Академический Документы
Профессиональный Документы
Культура Документы
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
Ago.
Sep.
Oct.
Nov.
2005
2006
2007
2008
2009
2010
2011
6.50
18.50
7.60
20.60
63.00
10.80
44.50
42.00
38.70
27.00
66.60
22.40
77.90
54.40
36.20
23.00
39.10
18.10
40.70
56.70
31.40
31.00
9.40
32.50
31.60
27.10
19.40
38.20
10.20
13.50
20.80
14.90
27.90
17.60
21.50
18.30
26.50
22.30
16.00
17.50
16.50
8.60
10.90
11.30
15.40
13.70
12.50
4.50
15.10
14.50
8.50
11.30
10.70
14.40
8.80
4.00
18.70
5.60
4.60
16.20
15.40
13.50
46.70
27.90
11.70
38.60
46.10
22.30
43.40
23.70
78.50
15.50
39.10
72.50
19.50
15.90
30.70
EL LIMON
2005
2006
2007
2008
2009
2010
2011
Ene.
2.70
12.00
1.80
3.50
10.70
14.10
18.80
Feb.
24.10
5.90
13.10
13.80
2.80
63.80
25.70
Mar.
12.10
2.70
43.00
21.30
29.20
15.10
20.80
Abr.
9.80
9.60
13.60
18.80
28.00
16.00
3.60
May.
3.70
18.40
3.30
21.40
4.60
8.90
6.90
Jun.
17.00
5.50
0.60
36.30
2.70
5.30
0.60
Jul.
8.70
3.78
3.42
11.70
1.40
3.90
7.80
Ago.
0.91
1.59
0.40
2.70
0.40
4.90
0.30
Sep.
2.50
6.20
2.00
1.80
3.70
1.10
3.20
Oct.
6.90
9.90
29.60
1.50
33.20
15.20
16.80
Nov.
12.90
5.60
2.80
12.30
22.50
24.30
28.20
PUENTE CHUNCHUCA
Ene.
Feb.
Mar.
Abr.
May.
Jun.
Jul.
2005
2006
2007
2008
2009
2010
2011
14.10
16.50
10.00
45.80
10.00
18.30
8.50
30.00
46.90
20.00
32.00
9.00
40.20
30.00
35.30
20.00
40.50
25.40
13.20
40.00
16.80
16.70
12.50
14.20
58.00
26.00
3.70
21.00
22.17
20.50
3.50
2.40
6.30
7.90
8.50
22.55
108.08
35.82
29.84
20.64
13.18
31.70
9.50
25.00
55.90
18.60
18.50
Ago.
1.20
Sep.
Oct.
Nov.
0.70
5.00
4.80
11.00
4.00
3.70
3.20
21.89
4.27
23.50
28.50
43.50
23.50
54.60
3.37
11.33
4.39
39.74
12.80
7.20
11.00
20.20
70.00
20.00
10.00
24.90
48.50
44.20
21.20
Dic.
31.50
16.00
20.80
11.50
24.30
30.20
55.20
Totales
326.20
198.20
279.10
338.50
307.00
315.20
374.00
Max. Anual
78.5
38.7
39.1
72.5
63.0
77.9
55.2
Dic.
7.40
15.20
13.00
2.00
4.00
4.40
10.90
Totales
108.71
96.37
126.62
147.10
143.20
177.00
143.60
Max. Anual
24.1
18.4
43.0
36.3
33.2
63.8
28.2
Dic.
51.50
29.50
19.50
50.00
12.20
8.20
55.37
Totales
280.90
179.70
226.60
305.26
322.87
341.34
286.97
Max. Anual
70.0
40.5
43.5
50.0
58.0
108.1
55.9
Chontali (2)
24.1
18.4
43
36.3
33.2
63.8
28.2
Jan (3)
70
40.5
43.5
50
58
108.08
55.9
(24 horas)
Area1 (Km2)
Area2 (Km2)
Area3 (Km2)
Area Cuenca
11.71
11.71
11.71
11.71
11.71
11.71
11.71
14.36
14.36
14.36
14.36
14.36
14.36
14.36
37.23
37.23
37.23
37.23
37.23
37.23
37.23
63.3
63.3
63.3
63.3
63.3
63.3
63.3
Pmed. (mm)
61.16
35.15
42.57
51.05
53.30
92.45
49.49
2005
2006
2007
2008
2009
2010
2011
P. (mm)
30.58
17.58
21.29
25.53
26.65
46.23
24.74
N DATOS
1
2
3
4
5
6
7
MEDIA =
DESV. EST. =
P. Ordenados
46.23
30.58
26.65
25.53
24.74
21.29
17.58
F(X)
0.9789
0.6304
0.4627
0.4147
0.3819
0.2496
0.1405
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
27.513
9.214
NORMAL
0.0211
0.3696
0.5373
0.5853
0.6181
0.7504
0.8595
MAXIMO =
CRITICO =
NORMAL
0.1039
0.1196
0.1623
0.0853
0.0069
0.0004
0.0155
0.1623
0.5140
ACEPTADA
LN2
0.0323
0.3134
0.4869
0.5434
0.5838
0.7604
0.9096
LN2
0.0927
0.0634
0.1119
0.0434
0.0412
0.0104
0.0346
2005
2006
2007
2008
2009
2010
2011
P. (mm)
30.58
17.58
21.29
25.53
26.65
46.23
24.74
N DATOS
1
2
3
4
5
6
7
P.Ordenados
46.23
30.58
26.65
25.53
24.74
21.29
17.58
y = lnx
3.8335
3.4203
3.2828
3.2397
3.2086
3.0581
2.8666
F(x)
0.9677
0.6866
0.5131
0.4566
0.4162
0.2396
0.0904
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
MEDIA =
DESV. EST. =
3.273
0.303
MAXIMO =
CRITICO =
0.1119
0.5140
2005
2006
2007
2008
2009
2010
2011
P. (mm)
30.58
17.58
21.29
25.53
26.65
46.23
24.74
N Datos
1
2
3
4
5
6
7
P.Ordenados
46.23
30.58
26.65
25.53
24.74
21.29
17.58
MEDIA
DESV.EST.
