Вы находитесь на странице: 1из 7

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Continuous Beam:

Checked by

Date

(Code of Practice : BS8110 - 1997)

C01

Input Tables
Fcu (MPa)

30

Fy (MPa)

450

Fyv (MPa)

250

% Redistribution

Downward/Optimized redistr.

Cover to centre top steel(mm)

40

Cover to centre bot.steel(mm)

40

Dead Load Factor

1.4

Live Load Factor

1.6

Density of concrete (kN/m3)

24

% Live load permanent

25

(Creep coefficient)

Ecs (Free shrinkage strain)

300E-6

Sec
No.

Bw
(mm)

D
(mm)

750

330

Bf-top
(mm)

Span
No

Section
Length(m)

Sec No
Left

4.87

Sup
No.

Code
C,F

Hf-top
(mm)

Case
D,L

Span

Wleft
(kN/m)

12

4.81

11.95

0.87

2.36

B(mm)

Wright
(kN/m)

0.4

Hf-bot
(mm)

Y-offset
(mm)

Web
offset

Flange
offset

Sec No
Right

Column Below
D(mm)

Bf-bot
(mm)

H(m)

a
(m)

Code
F,P

b
(m)

Code
F,P

Column above
D(mm)

P
(kN)

B(mm)

a
(m)

H(m)

M
(kNm)

a
(m)

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Checked by

Date

Deflection, Shear, Moment and Steel diagrams. Span 1


4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

Def max = 4.03mm @ 2.44m


1.20

1.00

.800

.600

.400

.500

.200

Elastic Deflections (Alternate spans loaded)

1.00
1.50
2.00
2.50
3.00
3.50
4.00

4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

Def max = 18.5mm @ 2.44m


2.00

1.80

1.60

1.40

1.20

1.00

.800

.600

.400

.200

Long-term Deflections (All spans loaded - using entered reinforcement)


2.00
4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0

4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

1.20

1.00

.800

.600

V max = 118 kN @ 0.00m

.400

.200

SHEAR: X-X
120
100
80.0
60.0
40.0
20.0
-20.0
-40.0
-60.0
-80.0
-100

4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

1.20

1.00

.800

M max = 135 kNm @ 2.44m


.600

.400

20.0

.200

MOMENTS: X-X

40.0
60.0
80.0
100
120

Shear Steel: X-X

Asv max = 1.26mm/mm @ 0.00m

1.20
1.00
.800
.600

200
400
600
800
1000
1200

4.80

4.60

4.40

4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

1.20

1.00

.800

As max = 1200mm2 @ 2.44m


.600

.400

.200

Bending Steel: X-X

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

1.20

1.00

.800

.600

.400

.200

.200

.400

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Checked by

Date

=====================================================================
C O N T I N U O U S B E A M
Ver W1.7.02 - 10 Nov 2000
Title :
Data File :
Date/Time : 4/6/2013
Code of Practice : BS8110 - 1997
=====================================================================
BENDING MOMENTS & REINFORCEMENT
SPAN 1
Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.435
2.685
2.935
3.185
3.435
3.685
3.935
4.185
4.435
4.685
4.870

0.00
17.70
33.27
46.75
58.17
67.56
74.98
80.44
84.00
85.69
85.75
84.27
81.01
76.03
69.34
61.00
51.03
39.48
26.38
11.76
0.00

0.00
27.77
52.23
73.43
91.43
106.28
118.03
126.73
132.43
135.20
135.37
133.13
128.09
120.30
109.81
96.68
80.95
62.68
41.91
18.71
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
235.76
443.44
623.48
782.39
919.24
1029.82
1113.09
1168.35
1195.29
1197.03
1175.17
1126.25
1051.47
952.28
830.39
687.62
532.16
355.86
158.86
0.00

--------------------------------------------------------------------SHEAR FORCES & REINFORCEMENT


SPAN 1
Position(m)

0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.435
2.685
2.935
3.185
3.435

Minimum
Shear(kN)
75.12
66.52
58.07
49.76
41.61
33.60
25.74
18.03
10.46
3.05
-3.28
-14.59
-25.70
-36.59
-47.28

Maximum
Shear(kN)
117.75
104.42
91.29
78.37
65.66
53.16
40.87
28.78
16.90
5.22
-2.34
-9.50
-16.51
-23.37
-30.08

Shear
Asv/Sv
Capacity(kN) (mm2/mm)
953.04
195.14
108.08
104.38
112.58
118.80
123.38
126.62
128.68
129.67
129.73
128.93
127.12
124.24
120.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Asv/Sv(nom)
(mm2/mm)
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26
1.26

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

3.685
3.935
4.185
4.435
4.685
4.870

Client
Calcs by

-57.77
-68.04
-78.11
-87.97
-97.62
-104.63

Checked by

-36.65
-43.06
-49.33
-55.45
-61.42
-65.74

114.84
107.84
99.01
115.44
263.70
953.04

Date

0.00
0.00
0.00
0.00
0.00
0.00

1.26
1.26
1.26
1.26
1.26
1.26

--------------------------------------------------------------------COLUMN REACTIONS
Support

