Вы находитесь на странице: 1из 38

0

21.Mar.2014

Issue for Construction

J. G. Kim

H.W.Chung

M.K. Kim

08.Jan.2014

Issue for Approval

J. G. Kim

H.W.Chung

M.K. Kim

REV.

DATE

DESCRIPTION

DESIGNED

CHECKED

APPROVED

OWNER

PROJECT

SHUQAIQ STEAM POWER PLANT


ENGINEER

CONTRACTOR

SUBCONTRACTOR

VENDOR INTERNAL DOC.NO


XXXX-XXXX-XXXX

THIS DOCUMENT IS NOT TO BE USED FOR


CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL
CERTIFIED AND DATED.THE CONTRACTOR HHI
CONFIRMS FULLY COMPLIANCE WITH THE O/ES
COMMENTS. NO OTHER CHANGES HAD BEEN MADE ON
THE DOCUMENT. THE CONTRACTOR MAY SUBMIT THE
DOCUMENTS AS FOR CONSTRUCTION

APPROVAL/CERTIFICATION INFORMATION
DOC. NO : POY-HHI-T-00397
REV. NO : A
DATE : 26. FEB. 2014
STATUS : Code 2, Approved with Comments

DOCUMENT TITLE

INSPECTION AND TEST PLAN (ITP)


FOR ELECTRICAL
CONTRACT NO.

DOCUMENT NO

NO. OF PAGES

REV.

31221097/00

S-00-TAA-Q-43-036-001

38

Doc. No. : S-00-TAA-Q-43-036-001


Rev. No. :
0

Table of Contents
1. S-00-TAA-Q-43-036-001 : ITP for Electrical...1 to 2
2. S-00-TAA-Q-43-036-002 : Cable and Tray & Conduit(Ele)...... .3 to 6
3. S-00-TAA-Q-43-036-003 : LV MV SWGR. ...7 to 8
4. S-00-TAA-Q-43-036-004 : Motor Control Center..........9 to 10
5. S-00-TAA-Q-43-036-005 : Transformer .......11 to 12
6. S-00-TAA-Q-43-036-006 : AC / DC UPS System....13 to 14
7. S-00-TAA-Q-43-036-007 : BUS DUCT....15 to 16
8. S-00-TAA-Q-43-036-008 : Distribution Board(Incl UPS AC/DC Board).17 to 18
9. S-00-TAA-Q-43-036-009 : Motor..19 to 20
10. S-00-TAA-Q-43-036-010 : Cathodic.....21 to 22
11.S-00-TAA-Q-43-036-011 : Earthing and Bonding.23 to 24
12.S-00-TAA-Q-43-036-012 : Lighting System..25 to 26
13.S-00-TAA-Q-43-036-013 : Lightning Protection....27 to 27
14. S-00-TAA-Q-43-036-014 : Receptacle, Junction Box, RCU....28 to 29
15. S-00-TAA-Q-43-036-015 : Cable and Tray & Conduit(Telecom)....30 to 32
16. S-00-TAA-Q-43-036-016 : CCTV....33 to 34
17. S-00-TAA-Q-43-036-017 : PA BX...35 to 36
19. S-00-TAA-Q-43-036-018 : Junction Box(Telecom).....37 to 38

2 of 38

Client

SEC, Kingdom of Saudi Arabia

Disc

Item

No

Activity Description

Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Cable / Tray / Conduit

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-002 Rev. 0

Reporting
Format

HSFP-ST-01

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy
Drawing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008001

Installation Cable Tray,


Ladder and Conduit
Installation.

100%

Approved
drawing.
Vender Drawing

clear of the soil.

- Check tag numbers are correct.


- Verify Cable tray and tray installed as per

HSFP-EL028

construction drawing.
- Check alignment as overlapped of trays.
- Check bonding jumpers installed at tray joint
connections and tight.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

SEC, Kingdom of Saudi Arabia

Disc

Item

: Cable / Tray / Conduit

No

Electrical

Activity Description

Installation Cable Tray,


Ladder and Conduit
Installation.

