Академический Документы
Профессиональный Документы
Культура Документы
NO HEAVY LOADS
CROSS BEAMS
PRIMARY BEAMS
U
AB kv
R /11
FO 6
E 20/6
SIT R 2 N
ED PE ATIO
OS SU ST
OP UR UB
S
PR MO
A
H
B
2338
2338
900
M
PLE
X
2950
CO
2338
BA
RW
A
2338
1
EX
IS
TIN
900
2
2050
900
580
500
KEY PLAN
298
725
500
1000
725
1000
500
800
800
500
500
320 480
400 400
Date Received:
3 EXTERNAL RAILINGS
500
4 BRACING CLAMP B
-LUMBER (BY SITE) CAN BE ATTACHED TO THE
FLOOR PROPS AS A DIAGONAL BRACE USING THE
BRACING CLAMP B
2702
2475
2500
A - APPROVED.
B - APPROVED WITH COMMENTS.
C - REVISED & RESUBMIT.
D - REJECTED.
N - NOTED.
2500
2475
2900
650
2650
2650
2700
650
2300
2300
DETAILS
DETAILS
5
650
1
650
400 400
400 400
800
2900
PLAN
650
PLAN
PRIMARY BEAMS
800
2160
725
2160
REFERENCE DRAWINGS
NO HEAVY LOADS
CROSS BEAMS
2850
A
650
2700
2500
725
800
Co-ordination Table
Date
1850
Structural
Electrical
3 EXTERNAL RAILINGS
Mechanical
2650
2338
2338
900
PROPS MODEL
1100
maximum
(range)
2338
minimum
1020
2338
1000
420
580
900
SHOP DRAWING
300
900
Building Coordination
2700
725
500
500
1000
725
2500
Infrastructure
4 BRACING CLAMP B
500
2050
Sign
Architectural
2050
Name
Trade
900
1000
500
2050
420
900
EXTENSION
RANGE
ECO 20 250
ECO 20 300
152-250 cm
172-300 cm
ECO 20 350
ECO 20 400
EUREX 20 550
197-350 cm
227-400 cm
297-550 cm
20.05.2015
AS
REV. No.
DATE
BY
RA
JL
CH'KD APP'D
CLIENT
CONSULTANT
LEGEND :
SUBSTATION BUILDING-25A
BEAM & SLAB FORMWORK - DOKAFLEX 20
MAIN BEAM + PROPS ARRANGEMENT PLAN
MAIN CONTRACTOR
LEIGHTON
CONTRACTING
SCALE 1 : 50A1
REMOVABLE FOLDING TRIPOD
SUBCONTRACTOR
ALL FLOOR PROPS HAVE TO BE PLACED CENTRALLY UNDER THE MAIN BEAMS.
PROJECT
ALL FLOOR PROPS HAVE TO BE ERECTED VERTICALLY.
NOTES :
DISTANCES BETWEEN BEAMS AND DISTANCES BETWEEN FLOOR PROPS HAVE TO CORRESPOND WITH THE DRAWING.
OVERLAPPING OF THE MAIN BEAM MEASURED FROM THE CENTRE OF THE MAIN BEAM TO THE FLOOR PROPS
WITH TRIPOD MAX. 50 CM.
Drawn:
Romeo Apolinario
20.05.2015
Drawing-No.:
Rev.:
Checked:
Jerico Lanto
20.05.2015
345-001037-1013
Scale:
Revised:
MAXIMUM ALLOWABLE
LIVE LOAD:
1.5
INTERMEDIATE FLOOR PROPS WITHOUT TRIPOD SHOULD BE PLACED AT EQUAL DISTANCES BETWEEN THE FLOOR
PROPS WITH TRIPOD. THE NUMBER OF INTERMEDIATE FLOOR PROPS HAS TO BE TAKEN FROM THE DRAWING.
AS SHOWN
Safety instruction:
Do not weld or heat tie rods!
USE OF INTERMEDIATE FLOOR PROPS BY COSTUMER: THE DESIGN CONSIDERS PROPS WITH A LOAD CAPACITY
OF 20kN. THE NUMBER OF PROPS HAS TO BE INCREASED IN THE RATIO OF ITS ALLOWABLE LOAD CAPACITY.
ALL INTERMEDIATE FLOOR PROPS HAVE TO BE SECURED
AGAINST TIPPING OVER.
TO AVOID RISKS REGARDING HEALTH & SAFETY OF USERS OR THIRD PERSONS, "USER INFORMATION",
"OPERATING INSTRUCTIONS" AND "FITTING INSTRUCTIONS" HAVE TO BE NOTED IN ADDITION TO THE INFORMATION
GIVEN ON THE DRAWINGS.
IF REQUIRED ASK YOUR DOKA PARTNER FOR THESE DOCUMENTS.
SCAFFOLD BOARDS FOR PLATFORMS AND RAILING ARE TO BE PROVIDED BY SITE AND MUST BE FIXED ACCORDING
TO HEALTH & SAFETY REGULATIONS AND LOCAL LAW!
TO PROTECT THE FORMWORK SHEET AGAINST DAMAGING USE VIBRATORS WITH PROTECTIVE CAPS.
CONSTRUCTION OF KAHRAMAA
CENTRAL WORKSHOP
TITLE
DRAWING No.
GTC517-25A-S-S-D-501
DATE
SHT.
REV.
2/6