a
C.ASIMETRIA
y = ln (x-a)
3.876
3.484
3.355
3.315
3.286
3.148
2.974
F(x)
0.9687
0.6836
0.5096
0.4534
0.4133
0.2396
0.0934
Empirica
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
3.348
0.283
2
0.9094254395
LN3
0.0313
0.3164
0.4904
0.5466
0.5867
0.7604
0.9066
MAXIMO =
CRITICO =
LN3
0.0937
0.0664
0.1154
0.0466
0.0383
0.0104
0.0316
0.1154
0.5140
GUMBEL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
30.58
17.58
21.29
25.53
26.65
46.23
24.74
N DATOS
1
2
3
4
5
6
7
P. Ordenados
46.23
30.58
26.65
25.53
24.74
21.29
17.58
y = (x - u)/a
2.2651
0.7713
0.3960
0.2888
0.2140
-0.1161
-0.4703
Tr
10.14
2.70
2.04
1.90
1.81
1.48
1.25
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
GUMBEL
0.0986
0.3702
0.4898
0.5272
0.5540
0.6747
0.7982
GUMBEL
0.0264
0.1202
0.1148
0.0272
0.0710
0.0753
0.0768
MEDIA =
DESV. EST. =
27.513
9.214
n = n de datos
yn medio =
Sn =
10.00
0.48
0.88
parmetros, segn n
a = Sx / Sn =
u = x-yn*a=
10.47
22.50
MAXIMO =
CRITICO =
0.1202
0.5140
Para 30 minutos:
DISTRIBUCION NORMAL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
17.66
10.15
12.29
14.74
15.39
26.69
14.29
N DATOS
1
2
3
4
5
6
7
MEDIA =
DESV. EST. =
P. Ordenados
26.69
17.66
15.39
14.74
14.29
12.29
10.15
15.885
5.321
F(X)
0.9789
0.6306
0.4626
0.4146
0.3818
0.2496
0.1404
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
NORMAL
0.0211
0.3694
0.5374
0.5854
0.6182
0.7504
0.8596
MAXIMO =
CRITICO =
NORMAL
0.1039
0.1194
0.1624
0.0854
0.0068
0.0004
0.0154
0.162
0.514
ACEPTADA
2005
2006
2007
2008
2009
2010
2011
P. (mm)
17.66
10.15
12.29
14.74
15.39
26.69
14.29
N DATOS
1
2
3
4
5
6
7
P.Ordenados
26.69
17.66
15.39
14.74
14.29
12.29
10.15
MEDIA =
DESV. EST. =
y = lnx
3.2843
2.8713
2.7335
2.6904
2.6592
2.5088
2.3173
F(x)
0.9677
0.6868
0.5130
0.4566
0.4161
0.2396
0.0904
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
2.724
0.304
LN2
0.0323
0.3132
0.4870
0.5434
0.5839
0.7604
0.9096
MAXIMO =
CRITICO =
LN2
0.0927
0.0632
0.1120
0.0434
0.0411
0.0104
0.0346
0.1120
0.514
2005
2006
2007
2008
2009
2010
2011
P. (mm)
17.66
10.15
12.29
14.74
15.39
26.69
14.29
N DATOS
1
2
3
4
5
6
7
P.Ordenados
26.69
17.66
15.39
14.74
14.29
12.29
10.15
y = ln (x-a)
6.934
6.925
6.923
6.922
6.922
6.920
6.918
F(x)
0.9787
0.6317
0.4634
0.4152
0.3823
0.2493
0.1396
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
LN3
0.0213
0.3683
0.5366
0.5848
0.6177
0.7507
0.8604
LN3
0.1037
0.1183
0.1616
0.0848
0.0073
0.0007
0.0146
MEDIA
DESV.EST.
