Para./Fig./Table No:
Subject Description:
Record Number:
BC83-563
Date Issued:
Interpretation Number :
01/13/1984
IX-83-100
Question(s) and Reply(ies): Question: A welder successfully qualifies using a P-No. 1 test coupon and a
carbon steel consumable insert A-No. 1. Is he qualified to weld stainless
steel P-No. 8 production welds using a stainless steel consumable insert
A-No. 8?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-529
Date Issued:
Interpretation Number :
01/16/1984
IX-83-101
Question(s) and Reply(ies): Question (1): Can the thickness of the test metal used for qualifying a
corrosion-resistant weld metal overlay procedure, to weld on a base metal
thickness of 25 mm (1 in.) or greater, be more than the base metal thickness
used for production?
Reply (1): Yes. See QW-214.1.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
2/36
Question (6): Is QW-310.5(c) applicable only when the filler metal does not
belong to F-Nos. 41 through 45?
Reply (6): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-551
Date Issued:
Interpretation Number :
01/19/1984
IX-83-102
Question(s) and Reply(ies): Question: In Note (1) of QW-451.1, QW-403.2, .3, .6, .9, and .10 are listed.
Do these variables apply to and further restrict the thickness of deposited
weld metal qualified, even though they are base metal variables?
Reply: No. In Note (1) of QW-451.1, only QW-407.4 applies to both base
metal and deposited weld metal thickness.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-237
Date Issued:
Interpretation Number :
05/02/1984
IX-83-103
Question(s) and Reply(ies): Question (1): Do the requirements of QW-202.2 apply in the manufacturing
of Section IV HLW water heaters where pressure retaining fillet welds are
used?
Reply (1): Yes.
Para./Fig./Table No:
Subject Description:
BPV Section IX
Section IX, QW-451 and QW-452
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
3/36
Date Issued:
05/02/1984
Interpretation Number :
IX-83-104
Record Number:
BC83-349
Question(s) and Reply(ies): Question (1): Does the procedure or performance qualification test, where
viewing windows are cut from a consumable insert, qualify the WPS or the
welder when the windows are later welded using a consumable insert of the
same chemical composition?
Reply (1): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-471
Date Issued:
Interpretation Number :
05/02/1984
IX-83-105
Question(s) and Reply(ies): Question: To qualify a welding procedure with an open butt joint, a 2 in.
thick coupon was welded open butt and filled partially to 5/8 in. using the
GTAW process. Is it a requirement of Section IX to fill the entire base
metal thickness (2 in.) instead of 5/8 in. to qualify base metal maximum
thickness to 4 in. and weld metal maximum thickness to 1-1/4 in. using the
GTAW process for open butt welding?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-630
Date Issued:
Interpretation Number :
05/02/1984
IX-83-106
Question(s) and Reply(ies): Question (1): P-No. 3 and P-No. 5 base materials are to be joined in
production. May P-No. 1 material be substituted for P-No. 3 or P-No. 5 for
a welder performance qualification test?
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
4/36
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-550
Date Issued:
Interpretation Number :
05/03/1984
IX-83-107
Question(s) and Reply(ies): Question (1): A welder is qualified on a 2 in. NPS pipe test coupon using
the GTAW process, and also on a 6 in. NPS pipe test coupon using the
SMAW process. If a branch connection is to be welded where the branch
connection fitting has a diameter between 1 in. and 2-7/8 in., and the run
pipe has a diameter greater than 2-7/8 in., may the welder weld this joint
using the GTAW process completely?
Reply (1): The welder may use the GTAW process for the qualified
thickness.
Question (2): May the welder weld the joint mentioned in Question (1)
using the GTAW process for the root and the SMAW process for the fill?
Reply (2): The welder may make the root weld with the GTAW process but
may not fill any portion of the remaining groove weld using the SMAW
process.
Question (3): May the welder weld the joint mentioned in Question (1)
using the SMAW process completely?
Reply (3): The welder may not use the SMAW process only.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-639
Date Issued:
Interpretation Number :
05/03/1984
IX-83-108
Question(s) and Reply(ies): Question: Based on the two qualifying tests listed below, is a welder
qualified to weld, in all positions, a P-No. 8, 10 in. diameter pipe with a
wall thickness of 1c in. using the SMAW process? Test 1 was performed on
6 in. diameter pipe and Test 2 was performed on plate.
Variable Test 1 Test 2 Base metal P-No. 1 P-No. 8 Filler metal F-No. 4
F-No. 5 Process SMAW SMAW Position 6G 1G Thickness 0.864 in. 0.250
in.
Reply: No.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
5/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-689
Date Issued:
Interpretation Number :
05/03/1984
IX-83-109
Question(s) and Reply(ies): Question (1): In QW-466.3, does the bender of the guided-bend wrap
around jig have to be calibrated to the specimen thickness plus 1/16 in.
distance between the roller and mandril?
Reply (1): No.
