Work Instructions
Frequency
Design
Value
Actual
Value
Remarks
Root should be welded by the argon and then arc welding will be carried out.
Stress relieving of the lines if thickness is more than 12 mm,if required. Radiography or
DPT of HP joints to be done as per requirement.
For each layer of welding grinding will be done to weld another layer if required.
Returning of PTW.
10
Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
cleaned and disposed.
11
Signature of Contractor
Page No. : 01
Prepared By :
Issue No. /
Date
01 / 01-09-2008
Rev No. /
Date
00 / 01-09-2008
UNIT :
WORK ORDER NO. :
PERMIT NO. :
Sl.
No.
TMD/CL/045
Work Instructions
DATE :
PTW ISSUE DATE :
Design
Value
Actual
Value
Remarks