Frequency

100%
Installation
All Route

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.

Approved
drawing.
Vender Drawing

Inspection Method / Acceptance Criteria

- Check hold down clamp and brackets are installed.


- Check cable ladder properly supported.

ITP No. :
Page

S-00-TAA-Q-43-036-002 Rev. 0

Reporting
Format

HSFP-EL028

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

- Check cover installed(to be installed after all the


cables are tested and properly terminated)
- Check junction box supports independent from
conduit and tray.
- Check conduit supports within the specified interval
according to approved drawing.
- Check touch up of galvanizing performed
(if required)
- No sharp edges.
- No obstructions.
- Check tray Labelling

Excavation,
backfilling(Civil), Duct,
Sand bed & Sand fill

100%
Installation
All Route

Approved
drawing.

- Check the cable trench and dimension and


elevation of bottom of trench as approved drawings.
- Check rigid PVC location and size as per drawing,
(if required)
- Check the tiles installed as per approved drawing

HSFP-EL029

Remarks

Client

Disc

Item

No

SEC, Kingdom of Saudi Arabia


Electrical

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Cable / Tray / Conduit

Activity Description

Excavation,
backfilling(Civil), Duct,
Sand bed & Sand fill

Frequency

100%
Installation
All Route

Procedure /
Spec.

Approved
drawing

Inspection Method / Acceptance Criteria

- Check using of clean sand without stone for sand


bedding

and sand filling with appropriate depth

ITP No. :
Page

S-00-TAA-Q-43-036-002 Rev.0

Reporting
Format

HSFP-EL029

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

- Check the Trench route marker and symbol


(after cable testing and complete backfill)

Cable Installation
- Installation & Visual
Check.
- Insulation resistance
Test

All Cable

Approved vender
Drawing
Approved drawing

- Check and confirm cable shall be meggered before


Installation(on reel test/Only Power cable : If
required)
- Verify cable type & configuration.
- Damaged cables shall be replaced before
Sand filling
- Check and confirm cable shall be meggered before
And after installation, record of testing shall be
available.
- Check proper arrangement, segregation and layer
Of cable, bending radius as per vender data, and
allowable Slack.
- Check the barrier between the HV/LV cable
(if required)
- Check cable fix to cable tray and ladder properly.

HSFP-EL001

Remarks

Client

Disc

Item

No

Activity Description

SEC, Kingdom of Saudi Arabia


Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Cable / Tray / Conduit

Cable Installation
- Installation & Visual
Check.
- Insulation resistance
test

INSPECTION & TEST PLAN (ITP)

Frequency

All Cable

Procedure /
Spec.
Approved vender
Drawing
Approved drawing

Inspection Method / Acceptance Criteria

- Check cable tags correct.


- Check cable caps for protection of cable ends
Shall be properly protected after installation.

ITP No. :
Page

S-00-TAA-Q-43-036-002 Rev. 0

Reporting
Format
HSFP-EL001/01B

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

1Client

: SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

MV / LV SWGR

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-003 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy Dra
wing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

MV/LV SWGR
-Installation & Visual
Check.
-Busbar conductivity Check.
-Insulation resistance test.

Each Unit

clear of the soil.


- Check Shock indicator (if required)

- Approved vender
Drawing

- Check installation method as per installation

- Approved drawing

- Check doors and panels to ensure proper

-Technical
specification(SEC)

drawing.

HSFP-EL006

opening and closure.


- Check paint damage, tag plate, warning label
, visual damage etc.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

Item

Item

No

Activity Description

SEC, Kingdom of Saudi Arabia


Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

MV / LV SWGR

MV/LV SWGR
-Installation & Visual
Check.
-Busbar conductivity
Check.
-Insulation resistance test

INSPECTION & TEST PLAN (ITP)

Frequency

Each Unit

Procedure /
Spec.
- Approved vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check fuse rating, main parts rating / type.


