NAIZAK CLARIFICATIONS

1- We need the proposal to be comply with SOW , Base design phase


4.8.4(CONTRACTORs design team shall conduct coordination meetings at the
PROJECT SITE with COMPANY on bi-weekly (once every 2 weeks) basis until
the design is complete.
2- Please clarify what it is mean by ( Assist in design approval ) in the scope of
proposal service mention ; as per SOW Dar Engineering should be provide
also the final design approval .
3- It is mention in the offer paragraph D. Assumption .d.(We have considered
only three visits to site .etc ), We need your proposal to comply with SOW
mention in our comments point 2 above .
4- Please provide us the projection of engineering design duration in numbers
of week .
5-

Please confirming that the offer proposal comply with SOW paragraph 4.7
Acquiring Documents & Information.

6- Please confirm that there will three(3) package submittal each 4 sets. As per
the SOW paragraph 4.9.6 (CONTRACTOR shall submit four (4) sets of the CMD
Final Design documents and CDs for review)
7- Please also let the validity of the offer remain for (60) days following the
date of submit.
8-

Please provide us with draft of project design schedule for the engineering
and design including the miles stone event .

9- Please provide us with engineering deliverables in team of paper size A for


different disciplines ( electrical , instrument , communication , etc

).