INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Electrical PVC Pipe Installation

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00040

Equipment Taq #:

Equipment Tag Description:

Taq Equipment Type:

No
1
2

Description of Item
Check for material in accordance to Project Specification, verify quality and
condition.
Check correct conduit pipe size.

Check that conduits enter the bottom of the devices wherever possible.

Check the conduit bend radius is as per requirements.

Check the conduit pipe has no sharp edges where cables may be damaged and
all exposed ends have bushings installed.
Check all conduit pipes laid as per the layout/drawings.

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction

2015 ENKA naat ve Sanayi A.. Contents Confidential


All Rights Reserved. Contains confidential information proprietary to ENKA and may not be disclosed to a third-party without ENKA's prior written
permission.