- CT/VT ratios shall be visualy checked against
drawing.
- Check operation of safety shutter.
- Check busbars are installed at correct location.
- Check busbars connection tight ness and correct
phasing.
- Torque check of busbar connection as per
manufacturer recommendation.
- Check busbars conductivity (end to end)
- Check the condition of earthing bar and
connections, measure continuity of switchboard
to main earth.
-Check insulation resistance values of busbars

ITP No. :
Page

S-00-TAA-Q-43-036-003 Rev. 0

Reporting
Format
HSFP-EL006

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

Motor Control Center

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-004 Rev. 0

Reporting
Format

HSFP-ST-01

of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy
Drawing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-001

Motor Control Center


-Installation & Visual
Check.
-Busbar conductivity Check.
-Insulation resistance test.

Each Unit

clear of the soil.

- Approved vender
Drawing

- Check installation method as per installation

- Approved drawing

- Check doors and panels to ensure proper

-Technical
specification(SEC)

drawing.

HSFP-EL005

opening and closure.


- Check paint damage, tag plate, warning label
, visual damage etc.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

Item

Item

No

Activity Description

SEC, Kingdom of Saudi Arabia


Electrical
Motor Control Center

Motor Control Center.


-Installation & Visual
Check.
-Busbar conductivity Check.
-Insulation resistance test

Frequency

Each Unit

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.
- Approved vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check fuse rating, main parts rating / type.


- Check operation of safety shutter.
- Check busbars are installed at correct location.
- Check busbars connection tight ness and correct
phasing.
- Torque check of busbar connection as per
manufacturer recommendation.
- Check busbars conductivity.
- Check the condition of earthing bar and
connections, measure continuity of switchboard
to main earth.
-Check insulation resistance values of busbars

ITP No. :
Page

S-00-TAA-Q-43-036-004 Rev. 0

Reporting
Format

HSFP-EL005

10 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

Transformer

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

Each
Delivery

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-005 Rev. 0

Reporting
Format
HSFP-ST-01

11 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy
Drawing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-001

Transformer
-Installation & Visual
Check.
-Insulation resistance test
-Oil level & dielectric Check

Each Unit

Approved vender
Drawing
Approved drawing
Technical
specification(SEC)

clear of the soil.


- Check Shock indicator or Shock record
(if required)

- Check installation method as per installation

HSFP-EL-011

drawing.
- Check paint damage, tag plate, warning label,
visual damage etc.
-Check insulation resistance for HV-earth
/ LV-earth
- Check explicit all porcelain & other bushings
For damages on the surface

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

Transformer

No

Activity Description

Transformer
-Installation & Visual
Check.
-Insulation resistance test
-Oil level & dielectric Check

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

Each Unit

Procedure /
Spec.

Inspection Method / Acceptance Criteria

Approved vender
Drawing

- Check no-load tap changer for proper

Approved drawing

- Check continuity on all tap position.

Technical
specification(SEC)

- Check oil colour and smell.

movement.

- Check connection as approved drawing.


- Check neutral earthing connection.
- Measure neutral earthing, equipment earthing
continuity.
- Check oil level and pressure level.
-

ITP No. :
Page

S-00-TAA-Q-43-036-005 Rev. 0

Reporting
Format

HSFP-EL-011

12 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

AC / DC UPS System

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-006 Rev. 0

Reporting
Format

HSFP-ST-01

13 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy
Drawing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-001

AC / DC UPS System
-Installation & Visual
Check.

Each Set

clear of the soil.

- Approved vender
Drawing

- Check installation method as per installation


drawing.

HSFP-EL003

- Approved drawing

- Check paint damage, tag plate, warning label,


visual damage etc.
- Check installation of inter-connection cabling as

HSFP-EL004

-Technical
specification(SEC)

per approved drawing.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

Item

Item

No

Activity Description

SEC, Kingdom of Saudi Arabia


Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

AC / DC UPS System

AC / DC UPS System
-Installation & Visual
Check.

INSPECTION & TEST PLAN (ITP)

Frequency

Each Set

Procedure /
Spec.
- Approved vender
Drawing

Inspection Method / Acceptance Criteria

- Check main parts rating / type as per relevant

Page

- Check isolation switch Open / Close.


- Check earthing for system cubicle.
- Check battery type.
-

S-00-TAA-Q-43-036-006 Rev. 0

Reporting
Format
HSFP-EL003

drawing.

- Approved drawing
- Technical
specification(SEC)

ITP No. :

HSFP-EL004

14 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

BUS DUCT

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-007 Rev. 0

Reporting
Format

HSFP-ST-01

15 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy
Drawing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-001

clear of the soil.


- Check the group Identification number of BUS
DUCT (If required)

BUS DUCT
-Installation & Visual
Check.
-Busbar conductivity Check.
-Insulation resistance test.

Each Set

- Approved vender
Drawing
- Approved drawing
-Technical
specification(SEC)

- Check the position of equipment to be connected


with regard to the layout drawing.

HSFP-EL010

- Check assemble & install support as detail


- Check paint damage, tag plate, warning label,
visual damage etc.
- Torque check of busbar connection per vendor
Recommendation.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

SEC, Kingdom of Saudi Arabia

Item

Electrical

Item

BUS DUCT

No

Activity Description

Frequency

BUS DUCT
-Installation & Visual
Check.
-Busbar conductivity Check.

Each Set

-Insulation resistance test

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.

ITP No. :
Page

Inspection Method / Acceptance Criteria

Reporting
Format

- Approved vender

- Check the phase sequence of the connection.

HSFP-EL-

Drawing

- Check the connection of switchboard bus duct

010

- Approved drawing

section.

- Technical

- Check busbars are installed at correct location.

specification(SEC)

- Check busbar conductivity test.


- Check insulation resistance of busbar
- Check the instrument air condition.

S-00-TAA-Q-43-036-007 Rev. 0
16 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

Electrical
Distribution Board(Incl UPS
AC/DC Board.

No

Activity Description

Material Verification
Receiving Inspection

Frequency

100%

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

ITP No. :
Page

S-00-TAA-Q-43-036-008 Rev. 0

Procedure /
Spec.

Inspection Method / Acceptance Criteria

Reporting
Format

Related POS/
Material Spec.,

As per Specified in Applicable Specification and

HSFP-ST-01

17 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy Drawi
ng

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp. Proc


edure: S-00-TAA-Q43-008-001

Distribution Board
-Installation & Visual
Check.
.

* Legend

Each Unit

clear of the soil.

- Approved vender
Drawing

- Check installation method as per installation

- Approved drawing

- Check assemble & install supports as drawing.

-Technical
specification(SEC)

- Check paint damage, tag plate, warning label

drawing.

HSFP-EL007

, visual damage etc.

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remark
s

Client

: SEC, Kingdom of Saudi Arabia

Item
Item

:
Electrical
: Distribution Board(Incl UPS
AC/DC Board.

No

Activity Description

Distribution Board
-Installation & Visual
Check.

Frequency

Each Unit

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.
- Approved vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check MCB rating, main parts rating / type.


- Check the condition of earthing bar and
connections, measure continuity of switchboard
to main earth.

ITP No. :
Page

S-00-TAA-Q-43-036-008 Rev. 0

Reporting
Format
HSFP-EL007

18 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

Motor

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-009 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

19 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy Dra
wing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

Motor
-Installation & Visual
Check.
-Insulation Check.

Each Unit

clear of the soil.

- Approved vender
Drawing

- Check orientation of installation correct as per


drawing.

- Approved drawing

- Check motor name plate, visual damage etc.

-Technical
specification(SEC)

HSFP-EL002

- Check insulation resistance values of motor.


- Check insulation resistance values of motor
space heater and temperature detector.
- Check motor earthing connection.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Item

Electrical

Item

Motor

No

Activity Description

Motor
-Installation & Visual
Check.
-Insulation Check.

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

Each Unit

Procedure /
Spec.
- Approved vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check power / control / space heater cable


are connected correctly.
- Check the correct condition(Gland /Foundation
Level)

ITP No. :
Page

S-00-TAA-Q-43-036-009 Rev. 0

Reporting
Format
HSFP-EL002

20 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

No

Activity Description

Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Cathodic

Material Verification
Receiving Inspection

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-010 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

21 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing

- Raw Material

General Assy Dra


wing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

Cathodic
-Installation & Visual
Check.
-Insulation resistance test.
-Installation Check of anode

Each Set

clear of the soil.

1. Common check point

- Approved vender
Drawing

- Check assemble & install supports as drawing.

- Approved drawing

- Check paint damage, tag plate, warning label,

-Technical
specification(SEC)

HSFP-EL022

visual damage etc.


- Check fuse rating , main parts rating / type.
- Check & verify the thermit weld condition.
- Check fuse rating, main parts rating / type.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Item

Item

No

Activity Description

Electrical

-Installation & Visual


Check.
-Insulation resistance test.
-Installation Check of anode

Frequen
cy

Each
Set

Procedure /
Spec.
- Approved vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check mechanical integrity of cable connection.


- Check epoxy encapsulation of weld.
- Measure the cable resistance to pipe.
- Check location as per requirement and approved
drawing.
- Check anode length,size, and physical damages.
- Check the reference electrode had been soaked.
- Check access point installed beneath isolation
joint.
2, Installation Check & Testing (Sacrificial Anode)
- Check no physical damages, sand bedded and
soaked prior install.
- Check Mg, anode are installed at correct location
- Check anode installed horizontally and paralled
to the pipe per vendor recommendation.
3, Installation Check & Testing (MMO

Anode)

- Check if any damages of MMO canistered anode


- Check anode length,size, and physical damages
- Check correct location, depth according to the
approved drawing.

ITP No. :
Page

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Cathodic

Cathodic

INSPECTION & TEST PLAN (ITP)

S-00-TAA-Q-43-036-010 Rev. 0

Reporting
Format
HSFP-EL022

22 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

No

Activity Description

Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Earthing and Bonding

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-011 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

23 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy Dr
awing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-00
1

Earthing and Bonding


-Earthing electrode /Cable
Route / Cable connection.
-Inspection earth pit check.
-Electrical system earthing
test

Each unit
&
Equipment

Approved vender
Drawing

clear of the soil.

- Verify the marking points for installation rod

As per construction drawing.

Approved drawing
Technical
specification(SEC
)

HSFP-EL018

- Check and verify the installation of earthing rod

HSFP-EL019

As per project specification.


- Verify the completed section of depth of the
Cable as per specification and construction
-

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

SEC, Kingdom of Saudi Arabia

Disc

Item

: Earthing and Bonding

No

Activity Description

Electrical

Earthing and Bonding


-Earthing electrode /Cable
Route / Cable connection.
-Inspection earth pit check.
-Electrical system earthing
test

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

Each unit
&
Equipment

Procedure /
Spec.
Approved vender
Drawing
Approved drawing
Technical
specification(SEC)

ITP No. :
Page

Inspection Method / Acceptance Criteria

Reporting
Format

- Verify cable kicker pipes or protection pipes are

HSFP-EL018

adequately
- Check cable size and connection.
- Check cable protection.
- Compression type splice or thermo-weld
connection, wrapped with insulation tape.
- Check inspection earth pit according to the
construction drawing.
- Check earth bar according to the construction
Drawing.
Check individual electrode resistance value.
- Check group or plant earth resistance value
- Check earth connection between the electrode
and the supply neutral and plant earth loop
continuity.
- Check connection of clean earth to plant earth.

