INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Heat Trace Installation After Cladding

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00018
Equipment Tag Description:

Equipment Tag #:
Tag Equipment Type:

No
1
2

Description of Item
Measure insulation resistance between tape and heater braid or pipe, using
500V Megger.
Check all connections are correct, tight and cable and tape markings are fitted.

Check cladding entry kit has been fitted correctly.

Check warning labels have been fitted on cladding.

Tagging and identification complete( panel, field components, instruments etc)

Warning signs provided as per the project specification and drawing.

Unused cable entries are blanked off with correct type of plugs.

If any tests required as per the manufacturer's installation manual, check to see
they are performed and results recorded - attached.

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction