Академический Документы
Профессиональный Документы
Культура Документы
ROAD 312
16
17
18
19
20
21
22
23
SUB.
C2
C3
C4
C5
H1
U
C1
L
A
-
Notes:
S.S.L. +3750
RELEVANT SERVICES
REV.
ARCHITECTURAL
STRUCTURAL
IFC DRAWING
C0
C0
C0
SA08-C2-AR-0100-01
SA09-C2-SC-0101-00
SA09-00-MA-0300
A
-
REVISIONS
N
00
20/05/2016
Rev.
Explanatory Note
Date
AK
KK
AG
CERTIFICATION
THE CONTRACTOR CERTIFIES THAT THIS DRAWING HAS BEEN
COORDINATED, CHECKED FOR COMPLIANCE WITH THE CONTRACT.
Employer:
P
Lead Consultant:
Hopkins Architects
Dubai
carillion
P.O. Box 1811. Dubai, United Arab Emirates,
Telephone +9714 3331200, Fax +9714 3331018
E-mail : afc@afcarillion.ae., www.afcarillion.ae.
Subcontractor:
R
ENGINEER DOCUMENT REVIEW
Document reviewed for compliance with the design concept and is not
checked for accuracy or suitability of purpose. This review does not relieve
the contractor from his contractual obIigations, nor does it authorise changes
in the Contract Sum / Period.
NO OBJECTION
REVIEWED BY DISCIPLINE
Architectural (HA)
Dubai Municipality (AOR)
Structure (WSP)
Electrical (WSP)
Mechanical (WSP)
Plumbing (WSP)
Others
SUBMITTAL / TRANSMITTAL
NO
B
-
B
-
REV:
Signed:
Drawing Status
CONSTRUCTION
Project
AFC-VOL-AC606-MCW-DRG-00026
Submittal No:
Rev:
Date:
00
20/05/2016
Sheet
Scale
A0
1:100