S-00-TAA-Q-43-036-011 Rev. 0

HSFP-EL019

24 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

No

Activity Description

Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Lighting System

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-012 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

25 of

38

Inspection By
SubSEC/
HHI
Con
OE

Drawing
General Assy Dra
wing

- No Damage, Corrosion & Deformation

- Shall be properly laid out on wooden supports


Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

Lighting System.
-Installation & Visual
Check.
-Insulation Resistance test.

Each unit
&
Equipment

Approved vender
Drawing
Approved drawing
Technical
specification(SEC)

clear of the soil.

- Check installation method as per installation

HSFP-EL012

drawing.
- Check paint damage, tag plate, warning label
, visual damage etc.
- Check cable size and connection.
- Check lighting model and type with lamp type.
- Fixtures tag number.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

1Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

No

Activity Description

Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Lighting System

Lighting System.
-Installation & Visual
Check.
-Insulation Resistance test.

INSPECTION & TEST PLAN (ITP)

Frequency

Each unit
&
Equipment

Procedure /
Spec.

Approved vender
Drawing
Approved drawing
Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check type of Ex-Protection.


- Check spare hole / cover to seal and cover
tightened.
- Check the earthing wire connection properly.
- Verify continuity and insulation resistance.
- Check the light cable condition
(rigid or flexible conduits, cable glands)

ITP No. :
Page

S-00-TAA-Q-43-036-012 Rev. 0

Reporting
Format

HSFP-EL012

26 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

No

Electrical

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

Lightning Protection

Activity Description

Material Verification
Receiving Inspection
- Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

Lightning Protection.
-Installation & Visual
Check.

Each unit
&
Equipment

Approved vender
Drawing
Approved drawing
Technical
specification(SEC)

Page

S-00-TAA-Q-43-036-013 Rev. 0

Reporting
Format

27 of

38

Inspection By
SubSEC/
HHI
Con
OE

As per Specified in Applicable Specification and


Drawing

General Assy Dra


wing

ITP No. :

Mill Certificate
&
HSFP-ST-01

clear of the soil.

- Check installation method as per installation

HSFP-EL-030

drawing.
- Check tag plate, visual damage etc.
- Check cable size and connection.
- Check lightning model and type.
- Fixtures tag number.
- Check the earthing wire connection properly.
- Verify continuity and insulation resistance.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

: Receptacle, Junction Box,RCU

No

Activity Description

Electrical

Material Verification
Receiving Inspection
- Raw Material

Frequency

100%

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-014 Rev. 0

Reporting
Format

HSFP-ST-01

28 of

38

Inspection By
SubSEC/
HHI
Con
OE

Drawing
General Assy Dr
awing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-00
1

Receptacle & Junction Box.


RCU.
-Installation & Visual
Check.
-Insulation Resistance test

Each unit
&
Equipment

Approved vender
Drawing
Approved drawing
Technical
specification(SEC
)

clear of the soil.

- Check installation method as per installation


drawing.
- Check paint damage, name plate, warning label
, visual damage etc. incl (IP protection class)
- Check adequate protection for fittings and cable
Against corrosion weather etc.
- Check earthing bonding correct.

* Legend

HSFP-EL009

HSFP-EL013
HSFP-EL014
HSFP-EL021

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

1Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

: Receptacle, Junction Box,RCU

No

Activity Description

Frequency

Receptacle & Junction Box.

Each unit
&
Equipment

Electrical

RCU
-Installation & Visual
Check.
-Insulation Resistance test

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.

Approved vender
Drawing
Approved drawing
Technical
specification(SEC

Inspection Method / Acceptance Criteria

ITP No. :
Page

Reporting
Format

- Check type of IP protection class &


Ex-Protection.

HSFP-EL009

- Check spare hole / cover to seal and cover


tightened.

HSFP-EL013

- Inspect wiring inside the junction boxes for


Correct wiring method and wire splicing.

HSFP-EL014

- Verify continuity and insulation resistance.


