Вы находитесь на странице: 1из 1

BridgeSurvey

IPC

Bridge Deck Deterioration, Rebar Placement and Sizing

Bridge Deck Deterioration,


Rebar Placement and Sizing
Assessment

Infrastructure
Preservation
Corporation

IPCs BridgeSurvey system provides a faster and more comprehensive tool for quickly determining the condition of aging bridge decks by identifying locations and degrees of concrete deterioration as well as rebar placement and sizing. Bridge inspectors and engineers use this
information to enhance their reports and produce more accurate load ratings.
Sample of what IPC can find
within the deck:
Rebar in Deck
Post Tension Cables/Ducts
Bottom of Deck

Typical uses include:


Bridge deck deterioration assessment
Steel reinforcement placement and sizing
Measure slab thickness
Deck assessments under asphalt
Bridge joint assessments under asphalt

What deck deterioration looks like.

This is a bridge deck deterioration map. Red shows


deterioration, yellow is suspect and blue has no deterioration. Notice the gray image, this is a sample of the
data collected where you can see the relationship between the data collected and the final report.

These figures show a typical rebar


pattern taken from the bridge
above. This is where we determine
the decks rebar pattern and sizing.
Raw rebar pattern

Enhanced rebar pattern

6217 Anderson Rd, Tampa, Florida 33634 Office: 813-374-2061 Email: NDT@InfrastructurePC.com

Вам также может понравиться