Check List for Isometrics is as follows:1.

PMS in Title/ Item code in BOM


2. Inchdia calculation appearing (lower left corner)
3. All the coordinates of the pipe at the Start and End are
4.
5.
6.
7.

depicted
The Elevation of the Funnel is 100100
The Elevation of the WF & Vent Pipe is 100300
MTO of atta should not appear in the BOM
There is a 100 mm spool between the top of the funnel

and the reducer


8. For CRWS/ OWS Pipes Manhole to Manhole/ CB to MH, the
tag number of the manhole and catch basin are
appearing.
9. Slope in the pipes