- Check zone applicable safety code.

HSFP-EL021

- Check that the appropriate cover is installed for


each type of receptacle.
- Verify the position of switch according to the
specification.

S-00-TAA-Q-43-036-014 Rev. 0

HSFP-EL021

29 of

38

Inspection By
SubSEC/
HHI
Con
OE

Remarks

1Client

SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

: Cable / Tray / Conduit (Telecom)

No

Activity Description

Material Verification
Receiving Inspection
- Raw Material

Frequency

100%

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-015 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

30 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing
General Assy Dr
awing

- No Damage, Corrosion & Deformation


- Shall be properly laid out on wooden supports

Receiving Insp.
Procedure: S-00TAA-Q-43-008-00
1

Installation Cable Tray,


Ladder and Conduit
Installation.

100%

Approved
drawing.
Vender Drawing

clear of the soil.

- Check tag numbers are correct.


- Verify Cable tray and tray installed as per

HSFP-TE001

construction drawing.
- Check alignment as overlapped of trays.
- Check bonding jumpers installed at tray joint
connections and tight.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client
Disc

: SEC, Kingdom of Saudi Arabia


:

Electrical

Item

: Cable / Tray / Conduit(Telecom)

No

Activity Description

Installation Cable Tray,


Ladder and Conduit
Installation.

Frequency

100%
Installation
All Route

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.
Approved
drawing.
Vender Drawing

Inspection Method / Acceptance Criteria

- Check hold down clamp and brackets are installed.


- Check cable fix to cable tray and ladder properly.

ITP No. :
Page

S-00-TAA-Q-43-036-015 Rev. 0

Reporting
Format

31 of

38

Inspection By
SubSEC/
HHI
Con
OE

HSFP-TE001

HSFP-TE001

- Check cable ladder properly supported.


- Check cover installed(to be installed after all the
cables are tested and properly terminated)
- Check junction box supports independent from
conduit and tray.
- Check conduit supports within the specified interval
according to approved drawing.
- Check touch up of galvanizing performed
(if required)
- No sharp edges.
- No obstructions.

3
Cable Installation
- Installation & Visual
Check.
- Insulation resistance
Test

All Cable

Approved vender
Drawing
Approved drawing

- Check megger test on the reel


(For the construction : If required)
- Verify cable type & configuration.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

Item

: Cable / Tray / Conduit(Telecom)

No

Electrical

Activity Description

Cable Installation
- Installation & Visual
Check.
- Insulation resistance
Test

Frequency

All Cable

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.

Approved vender
Drawing
Approved drawing

Inspection Method / Acceptance Criteria


- Check and confirm cable shall be meggered before
And after installation, record of testing shall be

ITP No. :
Page

S-00-TAA-Q-43-036-015 Rev. 0

Reporting
Format

HSFP-TE001

32 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

available.
- Check proper arrangement, segregation and layer
Of cable, bending radius as per vendor data, and
allowable Slack.

Cable Installation
- Installation & Visual
Check.
- Insulation resistance
test

All Cable

Approved vender
Drawing
Approved drawing

- Check cable tags correct.


- Check cable caps for protection of cable ends
Shall be properly protected after installation.

HSFP-TE001

Remarks

Client

SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

CCTV

No

Activity Description

Material Verification
Receiving Inspection

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-016 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

33 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing

- Raw Material

General Assy Dra


wing

- No Damage, type, specification, etc

Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

CCTV Installation
-Installation & Visual
Check.

Each Unit

- Approved Vender
Drawing
- Approved drawing
- Technical
specification(SEC)

- Check name plate, tag No,

HSFP-IN-004

- Check the cameras are mounted on correct


location as per drawing.
- Check the correct lighting is provided for camera
- Check power & signal cables are fixed properly
with appropriate cable marking & The cable
length is ample for movement of camera.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

SEC, Kingdom of Saudi Arabia

Item

Electrical

Item

CCTV

No

Activity Description

CCTV Installation
-Installation & Visual
Check.

