Description of Item
Check for material in accordance to Project Specification, verify quality and
condition.
Check correct conduit pipe size.
Check that conduits enter the bottom of the devices wherever possible.
Check the conduit pipe has no sharp edges where cables may be damaged and
all exposed ends have bushings installed.
Check all conduit pipes laid as per the layout/drawings.
OK
N/A
P/L
Remarks: