067
0.00
0.00
0.00
3.00
31/05/14
0.00
1.053
0.00
0.00
0.0057
0.00
0.00
0.00
4.00
30/06/14
4,905.20
1.056
5,179.89
981.04
0.0086
8.44
5,171.45
266.25
5.00
31/07/14
6,645.59
1.059
7,037.68
1,329.12
0.0115
15.28
7,022.40
376.81
6.00
31/08/14
11,919.11
1.064
12,681.93
2,383.82
0.0162
38.62
12,643.31
724.20
62.34
24,837.16
1,367.26
TOTAL
23,469.90
24,899.50
(2)
(3)
(4)
(5)
(6)
VALORIZACION
(4) - (7)
(8) - (2)
31/03/14
0.00
1.052
0.00
0.00
0.0048
0.00
0.00
30/04/14
0.00
1.054
0.00
0.00
0.0067
0.00
0.00
0.00
3.00
31/05/14
10,858.64
1.053
11,434.15
2,171.73
0.0057
12.38
11,421.77
563.13
4.00
30/06/14
9,191.15
1.056
9,705.85
1,838.23
0.0086
15.81
9,690.04
498.89
5.00
31/07/14
585.51
1.059
620.06
117.10
0.0115
1.35
618.71
33.20
6.00
31/08/14
69,599.27
1.064
74,053.62
13,919.85
0.0162
225.50
73,828.12
4,228.85
255.04
95,558.64
5,324.07
724.20
K/Ka - 1
(5) x (6)
2.00
95,813.68
A x V/C
REINTEGRO
1.00
VxK
(9)
VRC
FECHA
90,234.57
(8)
TOTAL
VALORIZ.
(7)
0.00
OBRA
DE
OBRA
DE
INFRAESTRUCTURA
ACONDICIONAMIENTO
DE
AREAS
DEL
CONTRATISTA
CONSORCIO UNION
PRESUPUESTO BASE
S/. 224,840.00
PRESUPUESTO CONTRATADO
S/. 202,356.00
S/.
34,297.63
C=
S/.
171,488.14
K=
COEFICIENTE DE REAJUSTE
D = DEDUCCION
VRC = V x K - A x V / C (K / Ka - 1)
REINTEGROS POR AVANCE PROGRAMADO
(1)
(2)
(3)
(4)
(5)
(6)
VALORIZACION
N
FECHA
VALORIZ.
VxK
A x V/C
K/Ka - 1
(7)
(8)
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
1.00
31/03/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
30/04/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
3.00
31/05/14
0.00
1.032
0.00
0.00
-0.0010
0.00
0.00
0.00
4.00
30/06/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
5.00
31/07/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
6.00
31/08/14
0.00
1.030
0.00
0.00
-0.0029
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
(2)
(3)
(4)
(5)
(6)
VALORIZACION
N
FECHA
VALORIZ.
VxK
A x V/C
K/Ka - 1
(7)
(8)
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
1.00
31/03/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
30/04/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
31/05/14
0.00
1.032
0.00
0.00
-0.0010
0.00
0.00
0.00
4.00
30/06/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
5.00
31/07/14
94,318.49
1.031
97,242.36
18,863.70
-0.0019
-35.84
97,278.20
2,959.71
6.00
31/08/14
0.00
1.030
0.00
0.00
-0.0029
0.00
0.00
0.00
-35.84
97,278.20
2,959.71
TOTAL
94,318.49
97,242.36
0.00
OBRA
DE
OBRA
DE
INFRAESTRUCTURA
ACONDICIONAMIENTO
DE
AREAS
DEL
CONTRATISTA
CONSORCIO UNION
PRESUPUESTO BASE
S/. 41,000.00
PRESUPUESTO CONTRATADO
S/. 36,900.00
S/.
6,254.24
C=
S/.
31,271.19
K=
COEFICIENTE DE REAJUSTE
D = DEDUCCION
VRC = V x K - A x V / C (K / Ka - 1)
REINTEGROS POR AVANCE PROGRAMADO
(1)
(2)
(3)
(4)
(5)
(6)
VALORIZACION
N
FECHA
VALORIZ.
VxK
A x V/C
K/Ka - 1
(7)
(8)
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
1.00
31/03/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
30/04/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
31/05/14
0.00
1.032
0.00
0.00
-0.0010
0.00
0.00
0.00
4.00
30/06/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
5.00
31/07/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
6.00
31/08/14
0.00
1.030
0.00
0.00
-0.0029
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
(2)
(3)
(4)
(5)
(6)
VALORIZACION
N
FECHA
VALORIZ.
VxK
A x V/C
K/Ka - 1
(7)
(8)
(9)
VRC
REINTEGRO
(5) x (6)
(4) - (7)
(8) - (2)
1.00
31/03/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
30/04/14
0.00
1.035
0.00
0.00
0.0019
0.00
0.00
0.00
2.00
31/05/14
0.00
1.032
0.00
0.00
-0.0010
0.00
0.00
0.00
4.00
30/06/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
5.00
31/07/14
0.00
1.031
0.00
0.00
-0.0019
0.00
0.00
0.00
6.00
31/08/14
0.00
1.030
0.00
0.00
-0.0029
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO
Aug-14
OBRA
CONSTRUCCION DE OBRA DE
INFRAESTRUCTURA Y ACONDICIONAMIENTO
DE AREAS DEL CITEMADERA,PROYECTO SNIP
N 126739
SUPERVISOR
A
V
D = ------- x ----C
Ka
CONSORCIO UNION
Consorcio Supervisor PRODUCE
CONTRATISTA
S/. 1,115,998.07
S/. 1,004,398.26
incluido el I.G.V.
S/. 200,879.65
S/. 170,236.99
(con IGV)
(K - Ka)
incluido el I.G.V.
(1) Monto del Contrato por valorizacin del mes del pago del adelanto.
(sin IGV)
VALORIZACION ESTRUCTURAS
MONTO (S/.)
PERIODO
(M)
AMORTIZACION DEL
ADELANTO DIRECTO
Ka
A=(Adel/Contrato)xM
DEDUCCION
PAGADO
REGULARIZACION
D=Ax(K/Ka-1)
Dp
Dr=D-Dp
1.00
2.00
March 2014
April 2014
S/. 22,886.78
S/. 41,783.53
S/. 4,577.36
S/. 8,356.71
1.042
1.044
S/. 8.79
S/. 0.00
S/. 8.79
1.042
1.046
S/. 32.08
S/. 8.79
S/. 23.29
3.00
4.00
May 2014
June 2014
S/. 150,433.65
S/. 244,454.18
S/. 30,086.73
S/. 48,890.84
1.042
1.047
S/. 144.37
S/. 32.08
S/. 23.29
1.042
1.048
S/. 281.52
S/. 55.37
S/. 411.39
5.00
6.00
July 2014
August 2014
S/. 170,369.65
S/. 60,171.16
S/. 34,073.93
S/. 12,034.23
1.042
1.045
S/. 98.10
S/. 466.76
S/. 98.10
1.042
1.064
S/. 254.08
S/. 564.86
S/. 254.08
TOTALES
Saldo por amortizar
S/. 138,019.80
S/. 32,217.19
Amortizacin acumulada :
S/. 138,019.80
Amortizacin anterior
S/. 125,985.57
S/. 12,034.23
S/. 254.08
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO
Aug-14
OBRA
CONSTRUCCION DE OBRA DE
INFRAESTRUCTURA Y ACONDICIONAMIENTO
DE AREAS DEL CITEMADERA,PROYECTO SNIP
N 126739
SUPERVISOR
A
V
D = ------- x ----C
Ka
CONSORCIO UNION
Consorcio Supervisor PRODUCE
CONTRATISTA
S/. 1,225,713.16
S/. 1,103,141.84
incluido el I.G.V.
S/. 220,628.37
S/. 186,973.19
(con IGV)
(K - Ka)
incluido el I.G.V.
(1) Monto del Contrato por valorizacin del mes del pago del adelanto.
(sin IGV)
VALORIZACION ARQUITECTURA
MONTO (S/.)
PERIODO
(M)
AMORTIZACION DEL
ADELANTO DIRECTO
Ka
A=(Adel/Contrato)xM
DEDUCCION
PAGADO
REGULARIZACION
D=Ax(K/Ka-1)
Dp
Dr=D-Dp
1
2
March 2014
April 2014
S/. 6,477.68
S/. 3,414.83
S/. 1,295.54
S/. 682.97
1.045
1.045
S/. 0.00
S/. 0.00
S/. 0.00
1.045
1.050
S/. 3.27
S/. 0.00
S/. 3.27
3
4
May 2014
June 2014
S/. 8,416.44
S/. 38,587.97
S/. 1,683.29
S/. 7,717.59
1.045
1.051
S/. 9.66
S/. 3.27
S/. 3.27
1.045
1.052
S/. 51.70
S/. 6.54
S/. 58.09
5
6
July 2014
August 2014
S/. 34,200.35
S/. 39,597.62
S/. 6,840.07
S/. 7,919.52
1.045
1.052
S/. 45.82
S/. 64.63
S/. 45.82
1.045
1.064
S/. 143.99
S/. 110.45
S/. 143.99
TOTALES
Saldo por amortizar
S/. 26,138.98
S/. 160,834.21
Amortizacin acumulada :
S/. 26,138.98
Amortizacin anterior
S/. 18,219.46
S/. 7,919.52
S/. 143.99
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO
Aug-14
OBRA
CONSTRUCCION DE OBRA DE
INFRAESTRUCTURA Y ACONDICIONAMIENTO
DE AREAS DEL CITEMADERA,PROYECTO SNIP
N 126739
SUPERVISOR
A
V
D = ------- x ----C
Ka
CONSORCIO UNION
Consorcio Supervisor PRODUCE
CONTRATISTA
S/. 109,828.66
S/. 98,845.79
incluido el I.G.V.
S/. 19,769.16
S/. 16,753.53
(con IGV)
incluido el I.G.V.
March 2014
April 2014
3
4
5
6
(1) Monto del Contrato por valorizacin del mes del pago del adelanto.
(sin IGV)
VALORIZACION SANITARIAS
MONTO (S/.)
PERIODO
(M)
1
2
(K - Ka)
AMORTIZACION DEL
ADELANTO DIRECTO
Ka
A=(Adel/Contrato)xM
DEDUCCION
PAGADO
REGULARIZACION
D=Ax(K/Ka-1)
Dp
Dr=D-Dp
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.068
1.073
S/. 0.00
S/. 0.00
S/. 0.00
1.068
1.070
S/. 0.00
S/. 0.00
S/. 0.00
May 2014
June 2014
S/. 7,130.14
S/. 17,752.29
S/. 1,426.03
S/. 3,550.46
1.068
1.071
S/. 2.67
S/. 0.00
S/. 0.00
1.068
1.075
S/. 23.27
S/. 0.00
S/. 25.94
July 2014
August 2014
S/. 5,799.29
S/. 5,923.14
S/. 1,159.86
S/. 1,184.63
1.068
1.076
S/. 8.69
S/. 25.94
S/. 8.69
1.068
1.097
S/. 32.17
S/. 34.63
S/. 32.17
TOTALES
Saldo por amortizar
S/. 7,320.98
S/. 9,432.55
Amortizacin acumulada :
S/. 7,320.98
Amortizacin anterior
S/. 6,136.35
S/. 1,184.63
S/. 32.17
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO
Aug-14
OBRA
CONSTRUCCION DE OBRA DE
INFRAESTRUCTURA Y ACONDICIONAMIENTO
DE AREAS DEL CITEMADERA,PROYECTO SNIP
N 126739
SUPERVISOR
A
V
D = ------- x ----C
Ka
CONSORCIO UNION
Consorcio Supervisor PRODUCE
CONTRATISTA
S/. 300,614.50
S/. 270,553.05
incluido el I.G.V.
S/. 54,110.61
S/. 45,856.45
(con IGV)
incluido el I.G.V.
March 2014
April 2014
3
4
5
6
(1) Monto del Contrato por valorizacin del mes del pago del adelanto.
(sin IGV)
VALORIZACION ELECTRICAS
MONTO (S/.)
PERIODO
(M)
1
2
(K - Ka)
AMORTIZACION DEL
ADELANTO DIRECTO
Ka
A=(Adel/Contrato)xM
DEDUCCION
PAGADO
REGULARIZACION
D=Ax(K/Ka-1)
Dp
Dr=D-Dp
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.047
1.052
S/. 0.00
S/. 0.00
S/. 0.00
1.047
1.054
S/. 0.00
S/. 0.00
S/. 0.00
May 2014
June 2014
S/. 10,858.64
S/. 9,191.15
S/. 2,171.73
S/. 1,838.23
1.047
1.053
S/. 12.45
S/. 0.00
S/. 0.00
1.047
1.056
S/. 15.80
S/. 0.00
S/. 28.25
July 2014
August 2014
S/. 585.51
S/. 69,599.27
S/. 117.10
S/. 13,919.85
1.047
1.059
S/. 1.34
S/. 28.25
S/. 1.34
1.047
1.064
S/. 226.01
S/. 29.59
S/. 226.01
TOTALES
Saldo por amortizar
S/. 18,046.91
S/. 27,809.54
Amortizacin acumulada :
S/. 18,046.91
Amortizacin anterior
S/. 4,127.06
S/. 13,919.85
S/. 226.01
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO
Aug-14
OBRA
CONSTRUCCION DE OBRA DE
INFRAESTRUCTURA Y ACONDICIONAMIENTO
DE AREAS DEL CITEMADERA,PROYECTO SNIP
N 126739
SUPERVISOR
A
V
D = ------- x ----C
Ka
CONSORCIO UNION
Consorcio Supervisor PRODUCE
CONTRATISTA
S/. 224,840.00
S/. 202,356.00
incluido el I.G.V.
S/. 40,471.20
S/. 34,297.63
(con IGV)
(K - Ka)
incluido el I.G.V.
(1) Monto del Contrato por valorizacin del mes del pago del adelanto.
(sin IGV)
AMORTIZACION DEL
ADELANTO DIRECTO
Ka
A=(Adel/Contrato)xM
DEDUCCION
PAGADO
REGULARIZACION
D=Ax(K/Ka-1)
Dp
Dr=D-Dp
1
2
March 2014
April 2014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.035
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.035
S/. 0.00
S/. 0.00
S/. 0.00
3
4
May 2014
June 2014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.032
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.031
S/. 0.00
S/. 0.00
S/. 0.00
5
6
July 2014
August 2014
S/. 94,318.49
S/. 0.00
S/. 18,863.70
S/. 0.00
1.033
1.031
-S/. 36.52
S/. 0.00
-S/. 36.52
1.033
1.030
S/. 0.00
-S/. 36.52
S/. 36.52
TOTALES
Saldo por amortizar
S/. 18,863.70
S/. 15,433.93
Amortizacin acumulada :
S/. 18,863.70
Amortizacin anterior
S/. 18,863.70
S/. 0.00
S/. 36.52
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO DIRECTO
Aug-14
OBRA
CONSTRUCCION DE OBRA DE
INFRAESTRUCTURA Y ACONDICIONAMIENTO
DE AREAS DEL CITEMADERA,PROYECTO SNIP
N 126739
SUPERVISOR
A
V
D = ------- x ----C
Ka
CONSORCIO UNION
Consorcio Supervisor PRODUCE
CONTRATISTA
S/. 41,000.00
S/. 36,900.00
incluido el I.G.V.
S/. 7,380.00
S/. 6,254.24
(con IGV)
(K - Ka)
incluido el I.G.V.
(1) Monto del Contrato por valorizacin del mes del pago del adelanto.
(sin IGV)
VALORIZACION ELEVADORES
MONTO (S/.)
PERIODO
(M)
AMORTIZACION DEL
ADELANTO DIRECTO
Ka
A=(Adel/Contrato)xM
DEDUCCION
PAGADO
REGULARIZACION
D=Ax(K/Ka-1)
Dp
Dr=D-Dp
1
2
March 2014
April 2014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.035
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.035
S/. 0.00
S/. 0.00
S/. 0.00
3
4
May 2014
June 2014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.032
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.031
S/. 0.00
S/. 0.00
S/. 0.00
5
6
July 2014
August 2014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.031
S/. 0.00
S/. 0.00
S/. 0.00
1.033
1.030
S/. 0.00
S/. 0.00
S/. 0.00
TOTALES
Saldo por amortizar
S/. 0.00
S/. 6,254.24
Amortizacin acumulada :
S/. 0.00
Amortizacin anterior
S/. 0.00
S/. 0.00
S/. 0.00
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALES
Aug 2014
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
S/. 1,115,998.07
S/. 1,004,398.26
S/. 395,023.15
(con IGV)
S/. 334,765.38
(sin IGV)
FECHA
MONTO OTORGADO
DESCRIPCION
DESCRIPCION
SIN IGV
MATERIAL
I.U.
44,801.09
ACERO DE
CONSTRUCCION
CORRUGADO
Mar-14
05
159,214.82
CEMENTO
PORTLAND TIPO I
Mar-14
03
45,693.64
AGREGADO
GRUESO
Mar-14
3/28/2014
39.33%
DE PAGO
Mar-14
Fecha de pago:
21
85,055.83
MADERA
NACIONAL PARA
ENCOFRADO Y
CARPINTERIA
43
INDICES MATERIAL
Io
Ia
MONTO
Ir
DEFLATADO
VALORIZACION
No.
AL
MTO. BTO.
VALORIZ
DEL MONOMIO
COEF.
MONTO
(Ir - Ia)/Io
DEDUCCION
UTILIZADO
498.41
473.60
473.60
47,148.04
31-Mar-14
1,204.62
0.121
46.28%
1,281.66
0.00
0.00
498.41
473.60
477.82
47,148.04
30-Apr-14
2,199.23
0.121
46.28%
2,339.88
0.01
23.40
498.41
473.60
470.04
47,148.04
31-May-14
7,917.89
0.121
46.28%
8,424.29
-0.01
-84.24
498.41
473.60
473.03
47,148.04
30-Jun-14
12,866.55
0.121
46.28%
13,689.44
0.00
0.00
498.41
473.60
451.86
47,148.04
31-Jul-14
8,967.20
0.121
46.28%
9,540.70
-0.04
-381.63
498.41
473.60
459.19
47,148.04
31-Aug-14
3,167.04
0.121
46.28%
3,369.59
-0.03
-101.09
216.58
215.85
215.85
44,952.61
31-Mar-14
1,204.62
0.000
53.72%
0.00
0.00
0.00
216.58
215.85
217.13
44,952.61
30-Apr-14
2,199.23
0.000
53.72%
0.00
0.01
0.00
216.58
215.85
218.32
44,952.61
31-May-14
7,917.89
0.000
53.72%
0.00
0.01
0.00
216.58
215.85
218.32
44,952.61
30-Jun-14
12,866.55
0.000
53.72%
0.00
0.01
0.00
216.58
215.85
217.20
44,952.61
31-Jul-14
8,967.20
0.000
53.72%
0.00
0.01
0.00
216.58
215.85
217.20
44,952.61
31-Aug-14
3,167.04
0.000
53.72%
0.00
0.01
0.00
339.42
339.42
339.42
159,214.82
31-Mar-14
4,280.99
0.210 100.00%
4,806.22
0.00
0.00
339.42
339.42
339.42
159,214.82
30-Apr-14
7,815.64
0.210 100.00%
8,774.54
0.00
0.00
339.42
339.42
339.42
159,214.82
31-May-14
28,138.73
0.210 100.00%
31,591.07
0.00
0.00
339.42
339.42
339.42
159,214.82
30-Jun-14
45,725.35
0.210 100.00%
51,335.38
0.00
0.00
339.42
339.42
339.42
159,214.82
31-Jul-14
31,867.78
0.210 100.00%
35,777.63
0.00
0.00
339.42
339.42
339.42
159,214.82
31-Aug-14
11,255.06
0.210 100.00%
12,635.94
0.00
0.00
559.60
577.63
577.63
82,400.92
31-Mar-14
2,286.99
0.098 100.00%
2,242.90
0.00
0.00
559.60
577.63
577.19
82,400.92
30-Apr-14
4,175.28
0.098 100.00%
4,094.79
0.00
0.00
559.60
577.63
575.73
82,400.92
31-May-14
15,032.29
0.098 100.00%
14,742.50
0.00
0.00
559.60
577.63
576.19
82,400.92
30-Jun-14
24,427.42
0.098 100.00%
23,956.51
0.00
0.00
559.60
577.63
577.59
82,400.92
31-Jul-14
17,024.42
0.098 100.00%
16,696.23
0.00
0.00
559.60
577.63
582.28
82,400.92
31-Aug-14
6,012.69
0.098 100.00%
5,896.77
0.01
58.97
Sub-total
334,765.38
23,601.83
21,902.30
I.G.V.
60,257.77
4,248.33
3,942.41
-7.58
Total
395,023.15
27,850.16
25,844.71
-49.70
Monto del
Periodo
Mar-14
22,886.78
S/. 334,765.38
S/. 8,977.22
S/. 325,788.16
Apr-14
41,783.53
S/. 334,765.38
S/. 16,389.38
S/. 309,398.78
May-14
150,433.65
S/. 334,765.38
S/. 59,006.80
S/. 250,391.98
Jun-14
244,454.18
S/. 334,765.38
S/. 95,885.87
S/. 154,506.11
Jul-14
170,369.65
S/. 334,765.38
S/. 66,826.60
S/. 87,679.51
Aug-14
60,171.16
S/. 334,765.38
S/. 23,601.83
S/. 64,077.68
Monto (S/.)
Adelanto
del Adelanto
Amortizar
-42.12
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALES
Aug 2014
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
S/. 1,225,713.16
S/. 1,103,141.84
S/. 346,323.25
(con IGV)
S/. 293,494.28
(sin IGV)
FECHA
MONTO OTORGADO
DESCRIPCION
DESCRIPCION
SIN IGV
MATERIAL
I.U.