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

Each Unit

Procedure /
Spec.
- Approved Vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check the accessibility and facilities


maintenance.
- Check No damage.
- Check earthing connection.

ITP No. :
Page

S-00-TAA-Q-43-036-016 Rev. 0

Reporting
Format

HSFP-IN-004

34 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

SEC, Kingdom of Saudi Arabia

Disc

Electrical

Item

PABX

No

Activity Description

Material Verification
Receiving Inspection

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

ITP No. :
Page

S-00-TAA-Q-43-036-017 Rev. 0

Inspection Method / Acceptance Criteria

Reporting
Format

As per Specified in Applicable Specification and

HSFP-ST-01

35 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing

- Raw Material

General Assy Dra


wing

- No Damage, type, specification, etc

Receiving Insp. Pr
ocedure: S-00-TAA
-Q-43-008-001

PABX

Installation

-Installation & Visual


Check.

Each Unit

- Approved Vender
Drawing
- Approved drawing
- Technical
specification(SEC)

- Check name plate, tag No,


- Check the wiring as per construction drawing.
- Check the structured cabling cabinet are
installed as per drawing and orientation.

HSFP-TE002

HSFP-TE003

- Check the earthing and arresters for telecom


cabinet(if applicable).

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

Item

: Telecommunication

Item

No

Activity Description

PABX

SEC, Kingdom of Saudi Arabia

Construction of Shuqaiq Steam Power Plant


Contract No. : 31221097/00

PABX Installation

Installation

-Installation & Visual


Check.

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure /
Spec.

- Approved Vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

- Check No damage.
- Verify the Explosion proof telephones are
mounted on easy accessible area.

ITP No. :
Page

S-00-TAA-Q-43-036-017 Rev. 0

Reporting
Format

HSFP-TE002
HSFP-TE003

36 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks

Client

SEC, Kingdom of Saudi Arabia

Disc

Item

No

Activity Description

Electrical

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00

Junction Box(Telecom)

Material Verification
Receiving Inspection

Frequency

100%

Procedure /
Spec.
Related POS/
Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. :
Page

S-00-TAA-Q-43-036-018 Rev. 0

Reporting
Format

HSFP-ST-01

37 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Drawing

- Raw Material

General Assy
Drawing

- No Damage, type, specification, etc

Receiving Insp.
Procedure: S-00TAA-Q-43-008-001

Junction Box Installation.


-Installation & Visual
Check.

Each Unit

- Approved Vender
Drawing
- Approved drawing
- Technical
specification(SEC)

- Verify the junction box identification number.


- Check the junction box specification(cable gland

HSFP-TE005

hole size and quantities and terminal block


arrangement etc.).
- Check earthing connection
- Check the junction box location.

* Legend

R (Review Point) : To determine subject matter has achieved objectives.


M (Monitoring) : Periodic and systematic check (does not imply any action will be taken)
W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements.
H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OEs Inspector.

Remarks

Client

SEC, Kingdom of Saudi Arabia

Item

Electrical

Item

: Junction Box(Telecom)

No

Activity Description

Junction Box Installation.


-Installation & Visual
Check.

Frequency

Each Unit

INSPECTION & TEST PLAN (ITP)


Construction of Shuqaiq Steam Power Plant
Contract No. : 31221097/00
Procedure /
Spec.

- Approved Vender
Drawing
- Approved drawing
- Technical
specification(SEC)

Inspection Method / Acceptance Criteria

-- Check No damage.
- Check the insulation material between HDG and
stainless steel.
- Check the tightness.
- Check the support welding and touch up paint
Condition.
- Check the cable installed and terminated as per
approved drawing.

ITP No. :
Page

S-00-TAA-Q-43-036-018 Rev. 0

Reporting
Format
HSFP-TE005

38 of

38

Inspection By
SubSEC/
HHI
Con
OE
W

Remarks