a
C.ASIMETRIA
6.924
0.0052
MAXIMO =
CRITICO =
1000
1.5785990498
0.1616
0.4301
ACEPTADA
GUMBEL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
17.66
10.15
12.29
14.74
15.39
26.69
14.29
N DATOS
1
2
3
4
5
6
7
P. Ordenados
26.69
17.66
15.39
14.74
14.29
12.29
10.15
MEDIA =
DESV. EST. =
15.885
5.321
n = n de datos
yn medio =
Sn =
10.00
0.48
0.88
parmetros, segn n
a = Sx / Sn =
6.05
y = (x - u)/a
2.2650
0.7718
0.3958
0.2887
0.2139
-0.1162
-0.4703
Tr
10.14
2.70
2.04
1.90
1.81
1.48
1.25
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
GUMBEL
0.0986
0.3701
0.4899
0.5273
0.5540
0.6748
0.7982
MAXIMO =
CRITICO =
GUMBEL
0.0264
0.1201
0.1149
0.0273
0.0710
0.0752
0.0768
0.1201
0.5140
u = x-yn*a=
12.99
Para 60 minutos:
DISTRIBUCION NORMAL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
12.48
7.18
8.69
10.42
10.88
18.87
10.10
N DATOS
1
2
3
4
5
6
7
MEDIA =
DESV. EST. =
P. Ordenados
18.87
12.48
10.88
10.42
10.10
8.69
7.18
F(X)
0.9789
0.6304
0.4627
0.4147
0.3819
0.2496
0.1405
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
11.232
3.762
NORMAL
0.0211
0.3696
0.5373
0.5853
0.6181
0.7504
0.8595
MAXIMO =
CRITICO =
NORMAL
0.1039
0.1196
0.1623
0.0853
0.0069
0.0004
0.0155
0.162
0.5140
ACEPTADA
LN2
0.0323
0.3134
0.4869
0.5434
0.5838
0.7604
0.9096
LN2
0.0927
0.0634
0.1119
0.0434
0.0412
0.0104
0.0346
2005
2006
2007
2008
2009
2010
2011
P. (mm)
12.48
7.18
8.69
10.42
10.88
18.87
10.10
N DATOS
1
2
3
4
5
6
7
P.Ordenados
18.87
12.48
10.88
10.42
10.10
8.69
7.18
y = lnx
2.9377
2.5245
2.3869
2.3439
2.3127
2.1622
1.9707
F(x)
0.9677
0.6866
0.5131
0.4566
0.4162
0.2396
0.0904
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
MEDIA =
2.377
MAXIMO =
0.1119
DESV. EST. =
0.303
CRITICO =
0.514
2005
2006
2007
2008
2009
2010
2011
P. (mm)
12.48
7.18
8.69
10.42
10.88
18.87
10.10
N DATOS
1
2
3
4
5
6
7
P.Ordenados
18.87
12.48
10.88
10.42
10.10
8.69
7.18
MEDIA
DESV.EST.
a
C.ASIMETRIA
y = ln (x-a)
6.252
6.239
6.236
6.235
6.235
6.232
6.229
F(x)
0.9787
0.6319
0.4638
0.4155
0.3825
0.2492
0.1392
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
6.237
0.007
500
1.5748537376
LN3
0.0213
0.3681
0.5362
0.5845
0.6175
0.7508
0.8608
MAXIMO =
CRITICO =
LN3
0.1037
0.1181
0.1612
0.0845
0.0075
0.0008
0.0142
0.1612
0.4301
ACEPTADA
GUMBEL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
12.48
7.18
8.69
10.42
10.88
18.87
10.10
N DATOS
1
2
3
4
5
6
7
P. Ordenados
18.87
12.48
10.88
10.42
10.10
8.69
7.18
y = (x - u)/a
2.2651
0.7713
0.3960
0.2888
0.2140
-0.1161
-0.4703
Tr
10.14
2.70
2.04
1.90
1.81
1.48
1.25
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
GUMBEL
0.0986
0.3702
0.4898
0.5272
0.5540
0.6747
0.7982
GUMBEL
0.0264
0.1202
0.1148
0.0272
0.0710
0.0753
0.0768
MEDIA =
DESV. EST. =
11.232
3.762
n = n de datos
yn medio =
Sn =
10.00
0.48
0.88
parmetros, segn n
a = Sx / Sn =
u = x-yn*a=
4.28
9.19
MAXIMO =
CRITICO =
2005
2006
2007
2008
2009
2010
2011
P. (mm)
8.83
5.07
6.14
7.37
7.69
13.34
7.14
N DATOS
1
2
3
4
5
6
7
P. Ordenados
13.34
8.83
7.69
7.37
7.14
6.14
5.07
F(X)
0.9788
0.6310
0.4626
0.4152
0.3818
0.2493
0.1403
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
NORMAL
0.0212
0.3690
0.5374
0.5848
0.6182
0.7507
0.8597
NORMAL
0.1038
0.1190
0.1624
0.0848
0.0068
0.0007
0.0153
0.1202
0.514
MEDIA =
7.940
MAXIMO =
0.162
DESV. EST. =
2.660
CRITICO =
0.514
ACEPTADA
LN2
0.0324
0.3129
0.4870
0.5427
0.5838
0.7607
0.9097
LN2
0.0926
0.0629
0.1120
0.0427
0.0412
0.0107
0.0347
2005
2006
2007
2008
2009
2010
2011
P. (mm)
8.83
5.07
6.14
7.37
7.69
13.34
7.14
N DATOS
1
2
3
4
5
6
7
P.Ordenados
13.34
8.83
7.69
7.37
7.14
6.14
5.07
MEDIA =
DESV. EST. =
y = lnx
2.5908
2.1782
2.0399
1.9974
1.9657
1.8148
1.6233
F(x)
0.9676
0.6871
0.5130
0.4573
0.4162
0.2393
0.0903
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
2.030
0.304
MAXIMO =
CRITICO =
0.1120
0.514
2005
2006
2007
2008
2009
2010
2011
P. (mm)
8.83
5.07
6.14
7.37
7.69
13.34
7.14
N DATOS
1
2
3
4
5
6
7
P.Ordenados
13.34
8.83
7.69
7.37
7.14
6.14
5.07
y = ln (x-a)
5.363
5.342
5.336
5.335
5.333
5.329
5.323
F(x)
0.9785
0.6337
0.4644
0.4166
0.3829
0.2486
0.1381
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
LN3
0.0215
0.3663
0.5356
0.5834
0.6171
0.7514
0.8619
LN3
0.1035
0.1163
0.1606
0.0834
0.0079
0.0014
0.0131
MEDIA
DESV.EST.
