Uraian
Satuan
Volume
PERSIAPAN
1 Pekerjaan Pembersihan Lokasi
2 Pekerjaan Pemasangan Bowplank
3 Pekerjaan Mobiliasi Peralatan Kerja
PEKERJAAN BALOK SLOFF
P.PS.02
-
1.00
34.00
1.00
Ls
M
Ls
P.T.04
68.25
M3
P.T.13
P.K.09
9.90
741.00
M3
Btg
P.Bb.01
3.44
M3
P.Bb.12
780.20
804.98
31.75
287.59
195.52
Kg
Kg
Kg
Kg
M2
P.Bb.04
P.Pls
42.83
264.64
M3
M2
P.Ct.11
238.06
M2
2.00
Unit
Pontianak,
CV. BONARDO BORNEO
SAHAT P SIAHAAN
Direktur
AYA (RAB)
2,500,000.00
1,665,830.00
3,700,000.00
84,705.60
5,781,157.20
227,898.00
37,424.00
2,256,190.20
27,731,184.00
1,268,086.06
4,362,216.03
17,741.00
20,020.00
22,330.00
21,450.00
349,960.60
13,841,528.20
16,115,699.60
708,977.50
6,168,805.50
68,424,296.51
1,527,352.47
59,541.84
65,416,506.15
15,757,151.48
34,632.74
8,244,670.08
1,500,000.00
3,000,000.00
245,674,212.45
24,567,421.25
270,241,633.70
270,241,000.00
Jumlah
PPN 10%
Jumlah Total
Pembulatan
Pontianak,
CV. BONARDO BORNEO
SAHAT P SIAHAAN
140,000,000.00
105,674,212.45
2
1
2
3
4
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
KUANTITAS
5
OH
OH
OH
OH
81,000.00
81,000.00
104,800.00
115,800.00
0.100
0.100
0.010
0.005
BAHAN
1 Kayu Pancang (Dolken) d =8-10 cm, p = 4m
2 Paku
Btg
Kg
16,500.00
22,900.00
1.000
0.020
M3
2,030,000.00
0.007
Jumlah
B
Jumlah
C
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
1
A
TENAGA
1 Pekerja
2 Mandor
OH
OH
81,000.00
115,800.00
KUANTITAS
5
0.100
0.050
Jumlah
B
C
Jumlah A
Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
Pekerjaan Persiapan
BIAYA
SATUAN
( Rp. )
6
8,100.00
8,100.00
1,048.00
579.00
17,827.00
16,500.00
458.00
14,210.00
31,168.00
48,995.00
48,995.00
BIAYA
SATUAN
( Rp. )
6
8,100.00
5,790.00
13,890.00
13,890.00
13,890.00
Pekerjaan Persiapan
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
1
A
TENAGA
1 Pekerja
2 Mandor
OH
OH
KUANTITAS
5
81,000.00
115,800.00
1.000
0.0320
Jumlah
B
Jumlah A
Harga Satuan
Acuan : SNI DT-91-0006-2007
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
1
A
TENAGA
1 Pekerja
2 Mandor
OH
OH
KUANTITAS
5
81,000.00
115,800.00
1.500
0.0600
Jumlah
B
Jumlah A
Harga Satuan
Acuan : SNI DT-91-0006-2007
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
1
A
TENAGA
1 Pekerja
2 Mandor
KUANTITAS
5
OH
OH
81,000.00
115,800.00
0.300
0.010
M3
168,700.00
1.200
Jumlah
B
BAHAN
1 Pasir Urug
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI DT-91-0006-2007
Pekerjaan Tanah
BIAYA
SATUAN
( Rp. )
6
81,000.00
3,705.60
84,705.60
84,705.60
84,705.60
BIAYA
SATUAN
( Rp. )
6
121,500.00
6,948.00
128,448.00
128,448.00
128,448.00
BIAYA
SATUAN
( Rp. )
6
24,300.00
1,158.00
25,458.00
202,440.00
202,440.00
227,898.00
227,898.00
Pekerjaan Tanah
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
OH
OH
OH
OH
KUANTITAS
5
81,000.00
81,000.00
104,800.00
115,800.00
24.000
8.000
2.400
0.400
Jumlah
B
BAHAN
1 Kayu Kelas I (Ketam Uk. 7/7)
2 Paku
M3
Kg
Err:509
1.100
22,900.00
6.000
Jumlah
C
Jumlah A + B
Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a
1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 (P.K. 08)
No.
1
A
1
2
3
4
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
OH
OH
OH
OH
KUANTITAS
5
81,000.00
81,000.00
104,800.00
115,800.00
24.000
8.000
2.400
0.400
Jumlah
B
BAHAN
1 Kayu Kelas I (Ketam Uk. 8/8)
2 Paku
M3
Kg
Err:509
1.100
22,900.00
6.000
Jumlah
C
Jumlah A + B
Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
Tukang Kayu
OH
104,500.00
KUANTITAS
5
0.250
Pekerjaan Kayu
2
3
4
Kepala Tukang
Pekerja
Mandor
Jumlah A
Harga Satuan
OH
OH
OH
104,800.00
81,000.00
115,800.00
0.025
0.100
0.005
Jumlah
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.1
Pekerjaan Kayu
10
BIAYA
SATUAN
( Rp. )
6
1,944,000.00
648,000.00
251,520.00
46,320.00
2,889,840.00
Err:509
137,400.00
Err:509
Err:509
Err:509
BIAYA
SATUAN
( Rp. )
6
1,944,000.00
648,000.00
251,520.00
46,320.00
2,889,840.00
Err:509
137,400.00
Err:509
Err:509
Err:509
BIAYA
SATUAN
( Rp. )
6
26,125.00
Pekerjaan Kayu
11
2,620.00
8,100.00
579.00
37,424.00
37,424.00
37,424.00
Pekerjaan Kayu
12
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB
No.
1
A
1
2
3
4
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)
Air
Jumlah
Jumlah A + B
Harga Satuan
B
1
2
3
4
KUANTITAS
5
OH
OH
OH
OH
81,000.00
81,000.00
104,800.00
115,800.00
1.200
0.200
0.020
0.060
Kg
Kg
Kg
Liter
1,586.00
120.50
655.56
0.00
230.000
893.000
1,027.000
0.000
No.
1
A
1
2
3
4
URAIAN PEKERJAAN
SATUAN
HARGA
SATUAN
( Rp. )
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
KUANTITAS
5
OH
OH
OH
OH
81,000.00
81,000.00
104,800.00
115,800.00
1.650
0.275
0.028
0.083
Kg
Kg
Kg
Liter
1,586.00
120.50
655.56
0.00
371.000
698.000
1,047.000
0.000
Jumlah
B
1
2
3
4
C
D
BAHAN
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)
Air
Jumlah
Jumlah A + B
Harga Satuan
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m 3, Buckling factor pasir = 20%
URAIAN PEKERJAAN
SATUAN
1
A
TENAGA
1 Pekerja
2 Tukang Besi
OH
OH
HARGA
SATUAN
( Rp. )
KUANTITAS
4
5
Pekerjaan Beton Bertulang
81,000.00
81,000.00
13
0.0250
0.0250
= 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01)
BIAYA
SATUAN
( Rp. )
6
97,200.00
16,200.00
2,096.00
6,948.00
122,444.00
364,780.00
107,606.50
673,255.56
0.00
1,145,642.06
1,268,086.06
1,268,086.06
BIAYA
SATUAN
( Rp. )
6
133,650.00
22,275.00
2,934.40
9,611.40
168,470.80
588,406.00
84,109.00
686,366.67
0.00
1,358,881.67
1,527,352.47
1,527,352.47
BIAYA
SATUAN
( Rp. )
6
14
2
1
2
3
4
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Jumlah
BAHAN
1 Plamur (dempul tembok)
2 Cat Dasar tembok
3 Cat Tembok Penutup 2 x
OH
OH
OH
OH
81,000.00
81,000.00
104,800.00
115,800.00
0.020
0.063
0.0063
0.0025
Kg
Kg
Kg
17,700.00
56,300.00
70,900.00
0.100
0.120
0.260
Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
Pekerjaan Pengecatan
15
7,672.74
1,770.00
6,756.00
18,434.00
26,960.00
34,632.74
34,632.74
Pekerjaan Pengecatan
16
LAMPIRAN 1
TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALI
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) K
TAHUN ANGGARAN 2010
( Periode Januari s/d Desember 2010 )
HARGA
TANPA
NO
TENAGA KERJA
SATUAN
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
A. UPAH
1
Mandor Lapangan
Org/hari
L.061
60,500.00
Mekanik
Org/hari
L.071
60,500.00
Kepala Tukang
Org/hari
L.073
60,500.00
Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang
Org/hari
L.079
55,000.00
Operator terlatih
Org/hari
L.081
49,500.00
Org/hari
L.082
44,000.00
Sopir
Org/hari
L.091
49,500.00
Org/hari
L.101
44,000.00
Org/hari
L.106
49,500.00
NO
MATERIAL
SATUAN
B. BAHAN PENGISI
1
Batu Kong
NO
MATERIAL
SATUAN
10
11
Stone Dust
12
Aspal
Kg
13
Pasir
14
Semen PC
Zak
15
Semen PC
Kg
16
17
18
Paving Block
Bh
19
Paving Stone
Bh
20
Bh
21
Bataco 15 x 30 x 7 cm
Bh
22
Bataco 20 x 40 x 9 cm ( press )
Bh
23
Bataco 20 x 40 x 7 cm ( press )
Bh
24
Kerawang ( roster ) 18 x 18 cm
Bh
25
Bh
26
Keramik 20 x 20 cm
Kotak
27
Keramik 30 x 30 cm
Kotak
28
Keramik 30 x 30 cm Unpolished
Kotak
29
Keramik 30 x 30 cm Artistik
Kotak
30
Keramik 40 x 40 cm (biasa)
Kotak
31
Kotak
32
Keramik 40 x 40 cm Unpolished
Kotak
33
Kotak
34
Granito 40 x 40 cm
Kotak
35
Marmer
36
Wood Flooring
37
Bh
38
M1
39
Keramik dinding 20 x 20 cm
Kotak
40
Keramik dinding 20 x 25 cm
Kotak
41
Floor Hardener
Kg
42
43
44
45
46
47
48
Gulung
NO
MATERIAL
SATUAN
49
Btg
50
Btg
51
Btg
52
Btg
53
Kpg
54
Kpg
55
Btg
56
57
NO
MATERIAL
SATUAN
C.
BAHAN KAYU
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Papan Simpiran
NO
MATERIAL
SATUAN
41
Btg
42
Btg
43
Btg
44
Btg
45
Btg
46
Btg
47
48
Btg
D.
BAHAN CAT
Amplas
Lbr
Minyak cat
Kg
Cat kilat
Kg
Plamur
Kg
Cat dasar
Kg
Cat tembok
Kg
Kg
Kg
Cat seng
Kg
10
Dempul
Kg
11
Plitur
Kg
12
Thiner
Ltr
13
Thiner ND
Ltr
14
Melamic
Ltr
15
Vernis
Ltr
16
Meni
Kg
17
Oker
Kg
18
Lem Kayu
19
Sealent
20
Soda Api
Kg
21
Kg
22
Teak Oil
Ltr
23
Ter / Residu
Ltr
24
Kuas 4"
Bh
25
Ltr
26
Glass Bit
Kg
27
Kg
28
Termoplast
Kg
Kg
Tube
E.
Kg
Kg
NO
MATERIAL
SATUAN
Kawat baja/bendrat
Kg
Simpai roll
Kg
Kawat simpai
Kg
Btg
Besi Penahan
bh
Beugel plat L. 3 cm
bh
Bh
10
Kg
11
Besi Konstruksi ( C )
Kg
12
Kg
13
Kawat Las
Btg
NO
MATERIAL
SATUAN
14
Kawat Las
Kg
15
Kawat harmonika
16
Kawat kasa
17
Btg
18
Btg
19
Btg
20
Btg
21
Btg
22
Btg
23
Btg
24
Btg
25
Folding gate
26
Meter
27
Meter
28
29
30
31
Alumatek
Unit
Unit
F.
BAHAN PENGANTUNG
Bh
Kait angin
Bh
Handle Jendela
Bh
Handle Pintu
Bh
Engsel jendela
Bh
Engsel pintu
Bh
Slot pintu
Bh
Slot jendela
Bh
Bh
10
Bh
11
Bh
12
Bh
13
Kunci silinder
Bh
14
Door Closer
Bh
15
Door Stoper
Bh
16
Paku Seng
Kg
17
Kg
18
Paku beton
Kg
19
Kg
20
Paku triplek
Kg
21
Paku GRC
Kg
22
Paku Zincallume
Kg
NO
MATERIAL
SATUAN
23
Sekrup Gypsum
Kg
24
Sekrup Fixer
Bh
25
Engsel Angin
Bh
G.
BAHAN ATAP
Sirap belian
Lbr
Asbes
Lbr
Eternit
Lbr
Lbr
Lbr
Lbr
Lbr
M'
10
11
12
13
Bh
14
Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm)
Bh
15
M'
16
M'
17
M'
18
M'
19
Lbr
20
Lbr
21
Lbr
22
Lbr
23
M'
24
Lbr
25
26
27
28
29
Lbr
30
Aluminium Foil
H.
BAHAN KACA
Kaca Polos, t = 5 mm
Kaca Rayben, t = 5 mm
Kaca Patri
NO
MATERIAL
SATUAN
Sealent
Kg
Bh
Bh
Kaca Es
I.
BAHAN TRIPLEK
Triplek t = 3 mm
Lbr
Triplek t = 6 mm
Lbr
Triplek t =9 mm
Lbr
Multiplek t = 10 mm
Lbr
Multiplek t = 12 mm
Lbr
NO
MATERIAL
SATUAN
Lbr
Lbr
GypsumBoard t = 9mm
Lbr
J.
BAHAN SANITASI
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
10
Btg
11
Btg
12
Btg
K.
Minyak solar
Ltr
Ltr
Bensin premium
Ltr
Minyak pelumas
Ltr
Ltr
Minyak tanah
Ltr
Ltr
Gas Elpiji
Kg
Alat-alat bantu
Set
10
Jam
11
Sewa Molen
Set
12
Set
L.
