JINDAL POWER LIMITED

CHECKLISTS
Doc. No.

TITLE : CHECKLIST FOR BREAKDOWN JOBS OF EQUIPMENTS

Issue No. /
Date

01 / 01-09-2008

TG & BOP MAINTENANCE DEPARTMENT

Rev No. /
Date

00 / 01-09-2008

Welding of LP Piping and Valves.

UNIT :
WORK ORDER NO. :

DATE :

PERMIT NO. :
Sl.
No.

TMD/CL/045

PTW ISSUE DATE :

PTW CLOSING DATE :

Work Instructions

Frequency

Design
Value

Actual
Value

Remarks

Welding of LP Piping and Valves.


1
2
3
4

Taking of proper PTW and ensuring of all isolations.


Cutting of pipe/valve by gas or cutting wheel as instructed by area engineer.
Preparation of edge for welding.
Preheating of piping where welding to be done, if required.

Root should be welded by the argon and then arc welding will be carried out.

Stress relieving of the lines if thickness is more than 12 mm,if required. Radiography or
DPT of HP joints to be done as per requirement.

For each layer of welding grinding will be done to weld another layer if required.

Repair of joint if required on the basis of Radiography report for HP joints.

Returning of PTW.

10

Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
cleaned and disposed.

11

Any rework will be attended.

Signature of Contractor

Signature of JPL Engineer

Signature of JPL Engineer in charge

Page No. : 01
Prepared By :

Reviewed & Approved By :

JINDAL POWER LIMITED


CHECKLISTS
Doc. No.

TITLE : CHECKLIST FOR BREAKDOWN JOBS OF EQUIPMENTS

Issue No. /
Date

01 / 01-09-2008

TG & BOP MAINTENANCE DEPARTMENT

Rev No. /
Date

00 / 01-09-2008

Welding of LP Piping and Valves.

UNIT :
WORK ORDER NO. :
PERMIT NO. :
Sl.
No.

TMD/CL/045

Work Instructions

DATE :
PTW ISSUE DATE :

PTW CLOSING DATE :


Frequency

Design
Value

Actual
Value

Remarks