a
C.ASIMETRIA
5.337
0.013
200
1.5608374636
MAXIMO =
0.1606
CRITICO =
0.4301
RECHAZADA
GUMBEL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
8.83
5.07
6.14
7.37
7.69
13.34
7.14
N DATOS
1
2
3
4
5
6
7
P. Ordenados
13.34
8.83
7.69
7.37
7.14
6.14
5.07
MEDIA =
DESV. EST. =
7.940
2.660
n = n de datos
yn medio =
Sn =
10.00
0.48
0.88
y = (x - u)/a
2.2644
0.7728
0.3957
0.2899
0.2138
-0.1169
-0.4708
Tr
10.13
2.70
2.04
1.90
1.80
1.48
1.25
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
GUMBEL
0.0987
0.3698
0.4899
0.5269
0.5540
0.6750
0.7984
MAXIMO =
CRITICO =
GUMBEL
0.0263
0.1198
0.1149
0.0269
0.0710
0.0750
0.0766
0.1198
0.5140
parmetros, segn n
a = Sx / Sn =
u = x-yn*a=
3.02
6.49
2005
2006
2007
2008
2009
2010
2011
P. (mm)
7.21
4.14
5.02
6.02
6.28
10.90
5.83
N DATOS
1
2
3
4
5
6
7
MEDIA =
DESV. EST. =
P. Ordenados
10.90
7.21
6.28
6.02
5.83
5.02
4.14
F(X)
0.9789
0.6305
0.4623
0.4152
0.3815
0.2501
0.1403
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
6.486
2.174
NORMAL
0.0211
0.3695
0.5377
0.5848
0.6185
0.7499
0.8597
MAXIMO =
CRITICO =
NORMAL
0.1039
0.1195
0.1627
0.0848
0.0065
0.0001
0.0153
0.163
0.514
ACEPTADA
LN2
0.0324
0.3133
0.4873
LN2
0.0926
0.0633
0.1123
2005
2006
2007
P. (mm)
7.21
4.14
5.02
N DATOS
1
2
3
P.Ordenados
10.90
7.21
6.28
y = lnx
2.3888
1.9755
1.8374
F(x)
0.9676
0.6867
0.5127
EMPIRICA
0.1250
0.2500
0.3750
2008
2009
2010
2011
6.02
6.28
4
5
6.02
5.83
1.7951
1.7630
0.4573
0.4157
0.5000
0.6250
0.5427
0.5843
0.0427
0.0407
10.90
5.83
6
7
5.02
4.14
1.6134
1.4207
0.2403
0.0901
0.7500
0.8750
0.7597
0.9099
0.0097
0.0349
MEDIA =
DESV. EST. =
1.828
0.304
MAXIMO =
CRITICO =
0.1123
0.514
2005
2006
2007
2008
2009
2010
2011
P. (mm)
7.21
4.14
5.02
6.02
6.28
10.90
5.83
N DATOS
1
2
3
4
5
6
7
P.Ordenados
10.90
7.21
6.28
6.02
5.83
5.02
4.14
MEDIA
DESV.EST.