Unit
Unit
Unit
Unit
Unit
Unit
Set
Set
Set
NO
MATERIAL
SATUAN
Set
Tiang
Tiang
Btg
Btg
Tiang
Tiang
Btg
Btg
Btg
Btg
Btg
Btg
Btg
12
Btg
Set
Set
Buah
29 Traffo
Buah
30 Traffo
Buah
31 Traffo
Buah
32 Traffo
Buah
33 Traffo
Buah
34 Traffo
Buah
35 Traffo
Buah
36 Traffo
Buah
37 Traffo
SON T 70 Watt
Buah
38 Traffo
Buah
39 Traffo
Buah
40 Traffo
Buah
41 Traffo
SON H 70 Watt
Buah
42 Traffo
HPiT 400
Buah
43 Traffo
Neon 40 Watt
Buah
44 Traffo
Neon 20 Watt
Buah
45 Traffo
Neon 10 Watt
Buah
46 HPL
400 Watt
Buah
47 HPL
250 Watt
Buah
48 HPL
125 Watt
Buah
49 SOX
135 Watt
Buah
50 SOX
180 Watt
Buah
51 MLL
160 Watt
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
60 SON H 70 Watt
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Kotak
64 Seri Kuning
Kotak
65 Neon Sen
Meter
66 Pijar 5 Watt
Buah
67 Pijar 20 Watt
Buah
68 Pijar 25 Watt
Buah
69 Pijar 40 Watt
Buah
70 Pijar 60 Watt
Buah
71 Pijar 75 Watt
Buah
72 Pijar 80 Watt
Buah
Buah
Buah
75 Neon 40 Watt
Buah
76 Neon 20 Watt
Buah
77 Neon 10 Watt
Buah
Set
Buah
Buah
81 Lampu XL 14 Watt
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
98 Lampu Taman
Buah
99 SL 15 Watt
Buah
100 SL 18 Watt
Buah
101 SL 25 Watt
Buah
Buah
NO
MATERIAL
SATUAN
Buah
Buah
Buah
Buah
Buah
Buah
109 NYY
1 x 1.5 mm
Meter
110 NYY
1 x 2.5 mm
Meter
111 NYY
1 x 4 mm
Meter
112 NYY
1 x 6 mm
Meter
113 NYY
2 mm
Meter
114 NYY
2 x 2.5 mm
Meter
115 NYY
2 x 4 mm
Meter
116 NYY
2 x 6 mm
Meter
117 NYY
2 x 10 mm
Meter
118 NYY
3 x 4 mm
Meter
119 NYY
4 x 2.5 mm
Meter
120 NYY
4 x 4 mm
Meter
121 NYY
4 x 6 mm
Meter
122 NYY
4 x 10 mm
Meter
123 NYY
4 x 16 mm
Meter
124 NYY
4 x 25 mm
Meter
125 NYY
4 x 35 mm
Meter
126 NYY
4 x 50 mm
Meter
127 NYY
4 x 70 mm
Meter
128 NYYFYGBY 4 x 6 mm
Meter
129 NYYFYGBY 4 x 10 mm
Meter
130 NYN
2 x 2,5 mm
Meter
131 NYN
3 x 1,5 mm
Meter
132 NYN
3 x 2,5 mm
Meter
133 NYA
1 x 1,5 mm
Meter
134 NYA
1 x 2,5 mm
Meter
135 NYA
1 x 4 mm
Meter
136 NYA
1 x 6 mm
Meter
137 NYA
2 x 2,5 mm
Meter
138 NYA
2 x 4 mm
Meter
139 NYA
2 x 30 mm
Meter
140 NYA
4 x 6 mm
Meter
141 NYA
1,5 mm
Meter
142 NYA
4 mm
Meter
143 NYA
10 mm
Meter
144 NYA
16 mm
Meter
NO
MATERIAL
SATUAN
145 NYF6BY 4 x 10 mm
Meter
146 NYF6BY 4 x 16 mm
Meter
147 NYF6BY 4 x 25 mm
Meter
148 NYF6BY 4 x 35 mm
Meter
149 NYF6BY 4 x 50 mm
Meter
150 NYF6BY 4 x 70 mm
Meter
151 NYM
4 mm
Meter
152 NYM
3 x 4 mm
Meter
153 NYM
2 x 2 mm
Meter
154 NYM
2 x 4 mm
Meter
NO
MATERIAL
SATUAN
155 NYM
2 x 2,5 mm
Meter
156 NYM
2 x 1,5 mm
Meter
157 NYM
3 x 1,5 mm
Meter
158 NYM
3 x 2,5 mm
Meter
159 NYM
3 x 10 mm
Meter
160 NYM
4 x 2,5 mm
Meter
161 NYM
4 x 4 mm
Meter
Meter
Meter
Buah
Buah
Buah
Buah
Roll
Meter
Meter
Roll
Meter
Roll
174 Kabel H / M
Meter
Meter
Meter
177 Kabel TC 2 x 10 mm
Meter
178 Kabel TC 2 x 16 mm
Meter
Buah
Buah
Buah
Buah
183 Conector
Buah
Buah
185 Esensial
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
NO
MATERIAL
SATUAN
197 Icnitor SN 58
Buah
198 Inector
Buah
199 Ignator
Buah
200 Indiktor
Buah
201 Insuluk
Buah
202 Kapasitor
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
212 MCB 25 A
Buah
213 MCB 63 A
Buah
214 MCB 40 A
Buah
215 MCB 45 A
Buah
216 MCB 50 A
Buah
217 MCB 10 A
Buah
218 MCB 16 A
Buah
219 MCB 6 A
Buah
220 MCB 2 A
Buah
221 MCB 4 A
Buah
222 MCB 32 A
Buah
Buah
Buah
225 MC Se-3 N
Buah
Buah
Buah
228 NH Fuse 80 A
Buah
Buah
Buah
Buah
Buah
Buah
234 On - Off
Buah
235 Pat 38
Buah
Buah
Batang
Batang
NO
MATERIAL
SATUAN
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
NO
MATERIAL
SATUAN
Batang
Unit
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
260 Sekring 63 A
Buah
Buah
262 Solder
Buah
Buah
Buah
Buah
266 Steker T
Buah
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
Steker PH
Sadel No. 6
Sadel No. 8
Sadel No. 9
Sadel No. 10
Sadel No. 12
Sadel No. 14
Sadel No. 19
Sadel No. 22
Skun RS-16
Stater
Ston 63 A
Stost 40 A + Ip
Stost 32 A + Ip
Tedus Hitam
Tali Tester
Tang Amper
Tang Buaya
Tang Potong
Tang Kombinasi
Tang Jepit
Tang Skun
Time Swicht Theben
Taping
Taping Conector 1 baut
Taping Conector 2 baut
Tespen
Timah Solder
Buah
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
NO
295
296
297
298
299
MATERIAL
Terminal 25 ml
Tolkit
Wedge Klem
Wide Klem
WD 40
SATUAN
Buah
Buah
Buah
Buah
Buah
Set
Buah
Buah
Buah
Buah
Pasang
Pasang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Buah
Buah
Roll
Roll
Buah
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
WAKIL WALIKOT
NO
MATERIAL
SATUAN
TENTANG
SATUAN BAHAN, UPAH DAN ANALISA
TERDIRI DARI ANALISA E DAN ANALISA
UNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
N ANGGARAN 2010
HARGA
HARGA TERMASUK
KEUNTUNGAN
KEUNTUNGAN
(OVERHEAD)
(OVERHEAD)
(Rp)
(Rp)
6,050.00
66,550.00
6,050.00
66,550.00
6,050.00
66,550.00
5,500.00
60,500.00
4,950.00
54,450.00
4,400.00
48,400.00
4,950.00
54,450.00
4,400.00
48,400.00
4,950.00
54,450.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
M.101
192,500.00
215,050.00
230,230.00
M.020
246,070.00
M.022
271,060.00
M.023
290,700.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
M.024
327,030.00
M.025
373,580.00
394,900.00
M.026
394,900.00
371,360.00
9,900.00
M.040
58,370.00
M.080
70,400.00
1,400.00
M.050.a
115,060.00
M.050
220,000.00
2,200.00
3,630.00
2,530.00
990.00
2,530.00
2,310.00
3,300.00
26,400.00
50,120.00
40,030.00
54,450.00
64,130.00
71,390.00
96,250.00
98,450.00
277,200.00
189,420.00
453,750.00
275,000.00
242,000.00
46,750.00
50,380.00
54,890.00
8,250.00
792,000.00
830,500.00
880,000.00
1,017,500.00
1,094,500.00
44,000.00
11,550.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
1,155,000.00
1,485,000.00
990,000.00
1,105,500.00
880,000.00
1,122,000.00
138,050.00
55,000.00
3,850.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
9,736,320.00
11,463,540.00
9,063,230.00
M.181.a
9,350,550.00
M.181.b
7,903,940.00
8,116,350.00
7,370,770.00
8,934,750.00
11,892,210.00
10,771,200.00
10,771,200.00
9,453,120.00
M.181.e
16,958,370.00
M.181.d
15,074,070.00
M.181.f
6,660,170.00
M.181.g
11,297,220.00
4,630,120.00
6,033,170.00
11,550,000.00
82,500.00
M.181.h
2,194,720.00
M.181.i
3,293,620.00
3,724,160.00
3,168,550.00
2,764,960.00
1,883,750.00
3,053,270.00
3,244,010.00
3,949,990.00
4,109,820.00
2,520,870.00
4,947,360.00
962,500.00
2,046,110.00
M.181.j
4,541,790.00
M.181.k
6,331,160.00
9,052,120.00
7,562,500.00
M.181.l
1,323,520.00
604,780.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
19,360.00
20,680.00
5,630.00
10,450.00
66,000.00
82,500.00
181,500.00
16,500.00
2,310.00
27,940.00
42,130.00
29,480.00
33,000.00
36,520.00
40,260.00
80,080.00
42,900.00
27,940.00
39,160.00
M.090.f
22,990.00
32,450.00
56,540.00
30,910.00
44,220.00
55,820.00
20,400.00
137,500.00
11,660.00
20,350.00
44,000.00
25,300.00
17,710.00
M.090.e
49,500.00
M.090.g
36,520.00
M.090.h
79,200.00
34,100.00
M.167
15,510.00
