i1 (SCOPE]
“This fnstruction manual sto explain how to assemble « Heat Shrinkable Termination for
TIRV.S3KV Single Core CoppeAtuminiuza conductor XUPE Insulated Cables
2 QSSEMBLY)
efor staring the jointing operations, please ensure tha the under mentioned contents are
ville inthe it
1. Heat Shrinkable Adhesive Lined Gland Sleeve 1 No.
2. Mastic Sealing Tape 1 Rott
3, Amour Eating Material (Backup Ring | No, + Timed Copper 1 set
Braid 1 No + Tublee Clamps 2 No)
4.” Mate Screen Bathing Material (Small Copper Braid + 1 set -
Solder Wire + Flux)
5. Sitican Grease 1 Pack
6 Stress Control Mastic 1 No
7, Beat Suinkable Ses Control Tubing 1 No
8. Heat Shrinkable Anti Tracking and Weather Resistant Tubing 1 No
9. Heat Shcinkable Polymeric Rain Sheds (KY) 7-2 Now
For Outdoor (22KV) 3 Nos
GaKV) U4 Nos
ForIndoor (2KV) 1 No
@3KV) 2 Nos.
10. Aloxite Emery Tape (80,150 & 220 Grit) 1 No. Each
11 Inuslating Tape for hug Sealing/Lug Sealing Mastic 1 Roll/l Strip
12, Heat Shiskable Teominal Sleeve 1 Na.
15, Cleaning tissoe/Core Cleaning Solvent 2 Nos
14, Heavy Duty Terminal Lug 1 No
15, Nylon Sting 1 No
16. Mopping Cloth 1 No
17, Tastruction Manual 1 No
[rete3. CABLE PREPARATION :-
‘Strip off the eable outer sheath, armour, inner sheath, metal
tape shield and semi-conducting sree as per the dimension
shown inthe drawing.
Voltage | — x
Rating ‘Termination ‘Termination
Length of barrel of | Length of bare of
TLKV | serminal ug + 450mm | terminal hig + $50cam
Teagit of banel oF
im | Length of barrel of
22KV | terminal tug +5500 beter
Length of barrel of ‘Length of barrel of
33KV | terminal lug + 800mm | terminal lug + 900mm
L = 40mm for cables having outer die upto SOmm & 65mm
for cables having outer die more than SOmm.
4, EARTHING ARRANGEMENT FOR METAL FOIL,
Solder one small copper braid to the metal sheild at about
100mm from the end of the inner sheath. Ensure that free
end of the braid extend upto the armour wires.
the metallic shileding of the core of the cable, down
towards armour for main earthing arrangement.
‘This small copper braid shall be inserted under the
jublee clamps being fixed on the armour for main
‘earthing connection.
Wrap Copper braided one layer around the armour
with minimum 30mm overlapping. Also insert small
copper braid under this assembly. Tighten the comp-
lete assembly with jublee clamps. The remaining
copper braided strip shall be taken out for connection|
to the earth point as shown (This arrangement is not
required for unarmoured cable) . Apply one layer of
mastic sealing tape around the cable outer sheath.
Put the earthing braid over it & wrap two more
layers. Also wrap mastic sealing tape over the
earthing assembly and sharp edge, if any.10,
(Cut off core insulation with the help of Nylon string for fixing ofthe lg. At this time
take care not to tthe cable condor. Put the terminal lg acd compress with spp
cable de, Fill the gap between XLPE insulating and the terminal lg withthe help of
sleeve and position the
E Page -5 of 5