Question (2): If the bender of the guided-bend wrap around jig in QW-466.3
is properly set to test 3/8 in. thick specimens, may 1/4 in. thick specimens
be tested without resetting the roller?
Reply (2): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-692
Date Issued:
Interpretation Number :
05/03/1984
IX-83-110
Question(s) and Reply(ies): Question (1): A PQR is run using pipe with an outside diameter greater than
3 in. and a thickness of 1 in. or less. If tension tests are performed per QW462.1(a) and the results meet the acceptance criteria of QW-153, will the
minimum requirements for QW-150 be met?
Reply (1): No.
Question (2): If the thickness is greater than 1 in., will the minimum
requirements for QW-150 be met?
Reply (2): No.
Question (3): If everything is the same as in Question (1) except that the
outside diameter is smaller than 3 in., will the minimum requirements for
QW-150 be met? Reply (3): No.
Question (4): What tolerance is allowed on the 3/4 in. dimension in QW462.1(b)?
Reply (4): Section IX does not specify dimensional tolerances for this
tensile test.
Standard Designation:
Edition/Addenda:
BPV Section IX
Para./Fig./Table No:
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
6/36
Subject Description:
Record Number:
BC84-001
Date Issued:
Interpretation Number :
05/03/1984
IX-83-111
Question(s) and Reply(ies): Question (1): For procedure qualification, does a change from automatic
GTAW to manual GTAW, or vice versa, constitute a change in the welding
process?
Reply (1): No.
Question (3): Is a new procedure qualification test and record required for
manual welding when previous PQR coupons were welded automatically,
using the same process within the same essential variables?
Reply (3): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-038
Date Issued:
Interpretation Number :
05/03/1984
IX-83-112
Question(s) and Reply(ies): Question: Is a welder who qualified prior to the Summer 1983 Addenda
with the GMAW-S process, 0.432 in. deposited weld metal thickness,
required to requalify to weld up to a maximum deposited weld metal
thickness of 0.864 in. after the Addenda becomes effective?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-055
Date Issued:
Interpretation Number :
05/03/1984
IX-83-113
Question(s) and Reply(ies): Question: A welder is presently qualified for a given WPS to perform
GTAW of P-No. 1 to P-No. 1 pipe using an F-No. 6, A-No. 1, SFA-5.18,
AWS Classification ER-70S-2 filler metal. The welder is also qualified for
another WPS to perform GTAW of P-No. 8 to P-No. 8 pipe using an F-No.
6, A-No. 8, SFA-5.9, AWS Classification ER-308 filler metal. All other
essential variables are the same. The welder has maintained his qualification
with the GTAW process using the ER-70S-2 filler metal on P-No. 1 base
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
7/36
metals. The welder has not used the P-No. 8 to P-No. 8 WPS for more than
6 months. Is the welder required to renew his qualification prior to using the
GTAW, P-No.8 to P-No.8 WPS?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-070
Date Issued:
Interpretation Number :
05/03/1984
IX-83-114
Question(s) and Reply(ies): Question: Must a weld buildup (other than corrosion-resistant or hardfacing weld metal overlay) on P-No. 1 materials using austenitic stainless
steel (or nickel alloy) filler metal be qualified with a groove weld per QW202.3?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-279
Date Issued:
Interpretation Number :
07/03/1984
IX-83-115
Question(s) and Reply(ies): Question (1): Is it acceptable to perform alternate bend tests as specified in
ASTM A 488 if the requirements of QW-162.1, QW-466.1, QW-466.2, and
QW-466.3 cannot be met due to high yield-to-tensile strength ratio of either
the base or the weld deposited metal?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-054
Date Issued:
Interpretation Number :
07/03/1984
IX-83-116
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
8/36
Question (1): May an existing PQR for joining P-No. 22 to P-No. 23 base
materials using an F-No. 22 filler metal also be used for joining P-No. 25 to
P-No. 25 base materials?
Reply (1): No. See QW-403.11.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-133
Date Issued:
Interpretation Number :
07/03/1984
IX-83-117
Question(s) and Reply(ies): Question: In accordance with QW-322(a) or (b), is there a maximum time
period following the expiration of performance qualifications whereby
renewal may be made using a single test joint?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-183
Date Issued:
Interpretation Number :
07/03/1984
IX-83-118
Question(s) and Reply(ies): Question (1): Regarding QB-406, does a change in fuel gas require a new
procedure qualification provided all other essential variables remain
unchanged?
Reply (1): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-253
Date Issued:
07/03/1984
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
9/36
Interpretation Number :
IX-83-119
Question(s) and Reply(ies): Question (1): In accordance with QW-151.1 (d), may tensile test specimens
be thermally cut when multiple specimens are to be used?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-474
Date Issued:
Interpretation Number :
07/09/1984
IX-83-120
Question(s) and Reply(ies): Question (1): Is it a requirement of QW-151.2(a), (b), and (c) that the test
specimen thickness be equal to the test coupon thickness?
Reply (1): No.
