07/24/2014
SAVANNAHNICKELMINE
PRIMARYVENTILATIONFANSERVICE
ServiceandInspectionofPrimaryVentilationFans
DocumentControl
Issue
Author
Draft
ChadSindorff
Date Revision
24/7/14
A
By:ChadSindorff
July27,2014
ReviewedBy
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
TABLEOFCONTENTS
1.
Introduction
2.
Background.
3.
Objective.
4.
ScopeofWork..
5.
O.H.S.E..
6.
ReferenceDocuments...
7.
Execution.
8.
Analysis.
9.
Recommendations..
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
1. INTRODUCTION
SavannahNickelMineisanundergroundminingoperationwhichextractsore
containing nickel/cobalt/copper for processing through a flotation
concentrator. To supply sufficient ventilation to the underground workings,
two Howdens 250KW VSD controlled centrifugal type impellor fans are used.
As part of the maintenance program for these fans a 6 monthly clean and
inspectionofthefanbladesiscarriedout.
2. BACKGROUND
These ventilation fans have been in service for 2 years. As part of normal
operations both fans run on a setpoint of 75% (Maximum 93%) which
producesairflowof240cubicmeterspersecond(m3/s).RecentlyaHowdens
technicianattendedsite(February2014)tocompletearealignmentofthefan
shaftsandbalancingofthefandrumsafterwhichbothfanswerefullytested
from50%runspeedto93%withnilbearingvibrationorheatsissuesdetected.
SinceMay2014Fan#1hasbeenexperiencingexcessivevibrationoftheDrive
Endshaftbearing.Duetothisissuethe6monthlycleaningandinspectionof
the fan blades has been bought forward 1 month to undertake root cause
analysis.
3. OBJECTIVE
Recordvibrationandairflowreadings,takephotosoffandrumsand
thoroughlycleanthefandrumblades.
Postcleanupandmaintenance,recordvibrationandairflowreadings.
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
4. SCOPEOFWORK
Thefollowingarekeyscopeitemsforthistask
JSAforthistaskreviewed
AllVibrationreadingstobeconfirmedwithhandheldvibrationmeter
Recordairflowreadingsofbothfansatmultiplerunspeeds
Beforeandafterphotosofbothfandrumstobetaken
Thoroughlycleanallbladesofbothfandrums
Recordallvibrationreadingsaftercleaningatallrunspeeds
CleaningofFanBlades
PostCleaningTests
DetailedReportSubmitted
5. OHSE
(a) ThistaskwascompletedunderaJobSafetyAnalysis
(b) Confinedspaceentrypermitandrescueplanwereauthorisedand
completed
(c) SNMIsolationandTaggingpolicyfollowed
(d) Potentiallycontaminatedmaterialremovedfromfanbladeswas
disposedofaccordingtotheSNMenvironmentalpolicy
6. REFERENCEDOCUMENTS
Workhasbeencarriedouttothefollowingapplicablestandards:
SavannahConfinedSpaceEntryProcedure
SavannahIsolationPolices
WAMiningandSafetyRegulations(1995)
SNMHeatStressandHydrationmanagementplan
Vendormanual
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
Testsheetsrecordingvibrationandflowbeforeandaftercleaningof
thefandrumblades
7. EXECUTION
1. Confinedspaceentrypermitcompletedandauthorised
2. Confinedspacerescueplanpreparedandsubmittedtositesafety
officerforauthorisation.
3. JSAfortaskreviewedandsignedoffbyworkcrew
4. Allequipmentrequiredforthetaskwaspreparedandtransportedtothe
worksite.
