S. No. Item
102 Jungle clearance including uprooting of rank
vegetation, grass, brush wood, saplings and tree
not exceeding 30cm girth and removing not
exceeding 50meters outside the periphery of
the area cleared.
Site clearing
1201 Rammed moorum flooring
Nos. L
D/H
Qty
Unit
Rate
Amount
190
63
11970 m2
7.4
88578
190
63
11970 m2
7.4
88578
506
0.3
455.4 m3
247.9
112893.66
506
2.5
1265 m2
586
741290
Total =
20 % above tender rate =
1 % for labour welfare =
3.5 % for contingencies=
Gross Total =
201471.66
40294.33
2014.72
7051.51
250832.22
Say 11.73 lacs