a
C.ASIMETRIA
y = ln (x-a)
6.133
6.125
6.123
6.123
6.122
6.120
6.118
F(x)
0.9787
0.6315
0.4630
0.4157
0.3818
0.2498
0.1395
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
6.124
0.005
450
1.5795408802
LN3
0.0213
0.3685
0.5370
0.5843
0.6182
0.7502
0.8605
MAXIMO =
CRITICO =
LN3
0.1037
0.1185
0.1620
0.0843
0.0068
0.0002
0.0145
0.1620
0.4301
ACEPTADA
GUMBEL
Ao
2005
P. (mm)
7.21
N DATOS
1
P. Ordenados
10.90
y = (x - u)/a
2.2651
Tr
10.14
EMPIRICA
0.1250
GUMBEL
0.0986
GUMBEL
0.0264
2006
2007
2008
2009
2010
2011
4.14
5.02
2
3
7.21
6.28
0.7716
0.3951
2.70
2.04
0.2500
0.3750
0.3702
0.4901
0.1202
0.1151
6.02
6.28
10.90
5.83
4
5
6
7
6.02
5.83
5.02
4.14
0.2899
0.2130
-0.1148
-0.4710
1.90
1.80
1.48
1.25
0.5000
0.6250
0.7500
0.8750
0.5268
0.5543
0.6743
0.7984
0.0268
0.0707
0.0757
0.0766
MEDIA =
DESV. EST. =
6.486
2.174
MAXIMO =
CRITICO =
0.1202
0.514
n = n de datos
yn medio =
Sn =
10.00
0.48
0.88
parmetros, segn n
a = Sx / Sn =
u = x-yn*a=
2.47
5.30
2005
2006
2007
P. (mm)
6.24
3.59
4.35
N DATOS
1
2
3
P. Ordenados
9.44
6.24
5.44
F(X)
0.9789
0.6297
0.4625
EMPIRICA
0.1250
0.2500
0.3750
NORMAL
0.0211
0.3703
0.5375
NORMAL
0.1039
0.1203
0.1625
2008
2009
2010
2011
5.21
5.44
4
5
5.21
5.05
0.4143
0.3815
0.5000
0.6250
0.5857
0.6185
0.0857
0.0065
9.44
5.05
6
7
4.35
3.59
0.2503
0.1406
0.7500
0.8750
0.7497
0.8594
0.0003
0.0156
MAXIMO =
CRITICO =
0.163
0.514
ACEPTADA
LN2
0.0322
0.3140
0.4871
0.5439
0.5843
0.7596
0.9095
LN2
0.0928
0.0640
0.1121
0.0439
0.0407
0.0096
0.0345
MEDIA =
DESV. EST. =
5.617
1.881
2005
2006
2007
2008
2009
2010
2011
P. (mm)
6.24
3.59
4.35
5.21
5.44
9.44
5.05
N DATOS
1
2
3
4
5
6
7
P.Ordenados
9.44
6.24
5.44
5.21
5.05
4.35
3.59
MEDIA =
DESV. EST. =
LOG NORMAL 3 PARMETROS
y = lnx
2.2450
1.8310
1.6938
1.6506
1.6194
1.4702
1.2782
1.684
0.303
F(x)
0.9678
0.6860
0.5129
0.4561
0.4157
0.2404
0.0905
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
MAXIMO =
CRITICO =
0.1121
0.5140
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
6.24
N DATOS
1
P.Ordenados
9.44
y = ln (x-a)
5.735
F(x)
0.9788
EMPIRICA
0.1250
LN3
0.0212
LN3
0.1038
3.59
4.35
5.21
5.44
9.44
5.05
2
3
4
5
6
7
6.24
5.44
5.21
5.05
4.35
3.59
5.724
5.722
5.721
5.720
5.718
5.716
0.6310
0.4634
0.4150
0.3820
0.2499
0.1396
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
0.3690
0.5366
0.5850
0.6180
0.7501
0.8604
0.1190
0.1616
0.0850
0.0070
0.0001
0.0146
MEDIA
DESV.EST.
a
C.ASIMETRIA
5.722
0.006
300
1.581767616
MAXIMO =
CRITICO =
0.1616
0.4301
ACEPTADA
GUMBEL
Ao
2005
2006
2007
2008
2009
2010
2011
P. (mm)
6.24
3.59
4.35
5.21
5.44
9.44
5.05
N DATOS
1
2
3
4
5
6
7
P. Ordenados
9.44
6.24
5.44
5.21
5.05
4.35
3.59
y = (x - u)/a
2.2662
0.7697
0.3956
0.2880
0.2132
-0.1142
-0.4696
Tr
10.15
2.70
2.04
1.90
1.80
1.48
1.25
EMPIRICA
0.1250
0.2500
0.3750
0.5000
0.6250
0.7500
0.8750
GUMBEL
0.0985
0.3707
0.4900
0.5275
0.5543
0.6740
0.7980
GUMBEL
0.0265
0.1207
0.1150
0.0275
0.0707
0.0760
0.0770
MEDIA =
DESV. EST. =
5.617
1.881
n = n de datos
yn medio =
Sn =
10.00
0.48
0.88
parmetros, segn n
a = Sx / Sn =
u = x-yn*a=
2.14
4.59
MAXIMO =
CRITICO =
0.1207
0.514
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
ACEPTADA
Ao
2005
2006
2007
2008
2009
2010
2011
Formula de GRUNSKY:
id=i24 (24/d)^0.5
Donde:
id: Intensidad de lluvia sin considerar el tiempo de retorno
i24 : Intensidad de lluvia sin considerar el tiempo de retorno
d : duracin del aguacero en horas.
Para ajustar la intensidad de lluvia involucrando el periodo de retorno se ha empleado el metodo
de Distribucion Normal:
Ao
2005
2006
2007
2008
2009
2010
Pmx. 24 hr.
