ASSIGNMENT I

Estimate the quantities of Earthwork, concrete, brickwork and finishing work for the given steps .
1. Estimate of simple step. Surface of steps are plastered with 20mm thick 1:3 cement sand mortar
finished with neat cement rendering.

2. Estimate the three sides step. Surface of the steps are provided with 2.5cm c.c. 1:1.5:3 finished
with neat cement.

3. Estimate of corner step. Surface of steps with 20mm cement plastered 1:3 with neat cement
rendering.