Question (3): In accordance with QW-163, are open defect sizes evaluated
individually?
Reply (3): Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-134
Date Issued:
Interpretation Number :
08/22/1984
IX-83-121
Question(s) and Reply(ies): Question (1): May a welder who qualifies the corrosion-resistant weld metal
overlay procedure in accordance with QW-214 be qualified to use that
procedure without additional testing?
Reply (1): Yes.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
10/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC83-645
Date Issued:
Interpretation Number :
10/03/1984
IX-83-122
Question(s) and Reply(ies): Question: Does QW-403.6 apply when supplemental essential variables are
not a consideration for the welding process being used?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-092
Date Issued:
Interpretation Number :
10/03/1984
IX-83-123
Question(s) and Reply(ies): Question: Does QW-202.4 apply to welder performance qualification?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-149
Date Issued:
Interpretation Number :
10/03/1984
IX-83-124
Question(s) and Reply(ies): Question: May the provisions of QW-322 be used to renew the performance
qualifications of a welder who has been laid off for a period of 10 months?
Reply: Yes, provided the original qualifications were conducted by the
same manufacturer or contractor as required by QW-301.2.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-151
Date Issued:
Interpretation Number :
10/03/1984
IX-83-125
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
11/36
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-221
Date Issued:
Interpretation Number :
10/03/1984
IX-83-126
Question(s) and Reply(ies): Question (1): May a welding procedure which is qualified on a 3/8 in. thick
coupon be used to weld a 1/4 in. deep scar on a shell which is 1 in. thick?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-224
Date Issued:
Interpretation Number :
10/03/1984
IX-83-127
Question(s) and Reply(ies): Question (1): Does QW-403.8 apply to deposited weld metal thickness as
shown on Form QW-482 for the GMAW, GTAW, SAW, and SMAW
processes?
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
12/36
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-226
Date Issued:
Interpretation Number :
10/03/1984
IX-83-128
Question(s) and Reply(ies): Question: May a welder who has been qualified previously, but who has not
welded in the past 6 months, be requalified in accordance with QW-304.1?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-251
Date Issued:
Interpretation Number :
10/03/1984
IX-83-129
Question(s) and Reply(ies): Question: In QW-281.2(e), does any increase in specified maximum
interpass temperature require requalification, or only an increase in excess
of 100F?
Reply: All increases in maximum specified interpass temperatures require
requalification.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
BPV Section IX
Section IX, QW-407
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
13/36
Date Issued:
10/03/1984
Interpretation Number :
IX-83-130
Record Number:
BC84-252
Question(s) and Reply(ies): Question: In QW-407.1, does a change in soaking time at the specified
postweld heat treatment temperature require requalification of the welding
procedure? Supplementary essential variables for notch toughness are not a
requirement.
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-365
Date Issued:
Interpretation Number :
10/03/1984
IX-83-131
Question(s) and Reply(ies): Question (1): May dual stamped A53/A120 CW pipe be used for weld test
coupons?
Reply (1): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-366
Date Issued:
Interpretation Number :
10/03/1984
IX-83-132
Question(s) and Reply(ies): Question: Does a welder/welding operator who qualifies for a groove joint
qualify for welding corrosion-resistant weld metal overlay?
Reply: No.
Standard Designation:
Edition/Addenda:
BPV Section IX
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
14/36
Para./Fig./Table No:
Subject Description:
Record Number:
BC84-370
Date Issued:
Interpretation Number :
10/03/1984
IX-83-133
Question(s) and Reply(ies): Question: May a group of welders transfer their performance qualifications
from a previous employer to a new company formed by those welders?
Reply: No. See QW-300.2.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-396
Date Issued:
Interpretation Number :
10/03/1984
IX-83-134
Question(s) and Reply(ies): Question (1): Do the essential variables listed in QW-282 also apply to the
performance qualification of QW-312(a)?
Reply (1): Yes.
Question (4): For procedure qualification, may the requirements of QW461.9 be used in lieu of QW-282.2(d)?
Reply (4): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-397
Date Issued:
Interpretation Number :
10/03/1984
IX-83-135
Question(s) and Reply(ies): Question: When the code of construction exempts the heat affected zone
from notch-toughness testing, is it necessary to provide an additional
qualification test for each base metal Group Number in accordance with
QW-403.5 if all other variables remain the same?
Reply: No. See QW-401.3.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
15/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-398
Date Issued:
Interpretation Number :
10/03/1984
IX-83-136
Question(s) and Reply(ies): Question: Is it permissible to qualify a brazing procedure joining a Code
approved SA specified pipe or tube to a part made of ASTM B-16 Alloy
C36000 (free cutting brass), which is not a material listed in QB-422, with
an assigned P-Number? The procedure qualification would be valid only for
the non-Code material and alloy number designated in conjunction with a
Code listed material of the same P-Number as that qualified.