(mm)
61.16
35.15
42.57
51.05
53.30
92.45
I24
(mm/hr)
2.55
1.46
1.77
2.13
2.22
3.85
10
30.58
17.58
21.29
25.53
26.65
46.23
30
17.66
10.15
12.29
14.74
15.39
26.69
180
7.21
4.14
5.02
6.02
6.28
10.90
2011
Tr
Pexc
Pno exc
z
y
x
Tr
Pexc
Pno exc
z
y
x
Tr
Pexc
Pno exc
z
y
x
Tr
Pexc
Pno exc
z
y
x
Tr
49.49
10
5
0.20
0.80
0.84
3.53
34.06
10
0.10
0.90
1.28
3.66
38.93
20
0.05
0.95
1.64
3.77
43.47
25
0.04
0.96
1.75
3.80
44.89
50
2.06
24.74
14.29
10.10
7.14
5.83
Promedio
Desv. Stand.
27.51
9.21
15.88
5.32
11.23
3.76
7.94
2.66
6.48
2.17
30
5
0.20
0.80
0.84
2.98
19.67
10
0.10
0.90
1.28
3.11
22.48
20
0.05
0.95
1.64
3.22
25.10
25
0.04
0.96
1.75
3.25
25.91
50
60
5
0.20
0.80
0.84
2.63
13.91
10
0.10
0.90
1.28
2.77
15.89
20
0.05
0.95
1.64
2.88
17.75
25
0.04
0.96
1.75
2.91
18.32
50
120
5
0.20
0.80
0.84
2.29
9.83
10
0.10
0.90
1.28
2.42
11.24
20
0.05
0.95
1.64
2.53
12.55
25
0.04
0.96
1.75
2.56
12.96
50
180
5
0.20
0.80
0.84
2.08
8.03
10
0.10
0.90
1.28
2.22
9.18
20
0.05
0.95
1.64
2.33
10.25
25
0.04
0.96
1.75
2.36
10.58
50
240
5
0.20
0.80
0.84
1.94
6.95
10
0.10
0.90
1.28
2.07
7.95
20
0.05
0.95
1.64
2.18
8.87
25
0.04
0.96
1.75
2.22
9.16
50
Pexc
Pno exc
z
y
x
Tr
Pexc
Pno exc
z
y
x
Tr
Pexc
Pno exc
z
y
x
Tr
5
10
20
25
50
75
100
0.02
0.98
2.05
3.90
49.21
75
0.01
0.99
2.22
3.95
51.70
100
0.01
0.99
2.33
3.98
53.45
0.02
0.98
2.05
3.35
28.41
75
0.01
0.99
2.22
3.40
29.85
100
0.01
0.99
2.33
3.43
30.86
0.02
0.98
2.05
3.00
20.09
75
0.01
0.99
2.22
3.05
21.11
100
0.01
0.99
2.33
3.08
21.82
10
34.06
38.93
43.47
44.89
49.21
51.70
53.45
0.02
0.98
2.05
2.65
14.21
75
0.01
0.99
2.22
2.70
14.92
100
0.01
0.99
2.33
2.74
15.43
0.02
0.98
2.05
2.45
11.60
75
0.01
0.99
2.22
2.50
12.19
100
0.01
0.99
2.33
2.53
12.60
0.02
0.98
2.05
2.31
10.04
75
0.01
0.99
2.22
2.36
10.55
100
0.01
0.99
2.33
2.39
10.91
120
9.83
11.24
12.55
12.96
14.21
14.92
15.43
180
8.03
9.18
10.25
10.58
11.60
12.19
12.60
240
6.95
7.95
8.87
9.16
10.04
10.55
10.91
INTENSIDAD (mm/h)
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0
50
100
150
TIEMPO (min)
200
250
30
240
6.24
3.59
4.35
5.21
5.44
9.44
10
3.42
2.87
3.06
3.24
3.28
3.83
30
2.87
2.32
2.51
2.69
2.73
3.28
hallando y =lnx
60
120
2.52
2.18
1.97
1.62
2.16
1.82
2.34
2.00
2.39
2.04
2.94
2.59
180
1.98
1.42
1.61
1.79
1.84
2.39
240
1.83
1.28
1.47
1.65
1.69
2.24
5.05
5.62
1.88
Promedio
Desv. Stand.