17,710.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
M.168
18,700.00
20,900.00
26,620.00
M.163
8,250.00
11,550.00
38,500.00
445,500.00
17,930.00
18,590.00
18,590.00
5,500.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
110,000.00
27,500.00
13,750.00
148,610.00
121,880.00
191,510.00
269,830.00
312,730.00
384,450.00
614,350.00
437,580.00
550,000.00
82,500.00
105,600.00
2,392,500.00
253,000.00
165,000.00
2,090,000.00
302,500.00
14,850.00
16,500.00
110,000.00
24,750.00
33,000.00
20,350.00
11,550.00
184,250.00
118,250.00
179,020.00
86,900.00
107,250.00
123,750.00
22,000.00
M.166.a
24,530.00
M.166.b
20,900.00
27,500.00
M.166.c
27,500.00
28,870.00
28,870.00
38,500.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
66,000.00
330.00
11,000.00
5,500.00
55,000.00
71,500.00
69,630.00
69,630.00
67,320.00
88,880.00
88,880.00
93,500.00
116,930.00
104,530.00
117,420.00
71,500.00
88,000.00
85,360.00
101,200.00
114,400.00
128,700.00
71,390.00
51,370.00
52,800.00
71,500.00
20,900.00
60,500.00
114,120.00
100,370.00
127,870.00
114,120.00
130,900.00
55,000.00
109,450.00
422,400.00
146,300.00
156,750.00
1,045,000.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
111,650.00
214,500.00
225,500.00
167,200.00
60,500.00
133,100.00
165,000.00
187,000.00
222,200.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
109,340.00
64,900.00
67,100.00
1,705,000.00
2,145,000.00
2,343,000.00
204,600.00
137,500.00
38,500.00
17,820.00
27,670.00
40,700.00
61,820.00
117,150.00
154,000.00
M.183
4,500.00
5,750.00
M.184
5,600.00
M.185
24,200.00
42,400.00
M.064
5,100.00
6,100.00
8,300.00
M.170
57,000.00
62,500.00
150,000.00
63,300.00
13,167,000.00
-
5,458,530.00
3,724,980.00
5,105,100.00
4,274,980.00
4,939,000.00
544,500.00
6,675,900.00
5,563,250.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
3,599,750.00
7,754,900.00
6,805,880.00
7,237,010.00
7,601,000.00
67,217,150.00
80,659,700.00
10,838,520.00
12,362,130.00
10,838,300.00
11,388,300.00
983,010.00
982,980.00
915,200.00
682,000.00
517,000.00
4,664,000.00
3,376,170.00
797,500.00
249,700.00
202,030.00
124,850.00
842,870.00
842,870.00
459,430.00
374,360.00
248,320.00
144,550.00
409,290.00
280,950.00
248,320.00
148,220.00
270,500.00
19,610.00
16,360.00
14,390.00
202,950.00
148,310.00
70,210.00
485,550.00
485,550.00
70,210.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
742,500.00
336,600.00
324,500.00
248,320.00
168,520.00
280,950.00
280,950.00
248,320.00
140,430.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
336,600.00
324,610.00
55,450.00
55,450.00
41,620.00
2,100.00
3,480.00
3,480.00
3,480.00
4,950.00
4,950.00
3,940.00
6,230.00
13,840.00
13,100.00
9,070.00
5,220.00
538,080.00
131,810.00
41,610.00
34,650.00
137,500.00
34,650.00
5,500.00
6,230.00
34,650.00
34,650.00
27,770.00
70,210.00
148,220.00
83,230.00
20,800.00
22,180.00
31,900.00
37,490.00
38,860.00
51,330.00
34,650.00
115,500.00
44,990.00
58,190.00
27,680.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
33,360.00
51,970.00
137,500.00
40,240.00
79,100.00
90,100.00
2,970.00
4,620.00
7,260.00
11,220.00
6,140.00
12,210.00
17,500.00
16,610.00
21,900.00
23,740.00
23,430.00
34,650.00
56,260.00
76,560.00
65,900.00
273,350.00
305,250.00
374,550.00
134,560.00
86,680.00
127,930.00
6,500.00
5,950.00
7,880.00
2,970.00
4,620.00
7,260.00
11,220.00
12,210.00
17,600.00
12,280.00
22,820.00
1,370.00
3,570.00
8,700.00
2,380.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
60,500.00
88,270.00
122,100.00
155,370.00
199,740.00
271,970.00
3,570.00
19,700.00
5,950.00
14,660.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
10,170.00
4,400.00
5,500.00
7,880.00
27,680.00
10,080.00
25,480.00
3,110.00
5,310.00
929,500.00
551,320.00
449,240.00
173,470.00
55,450.00
27,680.00
55,450.00
180,300.00
7,880.00
34,650.00
2,010.00
2,750.00
1,650.00
7,090.00
9,900.00
8,250.00
4,120.00
55,450.00
1,106,050.00
7,970.00
6,960.00
34,650.00
1,460.00
3,480.00
27,770.00
17,440.00
17,440.00
22,110.00
27,770.00
12,500.00
69,390.00
69,390.00
4,950.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
99,880.00
83,230.00
55,500.00
130,160.00
320.00
156,200.00
27,500.00
44,000.00
97,070.00
97,070.00
4,190.00
11,130.00
840.00
13,880.00
13,880.00
13,880.00
124,850.00
52,700.00
52,700.00
235,620.00
68,000.00
34,650.00
34,650.00
13,880.00
34,650.00
34,650.00
3,480.00
62,420.00
911,620.00
499,490.00
1,327,260.00
25,000.00
48,560.00
48,560.00
19,610.00
19,610.00
2,090.00
6,270.00
52,020.00
124,850.00
229,070.00
7,650.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
2,090.00
9,020.00
8,340.00
16,680.00
43,490.00
149,990.00
83,230.00
97,120.00
438,530.00
569,430.00
1,145,370.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
1,276,270.00
1,439,900.00
2,810.00
13,840.00
20,800.00
4,900.00
6,280.00
4,300.00
16,680.00
55,450.00
9,020.00
305,250.00
20,800.00
124,850.00
4,190.00
8,340.00
9,710.00
2,810.00
980.00
1,300.00
1,440.00
3,850.00
4,950.00
2,810.00
4,190.00
8,370.00
980.00
2,810.00
124,880.00
52,750.00
34,680.00
710.00
20,800.00
901,900.00
27,750.00
27,750.00
27,750.00
27,750.00
277,500.00
592,180.00
457,870.00
10,690.00
17,440.00
6,920.00
20,800.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
34,690.00
62,420.00
4,190.00
6,420.00
34,690.00
192,500.00
630,850.00
7,150,000.00
55,000.00
6,050,000.00
550,000.00
366,850.00
8,800,000.00
66,000.00
2,750,000.00
165,000.00
330,000.00
49,500.00
4,950,000.00
5,500,000.00
5,390,000.00
8,250,000.00
8,800,000.00
3,025,000.00
3,245,000.00
10,560,000.00
9,680,000.00
17,875,000.00
91,208,370.00
5,225,000.00
733,330.00
1,100,000.00
11,000,000.00
17,416,660.00
38,700,470.00
5,500,000.00
9,533,330.00
HARGA TERMASUK
KODE
KEUNTUNGAN
(OVERHEAD)
(Rp)
TERTANDA
PARYADI, S.Hut
r. H. TONI HERIANTO, MT
Pembina Utama Muda
2
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
BAHAN
Semen Portland
Pasir
Jumlah
Jumlah A + B
Harga Satuan
1
2
3
4
B
1
2
OH
OH
OH
OH
81,000.00
104,800.00
104,800.00
115,800.00
0.300
0.150
0.015
0.015
Kg
M3
1,586.00
168,700.00
7.776
0.023
BIAYA
SATUAN
( Rp. )
6
24,300.00
15,720.00
1,572.00
1,737.00
43,329.00
12,332.74
3,880.10
16,212.84
59,541.84
59,541.84
TENTANG
STANDAR HARGA SATUAN UPAH, BAHAN
ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONE
DAN ANALISA KABUPATEN SAMBAS
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
52
57
58
59
60
61
71
72
76
82
89
90
94
102
103
104
105
106
TENAGA KERJA
NO
A.
1
2
3
4
5
6
7
8
9
UPAH
Mandor Lapangan
Mekanik
Kepala Tukang
Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listr
Operator terlatih
Operator semi terlatih
Sopir
Pekerja / Buruh Lapangan Tak terlatih
Pekerja / Buruh Lapangan terlatih
NO
MATERIAL
B. BAHAN PENGISI
1 Batu Kong
1
2
3
4
C.
1
2
39
3
4
D.
1
2
3
BAHAN CAT
Plamur
Cat Dasar Emulsion setara Mowilex
Cat Akhir Emulsion setara Mowilex
E
36
37
38
39
40
41
42
43
107
108
109
110
111
112
113
114
115
116
117
118
119
NO
2
3
4
5
6
7
MATERIAL
I. BAHAN TRIPLEK
1 Triplek t =9 mm
K. BAHAN MINYAK (TANPA KEUNTUNGAN)
1 Minyak solar
286
287
288
290
291
304
351
352
353
364
1
4
Triplek t = 3 mm
Triplex t = 12 mm
9
TENTANG
10 BAHAN
AR HARGA SATUAN UPAH,
11
RUKSI STANDAR NASIONAL
INDONESIA (ABK-SNI)
12
ANALISA KABUPATEN SAMBAS
13
TENAGA KERJA
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
52
57
58
59
HARGA
(Rp)
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
Org/hari
115,800.00
98,000.00
104,800.00
81,000.00
113,400.00
86,400.00
110,000.00
81,000.00
91,000.00
SATUAN
210,800.00
M
M
Zak
Kg
885,000.00
168,700.00
120,700.00
1,586.00
M
M
M
M
Btg
4,776,800.00
2,370,000.00
7,187,500.00
2,030,000.00
16,500.00
Kg
Kg
Kg
17,700.00
56,300.00
70,900.00
Kg
19,800.00
60
61
71
72
76
82
89
90
94
102
103
104
105
106
J
36
37
38
39
40
41
42
43
107
108
109
110
111
112
113
114
115
116
117
118
119
SATUAN
Kg
Kg
Kg
Kg
Kg
Kg
47,200.00
17,741.00
20,020.00
22,330.00
21,450.00
22,100.00
Lbr
178,200.00
Ltr
13,125.00
Lbr
Lbr
63,200.00
259,700.00
286
287
288
290
291
304
351
352
353
364
LAMPIRAN 2
TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
a. Tandur
100 Titik/M2
M2
25 x 25 cm
M2
100 Titik/M2
M2
25 x 25 cm
M2
100 Titik/M2
M2
UNIT
I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
II
PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun
35 - 40
2 btg, 3 anakan
Polybag
20 - 25
1 btg/rumpun
Polybag
7 - 10
Tajuk 10 - 15
Polybag
7 - 10
Tajuk 10 - 15
Polybag
25 - 30
1 btg
Polybag
15 - 20
Tajuk 20 - 25
Polybag
15 - 20
1 btg
Polybag
8 Crossandra
20 - 40
Tajuk 20 - 25
Polybag
3 s/d 4 btg/rpn
Polybag
7 - 10
10 Dracaena Tricolor
30
11 Gandarusa
15
Polybag
3 s/d 4 btg/rpn
Polybag
15 - 20
dia. 1 btg
Polybag
15 - 20
dia. 1 btg
Polybag
20 - 25
dia. Btg 1 cm
Polybag
20 - 25
dia. Btg 1 cm
Polybag
15 - 20
Tajuk 15 - 20
Polybag
15 - 20
Tajuk 15 - 20
Polybag
10
5 btg/rpn
Polybag
10 - 12
1 btg/rpn
Polybag
20 - 25
5 s/d 7 btg/rpn
Polybag
25-35
5 s/d 7 btg/rpn
Polybag
10
3 s/d 5 btg/rpn
Polybag
10
3 s/d 5 btg/rpn
Polybag
15 - 20
3 s/d 5 btg/rpn
Polybag
20 - 25
3 s/d 5 btg/rpn
Polybag
10 - 15
Tajuk 10 - 15
Polybag
30 - 35
3 btg/rpn
Polybag
1 btg
Polybag
Tajuk 20 - 25
Polybag
3-5
15-20
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
Tajuk 20 - 25
Polybag
10
3 s/d 5 btg/rpn
Polybag
7 - 10
3 s/d 5 btg/rpn
Polybag
7 - 10
3 s/d 5 btg/rpn
Polybag
Tajuk 15 - 20
Polybag
30-40
UNIT
20 - 25
20
1 btg
Polybag
10
10 btg/pot
Polybag
10
10 btg/pot
Polybag
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
5
30 - 35
5 s/d 7 btg/rpn
Polybag
30 - 35
5 s/d 7 btg/rpn
Polybag
30
10
3 s/d 5 btg/rpn
Polybag
15
3 s/d 5 btg/rpn
Polybag
41 Lantana Warna-Warni
15
3 s/d 5 btg/rpn
Polybag
25
Tajuk 15
Polybag
16
Tajuk 15
Polybag
7-10
10 btg / rpn
Polybag
40
dia. Tajuk 30
Polybag
50
dia. Tajuk 40
Polybag
40
3 btg
Polybag
10 - 15
3 btg
Polybag
Polybag
PERDU
60
dia.Tajuk 60
Polybag
60
dia.Tajuk 60
Polybag
60
7 Bougenvil Biasa
dia.Tajuk 60
Polybag
15 - 20
1 btg
Polybag
20 - 40
dia.Tajuk 10-15
Polybag
30
3 daun/btg
Polybag
30
dia. Tajuk 30
Polybag
50
dia. Tajuk 30
Polybag
50
Polybag
kuning / merah
15 - 20
3 bth/pot
Polybag
15 - 20
3 btg
Polybag
30
diaTajuk 15 -20
Polybag
30
dia.Tajuk 15-20
Polybag
18 Kamboja putih
100
dia. Btg 3
Polybag
19 Kamboja rantai
100
dia. Btg 3
Polybag
2 s/d 3 btg/rpn
Polybag
dia. Tajuk 30
Polybag
1 btg/pot
Polybag
40
25 - 30
30
Polybag
50 - 75
25
dia.Tajuk15 -20
Polybag
30
dia.Tajuk 15-20
Polybag
50
2 anakan/rpn
Polybag
50
2 anakan/rpn
Polybag
30
1 rpn
Polybag
60
5 anakan/pot
Polybag
50
1 rpn
Polybag
50
1 rpn
Polybag
33 Pangkas Hijau
10
3 s/d 5 btg/rpn
Polybag
33 Pangkas Hijau
20-40
3 s/d 5 btg/rpn
Polybag
28 Melati Malaysia
Polybag
34 Variegata
34 Sambang darah
Polybag
50
dia. Tajuk 30
50
1 btg/pot
35 Siklok
36 Wali songo daun kecil (Scheffera sp)
Polybag
Polybag
Polybag
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
20
1 btg/pot
Polybag
20
1 btg/pot
Polybag
20
1 btg/pot
Polybag
20
1 btg/pot
Polybag
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
5
1 btg/pot
Polybag
putih, pink
30
1 btg/pot
Polybag
20
3 s/d 5 btg/rpn
Polybag
40
3 s/d 5 btg/rpn
Polybag
10 - 15
3 s/d 5 btg/rpn
Polybag
3-5
3 s/d 5 btg/rpn
Polybag
47 Pangkas Hijau
20
4 s/d 7 btg/rpn
Polybag
48 Bayam Merah
10 - 15
3 s/d 5 btg/rpn
Polybag
1 btg/pot
Polybag
45 Tapak dara
46 Pangkas Hijau
49 Soka Merah
20
50 Bawang-bawangan
15-20
f5 s/d 7 btg/rpn
Polybag
51 Bawang-bawangan
20-25
f5 s/d 7 btg/rpn
Polybag
53 Vinolia
20-30
5 s/d 10btg/rpn
Polybag
54 Vinolia
10-15
2 s/d 4 btg/rpn
Polybag
55 Vinolia
35-40
12sd 20 btg/rpn
Polybag
52 Veberia
Polybag
56 Variegata
Polybag
57 Aires
10
1sd 2 btg/rpn
Polybag
59 Kana Presiden
15 - 20
1sd 2 btg/rpn
Polybag
IV
TANAMAN PAGAR
1 Kedondong laut (Nothopanax sp)
30-65
3 s/d 4 btg/rpn
Polybag
60 - 75
3 s/d 4 btg/rpn
Polybag
75
1 btg/rpn
Polybag
30
1rpn
Polybag
50
3 s/d 4 btg/rpn
Polybag
50
3 s/d 4 btg/rpn
Polybag
30
3 s/d 4 btg/rpn
Polybag
50
3 s/d 4 btg/rpn
Polybag
70
3 s/d 4 btg/rpn
Polybag
10 Krokot
V
Polybag
58 Ketela Merah
15
Polybag
TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus)
30
Polybag
50
dia. Tajuk 40
Polybag
30
dia. Tajuk 20
Polybag
50
dia. Tajuk 40
Polybag
40
dia. Tajuk 30
Polybag
40
dia. Tajuk 30
Polybag
40
dia. Tajuk 30
Polybag
30
dia. Tajuk 20
Polybag
20
3 s/d 4 btg/rpn
Polybag
9 Pasiflora
60
dia. Tajuk 40
Polybag
30
3 s/d 4 btg/rpn
Polybag
30
dia. Tajuk 40
Polybag
30
Polybag
30
Polybag
NO
VI
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
TANAMAN HIAS
1 Anjuang hijau (Dracaena sp)
60
dia. Tajuk 40
Polybag
60
dia. Tajuk 40
Polybag
60
dia. Tajuk 40
Polybag
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
40
dia. Tajuk 20
Polybag
60
dia. Tajuk 40
Polybag
80
dia. Tajuk 50
Polybag
60
dia. Tajuk 40
Polybag
50
dia. Tajuk 40
Polybag
20
dia. Tajuk 40
Polybag
100 - 200
Polybag
100 - 200
Polybag
250
Polybag
151 - 200
Polybag
dia. Tajuk 40
Polybag
50
15 Rambusa
50
40
5 s/d 7 btg/rpn
Polybag
40
5 s/d 7 btg/rpn
Polybag
Polybag
150 - 200
dia. Tajuk 40
Polybag
200 - 250
dia. Btg 10
Polybag
75
dia. Tajuk 30
Polybag
75
dia. Tajuk 30
Polybag
75
dia. Tajuk 30
Polybag
40
dia. Tajuk 20
Polybag
75
dia. Tajuk 30
Polybag
50
dia. Tajuk 30
Polybag
60
dia. Tajuk 30
Polybag
27 Puring Kuning
20
dia. Tajuk 30
Polybag
dia. Btg 5
Polybag
28 Siklok
29 Sikas/Pakis haji halus (Cycas revoluta)
80
Polybag
100
dia. Btg 10
Polybag
100
dia. Btg 10
Polybag
50 - 100
Polybag
150 - 200
dia. Btg 3
Polybag
150 - 200
dia. Btg 3
Polybag
10-25
2-3 btg/pot
Polybag
50
5-7 btg/pot
Polybag
200 - 250
dia. Btg 20
Phn
200 - 250
dia. Btg 40
Phn
200 - 250
dia. btg 30
Phn
100
dia. btg 30
Phn
>200
dia. Btg 40
Phn
300
dia. Btg 25
Phn
100
dia. Btg 15
Phn
8 Palm alexander
150
dia. Btg 10
Phn
150 - 200
dia. btg 30
Phn
100
3 s/d 5 btg/rpn
Phn
11 Palm camedoria
200
3 s/d 5 btg/rpn
Phn
50-75
200
VII PALEM
9 Palm botol
10 Palm camedoria
Phn
dia. Btg 15
Phn
100 - 150
5 s/d 7 btg/rpn
Rmp
150 - 250
5 s/d 7 btg/rpn
Rmp
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
dia. Btg 10
Phn
50 - 100
3 s/d 5 btg/rpn
Phn
100 - 150
5 s/d 7 btg/rpn
Rmp
dia. Btg 5
Phn
20 Palm korembusa
100
UNIT
50
NO
21 Palm korembusa
22 Palm korembusa
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
3
100
>200
UNIT
5
dia. Btg 7
Phn
dia. Btg 10
Phn
150 - 200
3 s/d 5 btg/rpn
Phn
300 - 350
5 s/d 7 btg/rpn
Rmp
dia. Btg 8
Phn
dia. Btg 10
Phn
75 - 100
150 - 200
26 Palm putri
50
Phn
27 Palm putri
100-150
dia. Btg 10
Phn
28 Palm putri
150 - 200
dia. Btg 10
Phn
100 - 150
dia. Btg 10
Phn
100 - 200
dia. Btg 20
Phn
200 - 300
dia. Btg 25
Phn
32 Palm ratu
100 - 150
dia. Btg 10
Phn
50
dia. Btg 5
Phn
150
dia. Btg 8
Phn
150
dia. Btg 8
Phn
200
dia. Btg 8
Phn
37 Palm udang
50
3 s/d 5 btg/rpn
Phn
150
5 s/d 7 btg/rpn
Rmp
200
dia. Btg 10
Phn
50
5 s/d 7 btg/rpn
Dpr
150
5 s/d 7 btg/rpn
Dpr
200
5 s/d 7 btg/rpn
Dpr
150
5 s/d 7 btg/rpn
Dpr
200
dia. Btg 4
Phn
150
dia. Btg 4
Phn
150
dia. Btg 4
Phn
100 - 150
dia. Btg 4
Phn
150
dia. Btg 4
Phn
10 Cemara lilin
100
dia. Btg 3
Phn
150
dia. Btg 4
Phn
75
dia.tajuk 50
Phn
75
dia.tajuk 50
Phn
100 - 150
dia.tajuk 60
Phn
400 - 500
dia.tajuk 200
Phn
dia.tajuk 40
Phn
100 - 140
dia. Btg 3
Phn
200
dia. Btg 4
Phn
300
dia. Btg 5
Phn
100
dia. Btg 3
Phn
75
dia. Btg 3
Phn
3 Bintaro
50
dia. Btg 3
Phn
4 Bintaro
100
dia. Btg 3
Phn
5 Bintaro
150
dia. Btg 4
Phn
6 Buni (Atidesmabunius)
200 - 300
dia. Btg 5
Phn
7 Buni (Atidesmabunius)
400 - 500
dia. Btg 10
Phn
8 Cemara kipas
9 Cemara kuning daun emas (Cupressus sp)
IX
75
NO
8 Cermai
9 Duku condet (Lansium domisticum)
10 Durian (Durio zibenthinus)
11 Gatet
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
50-100
dia. Btg 5
Phn
100
dia. Btg 3
Phn
150
dia. Btg 4
Phn
200 - 300
dia. Btg 5
Phn
NO
DIAMETER
(cm)
(cm)
UNIT
5
100
dia. Btg 3
Phn
100-150
dia. Btg 5
Phn
200-300
dia. Btg 10
Phn
100
dia. Btg 3
Phn
100
dia. Btg 3
Phn
100
dia. Btg 3
Phn
100
dia. Btg 3
Phn
19 Kapilayu
100
dia. Btg 3
Phn
20 Kawista
200 - 300
dia. Btg 5
Phn
150
dia. Btg 4
Phn
22 Kecubung
100
dia. Btg 3
Phn
150 - 200
dia. Btg 4
Phn
100 - 150
dia. Btg 3
Phn
50
dia. Btg 3
Phn
100
dia. Btg 3
Phn
27 Kersen/serry
150
dia. Btg 4
Phn
28 Kesah
150
dia. Btg 4
Phn
150
dia. Btg 4
Phn
30 Kelengkeng
100
dia. Btg 3
Phn
150 - 200
dia. Btg 4
Phn
32 Kosambi
100
dia. Btg 3
Phn
150
dia. Btg 4
Phn
200
dia. Btg 4
Phn
200
dia. Btg 4
Phn
36 Mindi
100
dia. Btg 3
Phn
37 Nam-nam
200
dia. Btg 5
Phn
100
dia. Btg 3
Phn
39 Pala
200 - 300
dia. Btg 5
Phn
40 Petai
200 - 300
dia. Btg 5
Phn
50
dia. Btg 3
Phn
42 Rukem
100
dia. Btg 3
Phn
43 Sirsak
50-100
dia. Btg 5
Phn
100
dia. Btg 4
Phn
200
dia. Btg 4
Phn
31 Kluwih
41 Rambutan
46 Serikaya
47 Yangliu
48 Maja
X
UKURAN
TINGGI
50
dia. Btg 3
Phn
150 - 200
dia. Btg 4
Phn
200
dia. Btg 5
Phn
BUNGA POTONG
1 Amarilis (Amarylidaceae)
Tangkai
Tangkai
3 Anyelir
Tangkai
4 Apple blossom
Tangkai
Tangkai
6 Anggrek Dendrobium
Tangkai
7 Gladiol
Tangkai
8 Golden shower
Tangkai
Tangkai
Tangkai
10 Mawar
NO
XI
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
40 -50
3 s/d 5 btg/rpn
Polybag
2 Anggrek cathalea
40 -50
3 s/d 5 btg/rpn
Polybag
40 -50
3 s/d 5 btg/rpn
Polybag
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
5
4 Apple blossom
30 - 40
Polybag
5 Asparagus