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-399
Date Issued:
Interpretation Number :
10/03/1984
IX-83-137
Question(s) and Reply(ies): Question: Is a welder qualified to weld P-No. 4 or P-No. 5 base material if
performance qualification tests were made using P-No. 1 base material?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
Date Issued:
Record Number:
Interpretation Number :
BPV Section IX
Section III, Division 1, and Section IX (All Editions), NX-4321 Required
Qualifications
10/09/1984
N 184-058
IX-83-138
Question(s) and Reply(ies): Question: Does NX-4321 of Section III, Division 1, and Section IX provide
for the positive identification of the welder or the welding operator taking
the performance qualification test?
Reply: Yes.
BPV Section IX
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
16/36
Para./Fig./Table No:
Subject Description:
Record Number:
BC83-629
Date Issued:
Interpretation Number :
11/26/1984
IX-83-139
Question(s) and Reply(ies): Question (1): Can tensile results computed from a turned specimen which
does not meet the machining tolerances given in QW-462.1 (d) be used for
procedure qualification?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-250
Date Issued:
Interpretation Number :
11/26/1984
IX-83-140
Question(s) and Reply(ies): Question: Under the requirements of QW-404.5, can the A-Number be
obtained by assuming a welding filler metal's chemical composition (as
manufactured), as given by Section II, Part C, is close enough to the
deposited weld metal chemical composition to be used in QW-442?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-250*
Date Issued:
Interpretation Number :
12/04/1985
IX-83-140R
Question(s) and Reply(ies): Question: Under the requirements of QW-404.5, can the A-Number be
obtained by assuming a welding filler metal's chemical composition (as
manufactured), as given by Section II, Part C, is close enough to the
deposited weld metal chemical composition to be used in QW-442?
Reply: No, except as defined in Interpretation IX-81-44.
Note: This interpretation should have appeared in Interpretations No. 16 -Section IX, covering interpretations issued from July 1, 1984, through
December 31, 1984, and revised interpretations issued from July 1, 1984,
through February 8, 1985.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
17/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-434
Date Issued:
Interpretation Number :
11/26/1984
IX-83-141
Question(s) and Reply(ies): Question: A WPS was qualified using 1-1/8 in. thick base metal test plates
intended for use in making repair welds on castings. May this WPS be used
to fill a 1/4 in. deep excavation on a 3 in. thick section of a sand casting?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-548
Date Issued:
Interpretation Number :
11/26/1984
IX-83-142
Question(s) and Reply(ies): Question: Does QW-191 require that the radiographer hold SNT
certification to a manufacturer's written practice?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-581
Date Issued:
Interpretation Number :
11/26/1984
IX-83-143
Question(s) and Reply(ies): Question: Can weld reinforcement be considered for determining the
deposited weld metal thickness per QW-351, provided that the full weld
reinforcement is included in either the side bend tests (where side bends are
permitted by QW-452) or the radiographic examination (where permitted by
QW-304)?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-583
Date Issued:
11/26/1984
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
18/36
Interpretation Number :
IX-83-144
Question(s) and Reply(ies): Question (1): Does Section IX, QW-462.3(a) and (b), require that test
specimens joined in combination meet the y dimension of P-No. 23, if
P-No. 23 is joined to P-No. XX?
Reply (1): Yes.
Question (2): Does Section IX require that back gouging of the second side
prior to welding be an essential variable for welder/operator qualification?
Reply (2): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-584
Date Issued:
Interpretation Number :
11/26/1984
IX-83-145
Question(s) and Reply(ies): Question: QW-407.2 of the 1980 Edition of Section IX (including 1981
Winter Addenda) specifies the lower limit of PWHT time on the PQR as at
least 80% of that encountered in actual fabrication. Is there a limit on the
maximum PWHT time on the PQR?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-619
Date Issued:
Interpretation Number :
11/26/1984
IX-83-146
Question(s) and Reply(ies): Question (1): May a GTAW PQR for P-No. 4X to P-No. 4X qualified with
a backing strip and without gas backing be used to support a WPS for a gas
backed open butt joint?
Reply (1): No.
Question (2): May a GTAW PQR for P-No. 4X to P-No. 4X with an open
butt gas backed joint be used to support a WPS for a groove with a backing
strip without gas backing?
Reply (2): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
BPV Section IX
Section IX, AWS Number Change and PQR
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
19/36
Date Issued:
03/22/1985
Interpretation Number :
IX-83-147
Record Number:
BC84-249
Question(s) and Reply(ies): Question: When the AWS classification is changed with no change in
mechanical properties or chemical composition, may a Manufacturer use a
PQR referencing the old classification to support a new WPS referencing
the new classification?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-417
Date Issued:
Interpretation Number :
03/22/1985
IX-83-148
Question(s) and Reply(ies): Question: A PQR was qualified to the 1980 Edition of Section IX, where
the base metal thickness is 5/8 in. (16 mm) or greater. Regarding the use of
QW-403.6, can that PQR be used to support a 1983 SI Edition WPS where
the minimum base metal thickness is 15 mm?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-558
Date Issued:
Interpretation Number :
03/22/1985
IX-83-149
Question(s) and Reply(ies): Question (1): In reference to the 1983 Edition of Section IX, QW-301.2,
may the supervisor conducting the tests set his own visual requirements
prior to the mechanical testing listed in QW-302?