c. asimetria
3.21
2.66
2.31
1.97
1.76
1.62
3.27
0.30
2.72
0.30
2.38
0.30
2.03
0.30
1.83
0.30
1.68
0.30
Tr= 5 aos
Tr= 10 aos
Tr= 20 aos
Tr= 25 aos
Tr= 50 aos
Tr= 75 aos
Tr= 100 aos
250
300
CAUDALES DE DISEO
INTENSIDAD (mm/h)
AREA
Km2
63.30
Hmax
msnm
2450
Hmin
msnm
690
DESNIVEL
m
1760
LONG MAYOR
m
12789
PENDIENTE
%
13.76
60.00
50.00
40.00
Tr=
Tr=
30.00
Tr=
Tr=
20.00
Tr=
Tr=
Tr=
10.00
Tr=
Tr=
20.00
Tr=
Tr=
10.00
0.00
0
50
100
150
TIEMPO (min)
Q=0.278*C*I*A
Q=CAUDAL (m3/s)
C=Coeficiente de escorrentia
(tipicamente de 0.1a0.7)
I=Intensidad de precipitacion (mm/hora)
A=superficie de la cuenca (Km2)
se trabaja para un tiempo de retorno de 100 aos
CAUDALES DE DISEO
TC min=
60.71
200
250
300
Tr
AOS
Intensidad Diseo
mm/h
100
0.30
Km2
63.30
m3/s
121.42
23.00
TC=0.01947*(L^0.77/S^0.385)
TC min
Kirpich
60.71
Tr= 5 aos
Tr= 10 aos
Tr= 20 aos
Tr= 25 aos
Tr= 50 aos
Tr= 75 aos
Tr= 100 aos
150
TIEMPO (min)
Tr= 25 aos
Tr= 50 aos
Tr= 75 aos
Tr= 100 aos
200
250
300
Seccin 10.00
Estacin
Elevacin
-200
-186.7
-143.26
-132.48
-106.29
-92.79
-66.93
-61.77
0
56.03
80
120
132.42
169.6
200
827.12
823.82
810.45
810
782.95
770
739.01
730
728.95
730
743
769.4
778.4
810
834.37
1 + 880
860
840
820
800
780
760
740
720
700
680
660
-250
-200
-150
-100
-50
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
Left Bank
Right Bank
-66.93
80
ROB
0.045
pendiente
0.0050
50
100
150
200
250
Seccin 9.80
Estacin
Elevacin
-200
-167.62
-152.68
-121.65
-110
-80.91
-67.25
-53.54
-19.61
0
5.06
13.44
42.27
56.26
59.68
65.56
114.89
126.96
158.91
168.04
173.97
200
823.93
815.91
811.3
810
797.89
770
752.85
730
729.33
728.85
728.72
728.82
729.47
729.79
729.85
730
761.35
770
802.24
810
815.39
832.63
1 + 860
860
840
820
800
780
760
740
720
700
680
660
-250
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
Channel
ROB
-200
-150
-100
-50
50
100
150
200
250
0.045
0.03
0.045
Left Bank
Right Bank
-67.25
114.89
Seccin 9.60
Estacin
Elevacin
-200
-194.86
-162.12
-120
-114.74
-113.62
-92.43
-70
-46.31
-39.79
-27.56
0
11.82
34.98
50
76.62
103.79
134.17
162.64
173.26
195.32
200
820.74
819.85
811.34
811.68
810.76
810.32
792.29
770
730
729.86
729.73
728.85
728.19
729.38
730
730
748.24
770
798.35
810
824.78
828.96
1 + 840
840
820
800
780
760
740
720
700
680
660
-250
-200
-150
-100
-50
50
100
150
200
250
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
Left Bank
Right Bank
-70
134.17
Seccin 9.40
Estacin
Elevacin
-200
-190.33
-183.22
-171.55
-155.96
-133.33
-123.94
-122.29
-102.19
-87.49
-61.81
-53.94
-41.05
0
13.1
14.75
40
818.43
815.16
813.39
810.49
810.62
810.37
810.04
810
803.25
790.12
770
756.26
730
728.82
728.45
728.4
728.83
840
1 + 820
820
800
780
760
740
720
700
680
660
-250
-200
-150
-100
-50
50
100
150
200
250
700
680
84.63
92.71
141.38
156.04
178.3
181.64
200
730
735.13
770
784.71
810
812.29
828.21
660
-250
-200
-150
-100
-50
50
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
Left Bank
-53.94
Right Bank
92.71
Seccin 9.20
Estacin
-200
-194.32
-189.53
-184.75
-178.95
-169.61
-123.68
-98.05
-86.09
Elevacin
813.91
811.25
810
809.69
809.38
805.09
801.48
791.16
785.77
1+ 800
840
820
800
780
760
740
720
700
680
100
150
200
250
780
760
740
-67.48
-60
-50.93
775.24
770
756.48
-37.95
-8.47
0
24.28
30
46.96
70.84
87.27
142.71
148.59
149.56
151.56
198.68
200
730
729.15
728.91
728.23
728.33
728.77
729.44
730
765.83
770
770.97
773.19
810
820
720
700
680
-250
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
Left Bank
Right Bank
-50.93
142.71
Seccin 9.00
ROB
0.045
-200
-150
-100
-50
50
100
150
200
250
Estacin
Elevacin
-200
-195.42
-183.52
-178.47
-151.66
-121.24
-69.29
-65.54
-55.91
-39.36
-36.89
-34.78
-30
-21.06
0
25.79
42.06
85.47
117.59
146.08
170
196.3
200
812.63
810
808.33
805.6
793.27
790.88
770
768.18
756.58
738.54