57,063.49
PINTURA LATEX
Mar-14
26
43,093.47
BLOQUE Y
LADRILLO
Mar-14
21
19,412.64
CERRAJERIA
NACIONAL
Mar-14
40
30,414.16
CEMENTO
PORTLAND TIPO I
Mar-14
79
10,002.71
LOSETA
Mar-14
44
26,361.32
VIDRIO INCOLORO
NACIONAL
Mar-14
54
73,937.84
MADERA
TERCIADA PARA
CARPINTERIA
Mar-14
3/28/2014
31.39%
DE PAGO
Mar-14
Fecha de pago:
17
33,208.65
DOLAR MAS
INFLACION DEL
MERCADO USA
30
INDICES MATERIAL
Io
Ia
MONTO
Ir
DEFLATADO
VALORIZACION
No.
AL
MTO. BTO.
VALORIZ
DEL MONOMIO
COEF.
MONTO
(Ir - Ia)/Io
DEDUCCION
UTILIZADO
363.01
369.51
369.51
56,059.69
31-Mar-14
395.39
0.556
10.79%
388.65
0.00
0.00
363.01
369.51
373.45
56,059.69
30-Apr-14
208.44
0.556
10.79%
204.88
0.01
2.05
363.01
369.51
373.45
56,059.69
31-May-14
513.73
0.556
10.79%
504.97
0.01
5.05
363.01
369.51
373.45
56,059.69
30-Jun-14
2,355.38
0.556
10.79%
2,315.20
0.01
23.15
363.01
369.51
373.45
56,059.69
31-Jul-14
2,087.56
0.556
10.79%
2,051.95
0.01
20.52
363.01
369.51
373.45
56,059.69
31-Aug-14
2,417.01
0.556
10.79%
2,375.78
0.01
23.76
343.48
346.33
346.33
73,329.39
31-Mar-14
512.31
0.556
43.35%
1,561.11
0.00
0.00
343.48
346.33
348.00
73,329.39
30-Apr-14
270.08
0.556
43.35%
822.97
0.00
0.00
343.48
346.33
348.76
73,329.39
31-May-14
665.65
0.556
43.35%
2,028.35
0.01
20.28
343.48
346.33
349.50
73,329.39
30-Jun-14
3,051.89
0.556
43.35%
9,299.63
0.01
93.00
343.48
346.33
348.81
73,329.39
31-Jul-14
2,704.88
0.556
43.35%
8,242.22
0.01
82.42
343.48
346.33
349.00
73,329.39
31-Aug-14
3,131.75
0.556
43.35%
9,542.96
0.01
95.43
105.41
105.57
105.57
26,321.37
31-Mar-14
182.66
0.073
38.36%
181.37
0.00
0.00
105.41
105.57
105.78
26,321.37
30-Apr-14
96.29
0.073
38.36%
95.61
0.00
0.00
105.41
105.57
105.66
26,321.37
31-May-14
237.33
0.073
38.36%
235.66
0.00
0.00
105.41
105.57
106.27
26,321.37
30-Jun-14
1,088.10
0.073
38.36%
1,080.46
0.01
10.80
105.41
105.57
106.05
26,321.37
31-Jul-14
964.38
0.073
38.36%
957.61
0.00
0.00
105.41
105.57
105.89
26,321.37
31-Aug-14
1,116.57
0.073
38.36%
1,108.73
0.00
0.00
321.88
364.25
364.25
8,839.18
31-Mar-14
69.31
0.073
13.70%
64.78
0.00
0.00
321.88
364.25
382.14
8,839.18
30-Apr-14
36.54
0.073
13.70%
34.15
0.06
2.05
321.88
364.25
382.14
8,839.18
31-May-14
90.05
0.073
13.70%
84.17
0.06
5.05
321.88
364.25
390.18
8,839.18
30-Jun-14
412.88
0.073
13.70%
385.89
0.08
30.87
321.88
364.25
390.18
8,839.18
31-Jul-14
365.93
0.073
13.70%
342.01
0.08
27.36
321.88
364.25
390.18
8,839.18
31-Aug-14
423.68
0.073
13.70%
395.99
0.08
31.68
339.42
339.42
339.42
30,414.16
31-Mar-14
210.74
0.073
47.95%
226.72
0.00
0.00
339.42
339.42
339.42
30,414.16
30-Apr-14
111.10
0.073
47.95%
119.52
0.00
0.00
339.42
339.42
339.42
30,414.16
31-May-14
273.81
0.073
47.95%
294.57
0.00
0.00
339.42
339.42
339.42
30,414.16
30-Jun-14
1,255.39
0.073
47.95%
1,350.57
0.00
0.00
339.42
339.42
339.42
30,414.16
31-Jul-14
1,112.65
0.073
47.95%
1,197.01
0.00
0.00
339.42
339.42
339.42
30,414.16
31-Aug-14
1,288.24
0.073
47.95%
1,385.91
0.00
0.00
360.06
359.50
359.50
19,442.88
31-Mar-14
134.51
0.110
38.18%
272.06
0.00
0.00
360.06
359.50
359.60
19,442.88
30-Apr-14
70.91
0.110
38.18%
143.42
0.00
0.00
360.06
359.50
359.51
19,442.88
31-May-14
174.77
0.110
38.18%
353.49
0.00
0.00
360.06
359.50
359.60
19,442.88
30-Jun-14
801.29
0.110
38.18%
1,620.70
0.00
0.00
360.06
359.50
359.86
19,442.88
31-Jul-14
710.18
0.110
38.18%
1,436.42
0.00
0.00
360.06
359.50
359.81
19,442.88
31-Aug-14
822.25
0.110
38.18%
1,663.11
0.00
0.00
665.47
684.31
684.31
41,907.05
31-Mar-14
298.59
0.110
61.82%
440.48
0.00
0.00
665.47
684.31
680.39
41,907.05
30-Apr-14
157.41
0.110
61.82%
232.21
-0.01
-2.32
665.47
684.31
677.71
41,907.05
31-May-14
387.96
0.110
61.82%
572.32
-0.01
-5.72
665.47
684.31
675.44
41,907.05
30-Jun-14
1,778.75
0.110
61.82%
2,623.97
-0.01
-26.24
665.47
684.31
675.70
41,907.05
31-Jul-14
1,576.50
0.110
61.82%
2,325.62
-0.01
-23.26
665.47
684.31
672.49
41,907.05
31-Aug-14
1,825.29
0.110
61.82%
2,692.63
-0.02
-53.85
357.90
383.34
383.93
31,004.79
31-Mar-14
230.10
0.062 100.00%
401.62
0.00
0.00
357.90
383.34
383.93
31,004.79
30-Apr-14
121.30
0.062 100.00%
211.72
0.00
0.00
357.90
383.34
384.75
31,004.79
31-May-14
298.97
0.062 100.00%
521.82
0.00
0.00
357.90
383.34
385.05
31,004.79
30-Jun-14
1,370.74
0.062 100.00%
2,392.45
0.00
0.00
357.90
383.34
387.37
31,004.79
31-Jul-14
1,214.88
0.062 100.00%
2,120.42
0.01
21.20
357.90
383.34
386.98
31,004.79
31-Aug-14
1,406.60
0.062 100.00%
2,455.05
0.01
24.55
Sub-total
293,494.28
12,431.39
21,620.16
I.G.V.