Reply (1): Yes.
Para./Fig./Table No:
Subject Description:
BPV Section IX
Section IX, QW-322(a)
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
20/36
Date Issued:
03/22/1985
Interpretation Number :
IX-83-150
Record Number:
BC84-617
Question(s) and Reply(ies): Question: If in a single Vee-groove joint, a GMAW root pass is used and
the electrode is F-No. 6, SFA-5.18, AWS E705-3, can the GTAW process
be used to reheat the weld without the use of additional filler wire if the
procedure was qualified using filler wire F-No. 6, SFA-5.18, AWS E70S-2?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-620
Date Issued:
Interpretation Number :
03/22/1985
IX-83-151
Question(s) and Reply(ies): Question: When one or more related companies of different names within
an organization takes leave, becomes independent, or is no longer related to
the organization, will the previously supplied weld procedure qualifications
in their possession be in effect for their use?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-648
Date Issued:
Interpretation Number :
03/22/1985
IX-83-152
Question(s) and Reply(ies): Question (1): A SAW procedure was run on 1 in. thick base material using a
single pass on each side. Both weld beads were greater than 1/2 in. Is the
maximum base metal thickness qualified equal to 1.1 in.?
Reply (1): Yes.
Question (2): A SAW was run on 5/8 in. thick base material using a single
pass on each side. Both weld beads were less than 1/2 in. Is the maximum
base metal thickness qualified equal to 1-1/4 in.?
Reply (2): Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
Date Issued:
BPV Section IX
Section IX, QW-301.1
03/22/1985
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
21/36
Record Number:
Interpretation Number :
BC84-664
IX-83-153
Question(s) and Reply(ies): Question: The requirements of QW-301.1 are intended to determine the
ability of welders to deposit sound weld metal. If a percentage of coupons
fail due to porosity, does disregarding such porosity meet the requirements
of QW-301.1?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-689
Date Issued:
Interpretation Number :
03/22/1985
IX-83-154
Question(s) and Reply(ies): Question (1): In QW-322, does "renewal" mean the reestablishment of
qualification?
Reply (1): Yes.
Question (2): A welder is qualified only for the SMAW process, and during
a period of 3 months or more, he has not welded. Is his qualification
reestablished if he makes a single test using any thickness, position, or
material for which he was previously qualified?
Reply (2): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-692
Date Issued:
Interpretation Number :
03/22/1985
IX-83-155
Question(s) and Reply(ies): Question: May a groove weld performance on pipe/tube 2-7/8 in. O.D. or
larger qualify a welder to weld partial penetration groove welds on
diameters less than 2-7/8 in. O.D.?
Reply: No.
Standard Designation:
Edition/Addenda:
BPV Section IX
Para./Fig./Table No:
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
22/36
Subject Description:
Record Number:
BC84-697
Date Issued:
Interpretation Number :
03/22/1985
IX-83-156
Question(s) and Reply(ies): Question: Can AISI 8630 modified to 1.20 maximum Mn, 1.00 maximum
Ni, 1.20 maximum Cr, and 0.50 Mo be classified as P-No. 11?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-700
Date Issued:
Interpretation Number :
03/22/1985
IX-83-157
Question(s) and Reply(ies): Question: May a tube or pipe coupon be cut longitudinally in three or more
sections, and then radiographed with the source side being the concave side
of the sections and the penetrameter placed on the source side?
Reply: Yes. See QW-191, Winter 1984 Addenda, Section IX.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-368
Date Issued:
Interpretation Number :
03/25/1985
IX-83-158
Question(s) and Reply(ies): Question: May two welders, both qualified for a maximum deposit
thickness of 0.864 in., weld on a joint 1.5 in. thick when one welder
deposits metal up to 0.750 in. and the other welder then finishes the joint?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-690
Date Issued:
Interpretation Number :
03/25/1985
IX-83-159
Question(s) and Reply(ies): Question: May a welder maintain his qualification by welding on non-Code
work?
Reply: Yes.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
23/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-219
Date Issued:
Interpretation Number :
05/14/1985
IX-83-160
Question(s) and Reply(ies): Question (1): If a procedure for P-No. 1 to P-No. 8 has been qualified on
1-1/2 in. or greater plate using one or more welding processes, may the
resulting WPS be used for weld repair or buildup for either one or both of
the qualified base materials per QW-451.1?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-618
Date Issued:
Interpretation Number :
05/14/1985
IX-83-161
Question(s) and Reply(ies): Question (1): When preheat (QW-406.1) is a required essential variable for
procedure qualification, must the preheat temperature be as specified
immediately prior to each arc initiation?
Reply (1): Yes.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
24/36
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-663
Date Issued:
Interpretation Number :
05/14/1985
IX-83-162
Question(s) and Reply(ies): Question (1): Is it permissible to test welding operators on pipe for
corrosion-resistant weld metal overlay when the production welding is to be
performed on pipe in the 5G position?
Reply (1): Yes.
Question (2): If welders are tested on pipe with the weld deposited in the
horizontal position for corrosion-resistant weld metal overlays, are they
qualified to weld in the flat and horizontal position?
Reply (2): Yes.
Question (3): If welders are tested on pipe in the 5G position for corrosionresistant weld metal overlays, are they qualified to weld in the flat, vertical,
and overhead position?
Reply (3): Yes.
Question (5): When qualifying welding operators on pipe for corrosionresistant weld metal overlays, what is the minimum required width and
length of weld deposit?
Reply (5): The weld deposit must be a minimum of 1-1/2 in. wide by 6 in.
long per QW-311.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
Date Issued:
BPV Section IX
Section IX, QW-301.4
05/14/1985
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
25/36
Record Number:
Interpretation Number :
BC85-022
IX-83-163
Question(s) and Reply(ies): Question (1): If a welding operator is qualified to weld in accordance with
one qualified WPS, is the welding operator qualified to weld all thicknesses
per that process?
Reply (1): Yes.
Question (2): Is the process the only essential variable for welding
operators?
Reply (2): Yes, except for the special requirements in QW-362 and QW363.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-023
Date Issued:
Interpretation Number :
05/14/1985
IX-83-164
Question(s) and Reply(ies): Question (1): Per QW-322(a), is brazing considered a welding process for
the purpose of extending the welder's qualification in other processes?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-024
Date Issued:
Interpretation Number :
05/14/1985
IX-83-165
Question(s) and Reply(ies): Question (1): A PQR is generated that lists 400F as the preheat
temperature. Per QW-406.1, can the WPS require a minimum preheat
temperature of 300F?
Reply (1): Yes.
Question (2): Can the preheat temperature in the PQR be a range? Reply
(2): No.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
26/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-030
Date Issued:
Interpretation Number :
05/14/1985
IX-83-166
Question(s) and Reply(ies): Question: A Manufacturer has several WPSs for one process that list the
same P-Numbers but differ in Group Numbers, thicknesses, position, and
other variables. Is a qualified welder that has used only one of these WPSs
required to renew his qualifications to use any of the other WPSs if he has
not welded in accordance with them for a period longer than 6 months?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-031
Date Issued:
Interpretation Number :
05/14/1985
IX-83-167
Question(s) and Reply(ies): Question: A Manufacturer uses only one welding process but has two
WPSs, one of which has been properly qualified in accordance with Section
IX. If a welder only uses the unqualified procedure for non-Code work for
over 6 months, is he required to renew this qualifications in order to use the
qualified WPS for Code applications?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-059
Date Issued:
Interpretation Number :
05/14/1985
IX-83-168
Question(s) and Reply(ies): Question: A welder is qualified on groove joint of a pipe with inert gas
backing. He was allowed to make a production weld on a groove joint
without a gas backing. This production joint is a groove, welded from one
side only, without using a backing ring. The welding procedure used to
make this weld was qualified without inert gas backing. In accordance with
QW-408.8 of Section IX, is the welder qualified to make this weld?
Reply: No.
Standard Designation:
BPV Section IX
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
27/36
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
Record Number:
BC85-089
Date Issued:
Interpretation Number :
05/14/1985
IX-83-169
Question(s) and Reply(ies): Question: For submerged-arc welding, can a fabricator use a different brand
of flux than that specified in a wire-flux classification for which he is
qualified, without performing a new PQR?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-091
Date Issued:
Interpretation Number :
05/14/1985
IX-83-170
Question(s) and Reply(ies): Question: If a welder is qualified in the 6G position and welds in the 3G
position for a period of more than 3 months, is his qualification in the 6G
position still valid?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-132
Date Issued:
Interpretation Number :
05/14/1985
IX-83-171
Question(s) and Reply(ies): Question (1): Is it permissible to make editorial corrections to a PQR?
Reply (1): Yes.
BPV Section IX
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
28/36
Para./Fig./Table No:
Subject Description:
Record Number:
BC85-135
Date Issued:
Interpretation Number :
05/14/1985
IX-83-172
Question(s) and Reply(ies): Question (1): Is it necessary to record on the PQR that the single pass
thickness of each manual GTAW or SMAW weld pass in the qualification
test did not exceed 1/2 in.?
Reply (1): Yes. The method of recording information on the PQR may be
by statement, sketch, or other means, as long as the essential variables are
addressed.
Question (2): Is it necessary to specify on the WPS for a manual GTAW
and SMAW procedure that no single pass will exceed 1/2 in. thickness?