30 - 40
dia. Tajuk 20
Polybag
40 -50
dia. Tajuk 20
Polybag
40 -50
dia. Tajuk 20
Polybag
8 Begonia Hijau
40-50
dia. Tajuk 20
Polybag
9 Begonia perak
40 -50
dia. Tajuk 20
Polybag
10 Belanceng bintik
40 -50
4 s/d 5 dn/pot
Polybag
11 Belanceng putih
40 -50
4 s/d 5 dn/pot
Polybag
50
dia. Tajuk 20
Polybag
13 Gandasari
30 - 40
dia. Tajuk 15
Polybag
14 Hortensia
30 - 40
dia. Tajuk 30
Polybag
15 Kembang kancing
30 - 40
dia. Tajuk 20
Polybag
16 Kencuran
30 - 40
dia. Tajuk 20
Polybag
17 Krisdoren
30 - 40
dia. Tajuk 15
Polybag
18 Kuping gajah
30 - 40
4 s/d 5 dn/pot
Polybag
19 Kuping keledai
30 - 40
4 s/d 5 dn/pot
Polybag
20 Maranta macan
30 - 40
dia. Tajuk 25
Polybag
21 Maranta batik
30 - 40
dia. Tajuk 25
Polybag
30 - 40
dia. Tajuk 25
Polybag
23 Maranta keris
30 - 40
dia. Tajuk 25
Polybag
24 Maranta sepat
30 - 40
dia. Tajuk 25
Polybag
25 Meranti bintik
40 -50
dia. Tajuk 20
Polybag
26 Meranti kol
40 -50
dia. Tajuk 20
Polybag
40 -50
dia. Tajuk 20
Polybag
28 Meranti pisang
40 -50
dia. Tajuk 20
Polybag
29 Monstera
50 - 75
4 s/d 5 dn/pot
Polybag
30 Mutiara
40 -50
dia. Tajuk 20
Polybag
31 Pacing
40 -50
dia. Tajuk 20
Polybag
32 Dona Carmen
40-50
Polybag
33 Sisik Naga
30-40
Polybag
34 Palesota
20-30
Polybag
35 Diefenbachia
30-40
Polybag
36 Chiangmai
20-30
Polybag
37 Chiangmai balon
20-30
Polybag
12 Golden shower
38 Pilodendron
dia. Tajuk 15
Polybag
39 Sabrina ungu
20 - 30
dia. Tajuk 15
Polybag
40 Bambu China
20-30
dia. Tajuk 20
Polybag
41 Sirih Gading
40 -50
dia. Tajuk 20
Polybag
42 Sri rejeki
30 - 40
4 s/d 5 dn/pot
Polybag
30 - 40
dia. Tajuk 15
Polybag
44 Supelir halus
30 - 40
dia. Tajuk 15
Polybag
45 Tanduk rusa
40 -50
dia. Tajuk 20
Polybag
50 - 100
dia. Btg 2
Polybag
100 - 150
dia. Btg 3
Polybag
100 - 200
dia. Btg 3
Phn
150 - 200
dia.Btg 2,5s/d 4
Phn
150 - 200
dia.Btg 2,5s/d 4
Phn
46 Walisongo biasa
47 Walisongo kuning
XII
POHON PENEDUH
4 Biola cantik
10 - 25
Phn
5 Bumi
10 - 25
Phn
NO
6 Batavia
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
dia. Btg 5
Phn
150 - 200
dia.Btg 2,5s/d 4
Phn
200 - 300
Phn
Phn
9 Beringin putih
100
UNIT
200
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
5
150 - 250
dia.Btg 2,5s/d 4
Phn
100 - 200
dia. Btg 3
Phn
400 - 500
dia.Btg 8s/d 10
Phn
0,50-100
dia. Btg 2
Phn
250-300
Phn
50-100
Phn
100-150
Phn
150 - 250
Phn
19 Cassia golden
50-100
dia. Btg 3
Phn
20 Cassia golden
150-175
dia. Btg 3
Phn
21 Cassia golden
150-200
dia. Btg 3
Phn
22 Cassia sp
200 - 300
Phn
300 - 400
Phn
24 Ceremai
400 - 500
dia.Btg 8 s.d 10
Phn
300 - 400
Phn
300 - 400
Phn
100 - 200
Phn
150 - 200
Phn
300 - 400
Phn
30 Sungkai
50 - 100
31 Sungkai
150
Phn
Phn
500 - 700
Phn
150
Phn
300
dia. Btg 5
Phn
100 - 150
dia. Btg 3
Phn
33 Glodogan
10 - 25
100-150
Phn
Phn
150 - 200
Phn
200 - 300
Phn
50
150 - 300
dia. Btg 4
Phn
400 - 500
dia.Btg 8 s.d 10
Phn
40 Jatimas
200 - 300
Phn
150 - 200
Phn
dia. Btg 3
Phn
200 - 300
Phn
44 Kamboja rantai
300 - 400
Phn
dia. Btg 3
Phn
150
Phn
100
150 - 200
Phn
200 - 300
Phn
200
Phn
400 - 600
Phn
200 - 300
Phn
100-150
Phn
150 - 200
Phn
100-150
dia. Btg 3
Phn
200
dia. Btg 3
Phn
100 - 200
Phn
100 - 150
dia. Btg 3
Phn
300 - 400
Phn
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
150 - 200
Phn
500 - 600
Phn
60 Kepuh
300 - 400
Phn
150 - 200
Phn
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
62 Pucuk Merah
63 Kurma
64 Lampeni
UNIT
5
Phn
50
150 - 200
dia. Btg 3
Phn
Phn
20-40
Phn
30-50
Phn
50-75
Phn
200 - 300
Phn
500 - 800
Phn
Phn
71 Sawo manila
Phn
Phn
73 Lengkeng Diamond
Phn
74 Kedondong bangkok
Phn
Phn
Phn
300 - 400
Phn
75-100
Phn
600 - 700
Phn
80 Salam
50 - 100
dia. Btg 3
Phn
81 Salam
10 - 25
Phn
82 Sikat botol
200 - 300
Phn
83 Santorium
500 - 600
Phn
150 - 200
Phn
200
Phn
150 - 200
Phn
87 Spathodea campanulata
150 - 200
Phn
88 Spathodea campanulata
500 - 600
Phn
89 Tabebuia
100 - 200
dia. Tajuk 50 - 70
Phn
10 - 25
Phn
60 -100
Phn
100-150
150-200
Phn
200-250
Phn
200 - 300
Phn
96 Sirsak Madu
150 -200
Phn
97 Melinjo
150 - 200
Phn
98 Mahkota Dewa
150 - 200
Phn
10 - 25
200
Phn
Phn
dia. Btg 3,5
Phn
400 - 500
Phn
600 - 700
Phn
50 - 150
dia. Btg 3
Phn
50 - 100
dia. Btg 3
Phn
200
Phn
300
dia. Btg 5
Phn
500 - 600
Phn
150 - 200
Phn
XIII BIJI
1 Bixa (Bixaceae sp)
Kg
Kg
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
Kg
Kg
Kg
Kg
NO
UKURAN
TINGGI
DIAMETER
(cm)
(cm)
UNIT
Kg
Kg
Kg
50
Kondisi optimal
Polybag
2 Belenceng yongmay
50
Kondisi optimal
Polybag
3 Bonsai bentuk
75
Kondisi optimal
Phn
4 Cemara dent
100 - 150
Kondisi optimal
Phn
5 Cemara udang
50 - 100
Kondisi optimal
Phn
6 Cemara udang
150 - 200
Kondisi optimal
Phn
100 - 200
Kondisi optimal
Phn
8 Kapu-kapu
50
Kondisi optimal
Phn
9 Krisan pot
30 - 40
Kondisi optimal
Pot
10 Lotus
10 - 30
Kondisi optimal
Rmp
11 Melati air
40 - 50
Kondisi optimal
Rmp
12 Meranti karet
40 - 50
Kondisi optimal
Rmp
13 Meranti pisang
100
Kondisi optimal
Phn
14 Nolina
100
Kondisi optimal
Phn
15 Pacira tinggi
150
Kondisi optimal
Phn
150 - 200
Kondisi optimal
Phn
150 - 200
Kondisi optimal
Phn
100
Kondisi optimal
Phn
19 Philodendron hijau
50
Kondisi optimal
Phn
20 Philodendron kuning
50
Kondisi optimal
Phn
21 Philodendron merah
50
Kondisi optimal
Phn
22 Puring kuning
50
Kondisi optimal
Phn