Dead Load (kN)

Live Load (kN)

Ultimate (kN)

75.12
65.74

7.87
7.87

117.75
104.63

1
2

--------------------------------------------------------------------COLUMN MOMENTS (Ultimate limit state)


Columns below
Support
No.
1
2

Bending Moment(kNm)
Min.
Max.
0.00
0.00

0.00
0.00

Shear Force (kN)


Min.
Max.
0.00
0.00

0.00
0.00

Columns above
Support
No.
1
2

Bending Moment(kNm)
Min.
Max.
0.00
0.00

0.00
0.00

Shear Force (kN)


Min.
Max.
0.00
0.00

0.00
0.00

--------------------------------------------------------------------ELASTIC DEFLECTIONS (Alternate spans loaded - positive downward)


SPAN 1
Position(m)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.435
2.435
2.685
2.935
3.185
3.435
3.685
3.935

Min.Deflection(mm)
-0.00
0.59
1.16
1.69
2.18
2.61
2.98
3.27
3.48
3.60
3.63
3.63
3.57
3.41
3.17
2.85
2.47
2.02

Max.Deflection(mm)
-0.00
0.66
1.29
1.88
2.42
2.90
3.31
3.64
3.87
4.01
4.03
4.03
3.97
3.80
3.53
3.18
2.75
2.25

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

4.185
4.435
4.685
4.870

Checked by

1.53
0.99
0.43
0.00

Date

1.70
1.11
0.48
0.00

--------------------------------------------------------------------LONGTERM DEFLECTIONS (All spans loaded - positive downward)


Symbols: DS
DL
DI
DT

:
:
:
:

Shrinkage deflection.
Long-term deflection under permanent load.
Instantaneous deflection under short-term load.
Total long-term deflection.

SPAN 1
Position(m)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.435
2.435
2.685
2.935
3.185
3.435
3.685
3.935
4.185
4.435
4.685
4.870

DS(mm)

DL(mm)

DI(mm)

DT(mm)

-0.00
0.37
0.73
1.06
1.35
1.60
1.80
1.96
2.07
2.12
2.14
2.14
2.11
2.04
1.92
1.75
1.53
1.28
0.97
0.64
0.27
0.00

0.00
2.47
4.89
7.17
9.26
11.10
12.64
13.84
14.68
15.13
15.22
15.22
14.99
14.38
13.40
12.08
10.45
8.56
6.44
4.17
1.79
0.00

0.00
0.18
0.35
0.52
0.67
0.80
0.91
1.00
1.06
1.09
1.10
1.10
1.09
1.04
0.98
0.88
0.77
0.63
0.47
0.31
0.13
0.00

-0.00
3.02
5.97
8.75
11.28
13.50
15.35
16.79
17.80
18.35
18.45
18.45
18.19
17.46
16.30
14.71
12.75
10.46
7.89
5.11
2.20
0.00

--------------------------------------------------------------------Total weight of beam = 28.93 kN


=====================================================================

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Checked by

Date

Reinforcing Tables
Beam type (1-5)

Maximum bar length(mm)

13

TOP: Minimum bar diameter(mm)

12

Maximum bar diameter(mm)

40

BOTTOM: Minimum bar diameter(mm) 12


Maximum bar diameter(mm)

40

STIRRUP: Minimum diameter(mm)

Maximum diameter(mm)

16

Stirrup shape code

72

First bar mark - top

First bar mark - mid.[optional]


First bar mark - bot.[optional]
Cover to stirrups - top(mm)

30

Cover to stirrups - bot(mm)

30

Cover to stirrups - sides(mm)

25

Minimum stirrups as % of nominal

100

Loose method of detailing(Y/N)

Bars

Mark

SC

Span

Offset

Length

Hook Layer

7Y12

35

0.025

4.820

7Y16

35

0.025

4.820

Stirrup
Section
Number Number Bar

Mark

Shape
Code

R10

SA1

72

R10

SA2

72

R10

SA3

35

Stirrup
Number Spacing Span

Offset

Length
(m)

200

0.20

4.47

Label

Span

Offset(m)

2.6

File name

CB.PAD

First span

Last span

Draw grid lines?(Y/N)

Draw columns?(Y/N)

Number/Letter of first grid A


Number (U)p or (D)own

Drawing size?(A4 or A5)

A5

Job Number

Sheet

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Checked by

Date

Main and Shear Reinforcing diagrams. Span 1


SPAN 1

7Y12-A

7Y16-B

MAIN REINFORCEMENT

As max = 1410mm2 @ .750m

4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

1.20

1.00

.800

.600

.400

.200

-500

500
1000

SPAN 1

23-SA-200

SHEAR REINFORCEMENT

Asv max = 1.57mm/mm @ .250m

1.60
1.40
1.20
1.00
.800
.600
4.80

4.60

4.40

4.20

4.00

3.80

3.60

3.40

3.20

3.00

2.80

2.60

2.40

2.20

2.00

1.80

1.60

1.40

1.20

1.00

.800

.600

.400

.200

.200

.400

Вам также может понравиться