734.29
730
729.86
729.61
728.92
728.06
728.53
730
750.85
770
784.85
806.21
809.87
01 + 780
820
800
780
760
740
720
700
680
-250
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
-200
-150
-100
-50
50
100
150
200
250
Left Bank
Right Bank
-36.89
85.47
Seccin 8.80
Estacin
Elevacin
-200
-189.23
-188.73
-146.96
-133.51
-118.74
-93.18
-51.09
-34.94
0
0.78
24.35
81.89
83.67
84.22
142.83
192.46
200
816
810
809.8
787.91
781.45
780.27
770
749.57
730
728.71
728.72
727.91
729.93
730
730.25
770
800.74
806.94
01 + 760
840
820
800
780
760
740
720
700
680
-250
LOB
20
Channel
20
ROB
20
-200
-150
-100
-50
50
100
150
200
250
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
Left Bank
Right Bank
-51.09
142.83
Seccin 8.60
Estacin
Elevacin
-200
-176.45
-154.01
-116.51
-85.86
-36.64
-35.85
-30
0
23.74
60.72
83.48
111.19
140
183.76
200
819.24
810
787.95
770
754.85
730.96
730
729.78
728.65
727.76
729.05
730
750.8
770
797.42
807.89
01 + 740
840
820
800
780
760
740
720
700
680
-250
LOB
20
Channel
20
ROB
20
-200
-150
-100
-50
50
100
150
200
250
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
Left Bank
Right Bank
-85.86
111.19
Seccin 8.40
Estacin
Elevacin
-200
-162.25
-131.72
-125.54
-122.43
-95.77
-41.02
-21.79
0
0.29
24.01
37.06
83.31
134.45
136.56
138.07
150.16
191.35
200
824.81
810
780
770
769.61
756.82
730
729.22
728.49
728.48
727.61
728.08
730
768.43
770
771.53
780.55
810
812.59
1 + 720
840
820
800
780
760
740
720
700
680
660
-250
-200
-150
-100
-50
50
100
150
200
250
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
Left Bank
Right Bank
-95.77
134.45
Seccin 8.20
Estacin
Elevacin
-200
-146.26
-133.51
-121.11
-107.68
-46.43
-6.94
0
21.37
38.74
83.15
110.55
135.88
154.55
182.68
199.29
200
829.43
810
784.27
770
760
730
728.38
728.15
727.44
728.15
730
750.57
770
789.02
810
815.55
815.73
1 + 700
840
820
800
780
760
740
720
700
680
660
-250
-200
-150
-100
-50
50
100
150
200
250
LOB
20
Channel
20
ROB
20
Manning`s n Values
LOB
0.045
Channel
0.03
ROB
0.045
pendiente
0.0135
Left Bank
Right Bank
-107.68
110.55
Seccin 8.00
Estacin
Elevacin
-200
-148.3
-147.62
-113.43
-75.94
-51.83
0
7.91
15.9
77.13
82.97
86.35
135.2
171.03
175.73
200
810
809.23
770
741.82
730
728.88
727.88
727.55
727.28
729.75
730
732.71
770
806.5
810
818.09
840
1+ 680
820
800
780
760
740
720
700
680
-250
-200
-150
-100
-50
50
100
150
200
250
LOB
0
Channel
0
ROB
0
Manning`s n Values
LOB
0.045
Channel
0.03
Left Bank
Right Bank
-113.43
86.35
ROB
0.045
250
tabla de detalles de la seccion natural del lecho del rio tabaconas en suss 200 metros de estudio donde se ha
tomado la seccion 9.60 para el analisis por tener mayor tirante
121.42
AH
Pm
R
Q=
0.030
0.0054
1.500
47.080
68.860
0.684
121.420
EL DIAMETRO MEDIO D50 Y EL D90 SE HA CALCULADO ASUMIENDO LA GRALUNOMETRIA DEL LECHO PARA LA
QUEBRADA HODA PARA SIMULARLO EN EL HEC RAS
10
40
VER LAS CURVAS CAUDAL- TIRANTE DE CADA SECCION TRANSVERSAL EN ESTE CASO
SE PRESENTA LA SECCION DE ESTUDIO
DATOS DE GEOMETRIA
mbalse determinaremos la
m3/s
m2
m
Altura
Ancho medio
Velocidad media
gasto liquido unitario
Pendiente
0
Q
A
P
R
Y
Am=A/Y
Vm=Q/A
Q/Am
S
PeXRXS
Kg-f/m3
Kg/m3
Peso especfico
Densidad
Viscosidad cinematica
Pe
d
vc
(Pe sol-Pe)/(Pe)
Kgf/m3
Pe sol.
Kg/m3
D
mm
mm
Dm
d90
0.0220
n'
0.02249
0.4064
gB
10.282
GB
322.72
32.90
s de estudio donde se ha
10
121.420
47.08
68.86
0.00535
0.684
0.052
0.00002
0.189
0.1066
2.579
4.02454714
10581.4976
1000ppm= 1gr/l
10.5814975958 gr/l
1284805.43808006 gr/s
130.8595708052 Kg/s
concentracin total =
Volumen =
Tiempo de vida util
Volumen =
163.76
0.086
100
0.74
RAMETROS
E ARRASTRE
121.42
47.08
68.86
0.68
1.50
31.39
2.58
3.87
0.01
3.66
1000
1000
0.00001
0.9
1900
1900
10
40
Kg-f/sm
Kg/s
ENSION
mm.
m3/s
m2
m.
m/s
kg/m3
U*xD/u =
ppm
Kg/s
m3/s
aos
MMC