52,828.97
2,237.65
3,891.63
21.88
Total
346,323.25
14,669.04
25,511.79
143.45
121.57
Monto del
Periodo
Mar-14
6,477.68
S/. 293,494.28
S/. 2,033.61
S/. 291,460.67
Apr-14
3,414.83
S/. 293,494.28
S/. 1,072.07
S/. 290,388.60
May-14
8,416.44
S/. 293,494.28
S/. 2,642.27
S/. 287,746.33
Jun-14
38,587.97
S/. 293,494.28
S/. 12,114.42
S/. 275,631.91
Jul-14
34,200.35
S/. 293,494.28
S/. 10,736.96
S/. 264,894.95
Aug-14
39,597.62
S/. 293,494.28
S/. 12,431.39
S/. 252,463.56
Monto (S/.)
Adelanto
del Adelanto
Amortizar
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALES
Aug 2014
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
S/. 109,828.66
S/. 98,845.79
S/. 36,714.96
(con IGV)
S/. 31,114.37
(sin IGV)
FECHA
MONTO OTORGADO
DESCRIPCION
DESCRIPCION
SIN IGV
MATERIAL
I.U.
3,652.41
TUBERIA DE
FIERRO FUNDIDO
71
1,457.20
Feb-14
VALVULA DE
BRONCE
NACIONAL
77
1,966.56
Feb-14
DUCTO DE
CONCRETO
31
1,002.02
Feb-14
CEMENTO
PORTLAND TIPO I
21
9,591.95
Feb-14
TUBERIA DE PVC
72
13,444.23
Feb-14
3/28/2014
37.14%
DE PAGO
Feb-14
Fecha de pago:
APARATO
SANITARIO CON
GRIFERIA
10
INDICES MATERIAL
Io
Ia
MONTO
Ir
DEFLATADO
VALORIZACION
No.
AL
MTO. BTO.
VALORIZ
DEL MONOMIO
COEF.
MONTO
(Ir - Ia)/Io
DEDUCCION
UTILIZADO
504.34
558.29
558.29
3,299.46
31-Mar-14
0.085
47.06%
0.00
0.00
504.34
558.29
557.09
3,299.46
30-Apr-14
0.085
47.06%
0.00
0.00
0.00
0.00
504.34
558.29
554.71
3,299.46
31-May-14
310.89
0.085
47.06%
285.21
-0.01
-2.85
504.34
558.29
553.33
3,299.46
30-Jun-14
774.03
0.085
47.06%
710.09
-0.01
-7.10
504.34
558.29
553.33
3,299.46
31-Jul-14
252.86
0.085
47.06%
231.97
-0.01
-2.32
504.34
558.29
553.13
3,299.46
1-Aug-14
258.26
0.085
47.06%
236.93
-0.01
-2.37
275.39
280.26
280.26
1,431.88
31-Mar-14
0.085
20.00%
0.00
0.00
0.00
275.39
280.26
279.67
1,431.88
30-Apr-14
0.085
20.00%
0.00
0.00
0.00
275.39
280.26
281.29
1,431.88
31-May-14
124.03
0.085
20.00%
121.21
0.00
0.00
275.39
280.26
281.18
1,431.88
30-Jun-14
308.81
0.085
20.00%
301.79
0.00
0.00
275.39
280.26
281.29
1,431.88
31-Jul-14
100.88
0.085
20.00%
98.59
0.00
0.00
275.39
280.26
281.89
1,431.88
1-Aug-14
103.04
0.085
20.00%
100.69
0.01
1.01
361.24
375.12
375.12
1,893.79
31-Mar-14
0.085
32.94%
0.00
0.00
0.00
361.24
375.12
377.02
1,893.79
30-Apr-14
0.085
32.94%
0.00
0.01
0.00
361.24
375.12
376.62
1,893.79
31-May-14
167.39
0.085
32.94%
199.64
0.00
0.00
361.24
375.12
375.98
1,893.79
30-Jun-14
416.76
0.085
32.94%
497.06
0.00
0.00
361.24
375.12
376.62
1,893.79
31-Jul-14
136.15
0.085
32.94%
162.38
0.00
0.00
361.24
375.12
375.02
1,893.79
1-Aug-14
139.05
0.085
32.94%
165.85
0.00
0.00
339.42
339.42
339.42
1,002.02
31-Mar-14
0.098 100.00%
0.00
0.00
0.00
339.42
339.42
339.42
1,002.02
30-Apr-14
0.098 100.00%
0.00
0.00
0.00
339.42
339.42
339.42
1,002.02
31-May-14
85.29
0.098 100.00%
698.75
0.00
0.00
339.42
339.42
339.42
1,002.02
30-Jun-14
212.35
0.098 100.00%
1,739.72
0.00
0.00
339.42
339.42
339.42
1,002.02
31-Jul-14
69.37
0.098 100.00%
568.33
0.00
0.00
339.42
339.42
339.42
1,002.02
1-Aug-14
70.85
0.098 100.00%
580.47
0.00
0.00
346.99
376.37
376.37
8,843.19
31-Mar-14
0.126 100.00%
0.00
0.00
0.00
346.99
376.37
367.25
8,843.19
30-Apr-14
0.126 100.00%
0.00
-0.03
0.00
346.99
376.37
366.08
8,843.19
31-May-14
816.45
0.126 100.00%
898.40
-0.03
-26.95
346.99
376.37
368.40
8,843.19
30-Jun-14
2,032.76
0.126 100.00%
2,236.79
-0.02
-44.74
346.99
376.37
370.39
8,843.19
31-Jul-14
664.06
0.126 100.00%
730.71
-0.02
-14.61
346.99
376.37
370.75
8,843.19
1-Aug-14
678.24
0.126 100.00%
746.32
-0.02
-14.93
345.54
372.74
372.74
12,463.16
31-Mar-14
0.152 100.00%
0.00
0.00
0.00
345.54
372.74
371.96
12,463.16
30-Apr-14
0.152 100.00%
0.00
0.00
0.00
345.54
372.74
372.26
12,463.16
31-May-14
1,144.35
0.152 100.00%
1,083.78
0.00
0.00
345.54
372.74
377.62
12,463.16
30-Jun-14
2,849.14
0.152 100.00%
2,698.35
0.01
26.98
345.54
372.74
380.12
12,463.16
31-Jul-14
930.75
0.152 100.00%
881.49
0.02
17.63
345.54
372.74
382.51
12,463.16
1-Aug-14
950.63
0.152 100.00%
900.32
0.03
27.01
Sub-total
31,114.37
2,200.07
2,730.58
I.G.V.
5,600.59
396.01
491.50
1.93
Total
36,714.96
2,596.08
3,222.08
12.65
Monto del
Periodo
Mar-14
0.00
S/. 31,114.37
S/. 0.00
Apr-14
0.00
S/. 31,114.37
S/. 0.00
S/. 31,114.37
May-14
7,130.14
S/. 31,114.37
S/. 2,648.40
S/. 28,465.97
Jun-14
17,752.29
S/. 31,114.37
S/. 6,593.85
S/. 24,520.52
Jul-14
5,799.29
S/. 31,114.37
S/. 2,154.07
S/. 28,960.30
Aug-14
5,923.14
S/. 31,114.37
S/. 2,200.07
S/. 28,914.30
Monto (S/.)
Adelanto
del Adelanto
Amortizar
S/. 31,114.37
10.72
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALES
Aug 2014
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
S/. 300,614.50
S/. 270,553.05
S/. 86,812.86
(con IGV)
S/. 73,570.22
(sin IGV)
FECHA
MONTO OTORGADO
DESCRIPCION
DESCRIPCION
SIN IGV
MATERIAL
I.U.
14,137.26
TUBERIA PVC
72
9,595.77
Mar-14
ARTEFACTO DE
ALUMBRADO
INTERIOR
12
19,365.54
Mar-14
DLAR MAS
INFLACION DEL
MERCADO USA
30
30,471.65
Mar-14
3/28/2014
32.09%
DE PAGO
Mar-14
Fecha de pago:
ALAMBRE Y CABLE
TIPO TW Y THW
07
INDICES MATERIAL
Io
Ia
MONTO
Ir
DEFLATADO
VALORIZACION
No.
AL
MTO. BTO.
VALORIZ
DEL MONOMIO
COEF.
MONTO
(Ir - Ia)/Io
DEDUCCION
UTILIZADO
346.99
376.37
376.37
13,033.68
31-Mar-14
0.108
55.56%
0.00
0.00
346.99
376.37
367.25
13,033.68
30-Apr-14
0.108
55.56%
0.00
-0.03
0.00
0.00
346.99
376.37
366.08
13,033.68
31-May-14
669.53
0.108
55.56%
651.52
-0.03
-19.55
346.99
376.37
368.40
13,033.68
1-Jun-14
566.71
0.108
55.56%
551.47
-0.02
-11.03
346.99
376.37
370.39
13,033.68
2-Jun-14
36.10
0.108
55.56%
35.13
-0.02
-0.70
346.99
376.37
370.75
13,033.68
3-Jun-14
4,291.40
0.108
55.56%
4,175.99
-0.02
-83.52
295.17
300.60
300.60
9,422.43
31-Mar-14
0.108
44.44%
0.00
0.00
0.00
295.17
300.60
300.14
9,422.43
30-Apr-14
0.108
44.44%
0.00
0.00
0.00
295.17
300.60
299.22
9,422.43
31-May-14
454.45
0.108
44.44%
521.21
0.00
0.00
295.17
300.60
298.74
9,422.43
1-Jun-14
384.66
0.108
44.44%
441.17
-0.01
-4.41
295.17
300.60
299.22
9,422.43
2-Jun-14
24.50
0.108
44.44%
28.10
0.00
0.00
295.17
300.60
298.61
9,422.43
3-Jun-14
2,912.82
0.108
44.44%
3,340.73
-0.01
-33.41
357.90
383.34
383.34
18,080.36
31-Mar-14
0.080 100.00%
0.00
0.00
0.00
357.90
383.34
383.93
18,080.36
30-Apr-14
0.080 100.00%
0.00
0.00
0.00
357.90
383.34
384.75
18,080.36
31-May-14
917.14
0.080 100.00%
868.69
0.00
0.00
357.90
383.34
385.05
18,080.36
1-Jun-14
776.30
0.080 100.00%
735.29
0.00
0.00
357.90
383.34
387.37
18,080.36
2-Jun-14
49.45
0.080 100.00%
46.84
0.01
0.47
357.90
383.34
386.98
18,080.36
3-Jun-14
5,878.46
0.080 100.00%
5,567.94
0.01
55.68
598.55
609.27
609.27
29,935.51
31-Mar-14
0.135 100.00%
0.00
0.00
0.00
598.55
609.27
604.60
29,935.51
30-Apr-14
0.135 100.00%
0.00
-0.01
0.00
598.55
609.27
593.69
29,935.51
31-May-14
1,443.12
0.135 100.00%
1,465.92
-0.03
-43.98
598.55
609.27
592.91
29,935.51
1-Jun-14
1,221.51
0.135 100.00%
1,240.81
-0.03
-37.22
598.55
609.27
596.89
29,935.51
2-Jun-14
77.81
0.135 100.00%
79.04
-0.02
-1.58
598.55
609.27
594.59
29,935.51
3-Jun-14
9,249.75
0.135 100.00%
9,395.90
-0.02
-187.92
Sub-total
73,570.22
22,332.43
22,480.56
I.G.V.
13,242.64
4,019.84
4,046.50
-44.85
Total
86,812.86
26,352.27
26,527.06
-294.02
Monto del
Periodo
Mar-14
0.00
S/. 73,570.22
S/. 0.00
S/. 73,570.22
Apr-14
0.00
S/. 73,570.22
S/. 0.00
S/. 73,570.22
May-14
10,858.64
S/. 73,570.22
S/. 3,484.24
S/. 70,085.98
Jun-14
9,191.15
S/. 73,570.22
S/. 2,949.18
S/. 67,136.80
Jul-14
585.51
S/. 73,570.22
S/. 187.86
S/. 66,948.94
Aug-14
69,599.27
S/. 73,570.22
S/. 22,332.43
S/. 44,616.51
Monto (S/.)
Adelanto
del Adelanto
Amortizar
-249.17
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALES
Aug 2014
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
S/. 0.00
(con IGV)
S/. 0.00
(sin IGV)
3/28/2014
0.00%
FECHA
MONTO OTORGADO
DESCRIPCION
DESCRIPCION
DE PAGO
SIN IGV
MATERIAL
I.U.
INDICES MATERIAL
Io
0.00
Mar-14
Fecha de pago:
MAQUINARIA Y
EQUIPO
NACIONAL
48
Ia
MONTO
Ir
VALORIZACION
DEFLATADO
No.
AL
MTO. BTO.
VALORIZ
DEL MONOMIO
COEF.
MONTO
(Ir - Ia)/Io
DEDUCCION
UTILIZADO
328.27
339.73
339.73
0.00
31-Mar-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
339.81
0.00
30-Apr-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
338.89
0.00
31-May-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
338.34
0.00
1-Jun-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
338.46
0.00
2-Jun-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
337.96
0.00
3-Jun-14
1.000 100.00%
0.00
-0.01
0.00
Sub-total
0.00
0.00
0.00
0.00
I.G.V.
0.00
0.00
0.00
0.00
Total
0.00
0.00
0.00
0.00
Monto del
Periodo
Mar-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Apr-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
May-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Jun-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Jul-14
94,318.49
S/. 0.00
S/. 0.00
S/. 0.00
Aug-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Monto (S/.)
Adelanto
del Adelanto
Amortizar
CALCULO DE AMORTIZACION Y DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR EL ADELANTO DE MATERIALES
Aug 2014
OBRA
CONTRATISTA
CONSORCIO UNION
SUPERVISOR
S/. 41,000.00
S/. 36,900.00
S/. 0.00
(con IGV)
S/. 0.00
(sin IGV)
3/28/2014
0.00%
FECHA
MONTO OTORGADO
DESCRIPCION
DESCRIPCION
DE PAGO
SIN IGV
MATERIAL
I.U.
MAQUINARIA Y
EQUIPO
NACIONAL
INDICES MATERIAL
Io
0.00
Mar-14
Fecha de pago:
48
Ia
MONTO
Ir
VALORIZACION
DEFLATADO
No.
AL
MTO. BTO.
VALORIZ
DEL MONOMIO
COEF.
MONTO
(Ir - Ia)/Io
DEDUCCION
UTILIZADO
328.27
339.73
339.73
0.00
31-Mar-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
339.81
0.00
30-Apr-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
338.89
0.00
31-May-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
338.34
0.00
1-Jun-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
338.46
0.00
2-Jun-14
1.000 100.00%
0.00
0.00
0.00
328.27
339.73
337.96
0.00
3-Jun-14
1.000 100.00%
0.00
-0.01
0.00
Sub-total
0.00
0.00
0.00
0.00
I.G.V.
0.00
0.00
0.00
0.00
Total
0.00
0.00
0.00
0.00
Monto del
Periodo
Mar-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Apr-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
May-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Jun-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Jul-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Aug-14
0.00
S/. 0.00
S/. 0.00
S/. 0.00
Monto (S/.)
Adelanto
del Adelanto
Amortizar