100
Kondisi optimal
Phn
24 Srikit bangkok
40 - 50
Kondisi optimal
Phn
25 Teratai biasa
10 - 20
Kondisi optimal
Rmp
26 Tipha
50 - 100
Kondisi optimal
Rmp
100
Kondisi optimal
Phn
28 Zannia tunggal
50
Kondisi optimal
Phn
TENTANG
AR HARGA SATUAN TANAMAN HIAS
KOTA PONTIANAK TAHUN 2010
HARGA BAHAN
6
9,000
31,000
10,250
9,000
5,000
8,000
2,000
3,000
3,000
4,500
12,017
5,000
11,000
10,000
17,500
3,500
6,000
6,000
6,000
7,000
3,250
3,250
1,000
3,250
5,000
10,658
3,500
3,250
4,500
12,000
17,500
20,000
3,250
4,500
HARGA BAHAN
7,500
11,996
1,500
2,500
2,500
5,000
4,750
6,250
HARGA BAHAN
6
6,750
5,250
10,000
2,000
3,250
6,000
10,500
4,000
1,500
55,000
37,500
30,000
40,000
125,000
150,000
50,000
20,000
17,500
22,500
15,000
12,500
5,000
11,000
25,000
145,000
27,500
100,000
90,000
10,000
35,000
27,500
22,500
5,000
5,000
22,500
22,500
22,500
11,000
8,500
35,000
37,500
1,500
2,250
15,000
40,000
92,500
20,000
HARGA BAHAN
6,500
4,000
4,000
4,000
HARGA BAHAN
6
4,000
5,000
6,000
52,500
3,500
1,500
2,500
2,000
6,500
5,050
6,000
7,500
6,000
5,750
6,500
15,000
4,950
3,650
5,000
6,000
8,750
35,000
17,500
15,000
15,000
13,500
23,500
30,000
1,008
40,000
47,500
12,500
15,000
50,000
35,000
40,000
40,000
7,500
20,000
10,000
30,000
15,000
2,500
HARGA BAHAN
10,000
11,000
12,500
HARGA BAHAN
6
8,000
11,000
15,000
13,500
25,000
5,500
225,000
375,000
1,000,000
2,500,000
20,000
30,000
10,000
12,500
200,000
475,000
20,000
20,000
20,000
14,500
30,000
20,000
20,000
7,500
100,000
900,000
1,000,000
1,350,000
125,000
400,000
300,000
40,000
15,000
450,000
450,000
175,000
400,000
3,500,000
400,000
150,000
125,000
300,000
110,000
300,000
45,000
225,000
110,000
250,000
HARGA BAHAN
65,000
42,500
125,000
40,000
HARGA BAHAN
6
60,000
70,000
110,000
325,000
175,000
375,000
45,000
140,000
300,000
8,000,000
150,000
425,000
80,000
62,500
70,000
150,000
400,000
35,000
50,000
250,000
45,000
75,000
67,500
235,000
200,000
50,000
75,000
150,000
550,000
52,500
150,000
62,500
62,500
150,000
1,250,000
75,000
77,500
275,000
400,000
275,000
57,500
20,000
40,000
70,000
80,000
250,000
HARGA BAHAN
35,000
75,000
175,000
90,000
HARGA BAHAN
6
40,000
61,750
300,000
175,000
50,000
40,000
65,000
44,000
99,000
341,000
77,000
165,000
33,000
52,250
38,500
132,000
88,000
137,500
164,340
27,500
16,500
38,500
110,000
99,000
38,500
93,500
121,000
170,500
165,000
22,000
33,000
38,500
66,000
220,000
66,000
165,000
99,000
17,875
275,000
13,750
11,000
15,125
68,750
13,750
55,000
16,500
5,500
HARGA BAHAN
110,000
82,500
25,850
HARGA BAHAN
6
55,000
22,000
24,750
24,750
24,750
23,100
165,000
22,000
44,000
22,000
33,000
11,000
11,000
16,500
38,500
49,500
24,750
22,000
27,500
22,000
22,000
22,000
22,000
22,000
22,000
11,000
5,500
5,500
41,250
55,000
60,500
82,500
44,000
96,750
8,250
5,500
16,500
16,500
22,000
27,500
27,500
44,000
44,000
137,500
100,100
324,500
143,000
35,750
10,100
HARGA BAHAN
71,500
393,250
572,000
1,430,000
HARGA BAHAN
6
286,000
28,600
429,000
154,200
171,600
71,500
180,753
214,500
57,475
57,600
78,650
85,800
128,700
321,750
250,250
286,000
143,000
250,250
572,000
67,100
357,500
643,500
143,000
128,700
50,050
7,150
151,250
178,750
286,000
14,300
178,750
321,750
286,000
50,050
107,250
286,000
1,144,000
35,750
171,600
357,500
100,100
193,050
85,800
121,000
181,500
90,750
181,500
214,500
71,500
171,600
HARGA BAHAN
321,750
643,500
100,100
143,000
HARGA BAHAN
6
80,000
214,500
78,650
101,875
121,000
143,000
214,500
2,145,000
178,750
178,750
28,600
89,375
117,975
107,250
46,475
1,101,100
137,500
572,000
71,500
42,900
357,500
572,000
250,250
357,500
85,800
57,200
643,500
15,250
17,875
66,000
79,860
95,835
181,500
286,000
89,375
121,550
143,000
58,650
135,850
217,950
500,500
42,900
107,250
321,750
500,500
500,500
214,500
44,000
33,000
HARGA BAHAN
22,000
44,000
44,000
11,000
HARGA BAHAN
6
22,000
16,500
33,000
247,500
55,000
1,100,000
1,237,500
1,045,000
2,475,000
1,375,000
38,500
38,500
143,000
44,000
44,000
44,000
165,000
330,000
495,000
495,000
176,000
22,000
55,000
220,000
13,750
1,320,000
66,000
46,750
88,000
137,500
121,000
NO.
URAIAN
BOBOT
1
0.46
0.46
0.53
0.58
0.54
0.46
10
0.41
0.41
11
12
3.46
2.76
13
14
15
0.72
0.72
16
17
18
PERSIAPAN
1 Pekerjaan Pembersihan Lokasi
0.911
0.607
0.911
0.61
0.91
2.106
0.822
3 Pekerjaan Cerucuk 8 x 10 - 4 m
9.327
1.432
3.11
5 Pekerjaan Pembesian
C.
# besi 6
9.937
2.48
1.30
2.30
3.86
# besi 8
13.246
3.31
3.96
3.73
2.25
# besi 13
3.611
0.90
0.47
0.47
0.47
6.10
8.15
5.26
11.83
14.65
11.84
### 34.65
49.29
61.13
6 Pekerjaan Bekisting
24.418
22.104
Pekerjaan Plesteran
5.741
FINISHING
1 Pekerjaan Pengecatan
D.
3.004
PEKERJAAN TAMBAHAN
1 Tangga
1.822
0.46
1.06
0.91
0.53
0.58
0.54
0.46
0.41
3.52
3.46
0.46
1.52
2.43
2.96
3.54
4.08
4.53
4.95
8.47
### 14.68
2.76
14.68
0.72
15.40
7.41
KETERANGAN
19
20
21
22
23
24
25
26
27
1.29
4.90
4.42
4.69
4.60
4.69
3.70
1.91
1.92
1.91
1.00
1.01
0.99
1.82
10.62
4.69
4.60
4.69
5.61
1.92
4.73
1.01
0.99
71.75
76.44
81.04
85.73
91.35
93.26
98.00
99.01
100.00
28
29
30
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
0.911
0.607
0.911
2.106
0.822
9.327
1.432
9.937
13.246
3.611
24.419
22.104
5.741
3.004
1.822
0.000
-
0.000
0.000
0.000
3.644
0.000