Reply (2): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-013
Date Issued:
Interpretation Number :
06/25/1985
IX-83-173
Question(s) and Reply(ies): Question: A welder qualification weld is made on a 0.133 in. wall pipe. The
welder performance test is by radiography and reveals one rounded
indication that measures 0.029 in. maximum dimension. Does this
performance qualification test pass the requirements of Section IX?
Reply: No. See QW-191.2.2(b)(1).
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC84-557
Date Issued:
Interpretation Number :
06/26/1985
IX-83-174
Question(s) and Reply(ies): Question: When qualifying welders to perform Section I production
welding, is it permissible to use the maximum reinforcement allowed by
PW-35 of Section I for penetrameter selection?
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
29/36
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-038
Date Issued:
Interpretation Number :
06/26/1985
IX-83-175
Question(s) and Reply(ies): Question: May a PQR show a range on travel speed if the speeds reflect
those actually used in the qualification?
Reply: Yes. See QW-200.2(b).
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-088
Date Issued:
Interpretation Number :
06/26/1985
IX-83-176
Question(s) and Reply(ies): Question (1): Does QW-404.5 apply to ferrous materials only?
Reply (1): Yes.
Question (2): is the chemistry of the weld deposit of nonferrous filler metals
an essential variable for procedure qualification?
Reply (2): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-092
Date Issued:
Interpretation Number :
06/26/1985
IX-83-177
Question(s) and Reply(ies): Question (1): A welder has been qualified on P-No. 1 base metal, 0.375 in.
wall pipe, in the 6G position, with the root pass deposited downhill using
F-No. 3 electrodes, and the remainder of the joint welded uphill using F-No.
4 electrodes. Is the welder qualified to weld in the downhill/uphill
progression using F-No. 3 electrodes, and may his qualification range be
listed as downhill/uphill for F-No. 3?
Reply (1): Yes.
Question (2): May the F-No. 4 electrodes be deleted from the uphill portion
of the joint?
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
30/36
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-036
Date Issued:
Interpretation Number :
09/19/1985
IX-86-01
Question(s) and Reply(ies): Question: Per QW-200.4(a), Summer 1984 Addenda, when a qualified WPS
for a combination process is available, must a new WPS be generated if
only one of the processes is to be used in production, provided all
requirements of Section IX for the process used are met?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-292
Date Issued:
Interpretation Number :
09/19/1985
IX-86-02
Question(s) and Reply(ies): Question (1): In accordance with QB-203.1, does qualification in any of the
three flow positions (flat-flow, horizontal-flow, or vertical-upflow) qualify
for the vertical-downflow position?
Reply (1): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-293
Date Issued:
Interpretation Number :
09/19/1985
IX-86-03
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
31/36
Question(s) and Reply(ies): Question: May welding rods, electrodes, and filler metals not identified as
meeting an SFA specification be assigned F-Numbers, provided the
materials meet another specification in which the mechanical and chemical
properties are the same as specified in a SFA specification of Section II,
Part C?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-304
Date Issued:
Interpretation Number :
09/19/1985
IX-86-04
Question(s) and Reply(ies): Question: Does it meet the requirements of Section IX to specify in the
WPS that preheat and postweld heat treatment shall be in accordance with
the requirements of UCS-56?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-306
Date Issued:
Interpretation Number :
09/19/1985
IX-86-05
Question(s) and Reply(ies): Question: When qualifying a welding operator and recording the essential
variables on his record of qualification, is the thickness of base metal or
deposited weld metal an essential variable?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-328
Date Issued:
Interpretation Number :
09/19/1985
IX-86-06
Question(s) and Reply(ies): Question: Does the combination of 2 PQRs, each of different processes,
support a WPS combining the two processes in a single joint, with all
essential and supplementary essential variables unchanged?
Reply: No.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
32/36
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-560
Date Issued:
Interpretation Number :
12/02/1985
IX-86-07
Question(s) and Reply(ies): Question: A welder or welding operator's qualification for a process has
expired because he has not welded within the time periods required by QW322(a) and (b). There is no specific reason to question his ability to make
welds that meet the specification. Does QW-322 prohibit the use of QW321 for retest of qualification where a welder has failed the single renewal
test joint as provided by the last sentence of QW-322?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-134
Date Issued:
Interpretation Number :
12/04/1985
IX-86-08
Question(s) and Reply(ies): Question (1): Per QW-200.4(a), may two or more separate WPSs (each
properly qualified to weld the joint individually) be used to weld a single
production joint without writing a new WPS combining the separate WPSs
into a single WPS?
Reply (1): Yes.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-200
Date Issued:
Interpretation Number :
12/04/1985
IX-86-09
Question(s) and Reply(ies): Question (1): When a transverse tensile test specimen fractures partly in the
weld metal and partly in the base metal, should both locations of fracture be
described on the PQR?
Reply (1): Yes.
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
33/36
Question (2): When a transverse tensile test specimen fractures partly in the
weld metal and partly in the base metal, does QW-153.1(d) apply?