5. Testingoffan#1vibrationat5%incrementsbetween50%and93%
6. VibrationreadingofFan#1verifiedbysecondmeasurementdevice
7. TestingofFan#2vibrationat5%incrementsbetween50%and93%
8. VibrationreadingofFan#2verifiedbysecondmeasurementdevice
9. ConfinedspaceentrypermitforFan#1issued.
10.Fan#1Bladescleanedwithhighpressurewatercleaner
11.Fan#1restarted
12.ConfinedspaceentrypermitforFan#2issued
13.Fan#2Bladescleanedwithhighpressurewatercleaner
14.Fan#2restarted
15.Testingoffan#1vibrationat5%incrementsbetween50%and93%
16.VibrationreadingofFan#1verifiedbysecondmeasurementdevice
17.TestingofFan#2vibrationat5%incrementsbetween50%and93%
18.VibrationreadingofFan#2verifiedbysecondmeasurementdevice
19.Materialremovedfromfanbladescleanedupandremovedfromarea
20.Equipmentforjobpackedupandfansreturnedtonormaloperation
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
8. ANALYSIS(basedinpastandpresentdata)
(a) WhatWorkedWell
Prior to cleaning the fan blades vibration readings were taken. The
followinggraphsrepresentthevibrationreadingsobtainedfrombothfans,
whichwereverifiedbyasecondhandheldmeasuringdevice.
Fan#1PrecleanShaftVibration
8
7
6
5
4
3
2
1
0
50
55
60
65
70
75
80
85
90
95
100
Fig.#1Fan#1PreCleanVibration(mm/s)toFanSpeed(%)
Fan#2PrecleanShaftVibration
8
7
6
5
4
3
2
1
0
50
55
60
65
70
75
80
85
90
95
100
Fig#2Fan#2PreCleanVibration(mm/s)toFanSpeed(%)
Thevibrationalarmpointforbothfansis5.5mm/sandthetripsetpointis
7.5mm/s.AstheabovegraphdemonstratesFan#1couldnotgetabove
75%runspeedbeforetrippingonHighvibration.
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
Thefollowingpicturesdemonstratetheextentofbuiltupmaterialonthe
fanbladesthatwascleanedoffandtheconditionofthefanbladesafter
cleaningwascompleted.
Fig#4Fan#1MaterialBuildup
Fig#5Fan#2MaterialBuildup
Fig#6Postcleaningconditionoffanblades
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
Thefollowinggraphsrepresentvibrationofbothfansaftercleaningofthe
fanbladeshadbeencarriedout.
Fan#1PostCleanShaftVibration
8
6
4
2
0
50
55
60
65
70
75
80
85
90
95
100
Fig.#7Fan#1PostCleanVibration(mm/s)toFanSpeed(%)
Fan#2PrecleanShaftVibration
8
6
4
2
0
50
55
60
65
70
75
80
85
90
95
100
Fig#8Fan#2PostCleanVibration(mm/s)toFanSpeed(%)
Accordingtothecomplieddatabothfansreducedinvibrationafterthefan
drumswerecleanedandFan#1showaprofoundreductioninvibrationand
wasabletoberunupto93%withouttripping.Fan#1stillshowsahigher
vibrationreadingthanFan#2atallrunspeeds.
Measuredairflowwithbothfansrunningat75%was240m3/spriorto
cleaningandhadincreasedto250m3/safterwards.At93%measured
airflowwas380m3/s.
JSAandconfinedspaceentrypermitwasbotheffectiveandcompletedtoa
highstandard.
(b) WhatDidntWorkWell
Themanualcleaningofthefandrumsisahighriskjob
Thisprocessisalsoverylabourintensive
ManualHandlingwasintensivetoremovewastematerialfromfan
housingmakingitahighriskofsprains/strainsduringtask.
By:ChadSindorff
July27,2014
SAVANNAHPRIMARYVENTILTIONFAN6MONTHLYSERVICE
07/24/2014
RECOMMENDATIONS
Basedonthedatarecordedandresultsoftheinspectionthefollowing
arerecommendationstoimprovefanperformanceandreduce
downtimeduetovibrationrelatedtrips.
1. Increasethefrequencyofthefancleaningandinspectionserviceto3
monthlyintervalstolimittheamountofmaterialbuilduponthefan
bladeswhichresultsinaninbalanceofthefanbladesleadingto
highervibrationofthefanshaft.
2. PurchaseandinstallanOEMselfcleaningsystemforthebothfans
whichwilldecreasethelabouranddowntimerequiredtomanually
cleanthedrumsattherecommended3monthlyintervals.
3. ContactHowdenstoarrangeasitevisitbyoneoftheirtechniciansto
rebalanceFan#1asevenaftertheyhavebothbeencleanedthisfanis
stillrunningatapproximately1mm/shighervibrationthanFan#2.
By:ChadSindorff
July27,2014