Reply (2): No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-307
Date Issued:
Interpretation Number :
12/04/1985
IX-86-10
Question(s) and Reply(ies): Question: Does a Welding Procedure Specification with an open root butt
and fillet weld joint design require specifying backing material?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-420
Date Issued:
Interpretation Number :
12/04/1985
IX-86-11
Question(s) and Reply(ies): Question: Does QB-408.2 require that test specimens must be brazed with
joint clearance dimensions representing minimum and maximum joint
clearance intended to be used?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-482
Date Issued:
Interpretation Number :
12/04/1985
IX-86-12
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
Date Issued:
BPV Section IX
Section IX, QW-301.4
12/04/1985
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
34/36
Record Number:
Interpretation Number :
BC85-507
IX-86-13
Question(s) and Reply(ies): Question: For welder qualifications using combinations of GTAW root
passes and SMAW fill passes, is it necessary to specifically record the use
of backing for the SMAW passes on the welder qualification record when
the WPS used is referenced on the qualification record and the WPS
describes the GTAW deposit as backing for the SMAW?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-483
Date Issued:
Interpretation Number :
03/13/1986
IX-86-14
Question(s) and Reply(ies): Question: Is it acceptable to indicate on the WPS and PQR that the variable
QW-407.1 is addressed by indicating the letters "NA" to mean PWHT is not
used?
Reply: Section IX does not specify the terminology to be used.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-532
Date Issued:
Interpretation Number :
03/13/1986
IX-86-15
Question(s) and Reply(ies): Question: A WPS has been qualified to satisfy all requirements, including
notch toughness, for welding P-No. 1 Gr. No. 1 base metals. Another WPS
has been qualified to satisfy all requirements, including notch toughness, for
welding P-No. 1 Gr. No. 2 base metals. If all the variables, except for the
change in base metal group number in the two WPSs are the same, may a
third WPS be written to permit welding of P-No. 1 Gr. No. 1 to P-No. 1 Gr.
No. 2 base metals using the PQRs from the first two WPSs to support the
third WPS without additional qualification for the change in base metal
group numbers?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-533
Date Issued:
03/13/1986
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
35/36
Interpretation Number :
IX-86-16
Question(s) and Reply(ies): Question (1): According to QW-492, can the definition of an active flux be
interpreted to mean a flux which contains an alloying element(s) which is
transmitted to the weld metal and will affect the properties which the weld
metal is considered to possess, as a result of changes in the welding
parameters (welding amperage and arc voltage)?
Reply (1): No.
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-554
Date Issued:
Interpretation Number :
03/13/1986
IX-86-17
Question(s) and Reply(ies): Question: Does a welder need to requalify to weld AISI 4140 to API N-80
materials if he is qualified in the same process using P-No. 1 through P-No.
11 test plates?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC85-585
Date Issued:
Interpretation Number :
03/13/1986
IX-86-18
Question(s) and Reply(ies): Question: In QW-194.1, is it permitted to use a welding procedure qualified
using P-No. 1 base material buttered with F-No. 43 filler material joining a
P-No. 8 base material to support a welding procedure that will join P-No. 43
base material to P-No. 8 base material?
Reply: No.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
Subject Description:
BPV Section IX
Section IX, QW-322
https://cstools.asme.org/Interpretation/InterpretationDetail.cfm
2016/5/4
36/36
Date Issued:
03/13/1986
Interpretation Number :
IX-86-19
Record Number:
BC85-587
Question(s) and Reply(ies): Question: May a welder renew his SMAW qualifications in accordance
with QW-322 for his 6G position on a 5 in. Schedule 160 (0.625 in. wall
thickness), after 7 months of work interruption, by welding a 3/8 in. coupon
in the 1G position with SMAW?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC86-010
Date Issued:
Interpretation Number :
03/13/1986
IX-86-20
Question(s) and Reply(ies): Question: A P-No. 1 pipe is butt welded to a P-No. 8 pipe of the same size.
For procedure qualification under QW-407, is "postheating" to 2150F for
the sole purpose of centrifugally casting a metallic liner in the welded pipe
assembly considered to be "postweld heat treatment" above the upper
transformation temperature?
Reply: Yes.
Standard Designation:
Edition/Addenda:
Para./Fig./Table No:
BPV Section IX
Subject Description:
Record Number:
BC86-058
Date Issued:
Interpretation Number :
03/13/1986
IX-86-21
Question(s) and Reply(ies): Question (1): A brazing procedure qualification is conducted for a lap joint
consisting of a 1/8 in. test coupon brazed to a 1/2 in. test coupon. Are the
following ranges of thickness qualified: thick material: 3/16 in. to 1 in.; thin
material: 1/16 in. to 1/4 in.?
Reply (1): Yes.
Question (2): Does the above procedure qualification support a BPS for
brazing 1/16 in. material to 1/16 in. material?
Reply (2): No.
Copyright 2016 by the American Society of Mechanical Engineers. No reproduction may be made of this material without
written consent of ASME